Select By Operable Unit (OU)

For Operable Unit 5/GEN

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
05-FEB-08 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS DOE/ID-11042 04
31-JUL-07 HANEY, T. J. LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 DOE/ID-11316 01
09-JUL-07 CULP, B. ACTION MEMORANDUM FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND PBF VESSEL DISPOSAL DOE/ID-11331 00
04-MAY-07 STALEY, C. S. STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY EDF-7433 01
01-MAY-07 CULP, B. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL DOE/ID-11309 00
16-APR-07 MCCARTHY, J. M. GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE EDF-7618 01
28-SEP-06 NESSHOEFER, C. A. POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS EDF-7000 00
27-JUL-06 JOLLEY, W. L. IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN DOE/ID-11042 03
16-FEB-05 AR COORDINATOR PER-620 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) AR.INDEX.NTCRA.PER-620 00
15-FEB-05 RENO, S. L. ACTION MEMORANDUM FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) - PUBLIC COMMENTS AND RESPONSES TO SIGNIFICANT COMMENTS ARE INCLUDED IN APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D DOE/NE-ID-11213 00
15-FEB-05 HARKER, W. S. DOE RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #120 ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 OF DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) EM-FMDP-05-007 00
17-DEC-04 RENO, S. L. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) DOE/NE-ID-11196 00
03-AUG-04 HAIN, K. E. TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED EM-ER-04-172 00
01-AUG-04 PRATT, M. B. DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) DOE/NE-ID-11187 0A
28-MAY-04 HOLMES, F. C. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) 24887 00
23-MAR-04 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/ID-10587 08
12-SEP-02 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 DOE/ID-10587 07
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
01-JUN-00 INEEL COMMUNITY RELATIONS INEEL REPORTER - WASTE AREA GROUP 5 (WAG-5) CLEANUP UNDERWAY WITH GOAL OF SAVING $2.4 MILLION - JUNE 2000 - JULY 2000 (06/2000 - 07/2000) 21213 00
01-NOV-98 INEEL COMMUNITY RELATIONS INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) 17370 00
01-DEC-97 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) DOE/ID-10587 05
10-MAY-96 GREEN, L. A. REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN OPE-ER-96-84 00
01-MAR-95 BAUMER, A. R. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 INEL-95/0086 04
02-AUG-93 BARRY, G. A. TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) 93MSE/ID-225 00
01-AUG-93 BARRY, G. A. SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) 6744 00
01-JUN-93 SEHLKE, G. WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) DOE/ID-10392,VOL.01 00


Send Questions and Comments to: tua@inel.gov

Previous Page | Administrative Record Home Page