| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 20-APR-10 | NOT SPECIFIED | FISCAL YEAR 2009 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11419 | 0 |
| 30-SEP-09 | JESSMORE, JAMES J, | ASSESSMENT OF SHALLOW INJECTION WELLS 21-CPP, 22 CPP, AND 23-CPP | RPT-530 | 1 |
| 14-SEP-09 | HUTCHISON, DAVID P. | SUBMITTAL OF NOTICE OF COMPLETION OF ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS 15-CPP (34-X-0001-078), 41-CPP (34-X-0001-079), AND 44-CPP (34-X-0001-080) LOCATED AT INTEC, INL SITE | CCN 309108 | 0 |
| 30-JUN-09 | NOT SPECIFIED | 2008 ANNUAL REPORT FOR OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER | DOE/ID-11395 | 0 |
| 05-MAY-09 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN | DOE/ID-11334 | 1 |
| 08-DEC-08 | AR COORDINATOR | OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 | AR.INDEX.OU.3-14 | 1 |
| 17-OCT-08 | DOE, EPA, DEQ | SHALLOW INJECTION WELL 41-CPP WEST OF BUILDING CPP-710 | NSI-25119 | 0 |
| 23-SEP-08 | NOT SPECIFIED | SHALLOW INJECTION WELLS CPP-133 AND CPP-134 | NSI-25205 | 0 |
| 25-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER WASTE MANAGEMENT PLAN | DOE/ID-11335 | 0 |
| 25-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER CHARACTERIZATION PLAN FOR THE NORTH TANK FARM SOIL | DOE/ID-11336 | 0 |
| 25-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER WASTE MANAGEMENT PLAN | DOE/ID-11355 | 0 |
| 24-JUN-08 | NOT SPECIFIED | OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER OPERATION AND MAINTENANCE PLAN | DOE/ID-11337 | 0 |
| 17-JUN-08 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN | DOE/ID-11333 | 0 |
| 10-MAR-08 | SHANKLIN, D. E. | 2007 ANNUAL OPERATIONS REPORT FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION | DOE/ID-11358 | 00 |
| 25-JUL-07 | SHANKLIN, D. E. | OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) SCOPE OF WORK | DOE/ID-11318 | 00 |
| 22-MAY-07 | MCMANAMON, L. E. | ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 03 |
| 16-MAY-07 | AR COORDINATOR | OPERABLE UNIT (OU) 3-14 - IDAHO NATIONAL LABORATORY (INL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-14 | AR.INDEX.OU.3-14 | 00 |
| 16-MAY-07 | DEQ | RECORD OF DECISION (ROD) FOR TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER, OPERABLE UNIT (OU) 3-14 | DOE/ID-11296 | 00 |
| 31-OCT-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 02 |
| 22-AUG-06 | NOT SPECIFIED | IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - PUBLIC MEETINGS SCHEDULED ON PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 25016 | 00 |
| 21-AUG-06 | MAXAND, J. | SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER | 25015 | 00 |
| 16-AUG-06 | NOT SPECIFIED | IDAHO CLEANUP PROJECT (ICP) PUBLIC NOTICE - AGENCIES RELEASE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER | 25014 | 00 |
| 01-AUG-06 | CAHN, L. S. | PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 | RPT-223 | 00 |
| 13-JUL-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 01 |
| 01-JUL-06 | NOT SPECIFIED | IDAHO CLEANUP PROJECT (ICP) FACT SHEET - TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER - AGENCIES TO RELEASE PROPOSED PLAN FOR CLEANUP | 24977 | 00 |
| 31-MAY-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 00 |
| 01-MAY-06 | CAHN, L. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER FEASIBILITY STUDY (FS) | DOE/ID-11247 | 00 |
| 27-APR-06 | CAHN, L. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) | DOE/NE-ID-11227 | 00 |
| 27-APR-06 | BAILEY, A. L. | END OF WELL REPORTS FOR THE OPERABLE UNIT (OU) 3-14 2004 TANK FARM SOIL INVESTIGATION AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | ICP/EXT-04-00706 | 00 |
| 07-APR-06 | KECK, K. N. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TANK FARM INADVERTENT INTRUDER ASSESSMENT | EDF-6803 | 00 |
| 10-NOV-05 | HULL, L. C. | OPERABLE UNIT (OU) 3-14 TANK FARM ALLUVIUM GEOCHEMICAL PROPERTIES REPORT | DOE/ID-11271 | 00 |
| 01-NOV-05 | JENSEN, N. R. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-128, 4" SWA-100532 LEAK NEAR THE INTERSECTION WITH 8" SWN-3001 | 24920 | 00 |
| 25-OCT-05 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-126 - 20 INCH SW-NS-110477 FLANGE LEAK EAST OF CPP-601 | 24918 | 00 |
| 25-OCT-05 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-125 - 2 INCH SWA-106450 FLANGE LEAK NORTH OF CPP-1618 | 24919 | 00 |
| 08-SEP-05 | HAIN, K. E. | NEW SITE IDENTIFICATION (NSI) - CHEMICAL PROCESSING PLANT (CPP) PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS - ADDITIONAL INFORMATION | 24921 | 00 |
| 09-JUN-05 | KUHNS, D. J. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-112 - WM-184 CHEMICAL PROCESSING PLANT (CPP) TANK FARM CONTAINMENT VAULT POTENTIAL RELEASE | 24908 | 00 |
| 08-JUN-05 | CETO, N. | COMMENT PERIOD EXTENSION FOR DRAFT OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) | 24905 | 00 |
| 09-FEB-05 | MCMANAMON, L. E. | TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00529 | 03 |
| 03-NOV-04 | VERWOLF, M. C. | RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | FMDP-FFA/CO-04-053 | 00 |
| 22-JUL-04 | DOORNBOS, M. H. | TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00529 | 02 |
| 09-JUN-04 | HALL, R. C. | TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - REVISION 1 (REV.01) | EM-ER-04-120 | 00 |
| 07-JUN-04 | CAHN, L. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | DOE/ID-10676 | 01 |
| 07-JUN-04 | CAHN, L. S. | TANK FARM SOIL AND GROUNDWATER FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX A TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | DOE/ID-10764 | 01 |
| 01-JUN-04 | CAHN, L. S. | EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01 | INEEL/EXT-03-01010 | 00 |
| 01-JUN-04 | CAHN, L. S. | TANK FARM SOIL AND GROUNDWATER HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX B TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | INEEL/EXT-2000-00529 | 01 |
| 01-JUN-04 | CAHN, L. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | INEEL/EXT-99-00361 | 01 |
| 25-MAY-04 | HALL, R. C. | REQUEST FOR EXTENSION FOR SUBMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-04-107 | 00 |
| 11-MAY-04 | HALL, R. C. | DEPARTMENT OF ENERGY (DOE) APPROVAL TO PLACE NEW WASTE AREA GROUP 3 (WAG-3) SITES IN OPERABLE UNIT (OU) 3-14 | 24851 | 00 |
| 27-APR-04 | HAIN, K. E. | TRACK 1 DECISION DOCUMENTATION PACKAGE - NO ACTION REQUIRED - INVESTIGATION FOR SHALLOW INJECTION WELLS CPP-104, CPP-105, CPP-106, CPP-107 AND CPP-108 ASSOCIATED WITH FUEL OIL STORAGE TANKS (CPP-701) - APPROVED FOR OU 3-14 PER DOCUMENT ID #24851 | CPP-104, CPP-105, CPP-106, CPP-107 | 00 |
| 24-APR-04 | BRAGASSA, J. L. | DECISION DOCUMENTATION PACKAGE - TRACK 1 SITES CPP-102, CPP-103, CPP-109 AND CPP-110 - SHALLOW INJECTION WELLS LOCATED AT INTEC - APPROVED AS OPERABLE UNIT (OU) 3-14 SITES PER DOE MEMO (DOCUMENT ID #24851) DATED MAY 11, 2004 (05/11/04) | 24884 | 00 |
| 05-APR-04 | HALL, R. C. | REQUEST FOR EXTENSION FOR SUBMITTAL OF DRAFT FINAL OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-04-078 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 20-FEB-04 | DOE | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 | DOE/ID-11109 | 00 |
| 02-FEB-04 | HALL, R. C. | SUBMITTAL OF FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-13 | EM-ER-04-022 | 00 |
| 18-DEC-03 | HALL, R. C. | DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES | EM-ER-03-315 | 00 |
| 03-DEC-03 | HALL, R. C. | NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED | EM-ER-03-299 | 00 |
| 04-AUG-03 | HAIN, K. E. | NEW SITE IDENTIFICATION (NSI) - CPP-102, CPP-103, CPP-104, CPP-105, CPP-106, CPP-107, CPP-108, CPP-109, CPP-110 - ABANDONED SHALLOW INJECTION WELLS AT INTEC | 28120 | 00 |
| 05-MAR-03 | HALL, R. C. | NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED | EM-ER-03-065 | 00 |
| 04-MAR-03 | BOWHAN, B. R. | RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | OCC-03-025 | 00 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 08-JAN-02 | DOE | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14, CHEMICAL PROCESSING PLANT 58 (CPP-58) - NITRIC ACID CONTAMINATION IN PROXIMITY TO GROUP 1 INTERIM ACTION (IA) TRENCH NEAR CPP-604 | 10958 | 00 |
| 31-AUG-01 | JENKINS, T. W. | TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 | EM-ER-01-137 | 00 |
| 01-AUG-01 | FORSYTHE, H. S. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 | DOE/ID-10880 | 00 |
| 16-JUL-01 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OU 3-14, DOE/ID-10880 | 10946 | 00 |
| 16-JUL-01 | CODY, C. A. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OU 3-14, DOE/ID-10880 | 10949 | 00 |
| 16-JUL-01 | DOE | DEPARTMENT OF ENERGY (DOE) RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT | 10950 | 00 |
| 16-JUL-01 | DOE | DEPARTMENT OF ENERGY (DOE) RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT | 10951 | 00 |
| 12-JUN-01 | JENKINS, T. W. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT | EM-ER-01-099 | 00 |
| 21-DEC-00 | HAIN, K. E. | TRANSMITTAL OF FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-243-00 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER PHASE I REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | DOE/ID-10676 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | INJECTION WELL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10763 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | TANK FARM SOIL FIELD SAMPLING PLAN (FSP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10764 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | INJECTION WELL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00528 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | TANK FARM SOIL HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-2000-00529 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-99-00361 | 00 |
| 04-DEC-00 | IVY, K. | ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN; INJECTION WELL FIELD SAMPLING PLAN (FSP) | 10945 | 00 |
| 22-NOV-00 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - DRAFT FINAL OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | 10944 | 00 |
| 22-NOV-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 | 10948 | 00 |
| 06-NOV-00 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 | EM-ER-212-00 | 00 |
| 01-NOV-00 | IDEQ | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS & RESOLUTIONS FOR DRAFT FINAL OU 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN - DOE/ID-10676, REV. D (REV.0D) | 22899 | 00 |
| 31-AUG-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS - DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OPERABLE UNIT (OU) 3-14, DOE/ID-10676 | 10947 | 00 |
| 28-AUG-00 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS - OPERABLE UNIT (OU) 3-14 TANK FARM SOIL & GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) - DOE/ID-10676 | 10943 | 00 |
| 10-AUG-00 | NYGARD, D. | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) EXTENDS COMMENT REVIEW PERIOD FOR DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR OU 3-14 TANK FARM SOIL AND GROUNDWATER - DOE/ID-10676 | 21468 | 00 |
| 01-AUG-00 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - INVESTIGATION UNDER WAY FOR OPERABLE UNIT (OU) 3-14 AT WASTE AREA GROUP 3 (WAG-3) | 21212 | 00 |
| 26-JUN-00 | JENKINS, T. W. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | EM-ER-120-00 | 00 |
| 10-MAY-00 | RASCH, D. N. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AS ONE WASTE MANAGEMENT UNIT FOR CLOSURES AND DEMONSTRATING COMPLIANCE WITH DRINKING WATER STANDARDS | TS-ESTD-00-085 | 00 |
| 28-OCT-99 | JENKINS, T. W. | TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-175-99 | 00 |
| 18-OCT-99 | ENGLISH, M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON THE DRAFT FINAL SCOPE OF WORK (SOW) FOR WAG-3 OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ | 22695 | 00 |
| 07-OCT-99 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA | 24797 | 00 |
| 07-OCT-99 | DOE | FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 | DOE/ID-10660 | 00 |
| 01-OCT-99 | DOE | FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10653 | 00 |
| 01-OCT-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14, TANK FARM SOILS AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-99-141 | 00 |
| 30-AUG-99 | HAIN, K. E. | TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL | OPE-ER-119-99 | 00 |
| 05-AUG-99 | PIERRE, W. | REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED | 10683 | 00 |
| 04-AUG-99 | KOCH, D. F. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 | 10682 | 00 |
| 29-JUL-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-14 - DOE/ID-10653 | 10942 | 00 |
| 20-JUL-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-99-99 | 00 |
| 30-JUN-99 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-14 TANK FARM SOILS & GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) | OPE-ER-93-99 | 00 |
| 14-MAY-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 | 10681 | 00 |
| 11-MAY-99 | DOE | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14 TANK FARM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 17265 | 00 |
| 29-MAR-99 | JENKINS, T. W. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-44-99 | 00 |
| 01-MAR-99 | IDHW | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 10679 | 00 |
| 17-FEB-99 | JENKINS, T. W. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-99 | 00 |
| 09-FEB-99 | CRAPO, M. | PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10693 | 00 |
| 08-JAN-99 | JENKINS, T. W. | ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) | OPE-ER-05-99 | 00 |
| 03-DEC-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) DRAFT | 18064 | 00 |
| 10-NOV-98 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCOPE OF WORK (SOW) WASTE AREA GROUP (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 INEEL | 18065 | 00 |
| 27-OCT-98 | RANDOLPH, P. | PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 10689 | 00 |
| 16-OCT-98 | DOE | NEW SITE IDENTIFICATION (NSI) - TANK FARM INTERSTITIAL SOILS - CPP-96 | 16750 | 00 |
| 14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) TANK FARM OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - DRAFT | OPE-ER-161-98 | 00 |
| 14-OCT-98 | JENKINS, T. W. | DEPARTMENT OF ENERGY - IDAHO OPERATIONS OFFICE (DOE-ID) REQUEST FOR ADDITION OF OPERABLE UNIT (OU) 3-14 TO FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) | OPE-ER-162-98 | 00 |
| 14-AUG-98 | TAYLOR, A. E. | PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10688 | 00 |
| 27-MAY-98 | NYGARD, D. | IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) | 10446 | 00 |
| 27-MAY-98 | PIERRE, W. | EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) | 10447 | 00 |
| 15-MAY-98 | JENKINS, T. W. | REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS | OPE-ER-67-98 | 00 |
| 26-JAN-98 | RENO, S. L. | COMPREHENSIVE FACILITY CLOSURE EVALUATION PROCESS | 10799 | 00 |
| 01-NOV-97 | KAPTEIN, M. S. | HEALTH & SAFETY PLAN (HSP) FOR HIGH LEVEL LIQUID WASTE TANK FARM (HLLWTF) SOILS SAMPLING | INEEL/EXT-97-00987 | 00 |
| 17-APR-62 | LATCHUM, J. W. | REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) | LA-53-62A | 00 |
Previous Page | Administrative Record Home Page