| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 09-AUG-05 | JESSMORE, P. J. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 4 (WAG-4), CENTRAL FACILITIES AREA (CFA) | ICP/EXT-05-00955 | 00 |
| 28-MAR-00 | HUNTLEY, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 4 (WAG-4) RECORD OF DECISION (ROD) COST ESTIMATE | EDF-ER-152 | 00 |
| 19-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 4-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 4-08 | AR.INDEX.OU.4-08 | 00 |
| 18-SEP-97 | TANNER, D. M. | CFA TANK FARM REMOVAL, CFA FIRE TRAINING REMOVAL & LAND TREATMENT LIFTS | 10559 | 00 |
| 16-MAY-97 | RENO, S. L. | IDHW-DEQ REVIEW OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-08, CFA-13, CFA-15, CFA-17, CFA-47 CFA-42 | 10558 | 00 |
| 01-MAY-97 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-08, CFA-13, CFA-15, CFA-17, CFA-47, CFA-42 | INEL/EXT-97-00474 | 00 |
| 30-APR-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 | OPE-ER-69-97 | 00 |
| 28-APR-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR 1997 WAG-4 MISCELLANEOUS SITES REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 | OPE-ER-64-97 | 00 |
| 13-NOV-96 | KENOYER, D. J. | TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 | DJK-09-96-A | 00 |
| 23-MAY-96 | DOE, EPA, IDHW | TRACK 2 DECISION STATEMENT FOR OU 4-08 - TO BE FURTHER EVALUATED IN BASELINE RISK ASSESSMENT (BRA) OF OU 4-13 RI/FS | 10280 | 00 |
| 10-JAN-96 | ROSENBERGER, M. S. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) RECOMMENDATION FROM TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-08 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | 10398 | 00 |
| 18-AUG-95 | GREEN, L. A. | TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OU 4-08 | OPE-ER-154-95 | 00 |
| 01-AUG-95 | EVANS, S. K. | PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-08 | INEL-95/0111 | 00 |
| 14-JUL-95 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-08 | 15167 | 00 |
| 14-JUN-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-08 | OPE-ER-114-95 | 00 |
| 16-JAN-95 | PIERRE, W. | EPA RECOMMENDATION LETTER - PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-08 | 10154 | 00 |
| 12-JAN-95 | ROSENBERGER, M. S. | RECOMMENDATION FROM TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-08 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) - IDHW EVALUATION OF CFA OU 4-08 | 10153 | 00 |
| 13-MAY-94 | GREEN, L. A. | TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) & HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 4-08 TRACK 2 ASSESSMENT | OPE-ER-120-94 | 00 |
| 21-MAR-94 | DOE, EPA, IDHW | DOE, EPA & IDHW COMMENTS ON SAMPLING & ANALYSIS PLAN (SAP) FOR TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-08 | 7581 | 00 |
| 02-MAR-94 | GREEN, L. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 4-08 TRACK 2 ASSESSMENT | OPE-ER-054-94 | 00 |
| 22-NOV-93 | DUDZIAK, A. J. | TRANSMITTAL OF DRAFT PRELIMINARY SCOPING PACKAGE AND DRAFT SCOPE OF WORK (SOW) OF OPERABLE UNIT (OU) 4-08, CFA SEWAGE SYSTEM AT INEL | OPE-ER-040-93 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-08 SEWAGE PLANT CFA-691 SEPTIC TANK CFA-716 AND DRAINFIELD | 2513 | 00 |
Previous Page | Administrative Record Home Page