| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 12-MAY-99 | AR COORDINATOR | OPERABLE UNIT (OU) 7-06 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) GROUNDWATER PATHWAY OU 7-06 | AR.INDEX.OU.7-06 | 00 |
| 01-DEC-97 | BARRIE, S. L. | SAMPLING & ANALYSIS PLAN (SAP) FOR ROUTINE MONITORING OF OPERABLE UNIT (OU) 7-06 - FORMERLY EGG-ER-10747 | INEL-94/0027 | 06 |
| 05-FEB-96 | KOCH, D. F. | IDHW-DEQ RESPONSE TO REVISION OF WAG-7 OU 7-06 GROUNDWATER SAMPLING & ANALYSIS PLAN (SAP) - APPROVAL TO CONTINUE DISCHARGE OF M SERIES WELL PURGE WATER TO GROUND SURFACE | 10437 | 00 |
| 01-AUG-95 | BARRIE, S. L. | SAMPLING AND ANALYSIS PLAN (SAP) FOR ROUTINE MONITORING OF OPERABLE UNIT (OU) 7-06 (FORMERLY EGG-ER-10747) | INEL-94/0027 | 05 |
| 16-MAY-95 | ROHE, M. J. | ENGINEERING DESIGN FILE (EDF) - LARGE SCALE AQUIFER STRESS TEST & INFILTRATION TEST: WATER MANAGEMENT SYSTEM OPERATIONS & RESULTS | ER-WAG7-59 | 00 |
| 08-MAY-95 | BISHOP, C. W. | ENGINEERING DESIGN FILE (EDF) LARGE SCALE INFILTRATION TEST CPN DATA ANALYSIS | ER-WAG7-58 | 00 |
| 22-FEB-95 | WYLIE, A. H. | EDF - ENGINEERING DESIGN FILE - LARGE SCALE AQUIFER PUMPING TEST RESULTS | ER-WAG7-56 | 00 |
| 24-JAN-95 | DUNNIVANT, F. M. | EDF - ENGINEERING DESIGN FILE - RESULTS FROM LARGE SCALE AQUIFER PUMPING & INFILTRATION TEST (APIT) DOWNHOLE GAMMA SPECTROSCOPIC MONITORING | ER-WAG7-54 | 00 |
| 07-DEC-94 | DOE, EPA, IDHW | ACTION DETERMINATION FOR OPERABLE UNIT (OU) 7-06: WAG-7 GROUNDWATER PATHWAY TRACK 2 SUMMARY REPORT, JUNE 1994 (06/94) | 5868 | 00 |
| 01-JUN-94 | HIGGS, B. D. | WAG-7 GROUNDWATER PATHWAY TRACK 2 SUMMARY REPORT | EGG-ER-10731 | 00 |
| 26-JAN-94 | JONES, E. | EPA COMMENTS: INEL WAG-7 GROUNDWATER PATHWAY DRAFT TRACK 2 SUMMARY REPORT | 5622 | 00 |
| 27-DEC-93 | CLEARY, P. A. | ADVANCE NOTICE OF SAMPLING, RWMC | 5610 | 00 |
| 03-NOV-93 | NYGARD, D. | REVIEW COMMENTS FOR WAG-7 GROUNDWATER PATHWAY DRAFT TRACK 2 SUMMARY REPORT, OPERABLE UNIT (OU) 7-06, APRIL 1993, (04/93)(EGG-ER-10731) | 5364 | 00 |
| 01-MAR-92 | ROOD, A. S. | GWSCREEN: A SEMI-ANALYTICAL MODEL FOR ASSESSMENT OF GROUNDWATER PATHWAY FROM SURFACE OR BURIED CONTAMINATION: THEORY & USER'S MANUAL (REPORT) | EGG-GEO-10158 | 00 |
Previous Page | Administrative Record Home Page