| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 09-AUG-10 | NOT SPECIFIED | PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11389 | 1 |
| 27-JUL-10 | NOT SPECIFIED | HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT | ICP/EXT-04-00209 | 15 |
| 22-MAR-10 | NOT SPECIFIED | PHASE 1 INTERIM REMEDIAL ACTION REPORT FOR OPERABLE UNIT 7-13/14 TARGETED WASTE RETRIEVALS | DOE/ID-11396 | 0 |
| 23-FEB-10 | NOT SPECIFIED | TRANSITIONAL REMEDIAL ACTION STATUS REPORT FOR THE OPERABLE UNIT 7-08 ORGANIC CONTAMINATION IN THE VADOSE ZONE | RPT-686 | 0 |
| 27-JAN-10 | NOT SPECIFIED | PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11405 PART 1 | 0 |
| 27-JAN-10 | NOT SPECIFIED | PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11405 PART 2 | 0 |
| 08-DEC-09 | ARENAZ, MARK R. | DOCUMENTATION OF A NON-SIGNIFICANT CHANGE TO THE RECORD OF DECISION FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14, IDAHO NATIONAL LABORATORY SITE, IDAHO | AR-25271 | 0 |
| 03-DEC-09 | KOEPPEN, L. DON | FISCAL YEAR 2009 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | RPT-683 | 0 |
| 17-NOV-09 | CRESAP, DALE A. | OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN | DOE/ID-11393 | 0 |
| 17-NOV-09 | HOLDREN, K. JEAN | OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN | DOE/ID-11393 | 0 |
| 17-NOV-09 | NOT SPECIFIED | OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN | DOE/ID-11393 | 0 |
| 17-NOV-09 | LOPEZ, STEVE L. | OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN | DOE/ID-11393 | 0 |
| 17-NOV-09 | JORGENSEN, MICHAEL D. | OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN | DOE/ID-11393 | 0 |
| 09-NOV-09 | NOT SPECIFIED | HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT | ICP/EXT-04-00209 | 14 |
| 22-OCT-09 | NOT SPECIFIED | HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT | ICP/EXT-04-00209 | 13 |
| 21-SEP-09 | NOT SPECIFIED | FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT IV | PLN-3144 | 0 |
| 16-SEP-09 | KOEPPEN, L. DON | VADOSE ZONE FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 | PLN-3224 | 0 |
| 16-SEP-09 | HOLDREN, K. JEAN | VADOSE ZONE FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 | PLN-3224 | 0 |
| 19-AUG-09 | NOT SPECIFIED | PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11389 | 0 |
| 11-MAR-09 | NOT SPECIFIED | FIELD SAMPLING PLAN FOR LYSIMETER, VAPOR PORT, AIR, AND TENSIOMETER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX ACTIVE LOW-LEVEL WASTE DISPOSAL FACILITY | ICP/EXT-05-01060 | 1 |
| 17-DEC-08 | MEAGHER, BRANDT G. | REMEDIAL DESIGN/REMEDIAL ACTION SCOPE OF WORK FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX OPERABLE UNIT 7-13/14 | DOE/ID-11377 | 0 |
| 30-OCT-08 | NOT SPECIFIED | REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT I, II AND III | DOE/NE-ID-11178 | 4 |
| 06-OCT-08 | SOLOMON, HOPI | FIELD SAMPLING PLAN FOR THE ACCELERATED RETRIEVAL PROJECT III | PLN-2815 | 0 |
| 02-OCT-08 | NOT SPECIFIED | HEALTH AND SAFETY PLAN FOR THE ACCELERATED RETRIEVAL PROJECT | ICP/EXT-04-00209 | 12 |
| 01-OCT-08 | NOT SPECIFIED | OPERABLE UNIT (OU) 7-13/14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR WASTE AREA GROUP (WAG) 7 COMPREHENSIVE RI/FS | AR.INDEX.OU.7-13/14 | 0 |
| 01-OCT-08 | NOT SPECIFIED | RECORD OF DECISION FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX OPERABLE UNIT 7-13/14 | DOE/ID-11359 | 0 |
| 23-SEP-08 | CETO, NICHOLAS | ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) | DOE/ID-11363 | 0 |
| 23-SEP-08 | KOCH, DARYL F. | ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) | DOE/ID-11363 | 0 |
| 23-SEP-08 | PROVENCHER, RICHARD B. | ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III WITHIN PIT 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) | DOE/ID-11363 | 0 |
| 03-JUL-08 | NOT SPECIFIED | AGREEMENT TO IMPLEMENT, U.S. DISTRICT COURT ORDER DATED MAY 25, 2006 | 91-0035-S-EJL | 0 |
| 08-APR-08 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00029 | 04 |
| 21-MAR-08 | GREEN, O. D. | AGREEMENT TO EXTEND DEADLINES | 25199 | 00 |
| 03-DEC-07 | NOT SPECIFIED | AGREEMENT-IN-PRINCIPLE BETWEEN THE SHOSHONE-BANNOCK TRIBES AND THE UNITED STATES DEPARTMENT OF ENERGY | AR-25223 | 0 |
| 06-NOV-07 | CITIZENS ADVISORY BOARD | CAB RECOMMENDATION #135 -- IDAHO NATIONAL LABORATORY (INL) SITE ENVIRONMENTAL MANAGEMENT CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION TO THE WASTE AREA GROUP (WAG) 7 PROPOSED PLAN | 25172 | 00 |
| 02-NOV-07 | ARENAZ, M. R. | RESPONSE TO SNAKE RIVER ALLIANCE REQUEST TO EXTEND THE COMMENT PERIOD ON THE PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 | WDP-RWMC-07-049 | 00 |
| 17-OCT-07 | HOLDREN, K. J. | PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 | DOE/ID-11288 | 00 |
| 04-OCT-07 | DOORNBOS, M. H. | REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT FOR A DESCRIBED AREA WITHIN PIT 4 | DOE/NE-ID-11178 | 03 |
| 26-SEP-07 | BECHTOLD, T. E. | FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-2000-00714 | 04 |
| 15-AUG-07 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/ COST ANALYSIS (EE/CA) FOR THE IDAHO NATIONAL LABORATORY (INL), ACCELERATED RETRIEVAL PROJECT (ARP) III IN THE SUBSURFACE DISPOSAL AREA (SDA) | WPD-RWMC-07-030 | 00 |
| 30-JUL-07 | GREEN, O. D. | AGREEMENT TO EXTEND DEADLINE FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN TO AUGUST 7, 2007 | 25123 | 00 |
| 17-JUL-07 | MEAGHER, B. G. | PUBLIC PARTICIPATION PLAN FOR WASTE AREA GROUP (WAG) 7 OPERABLE UNIT (OU) 7-13/14 AT THE IDAHO NATIONAL LABORATORY (INL) SITE | DOE/ID-11308 | 00 |
| 30-JUN-07 | GURNEY, L. W. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 10 |
| 27-JUN-07 | GREEN, O. D. | AGREEMENT TO EXTEND DEADLINE FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN TO JULY 31, 2007 | 25114 | 00 |
| 25-JUN-07 | MEAGHER, B. G. | FISCAL YEAR 2006 (FY-06) ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | RPT-339 | 00 |
| 29-MAY-07 | HOLDREN, K. J. | FEASIBILITY STUDY (FS) FOR OPERABLE UNIT (OU) 7-13/14 | DOE/ID-11268 | 00 |
| 09-APR-07 | GURNEY, L. W. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 09 |
| 28-MAR-07 | HARDESTY, T. | AGENCIES AGREE TO EXTEND DEADLINES FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN | 25088 | 00 |
| 26-MAR-07 | BUTLER, J. LANE | ELIMINATION OF SELECTED SUBSURFACE DISPOSAL AREA MONITOROING EVENTS | CCN 304602 | 0 |
| 20-MAR-07 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II | RPT-204 | 01 |
| 16-MAR-07 | HARDESTY, T. | AGREEMENT TO EXTEND DEADLINES FOR THREE OPERABLE UNITS (OU) 7-13, 7-14 AND OU 7-10 DELIVERABLES | 2474048 | 00 |
| 22-JAN-07 | MARTIAN, P. | VERIFICATION AND BENCHMARK TESTING OF THE TETRAD SIMULATOR, - VERSION 12.7MS | RPT-335 | 00 |
| 19-DEC-06 | GURNEY, L. W. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 08 |
| 18-DEC-06 | GEOTRANS, INC. | BENCHMARKING VERIFICATION OF TETRAD SIMULATOR VERSION 12.7MS | 2313772 | 00 |
| 22-NOV-06 | MAGNUSON, S. O. | SUBSURFACE FLOW AND TRANSPORT MODEL DEVELOPMENT FOR THE OPERALBE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) | ICP/EXT-05-01016 | 01 |
| 22-NOV-06 | ANDERSON, D. L. | SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-05-01039 | 01 |
| 09-NOV-06 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I | ICP/EXT-04-00516 | 07 |
| 22-AUG-06 | BURTON, B. N. | REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | DOE/NE-ID-11178 | 02 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 09-AUG-06 | DICK, J. R. | ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) AND THE ACCELERATED RETRIEVAL PROJECT II | EDF-5307 | 01 |
| 20-JUN-06 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II | RPT-204 | 00 |
| 13-JUN-06 | KOEPPEN, L. D. | FISCAL YEAR 2005 (FY-05) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | RPT-171 | 00 |
| 31-MAY-06 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I | ICP/EXT-04-00516 | 06 |
| 19-MAY-06 | HOLDREN, K. J. | REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | DOE/ID-11241 | 00 |
| 25-APR-06 | GURNEY, L. W. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 07 |
| 17-APR-06 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II WITHIN PITS 4 AND 6 OF THE SUBSURFACE DISPOSAL AREA (SDA) | DOE/NE-ID-11238 | 00 |
| 07-APR-06 | WHELDON, N. M. | SHORT TERM RISK ASSESSMENT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 FEASIBILITY STUDY (FS) | RPT-188 | 00 |
| 24-MAR-06 | ANDERSON, D. L. | SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-05-01039 | 00 |
| 22-MAR-06 | MAGNUSON, S. O. | SUBSURFACE FLOW AND TRANSPORT MODEL DEVELOPMENT FOR THE OPERALBE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) | ICP/EXT-05-01016 | 00 |
| 22-MAR-06 | DANIELS, K. W. | INDEPENDENT INVESTIGATION REPORT OF THE NOVEMBER 2005 (11/05) DRUM FIRE AT THE IDAHO NATIONAL LABORATORY (INL) SITE | RPT-190 | 00 |
| 13-MAR-06 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I | ICP/EXT-04-00516 | 05 |
| 21-FEB-06 | KOEPPEN, L. D. | FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-2000-00714 | 03 |
| 15-FEB-06 | VARVEL, M. D. | ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS IN 743 SERIES WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 | INEEL/EXT-01-00277 | 02 |
| 24-JAN-06 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) EXTENDING REVIEW AND COMMENT OF OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) TWENTY (20) DAYS | 24927 | 00 |
| 24-JAN-06 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 06 |
| 18-JAN-06 | HAMPTON, N. L. | BIOLOGICAL DATA TO SUPPORT OPERABLE UNIT (OU) 7-13 AND 7-14 MODELING OF PLANT AND ANIMAL INTRUSION AT BURIED WASTE SITES | INEEL/EXT-01-00273 | 01 |
| 22-DEC-05 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00029 | 03 |
| 16-DEC-05 | VAIL, J. A. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) | INEEL/EXT-03-00967 | 01 |
| 29-NOV-05 | POLLITT, D. B. | FIELD SAMPLING PLAN (FSP) FOR LYSIMETER, TENSIOMETER, AND VAPOR PORT MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACTIVE LOW LEVEL WASTE (LLW) PIT | ICP/EXT-05-01060 | 00 |
| 23-NOV-05 | PERRY, J. N. | RESPONSE TO OCTOBER 19, 2005 (10/19/05) COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CLARIFICATION OF POSITION ON THE PRESENTATION OF RISK FOR ALL PATHWAYS | WDP-RWMC-05-075 | 00 |
| 18-NOV-05 | LOPEZ, S. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) | INEEL/EXT-03-00997 | 02 |
| 10-NOV-05 | CARBONEAU, M. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 | INEEL/EXT-02-01385 | 01 |
| 04-NOV-05 | MCKENZIE, M. D. | WASTE INFORMATION AND LOCATION DATABASE UPDATE FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROJECT | ICP/EXT-04-00271 | 00 |
| 01-NOV-05 | CISE, C. A. | ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL AND TARGETED WASTE REMOVAL AND DISPOSITION PROJECTS (ARP/T-RAD) WITHIN THE SUBSURFACE DISPOSAL AREA (SDA) AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EDF-4494 | 03 |
| 26-OCT-05 | HUBBELL, J. M. | MOISTURE MONITORING PROGRAM AT THE SUBSURFACE DISPOSAL AREA (SDA) FOR FISCAL YEAR 2004 (FY-04) | ICP/EXT-05-00829 | 00 |
| 19-OCT-05 | KOCH, D. F. | OPERABLE UNIT (OU) 7-13 AND 7-14 DRAFT BASELINE RISK ASSESSMENT (BRA) | 24928 | 00 |
| 05-OCT-05 | SEBO, D. E. | COLLOCATED FACILITIES ANALYSIS FOR WASTE AREA GROUP 7 (WAG-7) , OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-00027 | 01 |
| 29-SEP-05 | MATTHERN, G. E. | PREREMEDIAL DESIGN REPORT OF REMEDIATION OPTIONS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-04-00330 | 00 |
| 28-SEP-05 | HANSON, D. J. | EVALUATION OF THE DURABILITY OF PORTLAND CEMENT BASED GROUT FOR SUBSURFACE APPLICATIONS AT OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-05-00798 | 00 |
| 28-SEP-05 | KOEPPEN, L. D. | FIELD SAMPLING PLAN (FSP) FOR LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-2000-00714 | 02 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 07-SEP-05 | WENDT, D. S. | ENGINEERING DESIGN FILE (EDF) - RADIOLYTIC HYDROGEN GAS GENERATION IN IDC 003 AND IDC 004 WASTE FORMS FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-5223 | 00 |
| 30-AUG-05 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT I (ARP I) | ICP/EXT-04-00516 | 04 |
| 24-AUG-05 | SEBO, D. E. | BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-01678 | 03 |
| 10-AUG-05 | BURTON, B. N. | REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | DOE/NE-ID-11178 | 01 |
| 13-JUL-05 | PERRY, J. N. | RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #121 ON THE OVERALL APPROACH TO CLEANUP AND CLOSURE OF THE SUBSURFACE DISPOSAL AREA (SDA) | WDP-RWMC-05-037 | 00 |
| 09-JUN-05 | PERRY, J. N. | TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) DOCUMENTS - ICP/EXT-05-00784 FINAL REPORT FOR WAG-7 PROBING PROJECT | WDP-RWMC-05-035 | 00 |
| 31-MAY-05 | BRYAN, J. D. | ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II | EDF-5447 | 01 |
| 09-MAY-05 | PERRY, J. N. | TRANSMITTAL OF WAG-7 DOCUMENTS - QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RWMC AND SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR 2003 AND 2004 | WMD-RWMC-05-026 | 00 |
| 09-MAY-05 | PERRY, J. N. | TRANSMITTAL OF WAG-7 DOCUMENTS - OU 7-13 AND OU 7-14 QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | WMD-RWMC-05-027 | 00 |
| 05-MAY-05 | KOEPPEN, L. D. | FISCAL YEAR 2004 (FY-04) OPERABLE UNIT (OU) 7-13 AND 7-14 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-05-00795 | 00 |
| 03-MAY-05 | ST. MICHEL, W. D. | ENGINEERING DESING FILE (EDF) - AREA BASED APPROACH TO IDENTIFY TYPE IV (TYPE 4) WASTE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I | EDF-5601 | 00 |
| 01-MAY-05 | MEYER, T. J. | FINAL REPORT FOR THE WASTE AREA GROUP 7 (WAG-7) PROBING PROJECT | ICP/EXT-05-00784 | 00 |
| 28-APR-05 | PROVENCHER, R. B. | ACCELERATED RETRIEVAL PROJECT (ARP) DEPARTMENT OF ENERGY (DOE) MEMORANDUM - MULTI-SOURCE LEACHATE AT PIT 4 AND THE SUBSURFACE DISPOSAL AREA (SDA) AND PAPER DISCUSSING APPLICABILITY TO THE F039 HAZARDOUS WASTE NUMBER TO CERCLA REMEDIATION ACTIVITIES | 1808137 | 00 |
| 28-APR-05 | BRYAN, J. D. | ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE DESCRIBED AREA WITHIN PIT 4 FOR THE ACCELERATED RETRIVAL PROJECT (ARP) WITHIN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EDF-4478 | 03 |
| 28-APR-05 | GROENEWOLD, G. S. | ACTINIDE ANALYSIS AND LEACHING OF SAMPLES COLLECTED FROM THE GLOVEBOX EXCAVATOR METHOD PROJECT FOR OU 7-13 AND 7-14 | ICP/EXT-04-00439 | 00 |
| 28-APR-05 | VEJVODA, E. | SUMMARY OF ROCKY FLATS PLANT WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00717 | 00 |
| 28-APR-05 | GILES, J. R. | SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FROM 1953 TO 1999 | ICP/EXT-05-00833 | 00 |
| 27-APR-05 | JOSTEN, N. E. | TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 | INEEL/EXT-02-00558 | 02 |
| 12-APR-05 | OLSON, G. L. | FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00029 | 02 |
| 07-APR-05 | PERRY, J. N. | TRANSMITTAL OF DRAFT SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT RADIOACTIVE WASTE MANAGMENT COMPLEX (RWMC) FROM 1953 TO 1999 - ENCLOSURES NOT AVAILABLE | WDP-RWMC-05-018 | 00 |
| 06-APR-05 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT I (ARP I) | ICP/EXT-04-00516 | 03 |
| 04-APR-05 | VARVEL, M. D. | ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 | INEEL/EXT-01-00277 | 01 |
| 29-MAR-05 | NORTH WIND ENVIRONMENTAL | HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 | ICP/EXT-04-00248 | 01 |
| 21-MAR-05 | LIVIERATOS, T. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REQUEST TO KEEP PIT 9 SAMPLES | 1784126 | 00 |
| 17-MAR-05 | RITTER, P. D. | NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) RADIOLOGICAL MONITORING PLAN FOR PHASES I AND II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00389 | 01 |
| 10-MAR-05 | PROVENCHER, R. B. | RESPONSES TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #119 ON CLEANUP AND CLOSURE OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EM-WM-05-015 | 00 |
| 09-MAR-05 | JOSTEN, N. E. | SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), 2003-2004 | ICP/EXT-04-00702 | 00 |
| 01-MAR-05 | ICP COMMUNITY RELATIONS | PUBLIC ENCOURAGED TO ATTEND MEETINGS ON BURIED WASTE PROJECT | 24894 | 00 |
| 01-MAR-05 | BURTON, B. N. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II | DOE/NE-ID-11223 | 00 |
| 03-FEB-05 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 05 |
| 01-FEB-05 | USGS | U.S. GEOLOGICAL SURVEY (USGS) REVIEW OF TRANSPORT OF SELECTED RADIONUCLIDES IN INTERIM RISK ASSESSMENT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14, INEEL - VOLUMES I & II (VOL.01 & VOL.0 | DOE/ID-22192 | 00 |
| 01-FEB-05 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE INEEL ACCELERATED RETRIEVAL PROJECT (ARP) PROJECT PHASE II IN THE SUBSURFACE DISPOSAL AREA (SDA) | EM-WM-04-083 | 00 |
| 25-JAN-05 | KNIGHT, L. | INEEL CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #119 ON CLEANUP AND CLOSURE OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 05-CAB-016 | 00 |
| 20-JAN-05 | BRYAN, J. D. | ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY FOR PHASE II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) | EDF-5447 | 00 |
| 18-JAN-05 | LOPEZ, S. L. | SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT | ICP/EXT-04-00646 | 01 |
| 17-DEC-04 | PROVENCHER, R. B. | AUTHORIZATION TO PERFORM PHASE I (PHASE 1) OPERATIONS AT THE ACCELERATED RETRIEVAL PROJECT (ARP) | EM-WM-04-085 | 00 |
| 13-DEC-04 | MCILWAIN, B. A. | DATA QUALITY OBJECTIVES (DQO) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00515 | 01 |
| 08-DEC-04 | SHAW, P. G. | ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT | EDF-5333 | 00 |
| 06-DEC-04 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00516 | 02 |
| 03-NOV-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00209 | 04 |
| 27-OCT-04 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00516 | 01 |
| 26-OCT-04 | DICK, J. R. | ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-5307 | 00 |
| 08-OCT-04 | BURTON, B. N. | REMOVAL ACTION PLAN FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | DOE/NE-ID-11178 | 00 |
| 04-OCT-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00209 | 03 |
| 30-SEP-04 | ANKENY, M. | PRELIMINARY DESIGN FOR AN ENGINEERED SURFACE BARRIER AT THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00216 | 00 |
| 30-SEP-04 | JOHNESEE, J. A. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (CUSTOMER, PROJECT, AND SYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 1 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | TFR-267 | 00 |
| 30-SEP-04 | HOLDER, R. B. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (SUBSYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 2 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | TFR-269 | 00 |
| 30-SEP-04 | JOHNESEE, J. A. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (ASSUMPTIONS) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 3 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | TFR-280 | 00 |
| 29-SEP-04 | SENTIERI, P. J. | ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-4494 | 02 |
| 29-SEP-04 | BUNNELL, P. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT MEASUREMENT AND CONTROLS - ATTACHMENT 12 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-4933 | 00 |
| 29-SEP-04 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FOUNDATION GROUTING STUDY - ATTACHMENT 5 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5028 | 00 |
| 29-SEP-04 | CLARK, D. W. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FIRE PROTECTION - ATTACHMENT 15 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5054 | 00 |
| 29-SEP-04 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT DELIVERY SYSTEM - ATTACHMENT 10 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5102 | 00 |
| 29-SEP-04 | GRAFF, K. E. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ELECTRICAL UTILITIES - ATTACHMENT 13 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5122 | 00 |
| 29-SEP-04 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT STORAGE AND MIXING - ATTACHMENT 9 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5135 | 00 |
| 29-SEP-04 | BLAKELY, B. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT FACILITIES - ATTACHMENT 11 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5144 | 00 |
| 29-SEP-04 | JENSEN, S. A. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT SELECTION BASIS - ATTACHMENT 4 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5146 | 00 |
| 29-SEP-04 | JENSEN, S. A. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUBSURFACE DISPOSAL AREA (SDA) SITE CONDITIONS - ATTACHMENT 6 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5147 | 00 |
| 29-SEP-04 | EASTMAN, R. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT SYSTEMS - ATTACHMENT 14 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5150 | 00 |
| 29-SEP-04 | THOMPSON, E. B. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H) - ATTACHMENT 17 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5152 | 00 |
| 29-SEP-04 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT HYDRAULIC EXCAVATOR AND DRILL INJECTION RIG - ATTACHMENT 7 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5153 | 00 |
| 29-SEP-04 | THOMPSON, E. B. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT OPERATIONS, MAINTENANCE, AND LOGISTICS - ATTACHMENT 8 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5155 | 00 |
| 29-SEP-04 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT VEHICLES - ATTACHMENT 16 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5162 | 00 |
| 29-SEP-04 | SHROPSHIRE, K. L. | ENGINEERING STUDIES REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT | ICP/EXT-04-00525 | 00 |
| 28-SEP-04 | MCILWAIN, B. A. | FIELD SAMPLING PLAN (FSP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00516 | 00 |
| 16-SEP-04 | LEECASTER, M. K. | FISCAL YEAR 2004 (FY-04) GEOSTATISTICAL MODELING OF LITHOLOGIC CHARACTERISTICS IN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-04-00494 | 00 |
| 10-SEP-04 | PERRY, J. N. | SUPPLEMENTAL RESPONSIVENESS SUMMARY FOR THE ACTION MEMORANDUM FOR ACCELERATED RETRIEVAL OF A DESCRIBED AREA WITHIN PIT 4 | FMDP-FFA/CO-04-011 | 00 |
| 19-AUG-04 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR ACCELERATED RETRIEVAL OF A DESCRIBED AREA WITHIN PIT 4 | DOE/NE-ID-11179 | 00 |
| 18-AUG-04 | HOLDREN, K. J. | METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-03-00047 | 00 |
| 18-AUG-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT | ICP/EXT-04-00210 | 03 |
| 17-AUG-04 | HOLDREN, K. J. | SECOND ADDENDUM TO THE WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-11039 | 00 |
| 17-AUG-04 | NALLA, G. | NEAR FIELD SIMULATION OF CARBON-14 AND TRITIUM MIGRATION FROM BURIED BERYLLIUM BLOCKS IN THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00321 | 00 |
| 11-AUG-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00209 | 02 |
| 09-AUG-04 | BLACKWOOD, L. G. | VALIDATION OF THE ROCKY FLATS PLANT RADIONUCLIDE INVENTORY IN THE HISTORIC DATA TASK USING STORED WASTE EXPERIMENTAL PILOT PLANT (SWEPP) ASSAY DATA, VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) | ICP/EXT-04-00211 | 01 |
| 22-JUL-04 | WRIGHT, K. E. | AN EVALUATION OF TRACERS FOR USE IN VADOSE ZONE INVESTIGATIONS AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | ICP/EXT-04-00334 | 00 |
| 19-JUL-04 | SONDRUP, A. J. | ESTIMATING CARBON TETRACHLORIDE AND TOTAL VOLATILE ORGANIC COMPOUND (VOC) MASS REMAINING IN SUBSURFACE DISPOSAL AREA (SDA) PITS | ICP/EXT-04-00396 | 00 |
| 15-JUL-04 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 24871 | 00 |
| 08-JUL-04 | SNOOK, J. G. | PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EM-ER-04-144 | 00 |
| 08-JUL-04 | LOPEZ, S. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) | INEEL/EXT-03-00997 | 01 |
| 01-JUL-04 | LOPEZ, S. L. | ACTION MEMORANDUM FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT | DOE/NE-ID-11162 | 00 |
| 25-JUN-04 | ALLRED, C. S. | AGREEMENT TO EXTEND DEADLINES RELATED TO OPERABLE UNIT (OU) 7-13 AND 7-14 | 24868 | 00 |
| 18-JUN-04 | SENTIERI, P. J. | ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-4494 | 01 |
| 15-JUN-04 | ANSLEY, S. L. | UPDATED STRATIGRAPHIC SELECTIONS FOR WELLS IN THE VICINITY OF THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00207 | 00 |
| 15-JUN-04 | WHITAKER, C. A. | STRATIGRAPHIC AND GEOPHYSICAL DATA FOR WELLS IN THE VICINITY OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00208 | 00 |
| 03-JUN-04 | HANSON, D. J. | EVALUATION OF THE DURABILITY OF WAXFIX FOR SUBSURFACE APPLICATIONS | ICP/EXT-04-00300 | 00 |
| 02-JUN-04 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - AIR EMISSIONS EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-4692 | 00 |
| 01-JUN-04 | RILEY, R. G. | RECOMMENDED PARAMETER VALUES FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) SOURCE RELEASE MODELING | PNNL-14742 | 00 |
| 24-MAY-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT | ICP/EXT-04-00210 | 02 |
| 24-MAY-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT | ICP/EXT-04-00210 | 01 |
| 14-MAY-04 | LUKE, D. E. | PRELIMINARY DETERMINATION OF HAZARDOUS WASTE FROM OTHER GENERATORS COLLOCATED WITH ROCKY FLATS PLANT TRANSURANIC (TRU) WASTE IN THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-01139 | 00 |
| 12-MAY-04 | ICP COMMUNITY RELATIONS | COMMUNITY RELATIONS NOTICE - COMMENT PERIOD ON THE REMOVAL ACTION AT PIT 4 - KETCHUM MEETING ADDED | 24854 | 00 |
| 12-MAY-04 | MCELROY, D. L. | FISCAL YEAR 2003 (FY-03), OPERABLE UNIT (OU) 7-13 AND 7-14 ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00241 | 00 |
| 12-MAY-04 | ABBOTT, C. | HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 | ICP/EXT-04-00248 | 00 |
| 12-MAY-04 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) | INEEL/EXT-2000-01435 | 02 |
| 11-MAY-04 | BATCHELLER, T. A. | COLLOIDAL PLUTONIUM AT THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE OF INVENTORY AND TRANSPORT PROPERTIES | ICP/EXT-04-00253 | 00 |
| 10-MAY-04 | DOE | PUBLIC NOTICE - DEPARTMENT OF ENERGY (DOE) ANNOUNCES PLANS TO RETRIEVE BURIED WASTE AN THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 24849 | 00 |
| 10-MAY-04 | ICP COMMUNITY RELATIONS | COMMUNITY RELATIONS NOTICE - COMMENT PERIOD ON THE REMOVAL ACTION AT PIT 4 | 24852 | 00 |
| 29-APR-04 | ICP COMMUNITY RELATIONS | IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) INFORMATION FAIR ON COMPLETING CLEANUP AND STRENGTHENING OUR NUCLEAR LEGACY | 24846 | 00 |
| 29-APR-04 | ICP COMMUNITY RELATIONS | ATTEND AN INFORMATION FAIR ON COMPLETING CLEANUP AND STRENGTHENING OUR NUCLEAR LEGACY | 24847 | 00 |
| 29-APR-04 | BURTON, B. N. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL OF A DESIGNATED PORTION OF PIT 4 | DOE/NE-ID-11146 | 00 |
| 21-APR-04 | KOEPPEN, L. D. | FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00259 | 01 |
| 19-APR-04 | MYERS, D. R. | FISCAL YEAR 2003 (FY-03) SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROBING PROJECT | ICP/EXT-04-00189 | 00 |
| 12-APR-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE CLEAN CLOSE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PROJECT ROUTINE MONITORING | INEEL/EXT-01-01538 | 01 |
| 12-APR-04 | CARBONEAU, M. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 | INEEL/EXT-02-01385 | 00 |
| 09-APR-04 | ABBOTT, D. G. | FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00316 | 01 |
| 08-APR-04 | KOEPPEN, L. D. | FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00259 | 00 |
| 06-APR-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00209 | 01 |
| 01-APR-04 | DRESEL, P. E. | EVALUATION OF XENON GAS DETECTION AS A MEANS FOR IDENTIFYING BURIED TRANSURANIC (TRU) WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) | PNNL-14617 | 00 |
| 29-MAR-04 | VAIL, J. A. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) | INEEL/EXT-03-00967 | 00 |
| 26-MAR-04 | NICHOLS, T. T. | ENGINEERING DESIGN FILE (EDF) - REVISED RADIOLOGICAL DOSE AND NONRADIOLOGICAL EXPOSURE FACTORS FOR IN SITU VITRIFICATION (ISV) LOSS OF CONFINEMENT AND MELT EXPULSION ACCIDENT SCENARIOS AT OPERABLE UNIT (OU) 7-13 AND 7-14 | EDF-4527 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 18-MAR-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 EARLY ACTIONS BERYLLIUM PROJECT | ICP/EXT-04-00210 | 00 |
| 14-MAR-04 | DOE | NOTICE OF AVAILABILITY - DEPARTMENT OF ENERGY (DOE) ANNOUNCES PLANS TO REDUCE RISK AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 24830 | 00 |
| 12-MAR-04 | SHROPSHIRE, K. L. | MISSION NEED STATEMENT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT | ICP/EXT-03-00084 | 00 |
| 11-MAR-04 | WOOLEY, K. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00209 | 00 |
| 10-MAR-04 | INEEL COMMUNITY RELATIONS | AGENCIES SEEKING PUBLIC COMMENT ON A PROPOSAL TO COAT BERYLLIUM BLOCKS AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 24833 | 00 |
| 03-MAR-04 | LOPEZ, S. L. | ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM PROJECT | DOE/NE-ID-11144 | 00 |
| 25-FEB-04 | GREEN, L. A. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ACCELERATED RETRIEVAL PROJECT (ARP) IN PIT 4 OF SUBSURFACE DISPOSAL AREA (SDA) | EM-ER-04-032 | 00 |
| 23-FEB-04 | WHITAKER, C. A. | SAMPLING AND ANALYSIS PLAN (SAP) FOR ANALYSES OF HYDROLOGIC PROPERTIES, GEOCHEMISTRY, AND RADIONUCLIDES FROM INTERBED CORES DRILLED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00143 | 00 |
| 12-FEB-04 | SHAW, P. G. | ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) EARLY ACTION PROJECT | EDF-4397 | 00 |
| 11-FEB-04 | GREEN, L. A. | NON TIME CRITICAL REMOVAL ACTION (NTCRA) - APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR INEEL, IN SITU GROUTING (ISG) EARLY ACTION PROJECT IN SUBSURFACE DISPOSAL AREA (SDA) | EM-ER-04-018 | 00 |
| 03-FEB-04 | HULL, L. C. | SPATIAL DISTRIBUTION OF NEPTUNIUM AND URANIUM PARTITION COEFFICIENTS (KD) FOR INTERBED SEDIMENTS AT A RADIOACTIVE WASTE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-03-00088 | 00 |
| 02-FEB-04 | HAIN, K. E. | ADDITIONAL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS AND DOE RESPONSES ON OPERABLE UNIT (OU) 7-13 AND 7-14 DRAFT FINAL SECOND ADDENDUM TO THE WORK PLAN FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EM-ER-04-023 | 00 |
| 28-JAN-04 | ROGERS, N. K. | CONCEPTUAL DESIGN PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - PHASE TWO (PHASE II OR PHASE 2) | ICP/EXT-03-00039 | 00 |
| 20-JAN-04 | OLSON, G. L. | OPERABLE UNIT (OU) 7-13 AND 7-14 FIELD REPRESENTATIVE GLOVEBOX EXCAVATOR METHOD LOGBOOK - JANUARY 20, 2004 - FEBRUARY 20, 2004 (01/20/04 - 02/20/04) - GLOVEBOX BOOK | ER-038-2004 | 00 |
| 05-DEC-03 | ABBOTT, D. G. | FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU THERMAL DESORPTION (ISTD) IN THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00962 | 00 |
| 02-DEC-03 | LOPEZ, S. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) 1960 - 1993 | INEEL/EXT-03-00997 | 00 |
| 25-NOV-03 | KOZAK, M. | INDEPENDENT PEER REVIEW OF SOURCE TERM MODELING FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-03-00081 | 00 |
| 19-NOV-03 | OLSON, G. L. | FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00029 | 01 |
| 17-NOV-03 | ARROWROCK GROUP, INC. | THE IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) A HISTORICAL CONTEXT AND ASSESSMENT NARRATIVE AND INVENTORY | INEEL/EXT-97-01021 | 01 |
| 14-NOV-03 | HAIN, K. E. | INFORMAL DISPUTE CONCERNING OPERABLE UNIT (OU) 7-13 AND 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-03-285 | 00 |
| 11-NOV-03 | SLOAN, P. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNITS (OU) 7-13 & 7-14 | INEEL/EXT-99-00364 | 04 |
| 10-NOV-03 | NYGARD, D. | RESPONSE TO DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON DRAFT FINAL SECOND ADDENDUM WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY | 24814 | 00 |
| 29-OCT-03 | YANCEY, N. A. | TEST PLAN FOR EVALUATION OF IN SITU THERMAL DESORPTION (ISTD) AND GROUTING TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-03-00059 | 00 |
| 27-OCT-03 | PIERRE, W. | CONTINUING CONCERNS WITH THE DRAFT FINAL SECOND ADDENDUM TO THE WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 24813 | 00 |
| 30-SEP-03 | GROENEWOLD, G. S. | TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-03-00759 | 01 |
| 29-SEP-03 | NEELEY, M. N. | CRITICALITY SAFETY EVALUATION FOR IN SITU THERMAL DESORPTION (ISTD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-03-00825 | 00 |
| 20-SEP-03 | ABBOTT, D. G. | PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00316 | 00 |
| 04-SEP-03 | WEBBER, F. L. | TRANSMITTAL OF WHITE PAPER - THE NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS | JMS-105-03 | 00 |
| 02-SEP-03 | BURTON, B. N. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 PREREMEDIAL DESIGN, RETRIEVED WASTE AND SOIL CHARACTERIZATION, AND ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM TESTS | INEEL/EXT-03-00554 | 00 |
| 31-AUG-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00638 | 00 |
| 28-AUG-03 | BERKEY, E. | WHITE PAPER - NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS | 24827 | 00 |
| 27-AUG-03 | GROENEWOLD, G. S. | TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-03-00759 | 00 |
| 16-JUL-03 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) | INEEL/EXT-2000-01435 | 01 |
| 08-JUL-03 | MEAGHER, B. G. | FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU VITRIFICATION (ISV) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00317 | 00 |
| 30-JUN-03 | HULL, L. C. | FATE OF MAGNESIUM CHLORIDE BRINE APPLIED TO SUPPRESS DUST FROM UNPAVED ROADS AT INEEL SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-01-01173 | 00 |
| 30-JUN-03 | GILES, J. R. | EVALUATION OF GAMMA RAY PASSIVE LOGGING TOOL CALIBRATIONS FOR TYPE A PROBES AT INEEL SUBSURFACE DISPOSAL AREA (SDA) OPERABLE UNITS (OU) 7-13 AND 7-14 | INEEL/EXT-03-00118 | 00 |
| 18-JUN-03 | MILLER, C. M. | FINAL RESULTS REPORT, IN SITU GROUTING (ISG) TECHNOLOGY FOR APPLICATION IN BURIED TRANSURANIC (TRU) WASTE SITES - OPERABLE UNIT (OU) 7-13 AND 7-14 - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) | INEEL/EXT-02-00233 | 01 |
| 09-JUN-03 | ROBACK, R. C. | INITIAL REPORT AQUIFER BACKGROUND STUDY: SUMMARY OF URANIUM AND PLUTONIUM DATA FROM INEEL GROUNDWATER SAMPLES | INEEL/EXT-03-00655 | 00 |
| 06-JUN-03 | HULL, L. C. | FATE AND TRANSPORT OF PLUTONIUM AND AMERICIUM IN THE SUBSURFACE OF OU 7-13 AND 7-14 | INEEL/EXT-03-00558 | 00 |
| 02-JUN-03 | LEECASTER, M. K. | DETERMINATION OF BACKGROUND URANIUM CONCENTRATION IN THE SNAKE RIVER PLAIN AQUIFER (SRPA) UNDER THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-03-00367 | 00 |
| 13-MAY-03 | CASPER, J. L. | FIELD SAMPLING PLAN (FSP) FOR THE LYSIMETER AND PERCHED WATER MONITORING OF OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-2000-00714 | 01 |
| 30-APR-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR IN SITU VITRIFICATION (ISV) PROCESSING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL | INEEL/EXT-03-00207 | 00 |
| 30-APR-03 | ROBACK, R. C. | INTERIM REPORT FOR PLUTONIUM AQUIFER BACKGROUND STUDY | INEEL/EXT-03-00358 | 00 |
| 21-APR-03 | MYERS, D. R. | FISCAL YEAR 2002 (FY-02) SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-13 & 7-14 PROBING PROJECT | INEEL/EXT-03-00001 | 00 |
| 31-MAR-03 | OLSON, G. L. | FISCAL YEAR 2002 (FY-02) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-03-00055 | 00 |
| 26-MAR-03 | HAIN, K. E. | OPERABLE UNIT (OU) 7-13 & 7-14 SECOND ADDENDUM TO REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND SCOPE OF WORK (SOW) | EM-ER-03-086 | 00 |
| 17-MAR-03 | PIERRE, W. | OPERABLE UNIT (OU) 7-13 & 7-14 SECOND ADDENDUM TO REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND SCOPE OF WORK (SOW) | 26453 | 00 |
| 01-MAR-03 | MULLEN, C. K. | BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-01678 | 02 |
| 25-FEB-03 | HOLDREN, K. J. | SECOND REVISION TO THE SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-95/0253 | 02 |
| 12-FEB-03 | SENTIERI, P. J. | CRITICALITY SAFETY STUDY OF SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-01294 | 01 |
| 06-FEB-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) | INEEL/EXT-98-00857 | 05 |
| 09-JAN-03 | MCELROY, D. L. | ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-02-01276 | 00 |
| 23-DEC-02 | ARMSTRONG, A. T. | EVALUATION OF IN SITU GROUTING (ISG) FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-01-00278 | 00 |
| 23-DEC-02 | ZITNIK, J. F. | PRELIMINARY EVALUATION OF REMEDIAL ALTERNATIVES FOR THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-02-01258 | 00 |
| 20-DEC-02 | THOMAS, T. N. | EVALUATION OF IN SITU VITRIFICATION (ISV) FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-01-00279 | 00 |
| 20-DEC-02 | HOLDREN, K. J. | EVALUATION OF SOIL AND BURIED TRANSURANIC (TRU) WASTE RETRIEVAL TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-01-00281 | 00 |
| 20-DEC-02 | HOLDREN, K. J. | EVALUATION OF SHORT TERM RISKS FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-02-00038 | 00 |
| 19-DEC-02 | JOSTEN, N. E. | COMPILATION OF ANALYTICAL NOTES AND DATA ANALYSES FOR THE INTEGRATED PROBING PROJECT (IPP) 1999 - 2002 | INEEL/EXT-02-01306 | 00 |
| 23-OCT-02 | LITTLE, M. | A COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL RWMC DURING THE YEARS OF 1984 TO 2003 - SUPPLEMENTAL VOLUME 1 AND 2 (VOL.01 & VOL.02) | INEL-95/0135-SUPPL | 00 |
| 11-OCT-02 | SLOAN, P. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNITS (OU) 7-13 & 7-14 | INEEL/EXT-99-00364 | 03 |
| 27-SEP-02 | HOLDREN, K. J. | ANCILLARY BASIS FOR RISK ANALYSIS OF SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-02-01125 | 00 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 15-JUL-02 | JESSMORE, J. J. | OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDIES (TS) BENCH SCALE TESTING | INEEL/EXT-02-00851 | 00 |
| 03-JUL-02 | WATSON, L. R. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-99-00364 | 02 |
| 26-JUN-02 | NYGARD, D. | IDAHO DEPARTEMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON PRE-DRAFT WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT (RI/BRA) | 28047 | 00 |
| 21-APR-02 | LIVIERATOS, T. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW COMMENTS FOR DRAFT METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) | 1842977 | 00 |
| 18-APR-02 | ABRAHAM, S. | AGREEMENT TO RESOLVE DISPUTES IN THE MATTER OF: MARCH 16, 2001 (03/16/2001) STATEMENT OF DISPUTE - STATE OF IDAHO (IDEQ), UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) AND UNITED STATES DEPARTMENT OF ENERGY (DOE-HQ) | 10970 | 00 |
| 17-APR-02 | THOMPSON, E. R. | HISTORICAL DESCRIPTION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SURROGATE BURIED WASTE TEST PITS FOR ENVIRONMENTAL RESTORATION (ER) WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-2000-00785 | 01 |
| 15-APR-02 | LEECASTER, M. K. | GEOSTATISTIC MODELING OF SUBSURFACE CHARACTERISTICS IN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) REGION, OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-02-00029 | 00 |
| 04-APR-02 | ENGLISH, B. L. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON CLOSURE PLAN (CP) FOR TRANSURANIC STORAGE AREA (TSA) INTERIM STATUS UNITS (PADS 1, 2, AND R) LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ON THE INEEL (EPA ID NOS. ID489000895 | 24734 | 00 |
| 02-APR-02 | MONSON, B. R. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DOE'S MARCH 15, 2002 (03/15/02) LETTER CONCERNING EXISTING INVENTORY PERMIT DEFINITION AS APPLIED TO CERCLA WASTES LOCATED AT INEEL | 24733 | 00 |
| 29-MAR-02 | O'NEILL, K. C. | AGENCY EXTENSION OF DEADLINE FOR SUBMITTAL OF THE DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 7-13 AND OU 7-14 | 1842786 | 00 |
| 15-MAR-02 | SENTIERI, P. J. | CRITICALITY SAFETY STUDY OF THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-01-01294 | 00 |
| 15-MAR-02 | RASCH, D. N. | DOE RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REQUEST FOR INFORMATION CONCERNING LETTER FROM DOE DESCRIBING POSITION ON DEFINITION OF EXISTING INVENTORIES AS STIPULATED IN THREE HWMA RCRA PERMITS ADDRESSING UNITS AT RWMC | TS-ETSD-02-039 | 00 |
| 06-MAR-02 | BRADLEY, T. M. | FOLLOW-ON COMMENTS REGARDING NAVAL REACTORS PROGRAM RADIONUCLIDE INVENTORIES AT THE SUBSURFACE DISPOSAL AREA (SDA) | NR:IBO-02/032 | 00 |
| 14-FEB-02 | BRADLEY, T. M. | NAVAL REACTORS FACILITY (NRF) SUMMARY COMMENTS REGARDING PROJECTED INVENTORY OF NAVAL REACTORS WASTE DISPOSAL AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | NR:IBO-02/029 | 00 |
| 29-NOV-01 | O'NEILL, K. C. | TRANSMITTAL OF FINAL CLEMSON SORPTION STUDY REPORT AND LONG TERM CORROSION DEGRADATION TEST THIRD (3RD) YEAR RESULTS | EM-ER-01-197 | 00 |
| 21-NOV-01 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE WASTE AREA GROUP 7 (WAG-7) ROUTINE MONITORING | INEEL/EXT-01-01538 | 00 |
| 11-OCT-01 | BUKOWSKI, T. A. | FIELD SAMPLING PLAN (FSP) FOR GROUNDWATER MONITORING OF OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00029 | 00 |
| 05-OCT-01 | WATSON, L. R. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) COLD TEST PITS FOR OPERABLE UNIT (OU) 7-13 7-14 | INEEL/EXT-99-00364 | 01 |
| 28-SEP-01 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) | INEEL/EXT-01-00766 | 00 |
| 21-SEP-01 | ADLER-FLITTON, M. K. | LONG TERM CORROSION & DEGRADATION TEST THIRD (3RD) YEAR RESULTS | INEEL/EXT-01-00036 | 00 |
| 05-SEP-01 | PIERRE, W. | EPA RESPONSE TO DOE LETTERS: PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) EM-ER-01-141 AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) EM-ER-01-142 | 10952 | 00 |
| 05-SEP-01 | PIERRE, W. | PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OU 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) - EPA DOES NOT CONCUR WITH EXPANDED SCOPE OF WORK | 24706 | 00 |
| 27-AUG-01 | HAIN, K. E. | PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EM-ER-01-141 | 00 |
| 27-AUG-01 | HAIN, K. E. | PATH FORWARD FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) | EM-ER-01-142 | 00 |
| 22-AUG-01 | ANDERSON, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) SOIL MOISTURE INSTRUMENTED PROBE - PROBING, LOGGING AND INSTRUMENTATION PROJECT | EDF-ER-234 | 01 |
| 22-AUG-01 | ANDERSON, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) VAPOR PORT INSTRUMENTED PROBE | EDF-ER-235 | 00 |
| 22-AUG-01 | DICK, J. R. | NITRATE EXPLOSIVES TESTS TO SUPPORT THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU VITRIFICATION (ISV) PROJECT | INEEL/EXT-01-00265 | 00 |
| 28-JUN-01 | PIERRE, W. | POTENTIAL APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 24900 | 00 |
| 11-JUN-01 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR MONITORING TYPE B PROBES FOR OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) | INEEL/EXT-2000-01435 | 00 |
| 01-JUN-01 | GROSSMAN, C. J. | THE SORPTION OF SELECTED RADIONUCLIDES IN SEDIMENTARY INTERBED SOILS FROM THE SNAKE RIVER PLAIN | INEEL/EXT-01-01106 | 00 |
| 31-MAY-01 | VARVEL, M. D. | ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 | INEEL/EXT-01-00277 | 00 |
| 30-APR-01 | JACKSON, T. | FEASIBILITY STUDY (FS) ASSESSMENT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | 21311 | 00 |
| 04-APR-01 | HULL, L. C. | APPROACH TO SIMULATION OF ACTINIDES FOR OPERABLE UNIT (OU) 7-13 7-14 BASELINE RISK ASSESSMENT (BRA) | LCH-04-01 | 00 |
| 01-APR-01 | WHITMIRE, D. L. | SUMMARY REPORT - SIMULATION OF GROUNDWATER FLOW NEAR SUBSURFACE DISPOSAL AREA (SDA) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | INEEL/EXT-01-01643 | 00 |
| 16-MAR-01 | HAIN, K. E. | SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | EM-ER-01-048 | 00 |
| 15-MAR-01 | BRADLEY, T. M. | NAVAL NUCLEAR PROPULSION PROGRAM - RADIOLOGICAL INVENTORY OF WASTE DISPOSED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - RESPONSE TO QUESTIONS CONCERNING POTENTIAL DATA GAPS FOR NAVAL REACTORS FACILITY (NRF) WASTE DISPOSED AT THE RWMC | NR:IBO-01/039 | 00 |
| 14-MAR-01 | INEEL COMMUNITY RELATIONS | DOE NEWS - STATE AND INEEL SCIENTISTS FOCUS ON UNDERSTANDING RESULTS OF RADIONUCLIDE DETECTION | 24675 | 00 |
| 13-MAR-01 | WELLS, R. P. | ENGINEERING DESIGN FILE (EDF) - REVIEW OF THE ROCKY FLATS PLANT (RFP) DATA CONTAINED IN THE HISTORICAL DATA TASK (HDT) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 - FUNCTIONAL FILE #INEEL/EXT-01-00030 | INEEL/EXT-01-00030 | 00 |
| 02-MAR-01 | NYGARD, D. | RESPONSE TO DECEMBER 2000 (12/2000) SECOND ADDENDUM TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT AND SECOND REVISION TO THE SCOPE OF WORK (SOW) | 10926 | 00 |
| 20-FEB-01 | MILLER, B. P. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 INTEGRATED PROBING PROJECT (IPP) - PREVIOUSLY KNOWN AS SUBSURFACE INVESTIGATION | INEEL/EXT-98-00857 | 04 |
| 13-FEB-01 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 TRACER TEST AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-2000-01428 | 00 |
| 29-JAN-01 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TABLE DESCRIBING MINIMUM INFORMATION NEEDED TO REACH A SUPPORTABLE DECISION FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 24669 | 00 |
| 21-DEC-00 | FJELD, R. A. | FINAL REPORT - COLUMN TESTS TO STUDY TRANSPORT OF PLUTONIUM AND OTHER RADIONUCLIDES IN SEDIMENTARY INTERBED AT INEEL | INEEL/EXT-01-00763 | 00 |
| 20-DEC-00 | HAMPTON, N. L. | REVIEW OF WASTE AREA GROUP 7 (WAG-7) ECOLOGICAL CONTAMINANTS OF POTENTIAL CONCERN | INEEL/EXT-2000-01405 | 00 |
| 12-DEC-00 | BERGHOLZ, W. E. | WAG-7 NOVEMBER 15, 2000 (11/15/2000) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MEETING - INCLUDES PROPOSED PRIORITIES MEETING AGENDA DECEMBER 19, 2000 (12/19/2000) AND RESPONSE TO DIVISION OF ENVIRONMENTAL QUALITY (DEQ) DIFFERENCE OF OPINION | EM-ER-232-00 | 00 |
| 01-DEC-00 | MCNEIL TECHNOLOGIES, INC. | ANALYSIS OF THE ENVIRONMENTAL PROTECTION AGENCY'S (EPA) RECORDS OF DECISION (ROD) RELATED TO LANDFILLS | 21310 | 00 |
| 30-NOV-00 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR FLUORESCENT TRACER DYE STUDY FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-2000-01118 | 00 |
| 10-NOV-00 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE INVESTIGATION | INEEL/EXT-98-00857 | 03 |
| 01-NOV-00 | CHOPPIN, G. R. | ACTINIDE SOLUBILITY EXPERIMENTS IN INEEL PERCHED SIMULANT SOLUTION FINAL REPORT | INEEL/EXT-01-00762 | 00 |
| 01-NOV-00 | ROBACK, R. C. | ASSESSMENT OF URANIUM AND PLUTONIUM IN SATURATED AND UNSATURATED ZONES BENEATH THE SUBSURFACE DISPOSAL AREA (SDA), INEEL | INEEL/EXT-01-00771 | 00 |
| 26-OCT-00 | HULL, L. C. | TEST PLAN TO MEASURE ADSORPTION OF ACTINIDES ON INTERBED MATERIALS FROM RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | DOE/ID-10796 | 00 |
| 28-SEP-00 | BEITEL, G. A. | EVALUATION OF OPERABLE UNIT (OU) 7-10 STAGE I SOIL MOISTURE READINGS - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT STAGE I | INEEL/EXT-2000-00651 | 00 |
| 21-SEP-00 | ADLER-FLITTON, M. K. | LONG TERM CORROSION DEGRADATION (LTCD) TEST FIRST (1ST) YEAR RESULTS | INEEL/EXT-99-00678 | 00 |
| 20-SEP-00 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE SCOPE OF WORK (SOW) FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR RWMC SUBSURFACE DISPOSAL AREA (SDA) - REJECTED BY REGULATORS | 24341 | 00 |
| 01-SEP-00 | CASE, M. J. | TECHNICAL REVISION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) LOW LEVEL WASTE (LLW) RADIOLOGICAL PERFORMANCE ASSESSMENT FOR CALENDAR YEAR 2000 (CY-2000) | INEEL/EXT-2000-01089 | 00 |
| 15-AUG-00 | HAIN, K. E. | DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) LETTER DATED JULY 7, 2000 (07/07/2000) & IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER DATED JULY 19, 2000 (07/19/2000) - PIT 9 RECORD OF DECISION (ROD) REQUEST FOR EXTENSION | EM-ER-153-00 | 00 |
| 07-AUG-00 | MEYER, T. J. | RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 DRAFT REVISION 2 (REV.02) MARCH 02, 1998 (03/02/98) | 10841 | 00 |
| 07-AUG-00 | MEYER, T. J. | RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) DOE/ID-10569 DRAFT REVISION 2 (REV.02) MARCH 02, 1998 (03/02/98) | 10842 | 00 |
| 01-AUG-00 | SLATE, L. J. | PRELIMINARY CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-2000-00794 | 00 |
| 19-JUL-00 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE 30, 2000 (06/30/2000) - OU 7-10 STAGED INTERIM ACTION PROJECT (SIAP) - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | 24667 | 00 |
| 18-JUL-00 | BAUMER, A. R. | OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION, LOGGING & MONITORING OF PROBEHOLES IN THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-98-00856 | 01 |
| 07-JUL-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE, 30 2000 (06/30/2000) CONCERNING REQUEST FOR MODIFICATION MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) | 24666 | 00 |
| 30-JUN-00 | HAIN, K. E. | OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - (EXTENSION OF OPERABLE UNIT (OU) 7-10, 7-13 & 7-14 ENFORCEABLE DEADLINES) | EM-ER-118-00 | 00 |
| 20-APR-00 | EPA | AGREEMENT IN PRINCIPLE BY WASTE AREA GROUP 7 (WAG-7) PROJECT MANAGEMENT TEAM - APRIL 20, 2000 (04/20/2000) | 24668 | 00 |
| 13-APR-00 | HAIN, K. E. | WASTE AREA GROUP 7 (WAG-7) REQUEST FOR MODIFICATION OF MILESTONES - OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT, OU 7-13 & 7-14 PITS AND TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-63-00 | 00 |
| 01-APR-00 | HULL, L. C. | SOLUBILITY CALCULATIONS FOR CONTAMINANTS OF POTENTIAL CONCERN, OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00465 | 00 |
| 21-MAR-00 | WEIDNER, J. R. | ENGINEERING DESIGN FILE (EDF) - DURABILITY OF JET GROUT MATERIALS AND APPLICATION TECHNOLOGY FOR SUBSURFACE DISPOSAL AREA (SDA) - CONTAMINATED WASTE PITS AND TRENCHES TREATABILITY STUDIES (TS) - GROUT PERFORMANCE - IN SITU GROUTING (ISG) TREATABILITY | ER-EDF-128 | 00 |
| 16-MAR-00 | ARMSTRONG, A. | TRANSMITTAL OF DRAFT UNITED STATES GEOLOGICAL SOCIETY (USGS) ADMINISTRATIVE REPORT | OPE-ER-51-00 | 00 |
| 01-MAR-00 | MILLER, B. P. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE INVESTIGATION | INEEL/EXT-98-00857 | 02 |
| 29-FEB-00 | GREEN, T. S. | ENVIRONMENTAL RESTORATION (ER) PLAN - DOWNHOLE LOGGING | PLN-493 | 04 |
| 23-DEC-99 | BAUMER, A. R. | ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - DECEMBER 23, 1999 - JANUARY 12, 2000 (12/23/99 - 1/12/2000) | ER-122-99 | 00 |
| 17-DEC-99 | BAUMER, A. R. | ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - WELL #SOUTH MON-A-010 - RWMC SDA - TSA DRILLING - DECEMBER 17, 1999 - JANUARY 13, 2000 (12/17/99 - 01/13/2000) | ER-123-99 | 00 |
| 15-DEC-99 | ARMSTRONG, A. | OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - COMBINATION OF OPERABLE UNITS (OUS) 13 AND 14 | OPE-ER-198-99 | 00 |
| 01-NOV-99 | BONNEMA, B. E. | ENGINEERING DESIGN FILE (EDF) - ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) DESIGN BASIS SELF ASSESSMENT - IDENTIFY KEY SYSTEM FEATURES FOR OCVZ THERMAL SOIL VAPOR EXTRACTION UNITS & EVALUATE DESIGN BASIS | EDF-ER-097 | 00 |
| 27-OCT-99 | JORGENSEN, D. K. | ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - OCTOBER 27, 1999 - DECEMBER 23, 1999 (10/27/99 - 12/23/99) | ER-100-99 | 00 |
| 15-OCT-99 | JINES, A. | TRANSMITTAL OF DOCUMENTS - FIELD SAMPLING PLAN (FSP) FOR RWMC DRILLING & CORING SAMPLING PROJECT - INEEL/EXT-99-00598 & EXTRACTION OF PLUTONIUM FROM SPIKED INEEL SOIL SAMPLES USING LIGAND-ASSISTED SUPERCRITICAL FLUID TECHNIQUE - INEEL/EXT-99-00870 | OPE-ER-155-99 | 00 |
| 27-SEP-99 | JESSMORE, J. J. | OPERABLE UNIT (OU) 7-13 & 7-14 - IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) WORK PLAN | DOE/ID-10690 | 00 |
| 26-AUG-99 | FOX, R. V. | EXTRACTION OF PLUTONIUM FROM SPIKED INEEL SOIL SAMPLES USING LIGAND-ASSISTED SUPERCRITICAL FLUID EXTRACTION (LA-SFE) TECHNIQUE | INEEL/EXT-99-00870 | 00 |
| 09-AUG-99 | JINES, A. | TRANSMITTAL OF EX SITU TREATABILITY STUDY (TS) WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 & RESPONSES TO AGENCY REVIEW COMMENTS ON DRAFT DOCUMENT | OPE-ER-107-99 | 00 |
| 01-AUG-99 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DRILLING AND CORE SAMPLING PROJECT | INEEL/EXT-99-00598 | 00 |
| 01-JUL-99 | BONNEMA, B. E. | EX SITU TREATABILITY STUDY (TS) WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 | DOE/ID-10678 | 00 |
| 14-MAY-99 | JINES, A. | TRANSMITTAL OF OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT EX SITU TREATABILITY STUDY (TS) WORK PLAN | OPE-ER-70-99 | 00 |
| 01-MAY-99 | LMITCO | OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU THERMAL DESORPTION (ISTD) TREATABILITY STUDY (TS) WORK PLAN | DOE/ID-13467 | 00 |
| 01-MAY-99 | HOLDREN, K. J. | OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION & LOGGING OF PROBEHOLES IN PITS 4 & 10 OF SDA | INEEL/EXT-98-00856 | 00 |
| 01-MAY-99 | MILLER, B. P. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE INVESTIGATION | INEEL/EXT-98-00857 | 01 |
| 27-APR-99 | ARMSTRONG, A. | OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (R/FS) - TRANSMITTAL OF IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) WORK PLAN DRAFT FOR REVIEW | OPE-ER-63-99 | 00 |
| 08-APR-99 | JINES, A. | DISCUSSION OF & RESPONSE TO U. S. GEOLOGICAL SURVEY (USGS) PEER REVIEW: PROPOSED WELLS AT SUBSURFACE DISPOSAL AREA (SDA) | 17181 | 00 |
| 08-APR-99 | BARRIE, S. L. | ENGINEERING DESIGN FILE (EDF) - GROUNDWATER MONITORING RESULTS FOR WASTE AREA GROUP 7 (WAG-7) - OCTOBER 1997 TO JULY 1998 (10/97 - 07/98) | EDF-ER-063 | 00 |
| 08-APR-99 | JINES, A. | REPORT TITLED SIGNIFICANT ISSUES TO BE RESOLVED TO SUPPORT & DEFEND INTERIM RISK ASSESSMENT & ADDITIONAL WORK REQUIRED TO RESOLVE THOSE ISSUES DATED OCTOBER 15, 1998 (10/15/98) | OPE-ER-53-99 | 00 |
| 01-APR-99 | DOE | REMEDIATION PLANS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL - REVISION 1 (REV.01) - REVISION 8 (REV.08) WERE DRAFTS - REVISION 9 (REV.09) WAS ISSUED AS THE FIRST FINAL DOCUMENT | DOE/ID-10670 | 09 |
| 31-MAR-99 | JINES, A. | OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - TRANSMITTAL OF IN SITU VITRIFICATION (ISV) TREATABILITY STUDY (TS) WORK PLAN | OPE-ER-46-99 | 00 |
| 31-MAR-99 | JINES, A. | OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - TRANSMITTAL OF DRAFT IN SITU THERMAL DESORPTION (ISTD) TREATABILITY STUDY (TS) WORK PLAN | OPE-ER-47-99 | 00 |
| 01-MAR-99 | FARNSWORTH, R. K. | OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU VITRIFICATION (ISV) TREATABILITY STUDY (TS) WORK PLAN | DOE/ID-10667 | 00 |
| 11-AUG-98 | JINES, A. | TRANSMITTAL OF ADDENDUM A TO WORK PLAN FOR OU 7-13 & 7-14 | OPE-ER-98-130 | 00 |
| 01-AUG-98 | JORGENSEN, D. K. | INTERIM RISK ASSESSMENT (IRA) & CONTAMINANT SCREENING FOR WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION (RI) | DOE/ID-10569 | 00 |
| 01-AUG-98 | JORGENSEN, D. K. | ADDENDUM TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10622 | 00 |
| 01-AUG-98 | BRUCE, J. E. | FIELD SAMPLING PLAN (FSP) FOR D&D OF RWMC CERTIFIED & SEGREGATED (C&S) BUILDING (WMF-612) | INEEL/EXT-98-00565 | 00 |
| 22-JUL-98 | HAIN, K. E. | TRANSMITTAL OF ADDENDUM A TO WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 | OPE-ER-119-98 | 00 |
| 01-JUL-98 | MAGNUSON, S. O. | DEVELOPMENT CALIBRATION & PREDICTIVE RESULTS OF A SIMULATOR FOR SUBSURFACE PATHWAY FATE & TRANSPORT OF AQUEOUS & GASEOUS PHASE CONTAMINANTS IN SUBSURFACE DISPOSAL AREA (SDA) AT INEEL | INEEL/EXT-97-00609 | 00 |
| 01-MAY-98 | DOOLEY, K. J. | WASTE AREA GROUP 7 (WAG-7) HEALTH & SAFETY PLAN (HSP) FOR ROUTINE MONITORING OF OPERABLE UNITS (OU) 7-13 & 7-14 - EFFECTIVE 05/06/98 THIS DOCUMENT REPLACED EGG-ER-10748 - SEE ER-DAR-1259 | INEEL/EXT-98-00454 | 00 |
| 01-APR-98 | BURGESS, J. D. | HEALTH & SAFETY PLAN (HSP) FOR INSTALLATION OF GROUNDWATER & SOIL VAPOR MONITORING WELLS BETWEEN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND CENTRAL FACILITIES AREA (CFA) | INEEL/EXT-98-00150 | 00 |
| 01-SEP-97 | NOT SPECIFIED | HOT SPOT REMOVAL SYSTEM - SYSTEM DESCRIPTION | INEEL/EXT-97-00666 | 00 |
| 01-SEP-97 | JORGENSEN, D. K. | REVISED SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-95/0253 | 01 |
| 06-MAY-97 | DICKE, C. A. | REVIEW OF THE TRACK 2 SUMMARY REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACID PIT AND INTERPRETATION OF THE ACID PIT SECONDARY ION MASS SPECTROMETRY ANALYSIS | CAD-01-97 | 00 |
| 01-MAY-97 | BECKER, B. H. | SELECTION AND DEVELOPMENT OF MODELS USED IN THE WASTE AREA GROUP 7 (WAG-7) BASELINE RISK ASSESSMENT (BRA) | INEEL/EXT-97-00391 | 00 |
| 01-MAY-97 | DICKE, C. A. | DISTRIBUTION COEFFICIENTS & CONTAMINANT SOLUBILITIES FOR WAG-7 BASELINE RISK ASSESSMENT (BRA) | INEL/EXT-97-00201 | 00 |
| 01-MAY-97 | GALLOWAY, K. J. | WORK PLAN FOR THE IN SITU STABILIZATION TREATABILITY STUDY (TS) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ACID PIT | INEL/EXT-97/00068 | 00 |
| 21-MAR-97 | GROENEWOLD, G. S. | SCOPING STUDIES TO IDENTIFY FORMS OF MERCURY IN ACID PIT SOIL SAMPLES | GSG-10-97 | 00 |
| 18-MAR-97 | DOE, EPA, IDHW | AGREEMENT TO RESOLVE DISPUTES | 1088-06-29-120-A | 00 |
| 01-MAR-97 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION CONTINUING FOR RWMC WAG-7 OU 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 13945 | 00 |
| 01-MAR-97 | EVANS, S. K. | TEST PLAN FOR MATERIAL TESTING PHASE OF IN SITU STABILIZATION TREATABILITY STUDY (TS) | INEL/EXT-97-00096 | 00 |
| 06-SEP-96 | BARNES, C. M. | EDF - ENGINEERING DESIGN FILE - ENGINEERING SUPPORT FILLING DATA GAPS FOR PROCESSES & TECHNOLOGIES - COLLECTION OF TECHNOLOGY & PROCESS INFORMATION FOR USE IN OU 7-13 & 7-14 FEASIBILITY STUDY (FS) | ER-WAG7-92 | 00 |
| 01-AUG-96 | BARNES, C. M. | EDF - ENGINEERING DESIGN FILE - INDEX & DISCUSSION OF DATA GATHERED FOR PLASMA ARC CENTRIFUGAL FURNACE | ER-WAG7-87 | 00 |
| 15-MAY-96 | LABUY, S. A. | ENGINEERING DESIGN FILE (EDF) - ADVANCED REACTIVITY MEASUREMENT FACILITY (ARMF) RADIOACTIVE SOURCE SHIPPING DRUM - DESIGN INPUTS, ANALYSES, DESIGN DESCRIPTION | EDF-ER-023 | 00 |
| 08-MAY-96 | JENSEN, N. R. | TRANSMITTAL OF FINAL WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-96-83 | 00 |
| 02-MAY-96 | HAMPTON, N. L. | ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION | ER-WAG7-76 | 01 |
| 01-MAY-96 | BENSEN, T. A. | WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-95/0343 | 00 |
| 17-APR-96 | NEARMAN, M. J. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WORK PLAN FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10276 | 00 |
| 14-FEB-96 | DOE | FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) FEBRUARY 14, 1996 (02/14/96) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE | 17866 | 00 |
| 07-FEB-96 | PRENDERGAST, W. J. | EDF - ENGINEERING DESIGN FILE - DIGEST OF REPORTS & INFORMATION ON STATUS OF ISV TECHNOLOGY | ER-WAG7-85 | 00 |
| 18-JAN-96 | DOE | FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) JANUARY 18, 1996 (01/18/96) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE | 17862 | 00 |
| 09-JAN-96 | PIERRE, W. | EPA EXTENSION OF COMMENT PERIOD ON DRAFT WORK PLAN FOR OU 7-13 & 7-14 WAG-7 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10174 | 00 |
| 21-DEC-95 | NEARMAN, M. J. | EPA EXTENSION OF COMMENT PERIOD ON DRAFT WORK PLAN OU 7-13 & 7-14 WAG-7 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10173 | 00 |
| 20-DEC-95 | KOCH, D. F. | IDHW COMMENTS ON DRAFT WORK PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10151 | 00 |
| 01-DEC-95 | RAVIO, B. D. | WASTE DESCRIPTION INFORMATION FOR TRANSURANICALLY CONTAMINATED WASTES STORED AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | INEL-95/0412 | 00 |
| 25-OCT-95 | GARCIA, K. M. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) - DIGEST #2 (TWO) OF REPORTS ON SURFACE BARRIERS FOR ARID REGIONS | ER-WAG-83 | 00 |
| 17-OCT-95 | NOT SPECIFIED | SETTLEMENT AGREEMENT | SA1095 | 0 |
| 02-OCT-95 | BARNES, C. M. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING SUPPORT OF OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - PIT 9 INTERFACE INFORMATION FROM LESAT IN MEETING ON SEPTEMBER 14, 1995 (09/14/95) | ER-WAG7-79 | 00 |
| 01-SEP-95 | BARNES, C. M. | ENGINEERING DESIGN FILE (EDF) - PRELIMINARY DEVELOPMENT OF ALTERNATIVE REMEDIATION TECHNOLOGIES & IDENTIFICATION OF DATA NEEDS FOR OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) | ER-WAG7-78 | 01 |
| 01-AUG-95 | HUNTLEY, R. M. | SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 7-13 & 7-14 WASTE AREA GROUP 7 (WAG-7) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-95/0253 | 00 |
| 18-JUL-95 | KOCH, D. F. | IDAHO DEPARTMENT OF HEALTH AND WELFARE - DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT SCOPE OF WORK FOR OU 7-13 AND 7-14 WAG-7 COMPREHENSIVE RI/FS | 10039 | 00 |
| 12-JUL-95 | HARKER, Y. D. | ENGINEERING DESIGN FILE (EDF) - ENVIRONMENTAL RESTORATION (ER) HISTORICAL DATA TASK (HDT) RECENT & PROJECTED DATA TASK (RPDT) - TEST REACTOR AREA (TRA) EVALUATION - SCALING FACTORS FOR WASTE ACTIVITIES MEASURED BY G-M METHOD | ER-WAG7-57 | 00 |
| 09-JUN-95 | HAMPTON, N. L. | ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION | ER-WAG7-76 | 00 |
| 07-JUN-95 | HULA, G. A. | TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OU 7-13 TRU PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT WAG-7 | OPE-ER-106-95 | 00 |
| 31-MAY-95 | KECK, K. N. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) SURFACE WATER DESCRIPTION & DATA | ER-WAG7-66 | 00 |
| 31-MAY-95 | MARTIAN, P. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SUBSURFACE DISPOSAL AREA (SDA) BURIED DRUM FAILURE RATE DATA COMPILATION | ER-WAG7-68 | 00 |
| 31-MAY-95 | NEUPAUER, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SDA LITHOLOGY & PERCHED WATER DATA COMPILATION | ER-WAG7-69 | 00 |
| 31-MAY-95 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: BASALTS | ER-WAG7-70 | 00 |
| 31-MAY-95 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: SURFICIAL SEDIMENTS & INTERBEDS | ER-WAG7-71 | 00 |
| 31-MAY-95 | MAGNUSON, S. O. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) WATER & SOILS SAMPLING DATA - SUBSURFACE DISPOSAL AREA (SDA) SOIL BASALT & WATER CONCENTRATION DATA COMPILATION: RADIONUCLIDES & INORGANICS | ER-WAG7-72 | 00 |
| 31-MAY-95 | SONDRUP, A. J. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) SUBSURFACE DISPOSAL AREA (SDA) VOLATILE ORGANIC DATA COMPILATION SOIL VAPOR EMISSION & WATER SAMPLES | ER-WAG7-73 | 00 |
| 31-MAY-95 | NEUPAUER, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) DATA COMPILATION SUBSURFACE DISPOSAL AREA (SDA) COVER OVERBURDEN THICKNESS | ER-WAG7-74 | 00 |
| 31-MAY-95 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - AIR MONITORING DATA SUPPORTING WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | ER-WAG7-75 | 00 |
| 01-JUL-93 | MEACHUM, T. R. | ENGINEERING DESIGN FILE (EDF) - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES | ER&WM-EDF-0007-93 | 00 |
| 28-MAY-93 | MEACHUM, T. R. | EDF - ENGINEERING DESIGN FILE - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES | ER/WM-EDF-0007-93 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 1 (VOL.01) | EGG-WM-9707,VOL.01 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 2 (VOL.02) | EGG-WM-9707,VOL.02 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 3 (VOL.03) | EGG-WM-9707,VOL.03 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 4 (VOL.04) | EGG-WM-9707,VOL.04 | 00 |
| 27-SEP-91 | SCHWALLER, R. G. | FINAL REPORT - SOIL OVERBURDEN SAMPLING AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) TRANSURANIC STORAGE AREA (TSA) | EGG-WM-8986-B | 00 |
| 26-AUG-91 | SLOAN, P. A. | ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) LARGE FIELD TEST SITING REQUIREMENTS & SELECTION | ERP-ISV-032 | 00 |
| 01-JAN-91 | ARRENHOLZ, D. A. | HISTORICAL REPORT OF TRANSURANIC (TRU) WASTE PITS AND TRENCHES AT SUBSURFACE DISPOSAL AREA (SDA) OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | WTD-91-027 | 00 |
| 08-MAY-90 | MIYASAKI, D. H. | ENGINEERING DESIGN FILE (EDF) - CALCULATION OF OFF GAS CONCENTRATIONS DURING IN SITU VITRIFICATION (ISV) PROCESS - INTERMEDIATE FIELD TEST | ERP-ISV-034 | 00 |
| 12-OCT-89 | MACKINNON, R. J. | ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) CODE IMPLEMENTATION - OUTLINE MODELING REQUIREMENTS FOR ISV | ERP-ISV-021 | 00 |
| 02-JUN-89 | BELLER, J. M. | ENGINEERING DESIGN FILE (EDF) - BURIED WASTE PROGRAM (BWP) IN SITU VITRIFICATION (ISV) - PRODUCTION SCALE COST ESTIMATE | BWP-ISV-006 | 00 |
| 31-MAY-89 | CALLOW, R. A. | ENGINEERING DESIGN FILE (EDF) - INTERMEDIATE SCALE IN SITU VITRIFICATION (ISV) TEST REQUIREMENTS & PIT DESIGN | BWP-ISV-010 | 00 |
| 21-FEB-89 | MELVILLE, J. B. | ENGINEERING DESIGN FILE (EDF) - ISV TREATABILITY STUDY (TS) - LARGE SCALE DEMONSTRATION TEST TIME REQUIRED TO VITRIFY TRU CONTAMINATED PITS & TRENCHES AT SDA | BWP-ISV-007 | 00 |
| 24-JAN-89 | GARCIA, E. C. | ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) SUMMARY CHARACTERIZATION OF SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE METAL CONTENT OF WASTE BURIED IN SDA | BWP-ISV-005 | 00 |
| 29-APR-88 | VIGIL, M. J. | ENGINEERING DESIGN FILE (EDF) - MODEL OF MIGRATION OF HAZARDOUS CONSTITUENT - ESTIMATE OF WATER IN PITS DURING FLOODING EVENTS | BWP-12 | 00 |
| 01-JUL-85 | RODGERS, A. D. | A HISTORY OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEL | WM-F1-81-003 | 03 |
| 01-AUG-79 | HUDSON, R. J. | EARLY WASTE RETRIEVAL FINAL REPORT | TREE-1321 | 00 |
| 01-AUG-78 | MCKINNEY, J. D. | INITIAL DRUM RETRIEVAL FINAL REPORT | TREE-1286 | 00 |
| 01-MAY-72 | THOMPSON, R. J. | SOLID RADIOACTIVE WASTE RETRIEVAL TEST | ACI-120 | 00 |
| 10-JUN-71 | LEE, W. H. | ROCKY FLATS SOLID WASTE SENT TO THE NATIONAL REACTOR TESTING STATION (NRTS) 1954 THROUGH 1970 | 1792319 | 00 |
| 10-JUN-71 | LEE, W. H. | ROCKY FLATS SOLID WASTE SHIPPED TO NATIONAL REACTOR TESTING STATION (NRTS) | 26267 | 00 |