| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 09-AUG-05 | JESSMORE, P. J. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 4 (WAG-4), CENTRAL FACILITIES AREA (CFA) | ICP/EXT-05-00955 | 00 |
| 28-MAR-00 | HUNTLEY, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 4 (WAG-4) RECORD OF DECISION (ROD) COST ESTIMATE | EDF-ER-152 | 00 |
| 17-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 4-05 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 4-05 | AR.INDEX.OU.4-05 | 00 |
| 04-NOV-98 | MCCORMICK, S. H. | HAZARDOUS WASTE DETERMINATION (HWD) - WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-05 SITES CFA-17 & CFA-47 CENTRAL FACILITIES AREA (CFA) 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) | 10557 | 00 |
| 02-OCT-98 | HATHAWAY, C. | CORRECTION TO LETTER, SUBJECT - TRANSMITTAL OF REMOVAL ACTION SUMMARY OF CFA-04 POND & TSF-08 TIME CRITICAL REMOVAL ACTIONS (TCRA) FOR OPERABLE (OU) 4-05 | OPE-ER-150-98 | 00 |
| 03-SEP-98 | NICKLAUS, D. | REMOVAL ACTION SUMMARY OF CFA-04 POND & TSF-08 TIME CRITICAL REMOVAL ACTIONS (TCRA) | INEL-95/0382 | 02 |
| 12-JUN-98 | HATHAWAY, C. | TRANSMITTAL OF CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT FOR OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 | OPE-ER-94-98 | 00 |
| 01-JUN-98 | LANDIS, J. A. | CENTRAL FACILITIES AREA (CFA) CONTAMINATED SOIL REMOVAL ACTION SUMMARY REPORT OPERABLE UNITS (OU) 4-02, 4-05 & 4-09 | INEEL/EXT-97-01462 | 00 |
| 18-SEP-97 | TANNER, D. M. | CFA TANK FARM REMOVAL, CFA FIRE TRAINING REMOVAL & LAND TREATMENT LIFTS | 10559 | 00 |
| 01-SEP-97 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | INEL/EXT-97-00474 | 01 |
| 01-AUG-97 | KUHNS, D. J. | ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | 10428 | 00 |
| 25-JUL-97 | JENSEN, N. R. | DOE-ID TRANSMITTAL OF WAG-4 DOCUMENTS - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) & ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13, CFA-15, CFA-17, CFA-47 & CFA-42 | OPE-ER-907-117 | 00 |
| 01-JUL-97 | KUHNS, D. J. | ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | 10423 | 00 |
| 01-JUL-97 | LATRAY, D. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 | DOE/ID-10582 | 01 |
| 01-JUL-97 | REESE, C. L. | DECONTAMINATION PLAN FOR CONTAMINATED EQUIPMENT AT CERCLA OU 1-08 AND 4-05 MERCURY RETORTING | INEL/EXT-97-00503 | 01 |
| 04-JUN-97 | INEEL COMMUNITY RELATIONS | PUBLIC NOTICE - PUBLIC COMMENT PERIOD BEGINS ON REMOVAL OF CONTAMINATED SOILS FROM CENTRAL FACILITIES AREA (CFA) OF INEEL | 10556 | 00 |
| 23-MAY-97 | JENSEN, N. R. | RESPONSE TO APRIL 1, 1997 (04/01/97) SHAWN ROSENBERGER TO NOLAN JENSEN LETTER REGARDING SUMMARY OF CFA-674 POND TIME CRITICAL REMOVAL ACTION (TCRA) REPORT, OU 4-05 | OPE-ER-81-97 | 00 |
| 16-MAY-97 | RENO, S. L. | IDHW-DEQ REVIEW OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-08, CFA-13, CFA-15, CFA-17, CFA-47 CFA-42 | 10558 | 00 |
| 06-MAY-97 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) | 15170 | 00 |
| 01-MAY-97 | LATRAY, D. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 | DOE/ID-10582 | 00 |
| 01-MAY-97 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 | DOE/ID-10583 | 00 |
| 01-MAY-97 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-08, CFA-13, CFA-15, CFA-17, CFA-47, CFA-42 | INEL/EXT-97-00474 | 00 |
| 30-APR-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT FIELD SAMPLING PLAN (FSP) FOR WAG-4 MISCELLANEOUS SITES 1997 REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 | OPE-ER-69-97 | 00 |
| 28-APR-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR 1997 WAG-4 MISCELLANEOUS SITES REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 | OPE-ER-64-97 | 00 |
| 22-APR-97 | JENSEN, N. R. | FOURTEEN (14) DAY NOTIFICATION OF SAMPLING FOR WASTE AREA GROUP 4 (WAG-4) REMOVAL ACTION & COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-61-97 | 00 |
| 01-APR-97 | ROSENBERGER, M. S. | IDHW-DEQ REVIEW OF SUMMARY OF CFA-674 POND TIME CRITICAL REMOVAL ACTION (TCRA) REPORT | 10422 | 00 |
| 18-MAR-97 | ROSENBERGER, M. S. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON THE OPERABLE UNIT (OU) 4-05 & 1-08 REMOVAL ACTION MERCURY RETORT PROJECT WASTE STREAM APPLICABLE OR RELEVANT & APPROPRIATE REQUIREMENTS (ARAR) TABLE | 10410 | 00 |
| 12-MAR-97 | DOE | ACTION DETERMINATION FOR CFA-04, CFA-17 & CFA-47 TO BE EVALUATED IN OU 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) BASELINE RISK ASSESSMENT (BRA) - NO FURTHER ACTION DETERMINATION FOR CFA-50 IN OPERABLE UNIT (OU) 4-05 - TRACK 2 INVESTIGATI | 10401 | 00 |
| 12-FEB-97 | JENSEN, N. R. | DOE-ID TRANSMITTAL OF OPERABLE UNIT (OU) 4-05 & 1-08 REMOVAL ACTION MERCURY RETORT PROJECT WASTE STREAM APPLICABLE OR RELEVANT & APPROPRIATE REQUIREMENTS (ARAR) TABLE | OPE-ER-12-97 | 00 |
| 01-FEB-97 | JONES, R. W. | HEALTH & SAFETY PLAN (HSP) FOR MERCURY RETORT PROJECT | INEL-95/0424 | 03 |
| 28-JUN-96 | ROSENBERGER, M. S. | IDHW RECOMMENDATION FROM TRACK 2 INVESTIGATION OF OPERABLE UNIT (OU) 4-05 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | 10287 | 00 |
| 09-MAY-96 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RECOMMENDATION LETTER & COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-05 | 10274 | 00 |
| 02-MAY-96 | GREEN, L. A. | TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 | OPE-ER-79-96 | 00 |
| 01-APR-96 | PEATROSS, R. G. | PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 | INEL-95/0626 | 00 |
| 29-MAR-96 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-05 (DRAFT) | 10270 | 00 |
| 22-MAR-96 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW) COMMENTS ON PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 4-05 (DRAFT) | 10271 | 00 |
| 23-FEB-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT TRACK 2 SUMMARY REPORT FOR OU 4-05 | OPE-ER-34-96 | 00 |
| 01-OCT-95 | SHERWOOD, J. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR RETORTED MERCURY CONTAMINATED WASTE FROM CFA-674 & TAN MERCURY SPILL SITE AT INEL | INEL-95/0222 | 01 |
| 18-JUL-95 | GREEN, L. A. | TRANSMITTAL OF RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 4-05 TRACK 2 | OPE-ER-139-95 | 00 |
| 14-JUL-95 | GREEN, L. A. | TRANSMITTAL OF REVISED SAMPLING & ANALYSIS PLAN (SAP) & DOE RESPONSE TO IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT SAP FOR OPERABLE UNIT (OU) 4-05 TRACK 2 | OPE-ER-133-95 | 00 |
| 01-JUL-95 | HONEYCUTT, T. K. | FIELD SAMPLING PLAN (FSP) FOR WAG-4 OU 4-05, TRACK 2 INVESTIGATION | INEL-95/0188 | 00 |
| 01-JUL-95 | GURNEY, L. W. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 4-05 TRACK 2 INVESTIGATION | INEL-95/0237 | 00 |
| 25-MAY-95 | DUDZIAK, A. J. | DOE RESPONSE TO EPA & IDHW COMMENTS ON DRAFT OPERABLE UNIT (OU) 4-05 TRACK 2 SCOPE OF WORK (SOW) | 10176 | 00 |
| 25-MAY-95 | DUDZIAK, A. J. | TRANSMITTAL OF DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OU 4-05 | OPE-ER-092-95 | 00 |
| 15-FEB-95 | BLOOD, H. R. | EPA COMMENTS ON SCOPE OF WORK FOR OU 4-05 TRACK 2 INVESTIGATIONS AT CFA INEL | 15165 | 00 |
| 13-JAN-95 | DUDZIAK, A. J. | TRANSMITTAL OF TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 4-05 FOR REVIEW & COMMENT | OPE-ER-004-95 | 00 |
| 01-JAN-95 | INEL COMMUNITY RELATIONS | INEL REPORTER - 01/95 & 02/95 - TREATING MERCURY CONTAMINATED MATERIAL LAST STEP REMOVAL ACTION | 8898 | 00 |
| 22-DEC-94 | PIGOTT, W. R. | SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 4-05 TRACK 2 INVESTIGATION | 10671 | 00 |
| 29-NOV-94 | DUDZIAK, A. J. | TRANSMITTAL OF TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-05 | OPE-ER-311-94 | 00 |
| 23-SEP-94 | DUDZIAK, A. J. | TRANSMITTAL OF REMOVAL ACTION PLAN FOR CFA-674 POND OPERABLE UNIT (OU) 4-05 | OPE-ER-248-94 | 00 |
| 20-JUL-94 | SMITH, M. R. | REMOVING MERCURY & ASBESTOS CONTAMINATED MATERIAL FROM THE CFA-674 POND (OU 4-05) | 5754 | 00 |
| 08-JUL-94 | INEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY - INEL TO REMOVE MERCURY, ASBESTOS CONTAMINATED MATERIAL | 5714 | 00 |
| 05-JUL-94 | GREEN, L. A. | TRANSMITTAL OF REVISED ACTION MEMORANDUM FOR OU 4-05, CFA-674 POND CALCINE & ASBESTOS REMOVAL ACTION | OPE-ER-180-94 | 00 |
| 05-APR-94 | STAIGER, M. D. | CALCINE DISPOSAL AT CFA | MDS-2-94 | 00 |
| 18-MAR-94 | DUDZIAK, A. J. | TRANSMITTAL OF ACTION MEMORANDUM FOR; AND REQUEST FOR CONCURRENCE ON: TIME CRITICAL REMOVAL ACTION (TCRA) ON OU 4-05, CFA-674 WASTE CALCINE AREA | OPE-ER-65-94 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-17 FIRE DEPARTMENT TRAINING AREA; BERMED | 2499 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-04 POND CFA-674 | 2509 | 00 |