| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 30-APR-12 | NOT SPECIFIED | INL SITE-WIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS | DOE/ID-11042 | 7 |
| 01-SEP-11 | NOT SPECIFIED | EXPLANATION OF SIGNIFICANT DIFFERENCES TO REVISE INSTITUTIONAL CONTROLS IN VARIOUS RECORDS OF DECISION AT THE IDAHO NATIONAL LABORATORY SITE | DOE/ID-11439 | 0 |
| 01-AUG-11 | NOT SPECIFIED | REMOVAL ACTION REPORT FOR THE IDAHO CLEANUP PROJECT POWER BURST FACILITY AND WASTE EXPERIMENTAL REDUCTION FACILITY | DOE/ID-11445 | 0 |
| 19-JAN-11 | NOT SPECIFIED | FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 1) | DOE/ID-11429 (PART 1) | 0 |
| 19-JAN-11 | NOT SPECIFIED | FIVE-YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY SITE - FISCAL YEARS 2005-2009 (PART 2) | DOE/ID-11429 (PART 2) | 0 |
| 31-AUG-09 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN FOR WASTE AREA GROUPS 1, 2, 3, 4, 5, 6, 7, 10, AND REMOVAL ACTIONS | DOE/ID-10587 | 10 |
| 09-JAN-09 | RENO, SCOTT L. | ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) | DOE/ID-11293 | 1 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 30-OCT-07 | NELSON, L. O. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 | DOE/ID-11350 | 00 |
| 31-JUL-07 | HANEY, T. J. | LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 | DOE/ID-11316 | 01 |
| 09-JUL-07 | CULP, B. | ACTION MEMORANDUM FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND PBF VESSEL DISPOSAL | DOE/ID-11331 | 00 |
| 09-MAY-07 | WELLS, R. P. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP (WAG-5) FOR FISCAL YEAR 2007 (FY-07) | RPT-382 | 00 |
| 04-MAY-07 | STALEY, C. S. | STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY | EDF-7433 | 01 |
| 01-MAY-07 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL | DOE/ID-11309 | 00 |
| 16-APR-07 | MCCARTHY, J. M. | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE | EDF-7618 | 01 |
| 27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 02-OCT-06 | OLAVESON, B. E. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 | DOE/ID-11294 | 00 |
| 28-SEP-06 | NESSHOEFER, C. A. | POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS | EDF-7000 | 00 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
| 06-JUN-06 | WELLS, R. P. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP (WAG-5) FOR FISCAL YEAR 2006 (FY-06) | RPT-220 | 00 |
| 04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
| 26-SEP-05 | WELLS, R. P. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 5 (WAG-5) | ICP/EXT-05-00973 | 00 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
| 30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
| 23-AUG-05 | WELLS, R. P. | OPERATIONS AND MAINTENANCE (O&M) REPORT FOR OPERABLE UNIT (OU) 5-12 | DOE/NE-ID-11228 | 00 |
| 13-JUL-05 | WELLS, R. P. | REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 5-12 REMEDIAL ACTION | DOE/NE-ID-11205 | 00 |
| 07-JUN-05 | RODDY, M. S. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2005 (FY-05) | ICP/EXT-05-00901 | 00 |
| 16-FEB-05 | AR COORDINATOR | PER-620 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | AR.INDEX.NTCRA.PER-620 | 00 |
| 15-FEB-05 | RENO, S. L. | ACTION MEMORANDUM FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) - PUBLIC COMMENTS AND RESPONSES TO SIGNIFICANT COMMENTS ARE INCLUDED IN APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D | DOE/NE-ID-11213 | 00 |
| 15-FEB-05 | HARKER, W. S. | DOE RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #120 ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 OF DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | EM-FMDP-05-007 | 00 |
| 11-FEB-05 | AR COORDINATOR | OPERABLE UNIT (OU) 5-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 - INCLUDES NEW SITE IDENTIFICATION (NSI) DOCUMENT | AR.INDEX.OU.5-12 | 02 |
| 26-JAN-05 | AR COORDINATOR | OPERABLE UNIT (OU) 5-12 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) DOCUMENT ID #DOE/ID-11017 | AR.INDEX.OU.5-12 | 01 |
| 05-JAN-05 | DOE | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) - (PBF/ARA) OPERABLE UNIT (OU) 5-12 | DOE/ID-11017 | 00 |
| 17-DEC-04 | RENO, S. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | DOE/NE-ID-11196 | 00 |
| 13-DEC-04 | SHAW, R. M. | TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AND SIGNATURE READY COPIES OF ESD FOR THE ROD FOR POWER BURST FACILITY AUXILARY REACTOR AREA (PBF/ARA) OU 5 | FMDP-FFA/CO-04-085 | 00 |
| 04-NOV-04 | RODDY, M. S. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2004 (FY-04) | ICP/EXT-04-00369 | 01 |
| 27-OCT-04 | RENO, S. L. | NEW SITE IDENTIFICATION (NSI) FOR PBF-37 - CONTAMINATED SOILS BENEATH PER-751 PUMP HOUSE FLOOR SLAB AND FOUNDATION | 24889 | 00 |
| 20-SEP-04 | RODDY, M. S. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2004 (FY-04) | ICP/EXT-04-00369 | 00 |
| 09-SEP-04 | SMITH, D. M. | GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | DOE/ID-10779 | 02 |
| 03-AUG-04 | HAIN, K. E. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED | EM-ER-04-172 | 00 |
| 01-AUG-04 | PRATT, M. B. | DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) | DOE/NE-ID-11187 | 0A |
| 28-MAY-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | 24887 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 24-SEP-03 | WELLS, R. P. | FINAL DOCUMENTATION FOR OPERABLE UNIT (OU) 5-12 NO ACTION SITES | DOE/ID-11058 | 00 |
| 18-SEP-03 | JOLLEY, W. L. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2003 (FY-03) | INEEL/EXT-03-00729 | 00 |
| 22-AUG-03 | HATHAWAY, C. | TRANSMITTAL TO THE AGENCIES OF THE ANNUAL WASTE AREA GROUP 5 (WAG-5) INSTITUTIONAL CONTROLS STATUS REPORT | EM-ER-03-210 | 00 |
| 19-AUG-03 | WELLS, R. P. | INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA), OPERABLE UNIT (OU) 5-12, FOR FISCAL YEAR 2003 (FY-03) | DOE/ID-11064 | 00 |
| 01-AUG-03 | GILES, J. R. | 2003 ANNUAL INSPECTION SUMMARY FOR STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | INEEL/EXT-03-01126 | 00 |
| 01-APR-03 | WELLS, R. P. | GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | DOE/ID-10779 | 01 |
| 01-APR-03 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II FOR WASTE AREA GROUP 5 (WAG-5) | DOE/ID-10798 | 01 |
| 01-APR-03 | GILES, J. R. | FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II | DOE/ID-10808 | 01 |
| 01-APR-03 | ROBERTS, J. D. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 5-12 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) PROJECTS | INEEL/EXT-2000-00515 | 02 |
| 25-MAR-03 | IDEQ | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II | 24792 | 00 |
| 25-MAR-03 | IDEQ | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | 24793 | 00 |
| 25-MAR-03 | EPA | U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS AND RESOLUTIONS - WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, PHASE II | 24794 | 00 |
| 25-MAR-03 | IDEQ | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, PHASE II | 24795 | 00 |
| 10-FEB-03 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PHASE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | 24770 | 00 |
| 10-FEB-03 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT FINAL GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | 24772 | 00 |
| 10-FEB-03 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II | 24773 | 00 |
| 06-FEB-03 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PHASE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | 24771 | 00 |
| 23-JAN-03 | HATHAWAY, C. | TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) TO THE WAG-5 RECORD OF DECISION (ROD) | EM-ER-03-018 | 00 |
| 22-NOV-02 | HATHAWAY, C. | TRANSMITTAL OF REVISED INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 FOR THE YEAR 2002 (PBF/ARA) - WASTE AREA GROUP 5 (WAG-5) | EM-ER-02-199 | 00 |
| 12-NOV-02 | WELLS, R. P. | INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 FOR THE YEAR 2002 (PBF/ARA) WASTE AREA GROUP 5 (WAG-5) | DOE/ID-11018 | 01 |
| 05-NOV-02 | HATHAWAY, C. | TRANSMITTAL OF ANNUAL GROUNDWATER MONITORING STATUS (TRENDING) REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2002 (FY-02) | EM-ER-02-188 | 00 |
| 09-OCT-02 | JOLLEY, W. L. | ANNUAL GROUNDWATER MONITORING STATUS (TRENDING) REPORT FOR WASTE AREA GROUP 5 (WAG-5) FOR FISCAL YEAR 2002 (FY-02) | INEEL/EXT-02-01032 | 00 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 29-AUG-02 | WELLS, R. P. | INSTITUTIONAL CONTROLS STATUS REPORT FOR THE POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 FOR THE YEAR 2002 (PBF/ARA) - WASTE AREA GROUP 5 (WAG-5) | DOE/ID-11018 | 00 |
| 14-MAR-02 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON WASTE AREA GROUP 5 (WAG-5) INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 (PBF/ARA) FOR YEAR 2 | 10967 | 00 |
| 01-FEB-02 | WELLS, R. P. | INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 (PBF/ARA) FOR YEAR 2001 | DOE/ID-10977 | 00 |
| 09-JAN-02 | LIVIERATOS, T. | IDEQ REVIEW COMMENTS AND RESOLUTIONS ON REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT FINAL) | 10953 | 00 |
| 01-JAN-02 | WELLS, R. P. | REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA) SITES ARA-02, ARA-16, ARA-25, AND INACTIVE WASTE SYSTEM SITES ARA-07, ARA-08, ARA-13, AND ARA-21 | DOE/ID-10954 | 00 |
| 03-DEC-01 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) GENERAL AND SPECIFIC COMMENTS ON REMEDIAL ACTION (RA) REPORT FOR WAG-5 OU 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT) | 21566 | 00 |
| 28-AUG-01 | HATHAWAY, C. | WASTE AREA GROUP 5 (WAG-5) EXTENSION REQUEST FOR PHASE I PRE-FINAL INSPECTION REPORT AND REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 5-12 | EM-ER-01-143 | 00 |
| 17-AUG-01 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REMEDIAL ACTION (RA) REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR 1 (BORAX I) BURIAL GROUNDS | 23603 | 00 |
| 17-AUG-01 | POETON, R. W. | U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP REMEDIAL ACTION REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS | 24742 | 00 |
| 26-JUN-01 | HATHAWAY, C. | TRANSMITTAL OF REVISION 1 (REV.01) OF WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-01-111 | 00 |
| 19-JUN-01 | WELLS, R. P. | WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE I - OPERABLE UNIT (OU) 5-12 | DOE/ID-10761 | 01 |
| 14-JUN-01 | HATHAWAY, C. | DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 13 (ARA-13) SEPTIC WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | OPE-EM-ER-01-103 | 00 |
| 08-MAY-01 | HATHAWAY, C. | 2001 ANNUAL INSPECTION SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) AND OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS | EM-ER-01-077 | 00 |
| 19-APR-01 | HATHAWAY, C. | TRANSMITTAL OF FISCAL YEAR 2001 (FY-2001) ANNUAL GROUNDWATER MONITORING TRENDING REPORT FOR WASTE AREA GROUP 5 (WAG-5) | EM-ER-01-072 | 00 |
| 12-APR-01 | WELLS, R. P. | FISCAL YEAR 2001 (FY-2001) ANNUAL GROUNDWATER MONITORING TRENDING REPORT FOR WASTE AREA GROUP 5 (WAG-5) | INEEL/EXT-01-00268 | 00 |
| 12-APR-01 | WOOLEY, K. A. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 5-12 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) PROJECTS | INEEL/EXT-2000-00515 | 01 |
| 22-FEB-01 | HATHAWAY, C. | TRANSMITTAL OF WASTE AREA GROUP 5 (WAG-5) FISCAL YEAR 2001 (FY-2001) GROUNDWATER MONITORING ANALYTICAL DATA (L&V REPORTS) | EM-ER-01-036 | 00 |
| 19-DEC-00 | WELLS, R. P. | OPERATIONS AND MAINTENANCE (O&M) PLAN FOR POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 - APPENDIX A IS THE INSTITUTIONAL CONTROL PLAN | DOE/ID-10805 | 00 |
| 19-DEC-00 | HATHAWAY, C. | TRANSMITTAL OF WASTE AREA GROUP 5 (WAG-5) DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II | EM-ER-244-00 | 00 |
| 18-DEC-00 | WELLS, R. P. | WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II | DOE/ID-10798 | 00 |
| 13-DEC-00 | GILES, J. R. | FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II | DOE/ID-10808 | 00 |
| 07-DEC-00 | HATHAWAY, C. | TRANSMITTAL OF AUXILIARY REACTOR AREA 02 (ARA-02) SANITARY WASTE SYSTEM ANALYTICAL DATA (L&V REPORTS) | EM-ER-231-00 | 00 |
| 27-OCT-00 | HATHAWAY, C. | TRANSMITTAL OF AUXILIARY REACTOR AREA 21 (ARA-21) ARA-IV TEST AREA SEPTIC TANK AND CHLORINATION TANK ANALYTICAL DATA (L&V REPORTS) | EM-ER-207-00 | 00 |
| 27-OCT-00 | HATHAWAY, C. | DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 16 (ARA-16) AND ARA-25 SOILS AND PIPING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | OPE-EM-ER-205 | 00 |
| 26-OCT-00 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II | 21902 | 00 |
| 05-OCT-00 | HATHAWAY, C. | TRANSMITTAL OF OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER 1 (SL-1) BURIAL GROUNDS & OU 6-01 BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIED REACTOR ANNUAL INSPECTION REPORT, DE-AC07-99ID13727 | EM-ER-191-00 | 00 |
| 01-OCT-00 | WELLS, R. P. | GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | DOE/ID-10779 | 00 |
| 25-SEP-00 | WEBBER, F. L. | INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 | DOE/ID-10797 | 00 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 01-JUN-00 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - WASTE AREA GROUP 5 (WAG-5) CLEANUP UNDERWAY WITH GOAL OF SAVING $2.4 MILLION - JUNE 2000 - JULY 2000 (06/2000 - 07/2000) | 21213 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 01-APR-00 | HIARING, C. M. | POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 | DOE/ID-10722 | 00 |
| 06-MAR-00 | AR COORDINATOR | OPERABLE UNIT (OU) 5-12 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-12 | AR.INDEX.OU.5-12 | 00 |
| 07-FEB-00 | DOE | RECORD OF DECISION (ROD) FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 | DOE/ID-10700 | 00 |
| 11-JAN-00 | O'NEILL, K. C. | TRANSMITTAL OF OPERABLE UNIT (OU) 5-12 RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) | OPE-ER-06-00 | 00 |
| 05-JAN-00 | DOE | DEPARTMENT OF ENERGY (DOE) RESPONSE & RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 | 10820 | 00 |
| 03-JAN-00 | DOE | NEW SITE IDENTIFICATION (NSI) - ARA-24 OPERABLE UNIT (OU) 5-12 - RADIOLOGICALLY CONTAMINATED SOIL AND ABANDONED SUBSTRUCTURES AT ARA-III | 19276 | 00 |
| 22-DEC-99 | DOE | DEPARTMENT OF ENERGY (DOE) RESPONSE & RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 | 10821 | 00 |
| 16-DEC-99 | O'NEILL, K. C. | TIME EXTENSION REQUESTED TO INCORPORATE COMMENTS ON OPERABLE UNIT (OU) 5-12 DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) | OPE-ER-200-99 | 00 |
| 09-DEC-99 | GILES, J. R. | ENGINEERING DESIGN FILE (EDF) - EXTENT OF SILVER-108M CONTAMINATION AT AUXILIARY REACTOR AREA III (ARA-III) RADIOACTIVE WASTE LEACH POND CERCLA SITE ARA-12 - FUNCTIONAL FILE #INEEL/EXT-99-01241 | EDF-ER-103 | 00 |
| 08-DEC-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 | 10818 | 00 |
| 08-DEC-99 | KOCH, D. F. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 | 10819 | 00 |
| 01-DEC-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 5-08 | AR.INDEX.OU.5-08 | 00 |
| 01-DEC-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 5-09 | AR.INDEX.OU.5-09 | 00 |
| 18-NOV-99 | NOT SPECIFIED | SPERT II AIR COMPRESSOR - ELECTRONIC NOTES REGARDING LOCATION | 10803 | 00 |
| 18-NOV-99 | ROSE, K. A. | IDHW CONCURRENCE WITH HAZARDOUS WASTE DETERMINATION (HWD) FOR ARA-I BUILDING ARA-626 HOT CELLS 1 AND 2 CONCRETE FLOORS AND SOILS BENEATH THE FLOORS | 10804 | 00 |
| 26-OCT-99 | HAIN, K. E. | TRANSMITTAL OF SUMMARY REPORT FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) | OPE-ER-169-99 | 00 |
| 07-OCT-99 | KOCH, D. F. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR POWER BURST FACILITY AND AUXILIARY REACTOR AREA (PBF/ARA) OPERABLE UNIT (OU) 5-12 - DOE/ID-10700, AUGUST 1999 (10/99) | 10795 | 02 |
| 01-OCT-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL | 10794 | 00 |
| 01-OCT-99 | GILES, J. R. | SUMMARY REPORT FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) | INEEL/EXT-99-00733 | 00 |
| 19-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-13 - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND OU 5-13 | AR.INDEX.OU.5-13 | 00 |
| 11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-01 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-01 | AR.INDEX.OU.5-01 | 00 |
| 11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-03 | AR.INDEX.OU.5-03 | 00 |
| 11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-05 AND OU 6-01 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 SCOPING OF THE AUXILIARY REACTOR AREA II (ARA II) STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND OU 5-05 AND OU 6-01 | AR.INDEX.OU.5-05 | 00 |
| 11-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF AUXILIARY REACTOR AREA (ARA) ARA III AND ARA IV - OU 5-06 | AR.INDEX.OU.5-06 | 00 |
| 19-MAY-99 | BERKE, J. S. | TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 19, 1999 (05/19/99) IN LEWISTON, IDAHO | 10825 | 00 |
| 18-MAY-99 | CARPENTER, K. | TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 18, 1999 (05/18/99) IN IDAHO FALLS, IDAHO | 10823 | 00 |
| 18-MAY-99 | SCHWARTZ, N. | TRANSCRIPT FROM INEEL PUBLIC MEETING ON PROPOSED CLEANUP PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) HELD ON MAY 18, 1999 (05/18/99) IN BOISE, IDAHO | 10824 | 00 |
| 11-MAY-99 | AR COORDINATOR | OPERABLE UNIT (OU) 5-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 5-07 | AR.INDEX.OU.5-07 | 00 |
| 03-MAY-99 | IDHW | RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) | 17399 | 00 |
| 01-MAY-99 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) INEEL | 17237 | 00 |
| 29-APR-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL | 10664 | 00 |
| 29-APR-99 | EPA | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PROPOSED PLAN | 17397 | 00 |
| 26-APR-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTORS AREA (PBF/ARA) | 10665 | 00 |
| 22-APR-99 | NICKLAUS, D. | HAZARDOUS WASTE DETERMINATION (HWD) FOR ARA-I BUILDING ARA-626 HOT CELLS 1 AND 2 CONCRETE FLOORS AND SOILS BENEATH THE FLOORS | 10805 | 00 |
| 01-APR-99 | ROSE, K. A. | WASTE AREA GROUP 5 (WAG-5) PROPOSED PLAN COMMENTS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) | 17395 | 00 |
| 01-APR-99 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) | INEEL/EXT-98-00859 | 00 |
| 01-APR-99 | WELLS, R. P. | TREATABILITY STUDY (TS) WORK PLAN FOR SEGMENTED GATE SYSTEM TECHNOLOGY DEPLOYMENT | INEEL/EXT-98-01097 | 00 |
| 01-APR-99 | SCOBBY, P. T. | HEALTH & SAFETY PLAN (HSP) FOR SEGMENTED GATE SYSTEM TREATABILITY STUDY (TS) | INEEL/EXT-99-00179 | 00 |
| 18-MAR-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL | 10569 | 00 |
| 15-MAR-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTORS AREA (PBF/ARA) MARCH 1999 (03/99) | 10573 | 00 |
| 18-FEB-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVISED COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL | 10813 | 00 |
| 16-FEB-99 | O'NEILL, K. C. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) | OPE-ER-27-99 | 00 |
| 11-FEB-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10811 | 00 |
| 11-FEB-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW-DEQ) REVIEW OF DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 17004 | 00 |
| 11-FEB-99 | O'NEILL, K. C. | TRANSMITTAL OF CORRECTED PAGES FOR DRAFT FINAL OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-25-99 | 00 |
| 09-FEB-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 AT INEEL | 10812 | 00 |
| 21-JAN-99 | O'NEILL, K. C. | TRANSMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-15-99 | 00 |
| 01-JAN-99 | INEEL COMMUNITY RELATIONS | UPDATE FACT SHEET - WASTE AREA GROUP 5 (WAG-5) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE - JANUARY 1999 (01/99) | 10563 | 00 |
| 01-JAN-99 | HOLDREN, K. J. | WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10607 | 00 |
| 15-DEC-98 | DOE | DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10711 | 02 |
| 14-DEC-98 | DOE | DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10793 | 00 |
| 18-NOV-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10808 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 19-OCT-98 | DOE | NEW SITE IDENTIFICATION (NSI) - AUXILIARY REACTOR AREA 25 (ARA-25) ARA-I SOILS BENEATH ARA-626 HOT CELLS | 10548 | 00 |
| 16-JUL-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION (RI) WITH BASELINE RISK ASSESSMENT, DOE/ID-10607, MAY 1998 (05/98) | 10809 | 00 |
| 01-JUL-98 | DIETZ, C. G. | SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-07 AUXILIARY REACTOR AREA ARA-02 SEPTIC TANK SLUDGE REMOVAL ACTION | INEEL/EXT-98-00106 | 00 |
| 01-JUN-98 | O'NEILL, K. C. | TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION BASELINE RISK ASSESSSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 5-12 WAG-5 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-89-98 | 00 |
| 01-MAY-98 | DOE | DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), DOE/ID-10607, DRAFT REVISION 0 (REV.0) | 10807 | 00 |
| 01-MAY-98 | DOE | DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON WAG-5 OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DOE/ID-10607, DRAFT REVISION 0 (REV.0) | 10810 | 00 |
| 01-DEC-97 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 24-NOV-97 | COVELESKIE, A. D. | ENGINEERING DESIGN FILE (EDF) - AUXILIARY REACTOR AREA 729 (ARA-729) RADIOLOGICAL DATA EVALUATION OPERABLE UNIT (OU) 5-12 | EDF-ER-30/1000-69 | 00 |
| 28-OCT-97 | JOSTEN, N. E. | ENGINEERING DESIGN FILE (EDF) - IN SITU GAMMA RADIATION SURVEY AT ARA-23 & ARA-24 OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | ER-WAG5-104 | 00 |
| 01-OCT-97 | ROTHERMEL, J. S. | REMEDIAL ACTION (RA) REPORT OPERABLE UNIT (OU) 5-05 STATIONARY LOW POWER REACTOR 1 (SL-1) & OU 6-01 BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS | DOE/ID-10591 | 00 |
| 01-JUL-97 | CRAM, A. J. | STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION AND MAINTENANCE (O&M) PLAN OPERABLE UNIT (OU) 5-05 & OU 6-01 | INEL-95/0625 | 01 |
| 02-MAY-97 | ANDERSON, B. S. | TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR WASTE AREA GROUP 5 WAG-5, OPERABLE UNIT (OU) 5-12, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-72-97 | 00 |
| 01-MAY-97 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION BEGINS FOR POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) WAG-5 OPERABLE UNIT (OU) 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 13946 | 00 |
| 01-MAY-97 | WEBBER, F. L. | FINAL WORK PLAN FOR WAG-5 OU 5-12 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10555 | 00 |
| 01-JAN-97 | HIARING, C. M. | FINAL SCOPE OF WORK FOR OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10547 | 00 |
| 13-NOV-96 | KENOYER, D. J. | TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 | DJK-09-96-A | 00 |
| 01-OCT-96 | LMITCO | ACTION MEMORANDUM FOR A REMOVAL ACTION AT ARA-02 SEPTIC SYSTEM SITE OPERABLE UNIT (OU) 5-07 AT INEL | INEL-96/0307 | 00 |
| 01-SEP-96 | WELLS, R. P. | SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 5-07, ARA-I SITE, ARA-02 REMOVAL ACTION (PARSONS #ES.35.6.3, REV.01) | DOE/ID-10545 | 01 |
| 01-JUL-96 | FITCH, D. R. | FIELD SAMPLING PLAN (FSP) SL-1 & BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 & 6-01 (PARSONS ES-28.6.3) | DOE/ID-10540 | 00 |
| 01-JUL-96 | FITCH, D. R. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 5-07 ARA-02 SITE REMOVAL ACTION | INEL-96/0237 | 00 |
| 23-MAY-96 | DOE | TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR AUXILIARY REACTOR AREA 19 (ARA-19) ARA-II DETENTION TANK FOR FUEL OIL & RADIONUCLIDES (ARA-719) - DECISION DOCUMENTATION PACKAGE | 10309 | 00 |
| 23-MAY-96 | DOE | TRACK 1 INVESTIGATION - PBF REACTOR AREA ABANDONED SEPTIC SYSTEM | 10444 | 00 |
| 23-MAY-96 | DOE | NO FURTHER ACTION DETERMINATION - TRACK 1 INVESTIGATION - POWER BURST FACILITY 25 (PBF-25) SPECIAL POWER EXCURSION REACTOR TEST (SPERT) IV SEPTIC TANK & LEACH FIELD | 10538 | 00 |
| 10-MAY-96 | GREEN, L. A. | REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | OPE-ER-96-84 | 00 |
| 04-APR-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) ACTIVITIES & DOE COMMENT RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS | OPE/ER-96-061 | 00 |
| 01-APR-96 | COTTEN, G. B. | DESIGN DRAWINGS - CONSTRUCTION PLANS - APPENDIX C OF DOE/ID-10532, SL-1 & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT RD/RA WORK PLAN | 11822 | 00 |
| 01-APR-96 | ROSENBERGER, M. S. | DOE RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY ( IDHW-DEQ) COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 5-05 & 6-01 | 11823 | 00 |
| 01-APR-96 | COTTEN, G. B. | STATIONARY LOW POWER REACTOR-1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (PARSON'S #ES.28.06.23) | DOE/ID-10532 | 00 |
| 01-APR-96 | PARSONS ENGINEERING | STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT OPERATION & MAINTENANCE (O&M) PLAN OU 5-05 & 6-01 - PARSONS #ES-28.6.9.12 | INEL-95/0625 | 00 |
| 01-APR-96 | PARSONS ENGINEERING | STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS HEALTH & SAFETY PLAN (HSP) OU 5-05 & 6-01 - PARSONS #ES.28.6.12 | INEL-95/0636 | 00 |
| 22-MAR-96 | GREEN, L. A. | WORKING SCHEDULE FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN AND REMEDIAL ACTION (RD/RA) ACTIVITIES | OPE-ER-52-96 | 00 |
| 21-MAR-96 | GREEN, L. A. | TRANSMITTAL OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK FOR SL-1 & BORAX I BURIAL GROUNDS - RESOLUTION TABLES FOR IDHW REVIEW COMMENTS ARE INCLUDED | OPE-ER-50-96 | 00 |
| 01-MAR-96 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS - OU 5-05 & 6-01 | INEL-95/0456 | 00 |
| 29-FEB-96 | DOE | TRACK 2 DECISION STATEMENT FOR THE OPERABLE UNIT (OU) 5-06 ARA-III ARA-12 SITE & ARA-IV ARA-20 SITE - ACTION DETERMINATION | 10412 | 00 |
| 29-FEB-96 | DOE | TRACK 2 DECISION STATEMENT FOR THE OPERABLE UNIT (OU) 5-06 ARA-III ARA-12 SITE & ARA-IV ARA-20 SITE - NO FURTHER ACTION DETERMINATION | 10413 | 00 |
| 08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-27-96 | 00 |
| 08-FEB-96 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS OU 5-05 & 6-01 AND TEN (10) NO ACTION SITES ROD | OPE-ER-28-96 | 00 |
| 09-JAN-96 | DOE, EPA, IDHW | RECORD OF DECISION (ROD) FOR STATIONARY LOW POWER REACTOR 1 (SL-1) OU 5-05 & BORAX I BURIAL GROUNDS OU 6-01 & 10 (TEN) NO ACTION SITES (OU 5-01, 5-03, 5-04 AND 5-11) | INEL-95/0282 | 00 |
| 08-JAN-96 | COVELESKIE, A. D. | EDF - ENGINEERING DESIGN FILE - SOURCE TERM DETERMINATION OF ARA-02 SEPTIC TANKS | ER-BWP-88 | 00 |
| 22-DEC-95 | GREEN, L. A. | STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), TRANSMITTAL OF | OPE-ER-234-95 | 00 |
| 14-DEC-95 | GREEN, L. A. | TECHNICAL MEMORANDUM ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND | OPE-ER-228-95 | 00 |
| 07-DEC-95 | JINES, A. | AUXILIARY REACTOR AREA (ARA) WINDBLOWN SOILS EVALUATION | OPE-ER-225-95 | 00 |
| 13-NOV-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OU 5-05 AND 6-01 DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK | 11486 | 00 |
| 08-NOV-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT FINAL RECORD OF DECISION (ROD) | 10172 | 00 |
| 02-NOV-95 | JENSEN, N. R. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) BOILING WATER REACTOR EXPERIMENT BORAX I BURIAL GROUNDS OPERABLE UNIT (OU) 5-05 AND 6-01 & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD), FOR REVIEW AND SIGNATURE | OPE-ER-204-95 | 00 |
| 19-OCT-95 | GREEN, L. A. | DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 10445 | 00 |
| 19-OCT-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS | OPE-ER-201-95 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 13-OCT-95 | UNDERWOOD, E. J. | IDHW COMMENTS ON VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 | 10171 | 00 |
| 10-OCT-95 | ORLEAN, H. | EPA COMMENTS ON SEPTEMBER 1995 (09/95) DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) | 10163 | 00 |
| 06-OCT-95 | GREEN, L. A. | SAMPLING EVENT NOTIFICATION | OPE-ER-193-95 | 00 |
| 01-OCT-95 | GREENWELL, R. D. | DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | INEL-94/0171 | 00 |
| 22-SEP-95 | UNDERWOOD, E. J. | IDHW ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO THE SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES | 10169 | 00 |
| 22-SEP-95 | UNDERWOOD, E. J. | IDHW TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNIT (OU) 5-05 AND 6-01 | 10170 | 00 |
| 20-SEP-95 | GREEN, L. A. | COMMENT RESOLUTION TABLES FOR 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS), PROPOSED PLAN | OPE-ER-176-95 | 00 |
| 20-SEP-95 | JINES, A. | ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES | OPE-ER-177-95 | 00 |
| 13-SEP-95 | GREEN, L. A. | TRANSMITTAL OF VARIOUS DOCUMENTS FOR OU 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) | OPE-ER-187-95 | 00 |
| 12-SEP-95 | GREEN, L. A. | TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNITS (OU) 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) | OPE-ER0-172-95 | 00 |
| 07-SEP-95 | JORGENSEN, D. K. | ENGINEERING DESIGN FILE (EDF) - ARA WINDBLOWN AREA RISK EVALUATION - (EDF SERIAL NUMBER IS INEL-95/103) | ER-WAG5-54 | 02 |
| 01-SEP-95 | HOLDREN, K. J. | ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUNDS | 10137 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | SUPPORT DOCUMENTATION: ESTIMATION OF URANIUM-235 SURFACE SOIL CONCENTRATIONS BASED ON MASS UNRECOVERED AT BORAX I BURIAL GROUNDS | 10133 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | ERRATA FOR REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | 10134 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | SUPPORT DOCUMENTATION; ANNUAL DOSE CALCULATIONS FOR SELECTED SCENARIOS AT SL-1 AND BORAX I BURIAL GROUNDS | 10135 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | SL-1 & BORAX I CLASS C WASTE EQUIVALENCY DETERMINATION | 10136 | 00 |
| 22-AUG-95 | ORLEAN, H. | EPA COMMENTS ON FINAL DRAFT RECORD OF DECISION (ROD) FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) | 10162 | 00 |
| 18-AUG-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT RECORD OF DECISION (ROD) | 10168 | 00 |
| 03-AUG-95 | GREEN, L. A. | TRANSMITTAL OF STATIONARY LOW POWER REACTOR 1 (SL-1) & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) & TEN (10) NO ACTION SITES RECORD OF DECISION (ROD) - DRAFT FOR REVIEW | OPE-ER-146-95 | 00 |
| 25-JUL-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, VOLUME 1 OF 2 (VOL.01 OF VOL.02) FOR OPERABLE UNIT (OU) 5-05 & 6-01 SL-1 & BORAX I BURIAL GROUNDS | 10158 | 00 |
| 07-JUL-95 | ORLEAN, H. | EPA COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUND | 10161 | 00 |
| 20-JUN-95 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH AND WELFARE, DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND AND ARA WINDBLOWN AREA RISK EVALUATION | 10167 | 00 |
| 08-JUN-95 | ROOD, S. M. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME I, (VOL.01) | INEL-95/0259,VOL.01 | 00 |
| 18-MAY-95 | DANE, R. | INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN MOSCOW, IDAHO MAY 18, 1995 (05/18/96) | 10157 | 00 |
| 17-MAY-95 | SCHWARTZ, N. | INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS TRACK 1'S - HELD IN BOISE, IDAHO MAY 17, 1995 (05/17/95) | 10156 | 00 |
| 16-MAY-95 | DANE, R. | INEL PROPOSED PLANS PUBLIC MEETING & COMMENT SESSION TRANSCRIPT - PRESENTATION 1: SL-1 & BORAX I BURIAL SITE INVESTIGATIONS & TRACK 1'S - PRESENTATION 2: CFA LANDFILLS & TRACK 1'S - HELD IN IDAHO FALLS MAY 16, 1995 (05/16/95) | 10155 | 00 |
| 02-MAY-95 | GREEN, L. A. | TRANSMITTAL OF PROPOSED PLAN FOR OU 5-05, SL-1 BURIAL BURIAL GROUND AND 6-01, BORAX I BURIAL GROUND AND VARIOUS NO ACTION TRACK 1 SITES | OPE-ER-086-95 | 00 |
| 01-MAY-95 | DOE, EPA, IDHW | PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS | 10011 | 00 |
| 20-APR-95 | DOE, EPA, IDHW | TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR ARA-15 ARA-III RADIONUCLIDE TANK (ARA-735) - DECISION DOCUMENTATION PACKAGE | 10014 | 00 |
| 20-APR-95 | DOE, EPA, IDHW | TRACK 1 INVESTIGATION NO FURTHER ACTION DETERMINATION FOR ARA-18 ARA-III RADIONUCLIDE TANK (ARA-736) | 10015 | 00 |
| 01-APR-95 | DOE, EPA, IDHW | NOTICE OF AVAILABILITY FOR CFA LANDFILL I, II, & III OU 4-12, STATIONARY LOW POWER REACTOR 1 (SL-1) & BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS OU 5-05 & 6-01 | 10013 | 00 |
| 01-APR-95 | INEL COMMUNITY RELATIONS | UPDATE FACT SHEET - INEL INVESTIGATES REACTOR DEBRIS | 9649 | 00 |
| 20-MAR-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OPERABLE UNIT (OU) 5-05 AND 6-01 DRAFT PROPOSED PLAN | 10166 | 00 |
| 17-MAR-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT PROPOSED PLAN FOR SL-1 & BORAX I BURIAL GROUNDS (OU 5-05 & 6-01) | 10160 | 00 |
| 14-MAR-95 | AR COORDINATOR | OPERABLE UNIT (OU) 5-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-02 | AR.INDEX.OU.5-02 | 00 |
| 01-MAR-95 | HOLDREN, K. J. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | INEL-95/0027 | 00 |
| 01-MAR-95 | VETTER, D. W. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | INEL-95/0027 | 00 |
| 01-MAR-95 | FILEMYR, R. G. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS | INEL-95/0027 | 00 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 17-FEB-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS | 10159 | 00 |
| 17-FEB-95 | RENO, S. L. | IDHW COMMENTS ON REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) - DRAFT FINAL | 10165 | 00 |
| 06-FEB-95 | DOE, EPA, IDHW | NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF HISTORICAL SITE OF SPERT III LARGE LEACH POND - DECISION DOCUMENTATION PACKAGE | 10002 | 00 |
| 01-JAN-95 | INEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUNP & EVAPORATION POND RECORD OF DECISION (ROD) | 5815 | 00 |
| 23-DEC-94 | WILCYNSKI, J. M. | EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND RECORD OF DECISION (ROD) | 5814 | 00 |
| 02-DEC-94 | VETTER, D. W. | RECORD OF MEETING WITH CRAIG KVAMME, LITCO, REGARDING BASIS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DISPOSAL COSTS | 10027 | 00 |
| 04-NOV-94 | AR COORDINATOR | OPERABLE UNIT (OU) 5-04 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-04 | AR.INDEX.OU.5-04 | 00 |
| 04-NOV-94 | AR COORDINATOR | OPERABLE UNIT (OU) 5-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE AUXILIARY REACTOR AREA (ARA) CHEMICAL EVAPORATION POND REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - OU 5-10 | AR.INDEX.OU.5-10 | 00 |
| 04-NOV-94 | AR COORDINATOR | OPERABLE UNIT (OU) 5-11 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OU 5-11 | AR.INDEX.OU.5-11 | 00 |
| 04-NOV-94 | AR COORDINATOR | POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) NO ACTION SITES - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR NO ACTION SITES FOR PBF/ARA WASTE AREA GROUP 5 (WAG-5) | AR.INDEX.PBF/ARA.5-NA | 00 |
| 01-OCT-94 | HILLMAN-MASON, K. Y. | PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-08 & 5-09 (INEL-94/0108 FORMERLY EGG-ER-11428) | INEL-94/0108 | 00 |
| 26-SEP-94 | BLOOD, H. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS OF PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 5-08 & 5-09 (DRAFT) | 10044 | 00 |
| 23-SEP-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS OF THE PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 5-08 & 5-09 (DRAFT) (EGG-ER-11428) | 10045 | 00 |
| 09-SEP-94 | GREEN, L. A. | REVISION OF SCHEDULE FOR OPERABLE UNIT (OU) 5-05 SL-1 BURIAL GROUND SITE ARA-06 AND 6-01 BORAX I BURIAL GROUND SITE BORAX-02 | OPE-ER-237-94 | 00 |
| 01-SEP-94 | INEL COMMUNITY RELATIONS | INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - DOE STUDIES TWO (2) RADIONUCLIDE BURIAL GROUNDS | 7865 | 00 |
| 19-AUG-94 | GREEN, L. A. | TRANSMITTAL OF DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 5-08 AND 5-09 | OPE-ER-216-94 | 00 |
| 01-AUG-94 | RENO, S. L. | COMMENTS IN REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS) VOLUME 1 OF 2 (DRAFT) - VOL.01 OF VOL.02 | 10164 | 00 |
| 28-JUL-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR THE RUBBLE PILE AND CONSTRUCTION DEBRIS NORTHWEST OF PBF-720 - NO FURTHER ACTION DETERMINATION | 5740 | 00 |
| 28-JUL-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR 500 GALLON UNDERGROUND STORAGE TANK (UST) - NO FURTHER ACTION DETERMINATION | 5741 | 00 |
| 06-JUL-94 | HOLDREN, K. J. | INTERVIEWS WITH DARRELL HANNI REGARDING THE STATIONARY LOW POWER REACTOR SL-1 BURIAL GROUND | KJH-09-94 | 00 |
| 15-JUN-94 | LYLE, J. L. | TRANSMITTAL OF THE DRAFT REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT FOR OU 5-05 & 6-01 (SL-1 & BORAX I BURIAL GROUNDS, VOLUME 1 (VOL.01) OF 2 | OPE-ER-157-94 | 00 |
| 15-JUN-94 | GREEN, L. A. | TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OU 5-06 ARA-III SITE ARA-12 & ARA-IV SITE ARA-20 | OPE-ER-184-94 | 00 |
| 07-JUN-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR THE PBF-04 HISTORICAL LOCATION PBF CONTROL AREA OIL TANK AT PBF-608 - ACTION DETERMINATION, PROCEED TO TRACK 2 | 5751 | 00 |
| 01-JUN-94 | PICKETT, S. L. | FINAL TRACK 2 SUMMARY REPORT FOR OU 5-06 - ARA-III SITE, ARA-12 & ARA-IV SITE, ARA-20 | EGG-ER-11144 | 00 |
| 01-MAY-94 | WILCYNSKI, J. M. | EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP AND EVAPORATION POND RECORD OF DECISION (ROD) AT THE INEL | 5702 | 00 |
| 01-MAY-94 | EG&G IDAHO, INC. | TECHNICAL MEMORANDUM BASELINE RISK ASSESSMENT (BRA) FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS RI/FS DRAFT | EGG-ER-11316 | 00 |
| 26-APR-94 | LYLE, J. L. | TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | OPE-ER-099-94 | 00 |
| 15-APR-94 | MEADOWS, D. | RECORD OF MEETING WITH ROGER WILHELMSON, EG&G IDAHO REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) | 10024 | 00 |
| 14-APR-94 | MEADOWS, D. | RECORD OF MEETING WITH EDDY CHEW, DEPARTMENT OF ENERGY (DOE) IDAHO, REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND - PIPES | 10025 | 00 |
| 14-APR-94 | HOLDREN, K. J. | MEMO OF CONVERSATION WITH RICHARD GREEN REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | 10028 | 00 |
| 08-APR-94 | BLOOD, H. R. | EPA COMMENTS: DRAFT TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-06 ARA-III, SITE ARA-12 & ARA-IV, SITE ARA-20 | 5690 | 00 |
| 07-APR-94 | LYLE, J. L. | TRANSMITTAL OF THE DOCUMENT REVISION REQUEST (DRR) FOR OPERABLE UNIT (OU) 10-06 PHASE II SAMPLING & ANALYSIS PLAN (SAP) & HEALTH & SAFETY PLAN (HSP) | OPE-ER-085-94 | 00 |
| 04-APR-94 | FREDERICK, D. B. | IDHW COMMENTS FOR TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-06: ARA-III, SITE ARA-12 AND ARA-IV, SITE ARA-20 AT THE INEL, DRAFT, FEBRUARY 1994 (02/94) - EGG-ER-11144 | 5691 | 00 |
| 01-APR-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR THE ARA-744 EVAPORATION POND LOCATED NE OF ARA-I - NO FURTHER ACTION DETERMINATION | 5654 | 00 |
| 22-MAR-94 | LANEY, P. T. | COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | PTL-02-94 | 00 |
| 18-MAR-94 | LIVERMAN, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 5777 | 00 |
| 01-MAR-94 | HALFORD, V. E. | RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01 SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EGG-ER-10998 | 01 |
| 01-MAR-94 | HANEY, T. J. | HEALTH & SAFETY PLAN (HSP) FOR PHASE II OF THE OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EGG-ER-11231 | 01 |
| 17-FEB-94 | TUCKER, J. | RECORD OF MEETING WITH DICK MESERVEY, EG&G IDAHO REGARDING BOILING WATER REACTOR EXPERIMENT (BORAX) I | 10023 | 00 |
| 16-FEB-94 | VANDERPOEL, G. | RECORD OF MEETING WITH ROGER G. JENSEN, USGS REGARDING DEPTH TO AQUIFER NEAR BOILING WATER REACTOR EXPERIMENT (BORAX) I & STATIONARY LOW POWER REACTOR 1 (SL-1) | 10022 | 00 |
| 07-FEB-94 | LYLE, J. L. | TRANSMITTAL OF THE PHASE II SAMPLING & ANALYSIS PLAN (SAP) FOR THE RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 10-06 | OPE-ER-030-94 | 00 |
| 25-JAN-94 | MEADOWS, D. | RECORD OF MEETING WITH GLENN BRISCOE REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | 10026 | 00 |
| 10-JAN-94 | PIERRE, W. | EPA COMMENTS ON THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR THE POWER BURST FACILITY (PBF) CORROSIVE WASTE SUMP & EVAPORATION POND INTERIM ACTION (IA) OU 5-13 | 5851 | 00 |
| 01-JAN-94 | HANEY, D. F. | SAMPLING & ANALYSIS PLAN (SAP) FOR PHASE II OF OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EGG-ER-10971 | 00 |
| 01-DEC-93 | MSE, INC. | FINAL SCOPE OF WORK FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EGG-ER-10902 | 00 |
| 01-DEC-93 | HONEYCUTT, T. K. | TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS | EGG-ER-11101 | 00 |
| 22-NOV-93 | MK-FIC | FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN FOR PBF-08 CORROSIVE WASTE SUMP & PBF-10 EVAPORATION POND REMEDIATION OU 5-13 | 05.013.1.3.101.01 | 02 |
| 10-NOV-93 | BLOOD, H. R. | REVIEW OF TRACK 2 SUMMARY REPORT OPERABLE UNIT (OU) 5-07 ARA-I SITES ARA-02 & ARA-03 | 5715 | 00 |
| 09-NOV-93 | MK-FIC | DOE, EPA AND IDHW REVIEW COMMENTS AND RESOLUTIONS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REV.01 FOR PBF INTERIM ACTION (IA) OU 5-13 | 7212 | 00 |
| 02-NOV-93 | BLOOD, H. R. | EPA COMMENTS: THE DRAFT RI/FS SCOPE OF WORK FOR OPERABLE UNITS (OU) 5-05 AND 6-01, SL-1 AND BORAX I BURIAL GROUNDS | 5623 | 00 |
| 02-NOV-93 | STOOPS, T. M. | IDHW-DEQ RECOMMENDATIONS FOR OU 5-07 TRACK 2 SUMMARY REPORT | 5624 | 00 |
| 01-NOV-93 | NOT SPECIFIED | TECHNICAL MEMORANDUM - PRELIMINARY BASELINE RISK ASSESSMENT (BRA) FOR OU 5-05 & 6-01, SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | MISC-94001 | 00 |
| 26-OCT-93 | STOOPS, T. M. | IDHW-DEQ COMMENTS TO THE DRAFT SCOPE OF WORK (SOW) FOR THE RI/FS FOR OU 5-05 (SL-1 BURIAL GROUND) AND OU 6-01 (BORAX I BURIAL GROUND) | 5773 | 00 |
| 01-OCT-93 | NOT SPECIFIED | TECHNICAL MEMORANDUM - OVERVIEW OF EXPOSURE SCENARIOS FOR BASELINE RISK ASSESSMENT (BRA) OU 5-05, 6-01 STATIONARY LOW POWER REACTOR, BORAX I BURIAL GROUNDS REMEDIAL INVESTIGATION (RI) | 5662 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 24-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - ARA-I DRAIN (ARA-626) ARA-17 OU 5-01 | 5322 | 00 |
| 24-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - PBF SPERT IV BLOWDOWN PIT (ADJACENT TO PBF-716) PBF-24 OU 5-03 | 5323 | 00 |
| 22-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - PBF COOLING TOWER AREA AND DRAINAGE DITCH AT PBF REACTOR AREA PBF-28 OU 5-03 | 5324 | 00 |
| 21-JUN-93 | NOT SPECIFIED | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - ARA-III SANITARY SEWER LEACH FIELD AND SEPTIC TANK (ARA-740) | 5325 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 19-MAY-93 | NOT SPECIFIED | NO FURTHER ACTION DETERMINATION FOR TRACK 1 INVESTIGATION OF PBF-19, HISTORICAL LOCATION OF A 3,000 GAL. UNDERGROUND STORAGE TANK (UST) SPERT III (WERF) ON WEST SIDE OF PBF-609 | 5597 | 00 |
| 11-MAY-93 | NOT SPECIFIED | ACTION DETERMINATION EXPEDITED ACTION FOR THE TRACK 1 INVESTIGATION OF PBF-26 SPERT IV LAKE SOUTH OF PBF-613 | 5599 | 00 |
| 01-MAY-93 | PICKETT, S. L. | TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-07: ARA-1 SITES ARA-02 AND ARA-03 & REVIEW COMMENTS | EGG-ER-10593 | 00 |
| 08-APR-93 | DIETZ, C. G. | TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE - NO FURTHER ACTION DETERMINATION - PBF REACTOR AREA BOILER BLOWDOWN PIT PBF-06 | 5257 | 00 |
| 08-APR-93 | DIETZ, C. G. | NO FURTHER ACTION DETERMINATION - PBF REACTOR AREA OIL DRUM STORAGE - PBF-07 TRACK 1 INVESTIGATION DECISION DOCUMENTATION PACKAGE | 5258 | 00 |
| 29-MAR-93 | NOT SPECIFIED | NO FURTHER ACTION DETERMINATION FOR THE TRACK 1 INVESTIGATION OF PBF-12, HISTORICAL SITE OF SPERT I SEEPAGE PIT | 5598 | 00 |
| 16-FEB-93 | COE, M. | DOE NEWS - AGENCIES SIGN THREE (3) RECORDS OF DECISION (ROD) FOR NO REMEDIAL ACTION (RA) | 6149 | 00 |
| 01-DEC-92 | INEL COMMUNITY RELATIONS | RECORD OF DECISION (ROD) FOR THE AUXILIARY REACTOR AREA ARA-I CHEMICAL EVAPORATION POND OPERABLE UNIT (OU) 5-10 | 5232 | 00 |
| 01-NOV-92 | INEL COMMUNITY RELATIONS | RECORD OF DECISION (ROD) AVAILABILITY FOR THE PBF INTERIM ACTION (IA) | 5212 | 00 |
| 01-SEP-92 | INEL COMMUNITY RELATIONS | POWER BURST FACILITY (PBF) RECORD OF DECISION (ROD) FOR CORROSIVE WASTE SUMP & EVAPORATION POND | 5204 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - PBF CONTROL AREA SEPTIC TANK (PBF-724) & SEEPAGE PIT (PBF-735) | 5214 | 0 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - PBF CONTROL AREA SEPTIC TANK (PBF-738 & PBF-739) AND SEEPAGE PIT (PBF-736) | 5215 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - PBF CONTROL AREA SEPTIC TANK (PBF-632) AND SEEPAGE PIT (PBF-745 & PBF-748) | 5216 | 00 |
| 01-SEP-92 | HOVER, R. J. | NO ACTION SITE - PBF REACTOR AREA SEPTIC TANK & DRAINFIELD (PBF-728) | 5217 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - SPERT II SEPTIC TANK (PBF-725) AND SEEPAGE PIT (PBF-760) | 5218 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - SPERT IV SEPTIC TANK (PBF-727) AND LEACH PIT (PBF-757) | 5219 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - SPERT III SEPTIC TANK (PBF-726) & SEEPAGE PIT | 5220 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-I SEWAGE TREATMENT FACILITY | 5221 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-II SEEPAGE PIT TO EAST (ARA-720A) | 5222 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-II SEEPAGE PIT (ARA-720B) | 5223 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-II SEPTIC TANK (ARA-738) | 5224 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-II SEPTIC TANK EAST (ARA-613) | 5225 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-II SEPTIC TANK (ARA-606) | 5226 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-III SEPTIC TANK & DRAINFIELD (ARA-739) | 5227 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-IV SEPTIC TANK AND SEEPAGE PIT NO. 2 | 5228 | 00 |
| 01-SEP-92 | NOT SPECIFIED | NO ACTION SITE - ARA-IV CONTROL AREA SEPTIC TANK AND SEEPAGE PIT NO. 3 | 5229 | 00 |
| 24-JUL-92 | DOE | RESPONSE TO STATE OF IDAHO AND EPA COMMENTS ON THE DRAFT POWER BURST FACILITY (PBF) RECORD OF DECISION (ROD) | 5210 | 00 |
| 24-JUL-92 | BLOOD, H. R. | REVIEW COMMENTS FOR THE DRAFT RECORD OF DECISION (ROD) FOR THE POWER BURST FACILITY (PBF) EVAPORATION POND INTERIM ACTION (IA) - OU 5-13 | 5211 | 00 |
| 23-JUL-92 | NYGARD, D. | REVIEW COMMENTS FOR THE DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 5-13 AT THE AUXILIARY REACTOR AREA POWER BURST FACILITY (PBF/ARA) WAG-5 | 5209 | 00 |
| 10-JUL-92 | NOT SPECIFIED | PUBLIC COMMENT TRANSCRIPTS - PROPOSED PLAN FOR THE ARA CHEMICAL EVAPORATION POND | 5164-ARA | 00 |
| 01-JUL-92 | BARGELT, R. J. | TECHNICAL MEMORANDUM EXPOSURE ASSESSMENT SCENARIOS FOR THE PBF AND ARA, INEL | 5135 | 00 |
| 01-JUL-92 | INEL COMMUNITY RELATIONS | ATTENTION: AGENCIES SEEK PUBLIC COMMENT ON THREE (3) PLANS | 5136 | 00 |
| 26-JUN-92 | INEL COMMUNITY RELATIONS | PROPOSED PLANS AND DEAR CITIZEN LETTER FOR MONITORING THE PERCHED WATER AT TRA, THE MOTOR POOL POND AT CFA, AND THE CHEMICAL EVAPORATION POND AT ARA - SEE DOCUMENT NUMBER 5141 FOR CORRECTED PAGE B-6 TO CFA PROPOSED PLAN | 5130 | 00 |
| 01-JUN-92 | STANISICH, S. N. | FINAL REMEDIAL INVESTIGATION (RI) REPORT FOR THE ARA CHEMICAL EVAPORATION POND | EGG-WM-10001 | 00 |
| 08-APR-92 | NOT SPECIFIED | PUBLIC MEETING TRANSCRIPTS - PROPOSED PLAN FOR THE PBF CORROSIVE WASTE SUMP AND EVAPORATION POND, IDAHO FALLS, IDAHO 04/08/92 - BURLEY, IDAHO 04/09/92 | 5122 | 01 |
| 04-APR-92 | INEL COMMUNITY RELATIONS | CITIZENS ARE ASKED TO COMMENT ON A CLEANUP PROJECT AT THE INEL | 5167 | 00 |
| 01-APR-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON THE PROPOSED PLAN FOR POWER BURST FACILITY (PBF) | 5166 | 00 |
| 19-MAR-92 | DOE | DEAR CITIZEN LETTER AND PROPOSED PLAN FOR AN INTERIM ACTION (IA) OF PBF CORROSIVE WASTE SUMP & PBF EVAPORATION POND | 5076 | 00 |
| 12-MAR-92 | MK-FIC | INTERIM ACTION (IA) PROPOSED PLAN FOR PBF-10 COST ESTIMATE | ERP-92-199 | 00 |
| 01-MAR-92 | INEL COMMUNITY RELATIONS | INEL REPORTER - 03/92 - AGENCIES TO DISCUSS POWER BURST FACILITIES (PBF) CLEANUP PROJECT | 4612 | 00 |
| 01-MAR-92 | STANISICH, S. N. | PRELIMINARY RISK ASSESSMENT OF PBF-08 & PBF-10 SUMP & EVAPORATION POND | 5077 | 00 |
| 24-FEB-92 | PIERRE, W. | TRANSMITTAL OF CFA-05 MOTOR POOL POND & ARA-01 CHEMICAL EVAPORATION POND SCHEDULE | 5105 | 00 |
| 01-NOV-91 | BELLER, J. M. | TRA WARM WASTE POND (WWP) AT INEL SEDIMENT TREATABILITY STUDY (TS), PHASE I REPORT | EGG-WM-10000 | 00 |
| 01-AUG-90 | BACA, R. G. | INDEPENDENT VERIFICATION AND BENCHMARK TESTING OF THE PORFLO-3 COMPUTER CODE, VERSION 1.0 | EGG-BG-9175 | 00 |
| 23-MAY-90 | BLUMBERG, D. J. | OCTOBER 16, 1989 (10/16/89) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR ADDITIONAL INFORMATION FOR DELETION OF SELECTED SOLID WASTE MANAGEMENT UNITS (SWMU'S) FROM THE CONSENT ORDER AND COMPLIANCE AGREEMENT (COCA) THROUGH SUMMARY ASSESSMENT PROC | DJB-49-90 | 00 |
| 01-MAY-90 | LUDI, K. M. | SECTION 4 - SAMPLING AND ANALYSIS PROGRAM FROM REPORT NO. EGG-WM-8996, CLOSURE PLAN (CP) FOR POWER BURST FACILITY (PBF) | 5168 | 00 |
| 13-MAR-90 | SOLECKI, J. E. | SUPPORTING INFORMATION REQUESTED FOR SUMMARY ASSESSMENTS FOR SOLID WASTE MANAGEMENT UNITS (SWMU'S) | 6036 | 00 |
| 12-JAN-90 | BLUMBERG, D. J. | SUMMARY ASSESSMENT REVIEW LETTER FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE | DJB-09-90 | 00 |
| 11-JAN-90 | SOLECKI, J. E. | DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS | 8206 | 00 |
| 22-DEC-89 | BLUMBERG, D. J. | STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION | KHK-147-89 | 00 |
| 01-DEC-89 | HARDY, C. K. | PHASE I SAMPLING & ANALYSIS PLAN (SAP) FOR PBF EVAPORATION POND & WASTE SUMP (COCA UNITS PBF-08 & PBF-10) | EGG-WM-8804 | 00 |
| 01-DEC-89 | CASEY, C. E. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL ANALYSIS OF POWER BURST FACILITY (PBF) EVAPORATION POND SAMPLES | ST-CS-035-89 | 00 |
| 15-NOV-89 | SOLECKI, J. E. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE | 10986 | 00 |
| 09-NOV-89 | BLUMBERG, D. J. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE | DJB-40-89 | 00 |
| 09-NOV-89 | BLUMBERG, D. J. | SUMMARY ASSESSMENT REVIEW LETTER FROM EPA & STATE | DJB-41-89 | 00 |
| 26-OCT-89 | KOSHUTA, C. R. | NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT | 6709 | 00 |
| 16-OCT-89 | GEARHEARD, M. F. | SUMMARY ASSESSMENT REVIEWS | 3537 | 00 |
| 29-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO | 10110 | 00 |
| 01-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) | 8472 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-13 REACTOR AREA RUBBLE PIT | 2232 | 00 |
| 05-JAN-88 | FEIGNER, K. D. | REVIEW OF SELECTED SUMMARY ASSESSMENTS | 2494 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-07 REACTOR AREA OIL DRUM STORAGE PER-T-13 | 2717 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-01 CHEMICAL - EVAPORATION POND TO SE ARA-745 | 2979 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-02 SANITARY WASTE LEACH FIELD AND SEEPAGE PIT ARA-746 | 2980 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-03 PAD NEAR ARA-627 (PB SHEETING) | 2981 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-04 SEWAGE TREATMENT FACILITY ARA-737 | 2982 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-05 EVAPORATION POND TO NORTH EAST ARA-744 | 2983 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-07 SEEPAGE PIT TO EAST ARA-720A | 2985 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-08 SEEPAGE PIT TO WEST ARA-720B | 2986 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-09 SEPTIC TANK ARA-738 | 2987 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-10 SEPTIC TANK EAST ARA-613 | 2988 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-11 SEPTIC TANK WEST ARA-606 | 2989 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-16 RADIONUCLIDE TANKS ARA-729 | 2994 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-21 TEST AREA SEPTIC TANK AND LEACH PIT NO. 2 | 2999 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-22 CONTROL AREA SEPTIC TANK AND LEACH PIT NO. 3 ARA-617 | 3000 | 00 |
| 29-SEP-86 | MILLER, C. L. | EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT | EDF-263 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-14 SPERT II INACTIVE FUEL OIL TANK FRONT OF PBF-612 | 2724 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-26 SPERT IV LAKE ADJACENT TO PBF-758 | 2737 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-25 SPERT IV SEPTIC TANK & LEACH PIT PBF-727 & PBF-757 | 2738 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-24 SPERT IV BLOWDOWN PIT ADJACENT TO PBF-716 | 2739 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-22 SPERT IV LEACH POND PBF-758 | 2740 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-21 SPERT III LARGE LEACH POND | 2741 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-20 SPERT III SMALL LEACH POND | 2742 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-16 SPERT II LEACH POND | 2743 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-17 SPERT II SEPTIC TANK & SEEPAGE PIT PBF-725 | 2746 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-19 SPERT III INACTIVE FUEL OIL TANK AT PBF-609 WEST SIDE OF WERF | 2747 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-27 SPERT III SEPTIC TANK PBF-726 & SEEPAGE PIT | 2762 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-01 CONTROL AREA SEPTIC TANK PBF-724 SEEPAGE PIT PBF-735 | 2711 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-02 CONTROL AREA SEPTIC TANKS PBF-738,PBF-739 AND SEEPAGE PIT PBF-736 | 2712 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-03 CONTROL AREA SEPTIC TANK FOR PBF-632 & SEEPAGE PITS PBF-745 AND PBF-748 | 2713 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-04 CONTROL AREA OIL TANK AT PBF-608 SUBSTATION OUTSIDE PBF FENCE | 2714 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-05 REACTOR AREA WARM WASTE INJECTION WELL PBF-301 | 2715 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-06 REACTOR AREA BLOWDOWN PIT FOR BOILER BY PBF-621 | 2716 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-08 REACTOR AREA CORROSIVE WASTE DISPOSAL SUMP BRINE TANK PBF-731 | 2718 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-09 REACTOR AREA SEPTIC TANK & DRAINFIELD PBF-728 | 2719 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-10 REACTOR AREA EVAPORATION POND PBF-733 | 2720 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-11 SPERT I SEEPAGE PIT PBF-750 | 2721 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-12 SPERT I LEACH POND | 2722 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-15 REACTOR AREA CORROSIVE WASTE INJECTION WELL PBF-302 | 2725 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-06 SL-1 BURIAL GROUND | 2984 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-12 RADIOACTIVE WASTE LEACH POND | 2990 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-13 SANITARY SEWER LEACH FIELD AND SEPTIC TANK ARA-740 | 2991 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-14 SEPTIC TANK AND DRAINFIELD ARA-739 | 2992 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-15 RADIONUCLIDE TANK ARA-735 | 2993 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-17 DRAIN FROM ARA-626 | 2995 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-18 RADIONUCLIDE TANK ARA-736 | 2996 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-19 DETENTION TANK FOR FUEL OIL - RADIONUCLIDES ARA-719 | 2997 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-20 TEST AREA CONTAMINATED LEACH PIT #1 | 2998 | 00 |
Previous Page | Administrative Record Home Page