| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 25-JUN-09 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10881 | 7 |
| 19-FEB-09 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10881 | 6 |
| 11-AUG-08 | EATON, D. L. | ACTION MEMORANDUM FOR DECOMMISSIONING CPP-601/640 FUEL REPROCESSING FACILITIES | DOE/ID-11360 | 0 |
| 08-JUL-08 | CAHN, L. S. | ICDF DETECTION MONITORING BIENNIAL REPORT (2006-2007) | DOE/ID-11373 | 0 |
| 05-JUN-08 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10661 | 5 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 14-JAN-08 | EATON, D. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES | DOE/ID-11346 | 02 |
| 22-MAY-07 | MCMANAMON, L. E. | ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 03 |
| 04-JAN-07 | CROSON, D. V. | FINAL REMOVAL ACTION REPORT FOR THE CPP-603A BASIN FACILITY | DOE/ID-11306 | 01 |
| 15-DEC-06 | CROSON, D. V. | FINAL REMOVAL ACTION REPORT FOR THE CPP-603A BASIN FACILITY | DOE/ID-11306 | 00 |
| 31-OCT-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 02 |
| 06-SEP-06 | ROUSSEAU, J. P. | RESPONSE TO COMMENTS ALLEGING IDAHO NATIONAL LABORATORY (INL) RELATED CS-137 AND SR-90 CONTAMINATION IN THE MICHAUD FLATS AREA NEAR POCATELLO, IDAHO | CCN 304024 | 00 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 13-JUL-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 01 |
| 05-JUN-06 | RICHARDS, B. T. | REMOVAL ACTION WORK PLAN (RAWP) FOR THE CHEMICAL PROCESSING PLANT (CPP-603A) BASIN FACILITY | DOE/NE-ID-11214 | 02 |
| 31-MAY-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 00 |
| 08-MAR-06 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT 601 (CPP-601) FUEL REPROCESSING COMPLEX AT THE IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-06-028 | 00 |
| 07-FEB-06 | COLE, M. R. | FINAL REPORT FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-627 REMOTE ANALYTICAL FACILITY | ICP/EXT-06-01145 | 00 |
| 22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
| 30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
| 29-JUN-05 | MACCONNEL, M. J. | SUBMITTAL OF ADDITIONAL INFORMATION AND REQUEST FOR APPROVAL OF PERMANENT ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP | 34886 | 00 |
| 01-JUN-05 | LEWIS, M. G. | ADDITIONAL INFORMATION FOR SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP | ICP/EXT-05-00934 | 00 |
| 15-FEB-05 | RICHARDS, B. T. | REMOVAL ACTION WORK PLAN FOR THE CPP-603 BASIN FACILITY | DOE/NE-ID-11214 | 00 |
| 06-JAN-05 | RICHARDS, B. T. | ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE CPP-603A BASINS, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/NE-ID-11194 | 00 |
| 07-DEC-04 | AR COORDINATOR | CPP-603 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (NEEL) FUEL STORAGE BASIN COMPLEX AT CPP-630 | AR.INDEX.NTCRA.CPP-603 | 00 |
| 31-AUG-04 | ICP COMMUNITY RELATIONS | AGENCIES EXTEND COMMENT PERIOD ON PLAN TO REMOVE WATER FROM OLD INEEL SPENT FUEL BASINS | 24883 | 00 |
| 26-AUG-04 | RICHARDS, B. T. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/NE-ID-11140 | 01 |
| 04-AUG-04 | DOE | NOTICE OF AVAILABILITY - AGENCIES PROPOSE REMOVING WATER FROM OLD INEEL SPENT FUEL BASIN TO REMOVE POTENTIAL RISK TO AQUIFER | 24878 | 00 |
| 02-AUG-04 | HAIN, K. E. | DOE APPROVAL OF REQUEST FOR EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE CPP-603A BASIN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EM-ER-04-166 | 00 |
| 02-AUG-04 | HAIN, K. E. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) | EM-ER-04-171 | 00 |
| 22-JUL-04 | CLOUGH, M. K. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DRAFT CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 24876 | 00 |
| 22-JUL-04 | CLOUGH, M. K. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A NON TIME CRITICAL REMOVAL ACTION (NTCRA), DRAFT DOCUMENT (DOE/NE-ID-11140) | 24877 | 00 |
| 21-JUN-04 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CONCURRENCE ON A SUITABILITY DETERMINATION FOR AN OFF-SITE FACILITY TO MANAGE WASTE AREA GROUP 3 (WAG-3) WASTE | 24870 | 00 |
| 21-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 01 |
| 18-JUN-04 | HAIN, K. E. | TRANSMITTAL OF REMOVAL ACTION WORK PLAN, ACTION MEMORANDUM, AND WASTE MANAGEMENT PLAN (WMP) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | EM-ER-04-125 | 00 |
| 17-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 01 |
| 17-JUN-04 | PETERSON, D. T. | CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) ALTERNATIVES | RRH-11-04 | 00 |
| 16-JUN-04 | BRAGASSA, J. L. | REMOVAL ACTION WORK PLAN FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11158 | 00 |
| 16-JUN-04 | BRAGASSA, J. L. | CPP-627 CERCLA REMOVAL ACTION WASTE MANAGEMENT PLAN (WMP) | DOE/NE-ID-11171 | 00 |
| 14-JUN-04 | AR COORDINATOR | CPP-627 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) SP-6 CPP-627 DECONTAMINATION AND DECOMMISSION (D&D) | AR.INDEX.NTCRA.CPP-627 | 00 |
| 10-JUN-04 | TOMLINSON, G. E. | DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES | 24881 | 00 |
| 04-JUN-04 | RASCH, D. N. | SLUDGE REMOVAL FROM THE CPP-603 BASINS | TS-ETSD-04-113 | 00 |
| 01-JUN-04 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11164 | 00 |
| 19-APR-04 | DOE | NOTICE OF AVAILABILITY - DEPARTMENT OF ENERGY (DOE) PROPOSES DEMOLITION OF REMOTE ANALYTICAL FACILITY BUILDING (CPP-627) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 24839 | 00 |
| 15-APR-04 | BRAGASSA, J. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11157 | 01 |
| 08-APR-04 | ROSENBERGER, M. S. | VICINITY DISCHARGES ELIMINATION WORK PLAN FOR THE HAZARDOUS WASTE MANAGEMENT ACT (HWMA) AND THE RESOURCE CONSERVATION RECOVERY ACT (RCRA) POST CLOSURE PERMIT FOR INTEC WASTE CALCINING FACILITY (WCF) AT THE INEEL | DOE/NE-ID-11138 | 00 |
| 31-MAR-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF CPP-627, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INEEL | 24838 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 10-MAR-04 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 01 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 00 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 00 |
| 16-FEB-04 | DOORNBOS, M. H. | WHITE PAPER - BUILDING CPP-627 DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) CAN BE PERFORMED UNDER THE DEPARTMENT OF ENERGY'S (DOE) CERCLA REMOVAL ACTION AUTHORITY | 24828 | 00 |
| 16-FEB-04 | DOORNBOS, M. H. | APPROVAL NEEDED OF CERCLA TIME CRITICAL REMOVAL ACTION (TCRA) FOR DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) OF BUILDING CPP-627 AND TRANSMITTAL OF WHITE PAPER | JHV-019-04 | 00 |
| 27-JAN-04 | ARROWOOD, J. R. | DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES | 24837 | 00 |
| 19-DEC-03 | HOLMES, F. C. | DOE MEMORANDUM - APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR FUEL STORAGE BASIN COMPLEX AT CPP-603, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), INEEL | 24818 | 00 |
| 19-DEC-03 | HOLMES, F. C. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DEACTIVATION OF CPP-603 FUEL STORAGE BASINS | EM-ER-03-318 | 00 |
| 09-DEC-03 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 00 |
| 09-DEC-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - QUANTIFICATION OF THREE DEBRIS OBJECTS FROM THE SOUTH BASIN OF CPP-603 USING THE UNDERWATER GAMMA SPECTROMETER SYSTEM (TUGS) | EDF-4271 | 00 |
| 20-AUG-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - CPP-603 BASINS - FISSILE MATERIAL IN PARTICULATE FORM BASED ON 137CS TO 235U RATIO | EDF-3535 | 00 |
| 15-MAY-03 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - ACCEPTABLE RESIDUAL INVENTORY CALCULATIONS FOR CPP-603 | EDF-3684 | 00 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 01-JUN-01 | DOE | DRAFT ENVIRONMENTAL ASSESSMENT (EA) - DEACTIVATION, DECOMMISSIONING, AND DISMANTLEMENT (D&D&D) OF CPP-603 BASIN PROJECT | DOE/EA-1368 | 00 |
| 09-MAY-01 | PYLE, J. D. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL AIR EMISSIONS ASSOCIATED WITH DEACTIVATION, DECOMMISSIONING AND DISMANTLEMENT (D&D&D) OF CPP-603A BASIN PROJECT | EDF-1931 | 00 |
| 08-MAY-01 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 | EDF-1962 | 00 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 01-APR-00 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES TO DECIDE FATE OF THE CALCINER - APRIL 2000 - MAY 2000 (04/2000 - 05/2000) | 21216 | 00 |
| 01-DEC-99 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1999 AND DECEMBER 1999 (11/99 & 12/99) - INEEL INSERTS PROBE TUBE INTO BURIED WASTE PIT | 10964 | 00 |
| 01-JUN-99 | WAGNER, E. P. | PROCESS DESCRIPTION AND OPERATING HISTORY FOR CPP-601, CPP-604 AND CPP-627 FUEL REPROCESSING COMPLEX AT INEEL | INEEL/EXT-99-00400 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 21-SEP-98 | CHAMBERS, R. | MULTI-AGENCY RADIATION SURVEY & SITE INVESTIGATION MANUAL (MARSSIM) INVESTIGATION FOR CPP-709 RADIONUCLIDES | RC-10-98 | 00 |
| 08-JUL-98 | DOE | PRELIMINARY DRAFT - ENVIRONMENTAL ASSESSMENT (EA) AND DEACTIVATION PLAN FOR OBSOLETE SPENT NUCLEAR FUEL (SNF) PROCESSING, STORAGE, AND SUPPORT FACILITIES AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/EA-1244 | 00 |
| 29-APR-98 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED SOILS REPOSITORY AT INEEL | OPE-ER-73-98 | 00 |
| 01-DEC-97 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI | 14284 | 00 |
| 01-AUG-97 | JONES, R. W. | FIELD SAMPLING PLAN (FSP) FOR D&D OF CPP-631 RALA BUILDING & CPP-709 & CPP-734 MONITORING STATIONS AT ICPP | INEEL/EXT-97-00805 | 00 |
| 08-JUL-97 | FALCONER, K. L. | LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) | KLF-150-97 | 00 |
| 01-JUN-97 | JONES, R. K. | LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - CPP-701 PETROLEUM CONTAMINATED SOIL | INEEL/EXT-97-00677 | 00 |
| 01-JUN-97 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR D&D OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 01 |
| 23-DEC-96 | JENSEN, N. R. | TRANSMITTAL OF THREE TECHNICAL MEMORANDA ON TECHNOLOGY SCREENING REMEDIAL ACTION (RA) OBJECTIVES AND APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARS) | OPE-ER-199-96 | 00 |
| 19-JUN-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT WASTE AREA GROUP 3 (WAG-3) SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (SLERA) | OPE-ER-117-95 | 00 |
| 01-JUN-95 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 00 |
| 23-MAR-95 | GREEN, L. A. | TRANSMITTAL OF VALIDATED DATA FOR PERCHED WATER SAMPLING, DECEMBER 1994 (12/94) AND JANUARY 1995 (01/95) | OPE-ER-052-95 | 00 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 09-JAN-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON DRAFT WASTE AREA GROUP 3 (WAG-3) SATURATED ZONE CONCEPTUAL MODEL | 15044 | 00 |
| 22-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15040 | 00 |
| 28-OCT-94 | JENKINS, T. W. | TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 17286 | 00 |
| 14-OCT-94 | INEL COMMUNITY RELATIONS | COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - CITIZENS INVITED TO GIVE EARLY INPUT | 8028 | 00 |
| 30-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON SEDIMENT LAYERING EFFECT ON CONTAMINANT TRANSPORT FOR NONPERCHED UNSATURATED AREAS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 5779 | 00 |
| 30-AUG-94 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON TECHNICAL MEMORANDUM ASSESSMENT PORFLOW BOUNDARY CONDITIONS FOR USE IN THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) UNSATURATED ZONE MODEL & ATTACHMENT A CYLINDRICAL COORDINATE OPTION PORFLOW | 5784 | 00 |
| 10-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT AQUIFER CHARACTERISTICS TECHNICAL MEMORANDUM | 5778 | 00 |
| 15-JUL-94 | BURNS, S. M. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA | SMB-05-94 | 00 |
| 01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
| 01-APR-94 | BUGGER, B. | DOE NEWS - ENGINEERS NEW SENSOR SYSTEM WITH ARMS CONTROL, CLEANUP APPLICATIONS | 7595 | 00 |
| 30-MAR-94 | BUGGER, B. | DOE NEWS - RETECH SIGN AGREEMENT FOR TEST MELT OF CONTAMINATED METAL | 7559 | 00 |
| 28-FEB-94 | WINCO | BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) | 14143 | 00 |
| 01-FEB-94 | WENZEL, D. R. | RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL | WINCO-1123 | 01 |
| 15-OCT-93 | BUGGER, B. | DOE NEWS - WINCO PRIVATE VENDOR DEMONSTRATES TECHNOLOGY FOR CLEANER DECONTAMINATION | 6836 | 00 |
| 05-AUG-93 | COE, M. | DOE NEWS - IDAHO CHEMICAL PROCESSING PLANT (ICPP) TRANSITION PLAN MADE AVAILABLE | 6710 | 00 |
| 04-AUG-93 | HUESTIS, G. M. | SOIL TREATABILITY STUDY (TS) OF INEL SOILS INCLUDING ICPP SOILS | GMH-01-93 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 24-JUN-93 | COE, M. | DOE NEWS - DOE COMPLETES ENVIRONMENTAL ASSESSMENT (EA) ON UPGRADING CHEMICAL PLANT TANK FARM | 6548 | 00 |
| 01-JUN-93 | BUGGER, B. | DOE NEWS - WINCO COORDINATES EFFORT TO RECYLE CONTAMINATED METAL | 6520 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 2 (VOL.02) - ICPP | DOE/ID-10392,VOL.02 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 3 (VOL.03) - ICPP CONT'D & INEL MIDDLE, NORTH & SOUTH | DOE/ID-10392,VOL.03 | 00 |
| 08-JAN-93 | RHODES, D. W. | EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 | DWR-01-93 | 00 |
| 14-JAN-92 | JONES, K. L. | STATE OF IDAHO, REQUEST FOR INFORMATION | KXJ-9-92 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 13-OCT-91 | EARLE, O. K. | HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT USING DEVICES TO LOCATE UNDERGROUND UTILITIES | 6589 | 00 |
| 10-SEP-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 | SGS-353-91 | 00 |
| 22-AUG-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 | SGS-334-91 | 00 |
| 31-JUL-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 | SGS-289-91 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT | 6625 | 00 |
| 26-APR-90 | GREEN, L. A. | RESPONSE TO STATE QUESTIONS | 6635 | 00 |
| 08-NOV-89 | SEHLKE, G. | RESPONSE TO EPA'S NOTICE OF DEFICIENCY FOR WINCO'S ACCELERATED CLOSURE PLAN (CP) SCHEDULE | GS-15-89 | 00 |
| 01-NOV-88 | THOMAS, T. R. | MODELING HYPOTHETICAL GROUNDWATER TRANSPORT OF NITRATES, CHROMIUM, & CADMIUM AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | WINCO-1060 | 00 |
| 27-JUL-87 | HUNTER, B. R. | FINAL REPORT FOR 2ND (SECOND) PECR - LOG NO. 87072729 | 6629 | 00 |
| 24-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) WL-212 CONTAMINATED LIQUID SPILL | WIN-86-0032-CPP | 00 |
| 22-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) INADVERTENT TRANSFER RESULTING IN LOSS OF WASTE SOLUTION | WIN-86-0034-CPP | 00 |
| 02-FEB-86 | NEBEKER, R. L. | SOURCES OF INFORMATION FOR CERCLA STUDY | NEB-3-86 | 00 |
| 15-JAN-86 | WALLACE, M. T. | HAZARDOUS WASTE STREAMS AT CPP | 7756 | 00 |
| 09-AUG-85 | SMITH, D. L. | SUMMARY OF RALA D&D STATUS | DLS-31-85 | 00 |
| 01-JUL-85 | MOSER, C. L. | RALA OFF GAS CELL AND STORAGE TANK (CPP-631 & VES-702) DECONTAMINATION AND DECOMMISSIONING (D&D) PLAN | WINCO-1032 | 00 |
| 11-APR-85 | NISHIMOTO, D. D. | IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DDN-01-85 | 00 |
| 26-OCT-84 | MESERVEY, R. H. | TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT | RHM-33-84 | 00 |
| 19-JUL-84 | IKENBERRY, T. A. | RADIOLOGICAL CONTROLS FOR THE DECONTAMINATION OF LOW LEVEL WASTE (LLW) PROJECT EQUIPMENT | TAI-05-84 | 00 |
| 28-NOV-83 | HICKS, F. E. | DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 | MK-83-E-1792 | 00 |
| 01-MAY-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) BIF FILTER ROOM | WM-F1-83-006 | 00 |
| 01-MAY-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHARACTERIZATION OF THE RALA OFF GAS CELL, CHEMICAL PROCESSING PLANT 631 (CPP-631) | WM-F1-81-010 | 00 |
| 01-MAR-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION | WM-F1-81-004 | 00 |
| 01-APR-73 | NICCUM, M. R. | FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 4962 | 00 |
| 01-JUN-72 | PAIGE, B. E. | BURIED WASTE (BW) LINE REGISTER NATIONAL REACTOR TESTING STATION (NRTS) PART IV CPP | ACI-110 | 00 |