| 28-MAR-07 | HARDESTY, T. | AGENCIES AGREE TO EXTEND DEADLINES FOR SUBMISSION OF THE OPERABLE UNIT (OU) 7-13/14 PROPOSED PLAN | 25088 | 00 |
| 16-MAR-07 | HARDESTY, T. | AGREEMENT TO EXTEND DEADLINES FOR THREE OPERABLE UNITS (OU) 7-13, 7-14 AND OU 7-10 DELIVERABLES | 2474048 | 00 |
| 27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
| 04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
| 27-APR-05 | JOSTEN, N. E. | TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 | INEEL/EXT-02-00558 | 02 |
| 08-NOV-04 | BRYAN, J. D. | REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - TO VIEW ATTACHMENT 1 SEE ICP/EXT-04-00126 - TO VIEW ATTACHMENT 2 SEE 1564435 | DOE/NE-ID-11155 | 00 |
| 30-JUN-04 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO THE EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT | 24875 | 00 |
| 29-JUN-04 | SNOOK, J. G. | EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT | EM-ER-04-137 | 00 |
| 26-MAY-04 | CLOUGH, M. K. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) GLOVEBOX EXCAVATOR METHOD FACILITY FINAL INSPECTION | 24859 | 00 |
| 31-MAR-04 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 07 |
| 16-MAR-04 | EBERLINE | FINAL VALIDATION REPORT - MOBILE NONDESTRUCTIVE ASSAY (NDA) TRAILER FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - ATTACHMENT 2 TO REMEDIAL ACTION (RA) REPORT - DOE/NE-ID-11155 | 1564435 | 00 |
| 10-MAR-04 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS - DOCUMENT ID NUMBER ERRONEOUSLY APPEARS ON COVER PAGE AS ICP/EXT-02-01117 | INEEL/EXT-02-01117 | 06 |
| 24-FEB-04 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO LETTER REGARDING COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT | 24831 | 00 |
| 24-FEB-04 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO LETTER REGARDING COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT | 24832 | 00 |
| 24-FEB-04 | SNOOK, J. G. | COMPLETION OF EXCAVATION OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT | EM-ER-04-042 | 00 |
| 27-JAN-04 | KOCH, D. F. | AUTHORIZATION FOR RELEASE OF $2 MILLION DOLLARS IN DEPARTMENT OF ENERGY (DOE) FUNDS | 24825 | 00 |
| 26-JAN-04 | CETO, N. | COMMENCEMENT OF WASTE RETRIEVAL AT GLOVEBOX EXCAVATOR METHOD PROJECT | 24824 | 00 |
| 26-JAN-04 | SNOOK, J. G. | COMMENCEMENT OF WASTE RETRIEVAL AT GLOVEBOX EXCAVATOR METHOD PROJECT | EM-ER-04-004 | 00 |
| 21-JAN-04 | BRYAN, J. D. | PRE-FINAL INSPECTION REPORT FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - ATTACHMENT 1 TO REMEDIAL ACTION (RA) REPORT - DOE/NE-ID-11155 | ICP/EXT-04-00126 | 00 |
| 11-DEC-03 | SNOOK, J. G. | APPROVAL OF CRITICAL DECISION 4 (CD-4) FOR THE GLOVEBOX EXCAVATOR METHOD PROJECT | EM-ER-03-300 | 00 |
| 11-DEC-03 | SNOOK, J. G. | TRANSMITTAL OF APPROVAL OF CRITICAL DECISION 4 (CD-4) FOR THE GLOVEBOX EXCAVATOR METHOD PROJECT | EM-ER-03-307 | 00 |
| 11-DEC-03 | SELLERS, E. D. | AUTHORIZATION TO COMMENCE RETRIEVAL OPERATIONS AT THE GLOVEBOX EXCAVATOR METHOD PROJECT | EM-WM-03-129 | 00 |
| 05-DEC-03 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF EXTENSION OF STAGE III MILESTONE FROM APRIL 2002 (04/02) AGREEMENT TO RESOLVE DISPUTES | 24840 | 00 |
| 05-DEC-03 | WERNTZ, J. H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DENIAL OF EXTENSION OF STAGE III MILESTONE FROM APRIL 2002 (04/02) AGREEMENT TO RESOLVE DISPUTES | 24841 | 00 |
| 01-DEC-03 | ICP COMMUNITY RELATIONS | UPDATE FACT SHEET - EXCAVATION BEGINS AT PIT 9 DEMONSTRATION FACILITY | 24817 | 00 |
| 13-NOV-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-01-01617 | 05 |
| 28-OCT-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 05 |
| 10-OCT-03 | HELM, B. R. | PRECONCEPTUAL DESIGN RETRIEVAL ALTERNATIVES FOR THE PIT 9 REMEDIATION PROJECT | INEEL/EXT-03-00908 | 00 |
| 09-OCT-03 | LANDMAN, W. H. | TREATMENT ALTERNATIVES FEASIBILITY STUDY (FS) FOR THE PIT 9 REMEDIATION PROJECT | INEEL/EXT-03-00907 | 00 |
| 08-OCT-03 | AUSTAD, S. L. | ANALYSIS OF ALTERNATIVES SUMMARY FOR THE PIT 9 REMEDIATION PROJECT | INEEL/EXT-03-00909 | 00 |
| 06-OCT-03 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-00542 | 02 |
| 01-OCT-03 | NISHIOKA, D. E. | TECHNOLOGY EVALUATION OF RETRIEVAL OPTIONS FOR THE PIT 9 REMEDIATION PROJECT | INEEL/EXT-03-00526 | 00 |
| 12-SEP-03 | BURTON, B. N. | WASTE MANAGEMENT PLAN (WMP) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-00767 | 01 |
| 10-SEP-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 04 |
| 02-SEP-03 | NISHIOKA, D. E. | ENGINEERING DESIGN FILE (EDF) - WASTE RETRIEVAL PROCESS TECHNOLOGY SEARCH FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT | EDF-4025 | 00 |
| 28-AUG-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 03 |
| 27-AUG-03 | PRATT, M. B. | PROJECT TURNOVER DOCUMENTATION PACKAGE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-03-00622 | 00 |
| 04-AUG-03 | JACKSON, T. | TREATMENT TECHNOLOGIES FOR THE OPERABLE UNIT (OU 7-10) STAGE III PROJECT | INEEL/EXT-03-00022 | 00 |
| 30-JUL-03 | PEATROSS, R. G. | HAZARD IDENTIFICATION DOCUMENT FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT | INEEL/EXT-03-00790 | 00 |
| 30-JUL-03 | THOMPSON, D. F. | PLAN (PLN) - RISK MANAGEMENT PLAN FOR OPERABLE UNIT (OU) 7-10 STAGE III PROJECT | PLN-1358 | 01 |
| 10-JUL-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 02 |
| 20-JUN-03 | THOMPSON, D. F. | PLAN (PLN) - RISK MANAGEMENT PLAN FOR OPERABLE UNIT (OU) 7-10 STAGE III PROJECT | PLN-1358 | 00 |
| 05-JUN-03 | JAMISON, R. K. | PRE-FINAL INSPECTION CHECKLIST FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-01184 | 00 |
| 01-MAY-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 01 |
| 14-MAR-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-01-01617 | 03 |
| 13-MAR-03 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-00542 | 01 |
| 12-FEB-03 | SNOOK, J. G. | TRANSMITTAL OF FINALIZED GLOVEBOX EXCAVATOR METHOD PROJECT DOCUMENTS | EM-ER-03-044 | 00 |
| 05-FEB-03 | RITTER, P. D. | NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MONITORING PLAN FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-03-00079 | 00 |
| 29-JAN-03 | SALOMON, H. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-00542 | 00 |
| 27-JAN-03 | BURTON, B. N. | WASTE MANAGEMENT PLAN (WMP) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-00767 | 00 |
| 22-JAN-03 | MILLER, B. P. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT OPERATIONS | INEEL/EXT-02-01117 | 00 |
| 21-JAN-03 | BURTON, B. N. | ENGINEERING DESIGN FILE (EDF) - APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) IMPLEMENTATION MATRIX FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | EDF-2324 | 00 |
| 03-DEC-02 | IANI, L. J. | INEEL PIT 9 DISPUTE RESOLUTION -CONFIRMATION OF ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) UNDERSTANDING OF MAJOR POINTS DISCUSSED DURING FRIDAY'S TELECONFERENCE | 24722 | 00 |
| 21-NOV-02 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-01-01617 | 02 |
| 01-NOV-02 | KEMPTHORNE, D. | DIRK KEMPTHORNE'S LETTER TO SPENCER ABRAHAM, SECRETARY OF U. S. DEPARTMENT OF ENERGY (DOE-HQ), REGARDING RESCHEDULED VISIT TO IDAHO | 24719 | 00 |
| 21-OCT-02 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-01-01617 | 01 |
| 15-OCT-02 | DAVIES, S. A. | SUPPLEMENT TO REMEDIAL DESIGN (RD) PACKAGE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | DOE/ID-11032-SUPPL | 00 |
| 03-OCT-02 | JEWELL, J. K. | ESTIMATING THE MASS OF PU-239 WASTE NEAR P9-20 PROBE HOLE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-02-01189 | 00 |
| 19-SEP-02 | DAVIES, S. A. | REMEDIAL DESIGN (RD) PACKAGE FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) | DOE/ID-11032 | 00 |
| 05-SEP-02 | PACE, B. | STATUS OF CULTURAL RESOURCES REVIEW OF PIT 9 GLOVEBOX EXCAVATOR METHOD PROJECT | 24755 | 00 |
| 01-SEP-02 | INEEL COMMUNITY RELATIONS | A COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - PIT 9 CLEANUP CONSTRUCTION BEGINS | 24749 | 00 |
| 02-AUG-02 | NEITZEL, S. | LETTER FROM THE IDAHO STATE HISTORICAL SOCIETY - REVIEW COMMENTS ON THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 24754 | 00 |
| 01-AUG-02 | PREUSSNER, B. D. | SPECIFICATION (SPC) - BACKHOE SAFETY RELATED MODIFICATIONS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-351 | 00 |
| 01-AUG-02 | PREUSSNER, B. D. | SPECIFICATION (SPC) - BACKHOE MODIFICATIONS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-401 | 00 |
| 31-JUL-02 | PRATT, M. B. | OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CRITICAL DECISION 2/3 (CD-2/3) SUBMITTAL DOCUMENTS | DKJ-157-02 | 00 |
| 30-JUL-02 | SNOOK, J. G. | START OF CONSTRUCTION FOR GLOVEBOX EXCAVATOR METHOD PROJECT | EM-ER-02-125 | 00 |
| 24-JUL-02 | JOHNSON, B. E. | PERFORMANCE SPECIFICATION (SPC) - EMISSIONS MONITORING SYSTEM FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-392 | 00 |
| 23-JUL-02 | POPE, M. I. | PERFORMANCE SPECIFICATION (SPC) - HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTER SYSTEMS FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-391 | 00 |
| 19-JUL-02 | CARPENEDO, R. J. | DESIGN SPECIFICATION (SPC) - PACKAGING GLOVEBOX SYSTEM (PGS) FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-387 | 01 |
| 16-JUL-02 | STARCK, R. A. | LETTER TO THE IDAHO STATE HISTORICAL SOCIETY TO REVIEW THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - INEEL/EXT-01-01512 ENCLOSED TO FACILITATE REVIEW | TS-ESTD-02-109 | 00 |
| 16-JUL-02 | STARCK, R. A. | LETTER TO THE SHOSHONE BANNOCK TRIBES TO REVIEW THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - INEEL/EXT-01-01512 ENCLOSED TO FACILITATE REVIEW | TS-ESTD-02-110 | 00 |
| 14-JUL-02 | GUILLEN, L. E. | A-E CONSTRUCTION SPECIFICATION (SPC) - FACILITY PACKAGE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-389 | 00 |
| 10-JUL-02 | CARPENEDO, R. J. | PERFORMANCE SPECIFICATION (SPC) - PACKAGING GLOVEBOX SYSTEM (PGS) LIFT TABLE FOR THE OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-388 | 00 |
| 26-JUN-02 | SNOOK, J. G. | CRITICAL DECISION 2/3 (CD-2/3) FOR GLOVEBOX EXCAVATOR METHOD PROJECT APPROVED | EM-ER-02-107 | 00 |
| 15-MAY-02 | PRATT, M. B. | OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT PARTIAL CRITICAL DECISION 3B (CD-3B) SUBMITTAL | DKJ-111-02 | 00 |
| 10-MAY-02 | PALMER, S. L. | A-E PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - WEATHER ENCLOSURE STRUCTURE (WES) WMF-671 | SPC-364 | 00 |
| 10-MAY-02 | JENSEN, S. A. | A-E CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - FACILITY FLOOR STRUCTURE (FFS) FABRICATION | SPC-366 | 00 |
| 10-MAY-02 | JENSEN, S. A. | A-E CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - FACILITY STRUCTURES | SPC-367 | 00 |
| 18-APR-02 | ABRAHAM, S. | AGREEMENT TO RESOLVE DISPUTES IN THE MATTER OF: MARCH 16, 2001 (03/16/2001) STATEMENT OF DISPUTE - STATE OF IDAHO (IDEQ), UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) AND UNITED STATES DEPARTMENT OF ENERGY (DOE-HQ) | 10970 | 00 |
| 18-APR-02 | PRATT, M. B. | OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CRITICAL DECISION 3A (CD-3A) SUBMITTAL DOCUMENTS | DKJ-73-02 | 00 |
| 18-APR-02 | DIRKMAAT, P. J. | APPROVAL OF CRITICAL DECISION 3A (CD-3A) - EARLY PROCUREMENT AND SITE UTILITIES WORK FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT LOCATED AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT THE INEEL | EM-INTEC-02-021 | 00 |
| 17-APR-02 | HAIN, K. E. | PARTIAL ACHIEVEMENT OF CRITICAL DECISION 2/3 (CD-2/3) FOR GLOVEBOX EXCAVATOR METHOD PROJECT RETRIEVAL DEMONSTRATION | EM-ER-02-061 | 00 |
| 16-APR-02 | KINGSFORD, C. O. | CONSTRUCTION SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT SITE DEVELOPMENT | SPC-352 | 01 |
| 08-APR-02 | BURTON, B. N. | APPROVED ENVIRONMENTAL CHECKLIST (EC) - RWMC OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | RWMC-99-002EC | 01 |
| 04-APR-02 | ENGLISH, B. L. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON CLOSURE PLAN (CP) FOR TRANSURANIC STORAGE AREA (TSA) INTERIM STATUS UNITS (PADS 1, 2, AND R) LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ON THE INEEL (EPA ID NOS. ID489000895 | 24734 | 00 |
| 04-APR-02 | HARKER, W. S. | INDEPENDENT PROJECT REVIEW (IPR) PLAN OF OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT, CD-A3 SCOPE | EM-IDM-02-027 | 00 |
| 04-APR-02 | STEPHENS, D. L. | A-E PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - RETRIEVAL CONFINEMENT STRUCTURE (RCS) | SPC-358 | 00 |
| 02-APR-02 | MONSON, B. R. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DOE'S MARCH 15, 2002 (03/15/02) LETTER CONCERNING EXISTING INVENTORY PERMIT DEFINITION AS APPLIED TO CERCLA WASTES LOCATED AT INEEL | 24733 | 00 |
| 28-MAR-02 | IDEQ | IDEQ, EPA, AND DOE AGREEMENT FOR EXTENSION OF DEADLINE FOR SUBMITTAL OF DRAFT REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) AND FEASIBILITY STUDY (FS) FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 | 24731 | 00 |
| 25-MAR-02 | HAIN, K. E. | COMMENTS SUBMITTED BY DOE-ID PROGRAMMATIC SAFETY REVIEW GROUP ON PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT AND RESPONSES TO EPA AND IDEQ COMMENTS ON CONCEPTUAL DESIGN REPORT (CDR) | EM-ER-02-043 | 00 |
| 25-MAR-02 | AKERS, D. W. | SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT DESIGN INPUT FOR FISSILE MATERIAL MONITORING SYSTEM (FMMS) | SPC-360 | 00 |
| 15-MAR-02 | CRESAP, D. A. | PERFORMANCE SPECIFICATION (SPC) - OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR FISSILE MATERIAL MONITOR (FMM) - GLOVEBOX EXCAVATOR METHOD PROJECT | SPC-355 | 00 |
| 15-MAR-02 | RASCH, D. N. | DOE RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REQUEST FOR INFORMATION CONCERNING LETTER FROM DOE DESCRIBING POSITION ON DEFINITION OF EXISTING INVENTORIES AS STIPULATED IN THREE HWMA RCRA PERMITS ADDRESSING UNITS AT RWMC | TS-ETSD-02-039 | 00 |
| 06-MAR-02 | ABRAHAM, S. | LETTER FROM THE SECRETARY OF ENERGY TO THE GOVERNOR OF IDAHO - PROPOSAL TO RESOLVE DISPUTE IS BEING ACTIVELY PURSUED | 24730 | 00 |
| 06-MAR-02 | BRADLEY, T. M. | FOLLOW-ON COMMENTS REGARDING NAVAL REACTORS PROGRAM RADIONUCLIDE INVENTORIES AT THE SUBSURFACE DISPOSAL AREA (SDA) | NR:IBO-02/032 | 00 |
| 14-FEB-02 | BRADLEY, T. M. | NAVAL REACTORS FACILITY (NRF) SUMMARY COMMENTS REGARDING PROJECTED INVENTORY OF NAVAL REACTORS WASTE DISPOSAL AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | NR:IBO-02/029 | 00 |
| 29-JAN-02 | ROBERSON, J. H. | THANK YOU FOR INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH (IEER) REPORT - POISON IN THE VADOSE ZONE: AN EXAMINATION OF THE THREATS TO THE SNAKE RIVER PLAIN AQUIFER (SRPA) FROM INEEL - DOE POSITION ON CONCLUSIONS LISTED IN EXECUTIVE SUMMARY | 24727 | 00 |
| 24-JAN-02 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON PIT 9 10% CONCEPTUAL DESIGN FOR GLOVEBOX EXCAVATOR METHOD | 24724 | 00 |
| 23-JAN-02 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT 10% REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR STAGE II PIT 9 GLOVEBOX EXCAVATOR METHOD OPERABLE UNIT (OU) 7-10 | 24723 | 00 |
| 23-JAN-02 | GEARHEARD, M. F. | ENVIRONMENTAL PROTECTION AGENCY (EPA) NOTICE OF INSPECTION & REQUEST FOR INFORMATION TO EVALUATE COMPLIANCE WITH TERMS OF DECEMBER 1991 (12/91) FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) AND RELEVANT SECTIONS OF NATIONAL PRIORITIES LIST (NPL | 24725 | 00 |
| 22-JAN-02 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) NOTICE OF FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) INSPECTION OF THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AT IDAHO FALLS, IDAHO | 24726 | 00 |
| 09-JAN-02 | KEMPTHORNE, D. | LETTER FROM GOVERNOR OF IDAHO TO THE SECRETARY OF ENERGY - CONTROVERSY REGARDING CLEANUP OF PIT 9 - RESOLUTION OF OUTSTANDING ISSUES | 24732 | 00 |
| 01-JAN-02 | DAVIES, S. A. | OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT - CONCEPTUAL DESIGN REPORT (CDR) FOR CRITICAL DECISION 1 (CD-1) | INEEL/EXT-01-01512 | 00 |
| 01-JAN-02 | DAVIES, S. A. | OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT PRELIMINARY PROJECT EXECUTION PLAN (PEP) | INEEL/EXT-01-01513 | 00 |
| 14-DEC-01 | FREI, M. W. | EVALUATION OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER DATED JULY 23, 2001 (07/23/01) TO THE GOVERNOR OF IDAHO FOR RESOLUTION - INCLUDED DEPARTMENT OF ENERGY (DOE) POSITION PAPER | EM-ER-01-200 | 00 |
| 03-DEC-01 | ROUSSEAU, J. P. | USGS COMMENTARY ON INSTITUTE FOR ENERGY AND ENVIRONMENTAL RESEARCH (IEER) REPORT - POISON IN THE VADOSE ZONE: AN EXAMINATION OF THE THREATS TO THE SNAKE RIVER PLAIN AQUIFER (SRPA) FROM THE INEEL | 24728 | 00 |
| 30-NOV-01 | CASTANON, L. A. | INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT WITH AN ADDITIONAL EXTENSION TO CURRENT DEADLINE - NEW DEADLINE OF DECEMBER 15, 2001 (12/15/2001) | 24721 | 00 |
| 28-NOV-01 | ALLRED, C. S. | INEEL PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) PROPOSAL FOR SETTLEMENT | 24720 | 00 |
| 30-OCT-01 | FREI, M. W. | EXTENSION OF DISPUTE RESOLUTION FOR PIT 9 RETRIEVAL DEMONSTRATION UNTIL NOVEMBER 30, 2001 (11/30/2001) - CONTAINS LIST OF ENFORCEABLE DEADLINES & MILESTONES | EM-ER-01-180 | 00 |
| 25-OCT-01 | CASTANON, L. A. | INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT TO THE NOVEMBER 30, 2001 (11/30/2001) EXTENSION DATE | 24718 | 00 |
| 25-OCT-01 | HAIN, K. E. | RESPONSE TO AUGUST 22, 2001 (08/22/2001) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 0F CERCLA FOR WAG-7 OF THE INEEL | EM-ER-01-173 | 00 |
| 18-OCT-01 | CASTANON, L. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION WITH RESPONSES TO BBWI'S REQUEST FOR CLARIFICATION ENCLOSED | 24716 | 00 |
| 15-OCT-01 | ALLRED, C. S. | PIT 9 DISPUTE RESOLUTION - AGREEMENT TO EXTEND DEADLINE FOR AN ADDITIONAL PERIOD OF TIME CONCLUDING ON NOVEMBER 30, 2001 (11/30/2001) - ENFORCEABLE DEADLINES LISTED | 24715 | 00 |
| 12-OCT-01 | ALLRED, C. S. | PHONE CALL CONFIRMED FIRM DATES FOR FINAL TWO MILESTONES FOR STAGE II OF PIT 9 PROJECT - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEABLE TO EXTENSION OF DISPUTE RESOLUTION DATE TO NOVEMBER 30, 2001 (11/30/01) | 24714 | 00 |
| 11-OCT-01 | BERGHOLZ, W. E. | CONFIRMS TELEPHONE DISCUSSIONS HELD OCTOBER 11, 2001 (10/11/01) BETWEEN STEVE ALLRED AND ASSISTANT SECRETARY ROBERSON CONCERNING EXTENSION OF OCTOBER 12, 2001 (10/12/01) PIT 9 DISPUTE RESOLUTION DEADLINE, DOE REQUESTS EXTENSION TO NOVEMBER 30, 2001 | 24713 | 00 |
| 10-OCT-01 | ROBERSON, J. H. | THREE ENFORCEABLE MILESTONES SUCCESSFULLY DEVELOPED BY IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ), ENVIRONMENTAL PROTECTION AGENCY (EPA) AND DOE NEGOTIATING TEAM FOR PIT 9 DISPUTE DURING OCTOBER 3, 2001 (10/03/01) TELECONFERENCE MEETING | 24711 | 00 |
| 10-OCT-01 | BERGHOLZ, W. E. | OCTOBER 3, 2001 (10/03/2001) PIT 9 TELECONFERENCE MEETING RESULTED IN AGREEMENT ON SEVERAL MILESTONES FOR STAGE II WITH DRAFT PROPOSED REVISIONS ATTACHED | EM-ER-01-168 | 00 |
| 05-OCT-01 | KREIZENBECK, R. | DISPUTE RESOLUTION, INEEL OPERABLE UNIT (OU) 7-10, PIT 9 - ENVIRONMENTAL PROTECTION AGENCY (EPA) OBSERVATIONS AND ASSIGNMENT OF STAFF TO NEGOTIATE A RESOLUTION | 24708 | 00 |
| 04-OCT-01 | GEARHEARD, M. F. | INEEL, CERCLA SECTION 104(E) REQUEST FOR INFORMATION - ENVIRONMENTAL PROTECTION AGENCY (EPA) WILL RESPOND DIRECTLY TO BECHTEL BWXT IDAHO, LLC (BBWI) REGARDING EXTENSION TO INFORMATION REQUEST | 24707 | 00 |
| 04-OCT-01 | GEARHEARD, M. F. | INEEL CERCLA SECTION 104(E) REQUEST FOR INFORMATION - ENVIRONMENTAL PROTECTION AGENCY (EPA) - BBWI TO PROVIDE DOCUMENTS BY OCTOBER 25, 2001 (10/25/2001) | 24709 | 00 |
| 01-OCT-01 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER TO ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT - BELIEVE THAT CONCEPTUAL PLAN CAN PROVIDE A BASIS TO MOVE FORWARD TO A RESOLUTION | 24710 | 00 |
| 01-OCT-01 | BERGHOLZ, W. E. | TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) ANALYSIS OF OPERABLE UNIT (OU) 7-10 STAGE II MODIFICATIONS | EM-ER-01-159 | 00 |
| 01-OCT-01 | MCCONNEL, B. C. | WASTE AREA GROUP 7 (WAG-7) ANALYSIS OF OPERABLE UNIT (OU) 7-10 STAGE II MODIFICATIONS | INEEL/EXT-01-01105 | 00 |
| 25-SEP-01 | ROBERSON, J. H. | LETTER TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DIRECTOR FROM DEPARTMENT OF ENERGY (DOE) ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT (EM) - AGREEMENT REACHED ON A CONCEPTUAL PATH FORWARD - FUNDAMENTAL TOPICS OF AGREEMENT FOR PIT 9 | 24705 | 00 |
| 25-SEP-01 | OLSEN, M. D. | REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL - EPA LETTER RECEIVED AUGUST 21, 2001 (08/21/2001) - BBWI LEGAL - BBWI WILL ADDRESS DOE'S REQUEST FOR RECORDS WITH CLARIFICATION REQUEST ENCLOSED | MDO-62-01 | 00 |
| 25-SEP-01 | BERGHOLZ, W. E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL - BBWI WILL PREPARE DOE'S REQUEST FOR RECORDS | OCC-01-129 | 00 |
| 05-SEP-01 | PIERRE, W. | PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OU 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) - EPA DOES NOT CONCUR WITH EXPANDED SCOPE OF WORK | 24706 | 00 |
| 30-AUG-01 | LOCKHART, F. R. | LETTER FROM DOE ROCKY FLATS FIELD OFFICE TO REGIONAL DIRECTOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) - OPTIMISTIC MEETING NEXT WEEK FOCUSED ON RESOLUTION OF PIT 9 DISPUTE WILL BE SUCCESSFUL | 01-DOE-01667 | 00 |
| 29-AUG-01 | FINDLEY, C. E. | INEEL DISPUTE RESOLUTION OU 7-10 - PIT 9 DISPUTE NEGOTATIONS - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) PROPOSAL - GOALS AND PATH FORWARD | 24703 | 00 |
| 22-AUG-01 | GEARHEARD, M. F. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 OF CERCLA FOR INEEL | 24701 | 00 |
| 22-AUG-01 | DEBOLT, P. A. | TRANSMITTAL OF WRITTEN DISPOSITION QUESTIONS FOR DEPARTMENT OF ENERGY (DOE) RECORD CUSTODIANS | 24704 | 00 |
| 15-AUG-01 | FINDLEY, C. E. | DISPUTE RESOLUTION OU 7-10 - NEED FOR STAGE I CORING - EXTENT OF ADDITIONAL SAMPLING NEEDED | 24700 | 00 |
| 13-AUG-01 | FINDLEY, C. E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO UNDER SECRETARY OF ENERGY LETTER ON OU 7-10 DISPUTE RESOLUTION NEGOTIATION SCHEDULE EXTENSION TO OCTOBER 12, 2001 (10/12/2001) | 24699 | 00 |
| 10-AUG-01 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO EXTENSION REQUEST FOR PIT 9 DISPUTE RESOLUTION | 24698 | 00 |
| 07-AUG-01 | CARD, R. G. | LETTER FROM UNDER SECRETARY OF ENERGY TO ACTING ADMINISTRATOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 (X) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED | 24697 | 00 |
| 06-AUG-01 | CARD, R. G. | LETTER FROM UNDER SECRETARY OF ENERGY TO DIRECTOR OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED | 23573 | 00 |
| 01-AUG-01 | GREEN, O. D. | REPORT OF JOSEPH L. ALVAREZ AND JOHN A. AUXIER REGARDING WASTE RETRIEVAL FROM PIT 9, THE 90% DESIGN DATED JULY 25, 2001 (07/25/01) - TO DETERMINE TO WHAT EXTENT THERE WAS FLEXIBILITY TO REDUCE PIT 9 PROJECT TIME AND COST AND TRANSMITTAL LETTER | 24694 | 00 |
| 25-JUL-01 | FINDLEY, C. E. | OPERABLE UNIT (OU) 7-10 PIT 9 MODIFICATIONS ANALYSIS - INEEL DISPUTE - ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURS WITH IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TO DENY DEPARTMENT OF ENERGY'S (DOE'S) REQUEST FOR AN EXTENSION | 21473 | 00 |
| 23-JUL-01 | ALLRED, C. S. | DETERMINATION OF DISPUTE - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER ON DISPUTE RESOLUTION IN THE MATTER OF DEPARTMENT OF ENERGY'S (DOE'S) MARCH 16, 2001 (03/16/01) STATEMENT OF DISPUTE | 24692 | 00 |
| 18-JUL-01 | FINDLEY, C. E. | DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) OPTIONS ON HOW TO PROCEED WITH PROJECT AND REACH AGREEMENT ON ACCEPTABLE SCHEDULE AND REMEDIAL APPROACH | 24690 | 00 |
| 18-JUL-01 | ALLRED, C. S. | PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF EMVIRONMENTAL QUALITY (IDEQ) DENIAL OF DEPARTMENT OF ENERGY'S (DOE'S) FEBRUARY 26, 2001 (02/26/01) REQUEST FOR EXTENSION OF PIT 9 DEADLINES AND MARCH 16, 2001(03/16/01) STATEMENT OF DISPUTE | 24691 | 00 |
| 17-JUL-01 | HAIN, K. E. | DISPUTE RESOLUTION - DELIVERY OF PIT 9 SCHEDULE DETAILED INFORMATION ON ASSUMPTIONS USED TO DEVELOP THE SCHEDULE SUBMITTED WITH THE FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION OF DEADLINES (EM-ER-01-028) | EM-ER-01-123 | 00 |
| 11-JUL-01 | HAIN, K. E. | JULY 10 AND JULY 11, 2001 (07/11/2001 - 07/12/2001) MEETING ON PIT 9 SCHEDULE EXTENSION DISPUTE- STATEMENT FROM EACH AGENCY LEAD CONCERNING RESULTS OF THE MEETING - SUMMATION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) | 24740 | 00 |
| 05-JUL-01 | BERGHOLZ, W. E. | DISPUTE RESOLUTION - REVISED AGENDA FOR PIT 9 SCHEDULE DISPUTE MEETING TO BE HELD JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ALSO ENCLOSED IS A CONCEPTUAL DESCRIPTION OF AN ALTERNATIVE TO SCHEDULE AND SCOPE OF SCHEDULE PROVIDED BY IDEQ AND EPA | OM-01-002 | 00 |
| 03-JUL-01 | GREEN, O. D. | DISPUTE RESOLUTION - STAGE II VALUE ENGINEERING REVIEW MEETING SCHEDULED JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RECEIVED AND REVIEWED PROPOSED SCHED | 24689 | 00 |
| 26-JUN-01 | FINDLEY, C. E. | DISPUTE RESOLUTION - OPERABLE UNIT (OU) 7-10 ENVIRONMENTAL PROTECTION AGENCY (EPA) SCHEDULE ASSUMPTIONS | 24688 | 00 |
| 25-JUN-01 | COOK, B. A. | AGENDA FOR OU 7-10 STAGE II VALUE ENGINEERING REVIEW | EM-ER-01-110 | 00 |
| 18-JUN-01 | COOK, B. A. | CONFIRMATION OF JUNE 15, 2001 (06/15/2001) SENIOR EXECUTIVE COMMITTEE CONFERENCE CALL DECISIONS | EM-ER-01-107 | 00 |
| 15-JUN-01 | FINDLEY, C. E. | DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) | 24686 | 00 |
| 15-JUN-01 | ALLRED, C. S. | DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) | 24687 | 00 |
| 14-JUN-01 | FINDLEY, C. E. | DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREEMENT TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE JULY 6, 2001 (07/06/2001) | 24684 | 00 |
| 08-JUN-01 | FINDLEY, C. E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) STATEMENT OF DISPUTE - DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | 24683 | 00 |
| 08-JUN-01 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) WILL EXTEND DEADLINE FOR RESOLVING DISPUTE OVER EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | 24685 | 00 |
| 07-JUN-01 | DIRKMAAT, P. J. | DEPARTMENT OF ENERGY (DOE) PLANNED SPENT NUCLEAR FUEL (SNF) SHIPMENTS | EM-ER-01-097 | 00 |
| 07-JUN-01 | COOK, B. A. | CONFIRMATION OF JUNE 7, 2001 (06/07/2001) SENIOR EXECUTIVE COMMITTEE (SEC) CONFERENCE CALL DECISIONS | EM-ER-01-098 | 00 |
| 23-MAY-01 | ALLRED, C. S. | DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) JOINT COUNTER PROPOSAL | 24682 | 00 |
| 20-APR-01 | ALLRED, C. S. | ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEMENT TO EXTEND TIME FRAME FOR DELIBERATIONS OF THE SENIOR EXECUTIVE COMMITTEE (SEC) | 24681 | 00 |
| 19-APR-01 | LYLE, J. L. | COMMITMENT TO PROVIDE A PROPOSED PATH FORWARD AND PROPOSAL TO EXTEND THE SENIOR EXECUTIVE COMMITTEE (SEC) TIME PERIOD FOR RESOLUTION OF DISPUTE | EM-ER-01-073 | 00 |
| 02-APR-01 | LYLE, J. L. | ELEVATION OF OPERABLE UNIT (OU) 7-10 DISPUTE RESOLUTION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) | EM-ER-01-057 | 00 |
| 27-MAR-01 | GREEN, O. D. | PIT 9 - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE | 24677 | 00 |
| 21-MAR-01 | GEARHEARD, M. F. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE | 24738 | 00 |
| 16-MAR-01 | HAIN, K. E. | SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | EM-ER-01-048 | 00 |
| 14-MAR-01 | INEEL COMMUNITY RELATIONS | DOE NEWS - STATE AND INEEL SCIENTISTS FOCUS ON UNDERSTANDING RESULTS OF RADIONUCLIDE DETECTION | 24675 | 00 |
| 12-MAR-01 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) NON-CONCURRENCE OF REQUEST TO EXTEND DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | 24671 | 00 |
| 09-MAR-01 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | 24670 | 00 |
| 26-FEB-01 | EDGERTON, B. G. | DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 | EM-ER-01-028 | 00 |
| 29-JAN-01 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TABLE DESCRIBING MINIMUM INFORMATION NEEDED TO REACH A SUPPORTABLE DECISION FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 24669 | 00 |
| 12-DEC-00 | BERGHOLZ, W. E. | WAG-7 NOVEMBER 15, 2000 (11/15/2000) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MEETING - INCLUDES PROPOSED PRIORITIES MEETING AGENDA DECEMBER 19, 2000 (12/19/2000) AND RESPONSE TO DIVISION OF ENVIRONMENTAL QUALITY (DEQ) DIFFERENCE OF OPINION | EM-ER-232-00 | 00 |
| 22-NOV-00 | EDGERTON, B. G. | WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 REVISED WORKING SCHEDULE | EM-ER-222-00 | 00 |
| 31-OCT-00 | HAIN, K. E. | DOE RESPONSES TO AGENCY COMMENTS ON STAGE II DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 INTERIM RECORD OF DECISION (ROD) | EM-ER-00-206 | 00 |
| 28-SEP-00 | BEITEL, G. A. | EVALUATION OF OPERABLE UNIT (OU) 7-10 STAGE I SOIL MOISTURE READINGS - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT STAGE I | INEEL/EXT-2000-00651 | 00 |
| 27-SEP-00 | HAIN, K. E. | WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION | EM-ER-188-00 | 00 |
| 25-AUG-00 | HAIN, K. E. | WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION | EM-ER-162-00 | 00 |
| 15-AUG-00 | HAIN, K. E. | DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) LETTER DATED JULY 7, 2000 (07/07/2000) & IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER DATED JULY 19, 2000 (07/19/2000) - PIT 9 RECORD OF DECISION (ROD) REQUEST FOR EXTENSION | EM-ER-153-00 | 00 |
| 19-JUL-00 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE 30, 2000 (06/30/2000) - OU 7-10 STAGED INTERIM ACTION PROJECT (SIAP) - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | 24667 | 00 |
| 07-JUL-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE, 30 2000 (06/30/2000) CONCERNING REQUEST FOR MODIFICATION MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) | 24666 | 00 |
| 30-JUN-00 | HAIN, K. E. | OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - (EXTENSION OF OPERABLE UNIT (OU) 7-10, 7-13 & 7-14 ENFORCEABLE DEADLINES) | EM-ER-118-00 | 00 |
| 20-APR-00 | EPA | AGREEMENT IN PRINCIPLE BY WASTE AREA GROUP 7 (WAG-7) PROJECT MANAGEMENT TEAM - APRIL 20, 2000 (04/20/2000) | 24668 | 00 |
| 13-APR-00 | HAIN, K. E. | WASTE AREA GROUP 7 (WAG-7) REQUEST FOR MODIFICATION OF MILESTONES - OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT, OU 7-13 & 7-14 PITS AND TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-63-00 | 00 |
| 08-MAR-00 | BEITEL, G. A. | ENGINEERING DESIGN FILE (EDF) - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT - STAGE I INDEPENDENT TECHNICAL PANEL SAFETY REVIEW OF PROPOSED STAGE I DRILLING ACTIVITIES | EDF-ER-143 | 00 |
| 29-FEB-00 | GREEN, T. S. | ENVIRONMENTAL RESTORATION (ER) PLAN - DOWNHOLE LOGGING | PLN-493 | 04 |
| 01-DEC-99 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1999 AND DECEMBER 1999 (11/99 & 12/99) - INEEL INSERTS PROBE TUBE INTO BURIED WASTE PIT | 10964 | 00 |
| 19-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 7-10 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) PIT 9 COMPREHENSIVE DEMONSTRATION INTERIM ACTION (IA) OU 7-10 | AR.INDEX.OU.7-10 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 29-SEP-98 | INEEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY - AGENCIES RELEASE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT FOR PIT 9 | 10541 | 00 |
| 01-SEP-98 | DOE, EPA, IDHW | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 INTERIM ACTION (IA) RECORD OF DECISION (ROD) AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL IDAHO FALLS, IDAHO | 10537 | 00 |
| 01-AUG-98 | MILLER, B. P. | HEALTH & SAFETY PLAN (HSP) FOR OU 7-10 CONTINGENCY PROJECT STAGE I COLD TEST | INEEL/EXT-98-00570 | 00 |
| 29-JUN-98 | DUSTIN, J. D. | WORK PLAN FOR STAGE I OU 7-10 CONTINGENCY PROJECT | DOE/ID-10623 | 00 |
| 01-JUN-98 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES OUTLINE CONTINGENCY PLAN FOR PIT 9 CLEANUP | 16785 | 00 |
| 01-JUN-98 | DUSTIN, J. D. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 7-10 CONTINGENCY REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) - STAGE I | DOE/ID-10620 | 00 |
| 01-JUN-98 | MILLER, B. P. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 7-10 CONTINGENCY PROJECT STAGE I SUBSURFACE INVESTIGATION | INEEL/EXT-98-00138 | 00 |
| 01-MAY-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - PIT 9 SUBCONTRACT TERMINATED | 16783 | 00 |
| 01-OCT-97 | LMITCO | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) OU 7-10 - PIT 9 PROJECT INTERIM ACTION (IA) | INEL-94/0110 | 02 |
| 01-SEP-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - SEPTEMBER & OCTOBER 1997 (09/97 & 10/97) - DOE TO SUBMIT PROPOSAL OF PIT 9 CLEANUP, AGENCIES SIGN TRA ROD, WROC INCREASES VOLUME OF WASTE TREATED & CITIZENS ADVISORY BOARD (CAB) REVIEWS, PROVIDES COMMENTS ON DRAFT ERP FACT SHEET | 14283 | 00 |
| 01-JUN-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - JUNE & JULY 1995 (06/97 & 07/97) - AGENCIES RESOLVE DISPUTES ON PIT 9 & TEST AREA NORTH (TAN) PROJECTS | 14315 | 00 |
| 18-MAR-97 | DOE, EPA, IDHW | AGREEMENT TO RESOLVE DISPUTES | 1088-06-29-120-A | 00 |
| 01-JUN-96 | INEL COMMUNITY RELATIONS | INEL REPORTER - WEEKLY NEWSETTER DISCUSSING HOW WASTES ARE MANAGED AT THE INEL - CONSTRUCTION UNDERWAY ON PIT 9 RETRIEVAL FACILITY | 24175 | 00 |
| 01-NOV-95 | INEL COMMUNITY RELATIONS | INEL REPORTER - 11/95 - 12/95 - MILESTONE ACHIEVED AHEAD OF SCHEDULE | 11381 | 00 |
| 10-FEB-95 | SCHWARTZ, F. G. | PIT 9 ADMINISTRATIVE RECORD (AR) - FIXED PRICE CONTRACT WITH LESAT, SUBCONTRACT #C91-133136 & COST DIFFERENCE SUMMARIZED IN SUPPORT OF PIT 9 ESD DEVELOPMENT | OPE-ER-024-95 | 00 |
| 06-FEB-95 | DOE, EPA, IDHW | NOTICE OF AVALIABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 RECORD OF DECISION (ROD) | 5863 | 00 |
| 01-FEB-95 | INEL COMMUNITY RELATIONS | UPDATE FACT SHEET - CONSTRUCTION BEGINS AT PIT 9 | 8896 | 00 |
| 26-JAN-95 | DOE, EPA, IDHW | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PIT 9 INTERIM ACTION (IA) RECORD OF DECISION (ROD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 5862 | 00 |
| 26-JAN-95 | GREEN, L. A. | TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR PIT 9 | OPE-ER-008-95 | 00 |
| 01-JAN-95 | NOT SPECIFIED | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) AND REMEDIAL DESIGN WORK PLAN (RDWP) OU 7-10 - PIT 9 PROJECT INTERIM ACTION (IA) | INEL-94/0110 | 01 |
| 01-DEC-94 | INEL COMMUNITY RELATIONS | INEL REPORTER - (12/94) - ENERGY SECRETARY ANNOUNCES PIT 9 CONTRACT WINNER | 8897 | 00 |
| 24-OCT-94 | LYLE, J. L. | PIT 9 PRIMARY DOCUMENT EXTENSION NOTIFICATION | OPE-ER-288-94 | 00 |
| 01-MAR-94 | DAMES & MOORE | COMPILATION AND SUMMARIZATION OF THE SUBSURFACE DISPOSAL AREA (SDA) RADIONUCLIDE TRANSPORT DATA AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EGG-ER-10546 | 03 |
| 23-FEB-94 | FORSBERG, D. L. | EDF - ENGINEERING DESIGN FILE - REVISED PLUTONIUM, AMERICIUM-241, AND URANIUM-235 INVENTORY ESTIMATES FOR PIT 9 BASED ON THE 1993 HISTORICAL DATA TASK | ER-BWP-82 | 02 |
| 01-DEC-93 | BURTON, B. N. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) - OU 7-10 PIT 9 PROJECT INTERIM ACTION (IA) | EGG-ER-11055 | 00 |
| 01-NOV-93 | INEL COMMUNITY RELATIONS | INEL REPORTER - 11/93 - AGENCIES SIGN RECORD OF DECISION (ROD) FOR PIT 9 | 6994 | 00 |
| 01-OCT-93 | INEL COMMUNITY RELATIONS | RECORD OF DECISION (ROD) - DECLARATION FOR PIT 9 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) | 5569 | 00 |
| 20-SEP-93 | NEARMAN, M. J. | EPA COMMENTS ON THE RESPONSIVENESS SUMMARY FOR PIT 9 | 5530 | 00 |
| 20-SEP-93 | NEARMAN, M. J. | INEL WAG-7 RWMC PIT 9 INTERIM ACTION (IA) - DEVELOPMENT OF DELISTING LEVELS | 5554 | 00 |
| 17-SEP-93 | LYLE, J. L. | TRANSMITTAL OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10, PIT 9, AT THE RWMC AT INEL | ERD-091-93 | 00 |
| 16-SEP-93 | NEARMAN, M. J. | EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) | 5524 | 00 |
| 04-SEP-93 | NOT SPECIFIED | EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) | 5523 | 00 |
| 04-SEP-93 | NYGARD, D. | STATE OF IDAHO COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) | 5525 | 00 |
| 04-SEP-93 | NEARMAN, M. J. | ADDITIONAL EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF DECISION (ROD) | 5537 | 00 |
| 03-SEP-93 | NEARMAN, M. J. | EPA COMMENTS ON THE 08/10/93 REVISION OF THE RECORD OF THE DECISION (ROD) | 5542 | 00 |
| 01-SEP-93 | NOT SPECIFIED | EVALUATION OF THE CORRECTIVE ACTION MANAGEMENT UNIT (CAMU) RULE'S APPLICATION TO THE PIT 9 INTERIM ACTION (IA) | 5534 | 00 |
| 01-SEP-93 | NOT SPECIFIED | FINAL RESPONSIVENESS SUMMARY OVERVIEW | 5551 | 00 |
| 30-AUG-93 | NYGARD, D. | ADDITIONAL ARARS INDENTIFIED BY THE STATE OF IDAHO | 5527 | 00 |
| 11-AUG-93 | STALEY, C. S. | EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL AND NONRADIOLOGICAL EFFECTS OF INCINERATING RETRIEVED WASTES FROM PIT 9 | RWMC-91-004.3 | 02 |
| 10-AUG-93 | DOE | RESPONSE FROM DOE-ID TO EPA COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 | 5543 | 00 |
| 10-AUG-93 | DOE | RESPONSE FROM DOE-ID TO IDHW COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 | 5544 | 00 |
| 05-AUG-93 | STALEY, C. S. | EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL IMPACTS FROM ROUTINE OPERATIONS OF PIT 9 WASTE RETRIEVAL | RWMC-91-004 | 02 |
| 01-AUG-93 | NOT SPECIFIED | PIT 9 LAND DISPOSAL RESTRICTION (LDR) AS APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) ANALYSIS | 5545 | 00 |
| 29-JUL-93 | NOT SPECIFIED | FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR INTERIM ACTION (IA) FOR CLEANUP OF PIT 9 AT RWMC, INEL | 6821 | 00 |
| 21-JUL-93 | NEARMAN, M. J. | EPA COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (R0D) | 5526 | 00 |
| 01-JUL-93 | BROWN, R. M. | INEL TRANSURANIC WASTE ACCEPTANCE CRITERIA (WAC) | DOE/ID-10074 | 05 |
| 23-JUN-93 | LYLE, J. L. | PIT 9 DRAFT FINAL RECORD OF DECISION (ROD) EXTENSION NOTIFICATION (ERWM-ERD-046-93) | 5546 | 00 |
| 04-JUN-93 | EPA | EPA COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (ROD) | 5522 | 00 |
| 03-JUN-93 | NOT SPECIFIED | SUPPLEMENT TO THE REVISED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL | 6820 | 00 |
| 17-MAY-93 | NOT SPECIFIED | DRAFT RESPONSIVENESS SUMMARY OVERVIEW | 5539 | 00 |
| 14-MAY-93 | LYLE, J. L. | TRANSMITTAL OF THE DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10, PIT 9, AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), INEL (ERWM-ERD-054-93) | 5548 | 00 |
| 23-APR-93 | LYLE, J. L. | PIT 9 DRAFT FINAL RECORD OF DECISION (ROD) EXTENSION NOTIFICATION (ERWM-ERD-046-93) | 5547 | 00 |
| 02-APR-93 | NEARMAN, M. J. | INEL WAG-7 PIT 9 INTERIM ACTION (IA) DRAFT RESPONSIVENESS SUMMARY | 5361 | 00 |
| 18-MAR-93 | DOE | RESPONSE TO IDHW ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 | 5528 | 00 |
| 18-MAR-93 | DOE | RESPONSE TO EPA COMMENTS ON THE DRAFT PIT 9 RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 | 5529 | 00 |
| 10-MAR-93 | NYGARD, D. | COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-10 | 5359 | 00 |
| 17-FEB-93 | NYGARD, D. | RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DRAFT RECORD OF DECISION (ROD) - (COMMENT PERIOD EXTENSION) | 5360 | 00 |
| 09-FEB-93 | DOE | RESPONSE TO EPA COMMENTS ON THE DRAFT RECORD OF DECISION (ROD) FOR PIT 9 AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 5532 | 00 |
| 02-FEB-93 | NOT SPECIFIED | IDHW COMMENTS ON THE 06/02/93 REVISION OF THE RECORD OF DECISION (ROD) | 5536 | 00 |
| 31-DEC-92 | LYLE, J. L. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 7-10 PIT 9 AT THE RWMC AT THE INEL | AM/ERWM-ERD-120 | 00 |
| 24-DEC-92 | NOT SPECIFIED | DRAFT RESPONSIVENESS SUMMARY OVERVIEW | 5552 | 00 |
| 22-DEC-92 | STALEY, C. S. | EDF - ENGINEERING DESIGN FILE - HAZARDOUS CHEMICAL RELEASES RESULTING FROM PIT 9 WASTE RETRIEVAL AT RWMC | RWMC-91-004.2 | 01 |
| 21-DEC-92 | PIERRE, W. | TREATABILITY VARIANCE FOR PIT 9 RECORD OF DECISION (ROD) | 5533 | 00 |
| 04-NOV-92 | INEL COMMUNITY RELATIONS | PUBLIC MEETING TRANSCRIPTS - REVISED PROPOSED PLAN FOR PIT 9 - MOSCOW, BOISE, TWIN FALLS, POCATELLO AND IDAHO FALLS, IDAHO | 5233 | 00 |
| 01-NOV-92 | INEL COMMUNITY RELATIONS | INEL REPORTER - 11/92 - REVISED PIT 9 PROPOSED PLAN ISSUED, MEETINGS SCHEDULED | 6041 | 00 |
| 29-OCT-92 | BURTON, B. N. | EDF - ENGINEERING DESIGN FILE - SUMMARY PROCESS DESCRIPTION OF PROPOSED REMEDIAL ALTERNATIVES FOR A CLEANUP OF PIT 9 AT THE INEL RWMC | ERD-BWP-077 | 00 |
| 22-OCT-92 | NOT SPECIFIED | RECORD OF WRITTEN COMMENTS RECEIVED DURING THE PUBLIC COMMENT PERIOD ON THE REVISED PIT 9 PROPOSED PLAN | 5231 | 00 |
| 20-OCT-92 | FORSBERG, D. L. | EDF - ENGINEERING DESIGN FILE - PIT 9 COMPREHENSIVE DEMONSTRATION PROJECT COST ESTIMATE BASIS OF ALTERNATIVES LISTED IN THE REVISED PROPOSED PLAN | ERD-BWP-076 | 00 |
| 19-OCT-92 | DOE PUBLIC AFFAIRS | DOE NEWS - AGENCIES REVISE PIT 9 PROPOSED PLAN, SCHEDULE MEETINGS | 5213 | 00 |
| 01-OCT-92 | INEL COMMUNITY RELATIONS | REVISED PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT THE RWMC, INEL | 5203 | 00 |
| 01-OCT-92 | NOT SPECIFIED | CODED VERBAL AND WRITTEN COMMENTS RECEIVED ON THE REVISED PROPOSED PLAN FOR PIT 9 | 5535 | 00 |
| 01-OCT-92 | MCCARTHY, J. M. | EDF - ENGINEERING DESIGN FILE - GWSCREEN MODELING FOR THE PIT 9 PROJECT - SENSITIVITY TO KD IN THE SOURCE AND ATTENUATION LAYER | RWMC-92-005.1 | 00 |
| 01-JUL-92 | SAIC | DOCKET REPORT ON HEALTH BASED LEVELS & SOLUBILITIES USED IN THE EVALUATION OF DELISTING PETITIONS, SUBMITTED UNDER 40 CFR 260.20 & 260.22 | 5550 | 00 |
| 01-JUN-92 | RENY, D. A. | TENTATIVE HAZARD CLASSIFICATION FOR PIT 9 COMPREHENSIVE DEMONSTRATION | EGG-WM-9966 | 00 |
| 01-MAY-92 | EPA | VITRIFICATION TECHNOLOGIES FOR TREATMENT OF HAZARDOUS AND RADIOACTIVE WASTE | EPA/625/R-92/002 | 00 |
| 08-APR-92 | AWC, INC. | JOHNSTON ATOLL TRU SOIL CLEANUP PROJECT (DRAFT REPORT) | 5101 | 00 |
| 01-APR-92 | MCKENZIE, M. D. | SUMMARY OF CONCEPTUAL COST FOR PIT 9 | EGG-WM-10153 | 00 |
| 23-MAR-92 | FORSBERG, D. L. | EDF - ENGINEERING DESIGN FILE - EVALUATION OF REMEDIAL ALTERNATIVES FOR PIT 9 INTERIM ACTION (IA) | ERP-BWP-68 | 00 |
| 17-MAR-92 | FIGUEROA, I. C. | EDF - ENGINEERING DESIGN FILE - PIT 9 RESIDUAL RISK ASSESSMENT | ERP-BWP-69 | 00 |
| 23-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHO PRESS TRIBUNE, NAMPA, IDAHO 01/23/92 | 4427 | 00 |
| 23-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, THE TIMES NEWS, TWIN FALLS, IDAHO, 01/23/92 | 4428 | 00 |
| 23-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHO STATESMAN, BOISE, IDAHO, 01/23/92 | 4429 | 00 |
| 23-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED FOR PROPOSED PLAN FOR PIT 9, IDAHO STATE JOURNAL, POCATELLO, IDAHO, 01/23/92 | 4430 | 00 |
| 23-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, LEWISTON, IDAHO 01/23/92 | 4433 | 00 |
| 22-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, IDAHOAN, MOSCOW, IDAHO 01/22/91 | 4431 | 00 |
| 22-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9, SOUTH IDAHO PRESS, BURLEY, IDAHO 01/22/92 | 4432 | 00 |
| 22-JAN-92 | INEL COMMUNITY RELATIONS | COMMENT PERIOD EXTENDED ON THE PROPOSED PLAN FOR PIT 9, BURLEY, IDAHO 01/22/92 | 7762 | 00 |
| 21-JAN-92 | NOT SPECIFIED | COMMENT PERIOD EXTENDED ON PROPOSED PLAN FOR PIT 9 - THE POST REGISTER IDAHO FALLS, IDAHO 01/21/92 | 3550 | 00 |
| 07-JAN-92 | NOT SPECIFIED | PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN FOR AN INTERIM ACTION (IA) AT PIT 9 AT RWMC, IDAHO FALLS, IDAHO 01/07/92 | 3544 | 00 |
| 01-JAN-92 | LIEKHUS, K. J. | NONRADIONUCLIDE INVENTORY IN PIT 9 AT RWMC | EGG-WM-10079 | 00 |
| 01-JAN-92 | LUGAR, R. M. | EDF - ENGINEERING DESIGN FILE - RESULTS OF CHEMICAL & RADIOLOGICAL ANALYSIS OF RWMC PIT 9 & ACID PIT PERIMETER SUBSURFACE SOIL | ERP-BWP-67 | 00 |
| 13-DEC-91 | DOE PUBLIC AFFAIRS | RECORD OF WRITTEN COMMENTS RECEIVED DURING THE PUBLIC COMMENT PERIOD 12/13/91 - 02/11/92 ON THE PROPOSED PLAN OF PIT 9 | 5098 | 00 |
| 06-DEC-91 | COE, M. | DOE NEWS - AGENCIES RESCHEDULE COMMENT PERIOD ON PROPOSED CLEANUP | 3392 | 00 |
| 05-DEC-91 | NOT SPECIFIED | PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL | 3543 | 00 |
| 05-DEC-91 | NOT SPECIFIED | CODED VERBAL AND WRITTEN COMMENTS RECEIVED ON THE ORIGINAL PROPOSED PLAN FOR PIT 9 | 5521 | 00 |
| 01-NOV-91 | DOE | PUBLIC PARTICIPATION IN ENVIRONMENTAL RESTORATION (ER) ACTIVITIES | DOE/EH-0221 | 00 |
| 01-NOV-91 | MCCLELLAN, Y. | PRELIMINARY RISK EVALUATION FOR PIT 9 | EGG-WM-9938 | 00 |
| 11-SEP-91 | LIIKALA, S. C. | ENGINEERING SCALE TESTS OF ISV TO PCB AND RADIOACTIVE CONTAMINATED SOILS | 5099 | 00 |
| 01-AUG-91 | KNIGHT, J. L. | BRIEF ANALYSIS & DESCRIPTION OF TRANSURANIC (TRU) WASTES IN SUBSURFACE DISPOSAL AREA (SDA) OF RWMC AT INEL | EGG-WTD-9438 | 01 |
| 01-AUG-91 | CALLOW, R. A. | IN SITU VITRIFICATION (ISV) APPLICATION TO BURIED WASTE (BW): FINAL REPORT OF INTERMEDIATE FIELD TESTS AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | EGG-WTD-9807 | 00 |
| 10-JUL-91 | KING, J. J. | ENGINEERING DESIGN FILE (EDF) - METHODOLOGY FOR DETERMINATION OF A RADIOLOGICAL INVENTORY FOR PIT 9 & CORRESPONDING RESULTS | ERP-BWP-64 | 00 |
| 01-JUN-91 | DOE | NATURAL RESOURCE TRUSTEESHIP & ECOLOGICAL EVALUATION FOR ENVIRONMENTAL RESTORATION (ER) AT DOE FACILITIES PUBLIC PARTICIPATION ENVIRONMENTAL RESTORATION (ER) ACTIVITIES | DOE/EH-0192 | 00 |
| 01-FEB-91 | ARRENHOLZ, D. A. | IN SITU VITRIFICATION (ISV) PROGRAM TREATABILITY INVESTIGATION PROGRESS REPORT | EGG-WTD-9383 | 01 |
| 01-FEB-90 | SALEEM, Z. | BACKGROUND DOCUMENT FOR EPA'S COMPOSITE MODEL FOR LANDFILLS (EPACML) | 5549 | 00 |
| 01-APR-88 | LANEY, P. T. | ANNUAL PROGRESS REPORT FY-87 SUBSURFACE INVESTIGATIONS (SI) PROGRAM AT RWMC OF INEL | DOE/ID-10183 | 00 |
| 01-JUN-87 | MARKHAM, O. D. | SUMMARIES OF INEL RADIOECOLOGY AND ECOLOGY PROGRAM RESEARCH PROJECTS | DOE/ID-12111 | 00 |
| 01-MAR-87 | BUELT, J. L. | IN SITU VITRIFICATION (ISV) OF TRANSURANIC WASTE: AN UPDATED SYSTEMS EVALUATION AND APPLICATIONS ASSESSMENT | PNL-4800-SUPPL.1 | 00 |
| 01-JUL-84 | ARTHUR, W. J. | VERTEBRATES OF INEL | DOE/ID-12099 | 00 |
| 16-JUL-79 | REICH, E. E. | BERYLLIUM REGULATIONS LETTER | 5538 | 00 |
| 01-AUG-76 | BARRACLOUGH, J. T. | HYDROLOGY OF SOLID WASTE BURIAL GROUND AS RELATED TO POTENTIAL MIGRATION OF RADIONUCLIDES, INEL - USGS OPEN FILE REPORT 76-471 | IDO-22056 | 00 |