| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 31-JUL-07 | HANEY, T. J. | LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 | DOE/ID-11316 | 01 |
| 09-JUL-07 | CULP, B. | ACTION MEMORANDUM FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND PBF VESSEL DISPOSAL | DOE/ID-11331 | 00 |
| 04-MAY-07 | STALEY, C. S. | STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY | EDF-7433 | 01 |
| 01-MAY-07 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL | DOE/ID-11309 | 00 |
| 16-APR-07 | MCCARTHY, J. M. | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE | EDF-7618 | 01 |
| 28-SEP-06 | NESSHOEFER, C. A. | POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS | EDF-7000 | 00 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 16-FEB-05 | AR COORDINATOR | PER-620 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | AR.INDEX.NTCRA.PER-620 | 00 |
| 15-FEB-05 | RENO, S. L. | ACTION MEMORANDUM FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) - PUBLIC COMMENTS AND RESPONSES TO SIGNIFICANT COMMENTS ARE INCLUDED IN APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D | DOE/NE-ID-11213 | 00 |
| 15-FEB-05 | HARKER, W. S. | DOE RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #120 ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 OF DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | EM-FMDP-05-007 | 00 |
| 17-DEC-04 | RENO, S. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | DOE/NE-ID-11196 | 00 |
| 03-AUG-04 | HAIN, K. E. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED | EM-ER-04-172 | 00 |
| 01-AUG-04 | PRATT, M. B. | DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) | DOE/NE-ID-11187 | 0A |
| 28-MAY-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | 24887 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 01-JUN-00 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - WASTE AREA GROUP 5 (WAG-5) CLEANUP UNDERWAY WITH GOAL OF SAVING $2.4 MILLION - JUNE 2000 - JULY 2000 (06/2000 - 07/2000) | 21213 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 01-DEC-97 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 10-MAY-96 | GREEN, L. A. | REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | OPE-ER-96-84 | 00 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |