| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 09-AUG-05 | JESSMORE, P. J. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 4 (WAG-4), CENTRAL FACILITIES AREA (CFA) | ICP/EXT-05-00955 | 00 |
| 28-MAR-02 | HAIN, K. E. | TRANSMITTAL OF NEW SITE IDENTIFICATION (NSI) FORM AT THE CFA-10 TRANSFORMER YARD - SOIL FILLED CONCRETE RING ADJACENT TO BUILDING CFA-667 - SITE TITLE: CFA-10A FOR REVIEW AND CONCURRENCE | EM-ER-02-044 | 00 |
| 28-MAR-00 | HUNTLEY, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 4 (WAG-4) RECORD OF DECISION (ROD) COST ESTIMATE | EDF-ER-152 | 00 |
| 03-SEP-99 | AR COORDINATOR | OPERABLE UNIT (OU) 4-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 4-09 | AR.INDEX.OU.4-09 | 00 |
| 18-FEB-99 | HATHAWAY, C. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 4 (WAG-4) REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT | OPE-ER-30-99 | 00 |
| 29-JAN-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 AT INEEL | 10564 | 00 |
| 01-JUL-98 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 4-13 WASTE AREA GROUP 4 (WAG-4) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-96/0298 | 01 |
| 01-JUL-98 | BLACKMORE, C. S. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 4-13 CFA | INEL-96/0315 | 01 |
| 12-JUN-98 | HATHAWAY, C. | TRANSMITTAL OF CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT FOR OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 | OPE-ER-94-98 | 00 |
| 01-JUN-98 | LANDIS, J. A. | CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 | INEEL/EXT-97-01462 | 00 |
| 18-SEP-97 | TANNER, D. M. | CFA TANK FARM REMOVAL, CFA FIRE TRAINING REMOVAL & LAND TREATMENT LIFTS | 10559 | 00 |
| 01-SEP-97 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | INEL/EXT-97-00474 | 01 |
| 01-AUG-97 | KUHNS, D. J. | ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | 10428 | 00 |
| 01-AUG-97 | JONES, R. K. | INFORMATION REGARDING CFA-677 PUMPHOUSE | 10560 | 00 |
| 25-JUL-97 | JENSEN, N. R. | DOE-ID TRANSMITTAL OF WAG-4 DOCUMENTS - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) & ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13, CFA-15, CFA-17, CFA-47 & CFA-42 | OPE-ER-907-117 | 00 |
| 01-JUL-97 | KUHNS, D. J. | ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | 10423 | 00 |
| 01-JUL-97 | LATRAY, D. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | DOE/ID-10582 | 01 |
| 24-JUN-97 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW OF CFA CONTAMINATED SOIL REMOVAL SUMMARY REPORT FOR OU 4-06 & 4-09 | 10425 | 00 |
| 19-JUN-97 | RENO, S. L. | IDAHO DEPARTMENT OF WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT OPERABLE UNITS (OU) 4-06 & 4-09 - INEL/EXT-97-00112 - APRIL 1997 (04/97) | 15168 | 00 |
| 04-JUN-97 | INEEL COMMUNITY RELATIONS | PUBLIC NOTICE - PUBLIC COMMENT PERIOD BEGINS ON REMOVAL OF CONTAMINATED SOILS FROM CENTRAL FACILITIES AREA (CFA) OF INEEL | 10556 | 00 |
| 16-MAY-97 | RENO, S. L. | IDHW-DEQ REVIEW OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-08, CFA-13, CFA-15, CFA-17, CFA-47 CFA-42 | 10558 | 00 |
| 06-MAY-97 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) | 15170 | 00 |
| 01-MAY-97 | LATRAY, D. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 | DOE/ID-10582 | 00 |
| 01-MAY-97 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 | DOE/ID-10583 | 00 |
| 01-MAY-97 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-08, CFA-13, CFA-15, CFA-17, CFA-47, CFA-42 | INEL/EXT-97-00474 | 00 |
| 30-APR-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 | OPE-ER-69-97 | 00 |
| 28-APR-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR 1997 WAG-4 MISCELLANEOUS SITES REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 | OPE-ER-64-97 | 00 |
| 24-APR-97 | JENSEN, N. R. | TRANSMITTAL OF THE CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL (1996) REMOVAL ACTION SUMMARY REPORT FOR OPERABLE UNITS (OU) 4-06 & 4-09 | OPE-ER-061-97 | 00 |
| 22-APR-97 | JENSEN, N. R. | FOURTEEN (14) DAY NOTIFICATION OF SAMPLING FOR WASTE AREA GROUP 4 (WAG-4) REMOVAL ACTION & COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-61-97 | 00 |
| 11-APR-97 | HIGGINS, L. M. | TRANSMITTAL OF CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT, WAG-4 OU 4-06 & 4-09 - DOE COMMENTS & RESOLUTIONS ARE INCLUDED | 37:04:004-97 | 00 |
| 01-APR-97 | HIGGINS, L. M. | CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT OPERABLE UNITS (OU) 4-06 & 4-09 | INEL/EXT-97-00112 | 00 |
| 12-MAR-97 | DOE | ACTION DETERMINATION FOR CFA-10, CFA-26, CFA-42 & CFA-46 FOR OPERABLE UNIT (OU) 4-09 - TO BE EVALUATED IN OU 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) BASELINE RISK ASSESSMENT (BRA) | 10403 | 00 |
| 17-JAN-97 | DUDZIAK, A. J. | TRANSMITTAL OF DATA COLLECTED IN SUPPORT OF OPERABLE UNIT (OU) 4-06 & 4-09 REMOVAL ACTION TO WASTE AREA GROUP 4 (WAG-4) MANAGERS | AJD-9704.06V | 00 |
| 15-OCT-96 | JENSEN, N. R. | DOE-ID TRANSMITTAL OF REVISION 2 (REV.02) LEAD AGENCY ACTION MEMORANDUM REMOVAL ACTION CENTRAL FACILITIES AREA (CFA) OPERABLE UNITS (OU) 4-06 & 4-09 | OPE-ER-155-96 | 00 |
| 01-OCT-96 | HIGGINS, L. M. | DEPARTMENT OF ENERGY IDAHO OPERATIONS OFFICE (DOE-ID) LEAD AGENCY ACTION MEMORANDUM REMOVAL ACTION CENTRAL FACILITIES AREA (CFA) OPERABLE UNITS (OU) 4-06 & 4-09 | INEL-96/0283 | 02 |
| 26-SEP-96 | JENSEN, N. R. | TRANSMITTAL OF REVISION 1 (REV.01) OF LEAD AGENCY ACTION MEMORANDUM, REMOVAL ACTION, CENTRAL FACILITIES AREA (CFA), OPERABLE UNITS (OU) 4-06 & 4-09 | OPE-ER-140-96 | 00 |
| 23-AUG-96 | JENSEN, N. R. | TRANSMITTAL OF LEAD AGENCY ACTION MEMORANDUM, REMOVAL ACTION, CENTRAL FACILITIES AREA (CFA) OPERABLE UNITS (OU) 4-06 & 4-09 | OPE-ER-127-96 | 00 |
| 23-AUG-96 | JENSEN, N. R. | TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) FOR CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION, OPERABLE UNITS (OU) 4-06 & 4-09 | OPE-ER-128-96 | 00 |
| 01-AUG-96 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION OPERABLE UNITS (OU) 4-06 & 4-09 - (PARSONS ES-37.6.3) | DOE/ID-10546 | 02 |
| 01-AUG-96 | PARSONS ENGINEERING | HEALTH & SAFETY PLAN (HSP) FOR CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION OU 4-06 & 4-09 (PARSONS ES.37.6.12) | INEL-96/0255 | 01 |
| 01-AUG-96 | HIGGINS, L. M. | DEPARTMENT OF ENERGY IDAHO OPERATIONS OFFICE (DOE-ID) LEAD AGENCY ACTION MEMORANDUM REMOVAL ACTION CENTRAL FACILITIES AREA (CFA) OPERABLE UNITS (OU) 4-06 & 4-09 | INEL-96/0283 | 00 |
| 01-JUL-96 | ROSENBERGER, M. S. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) RECOMMENDATION FROM TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-09 AT INEL | 10290 | 00 |
| 14-MAY-96 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-09 | 10275 | 00 |
| 18-APR-96 | DUDZIAK, A. J. | OV NOTE - PLACE OPERABLE UNIT (OU) 4-09 TRACK 2 SUMMARY REPORT INTO ADMINISTRATIVE RECORD (AR) (ALSO 4-03 & 4-07) ALONG WITH COPY OF THIS NOTE | 10273 | 00 |
| 05-APR-96 | GREEN, L. A. | TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-09 & DOE-ID RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) & IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT REPORT | OPE-ER-62-96 | 00 |
| 01-APR-96 | BLACKMORE, C. S. | PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-09 (INCORPORATING SELECTED SITES FROM OPERABLE UNITS 4-03 & 4-07) & CFA FRENCH DRAIN REMOVALS | INEL-95/0586 | 00 |
| 08-MAR-96 | ROSENBERGER, M. S. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-09 | 15171 | 00 |
| 29-FEB-96 | ORLEAN, H. | EPA COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-09 & CFA FRENCH DRAIN REMOVALS | 10177 | 00 |
| 24-JAN-96 | JENSEN, N. R. | TRANSMITTAL OF DRAFT TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-09 | OPE-ER-17-96 | 00 |
| 18-JUL-95 | GREEN, L. A. | TRANSMITTAL OF FINAL ACTION MEMORANDUM FOR OPERABLE UNIT (OU) 4-09 | OPE-ER-134-95 | 00 |
| 07-JUL-95 | NOT SPECIFIED | DEPARTMENT OF ENERGY IDAHO OPERATIONS (DOE-ID) LEAD AGENCY ACTION MEMORANDUM REMOVAL ACTION CENTRAL FACILITIES AREA (CFA) CFA-07, CFA-12 AND CFA-50 FRENCH DRAINS | INEL-95/0341 | 00 |
| 07-JUN-95 | DUDZIAK, A. J. | TRANSMITTAL OF DRAFT ACTION MEMORANDUM FOR OPERABLE UNIT (OU) 4-09 | OPE-ER-104-95 | 00 |
| 25-MAY-95 | DUDZIAK, A. J. | DOE RESPONSE TO EPA & IDHW COMMENTS ON DRAFT OPERABLE UNIT (OU) 4-09 TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) | 10182 | 00 |
| 25-MAY-95 | DUDZIAK, A. J. | TRANSMITTAL OF TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 4-09 | OPE-ER-091-95 | 00 |
| 01-MAY-95 | GIANOTTO, D. F. | SAMPLING & ANALYSIS PLAN (SAP) FOR WAG-4 OU 4-09 TRACK 2 INVESTIGATION (INCORPORATING SELECTED SITES FOR OU 4-03 & 4-07) & CFA FRENCH DRAIN REMOVALS | INEL-95/0003 | 00 |
| 01-MAY-95 | HILLMAN-MASON, K. Y. | HEALTH & SAFETY PLAN (HSP) FOR TRACK 2 INVESTIGATION OF OU 4-09 (INCORPORATING SELECTED SITES FROM OU 4-03 & 4-07) & CFA FRENCH DRAIN REMOVALS | INEL-95/0004 | 00 |
| 22-MAR-95 | DUDZIAK, A. J. | TRANSMITTAL OF DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 4-09 (INCORPORATING SELECTED SITES FROM OU 4-03 & 4-07) | OPE-ER-051-95 | 00 |
| 19-JAN-95 | BLOOD, H. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON SCOPE OF WORK FOR OPERABLE UNITS (OU) 4-03, 4-07 & 4-09 TRACK 2 INVESTIGATIONS AT CENTRAL FACILITIES AREA (CFA) INEL | 15169 | 00 |
| 15-DEC-94 | DUDZIAK, A. J. | TRANSMITTAL OF TRACK 2 SCOPE OF WORK (SOW) FOR OPERABLE UNITS (OU) 4-03, 4-07 & 4-09 FOR REVIEW & COMMENT | OPE-ER-322-94 | 00 |
| 22-NOV-94 | DUDZIAK, A. J. | TRANSMITTAL OF FOURTH (4TH) OF FOUR (4) TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-09 FOR REVIEW | OPE-ER-305-94 | 00 |
| 26-OCT-94 | GREEN, L. A. | TRANSMITTAL OF DRAFT TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-09 | OPE-ER-286-94 | 00 |
| 28-SEP-94 | GREEN, L. A. | FEDERAL FACILITY AGREEMENT CONSENT ORDER (FFA/CO) SEPTEMBER 28, 1994 (09/28/94) PROJECT MANAGER MEETING MINUTES - TELECONFERENCE | 8075 | 00 |
| 19-SEP-94 | PIGOTT, W. R. | NEW SITE IDENTIFICATION (NSI) FORM FOR CENTRAL FACILITIES AREA (CFA) CAFETERIA OIL TANK LEAK CFA-721 | 8704 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-26 PUMP STATION FUEL SPILL CFA-760 | 2521 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-42 TANK FARM PUMP STATION SPILLS | 2532 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-10 TRANSFORMER YARD OIL SPILLS | 2515 | 00 |
Previous Page | Administrative Record Home Page