| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 18-MAY-10 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10881 | 9 |
| 09-DEC-09 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10881 | 8 |
| 18-NOV-09 | FORSYTHE, HOWARD S. | OPERABLE UNIT 3-13, GROUP 3, OTHER SURFACE SOILS (PHASE II) REMEDIAL ACTION REPORT | DOE/ID-11402 | 0 |
| 29-JUN-09 | NOT SPECIFIED | OPERABLE UNIT 3-13, GROUP 7, SFE-20 HOT WASTE TANK SYSTEM REMEDIAL ACTION REPORT | DOE/ID-11391 | 0 |
| 04-JUN-09 | NOT SPECIFIED | INTEC OU 3-13, GROUP 3, SITES CPP-13, CPP-35, CPP-81, AND CPP-93 PRE-FINAL/FINAL INSPECTION REPORT | PFI-1006 | 0 |
| 05-MAY-09 | NOT SPECIFIED | OPERABLE UNIT 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN | DOE/ID-11334 | 1 |
| 23-JAN-09 | CLOUGH, MARK K | OPERABLE UNIT (OU) 3-13 PREFINAL/FINAL INSPECTION CHECKLISTS FOR CPP-01, CPP-04, CPP-05, CPP-09, CPP-10, CPP-11, CPP-69, AND CPP-130 | PFI-1003 | 0 |
| 29-SEP-08 | NOT SPECIFIED | ICDF COMPLEX OPERATIONS AND MAINTENANCE PLAN | DOE/ID-11000 | 4 |
| 15-SEP-08 | CLOUGH, MARK, K. | PRE-FINAL INSPECTION CHECKLIST FOR CPP-4/5 SITE CLOSURE | PFI-1000 | 0 |
| 15-SEP-08 | CLOUGH, MARK, K | PRE-FINAL INSPECTION CHECKLIST FOR CPP-09/10 SITE CLOSURE | PFI-1001 | 0 |
| 27-JUN-08 | NOT SPECIFIED | OPERABLE UNIT (OU) 3-14, TANK FARM SOIL AND INTEC GROUNDWATER LONG-TERM MONITORING PLAN | DOE/ID-11334 | 0 |
| 02-JUN-08 | JEFFREY R. FORBES | INTEC GROUNDWATER MONITORING REPORT (2007) | DOE/ID-11356 | 1 |
| 02-JUN-08 | SHANNON L. ANSLEY | INTEC GROUNDWATER MONITORING REPORT (2007) | DOE/ID-11356 | 1 |
| 29-MAY-08 | HERNANDEZ, NICHOLE K. | PREFINAL INSPECTION OF CERCLA SITES CPP-08, CPP-19, AND CPP-132 | PFI-1004 | 0 |
| 10-MAR-08 | SHANKLIN, D. E. | 2007 ANNUAL OPERATIONS REPORT FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION | DOE/ID-11358 | 00 |
| 19-FEB-08 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - ABANDONED DRUM NEAR CPP-665 | NSI-25178 A | 00 |
| 30-JAN-08 | DAVISON, L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM | DOE/ID-11048 | 02 |
| 29-NOV-07 | CETO, N. | CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE | 25184 | 00 |
| 28-NOV-07 | KOCH, D. F. | CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE | 25183 | 00 |
| 19-NOV-07 | HERNANDEZ, N. K. | REQUEST FOR CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE | FMDP-RFDP-07-027 | 00 |
| 19-NOV-07 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 GROUP 3 - SOIL CONTAMINATION BENEATH OLIVE AVENUE CPP-132 | NSI-25157 | 00 |
| 15-NOV-07 | SCHWENDIMAN, G. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4-6 (PHASE II) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN APPENDIX F-1, NEW SITE CPP-130 - SOILS AND BURIED DEBRIS - NOVEMBER 2007 | DOE/ID-11342 | 00 |
| 09-OCT-07 | SIMONDS, R. E. (JACK) | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR IDAHO CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS | INEEL/EXT-01-01318 | 04 |
| 03-OCT-07 | FORSYTHE, H. S. | MONITORING REPORT/DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER | DOE/ID-11326 | 00 |
| 09-AUG-07 | DAVISON, R. L. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) | DOE/ID-10955 | 05 |
| 31-JUL-07 | DAVISON, L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS (PHASE I) REMEDIAL ACTION (RA) REPORT | DOE/ID-11311 | 00 |
| 31-JUL-07 | CAHN, L. S. | EVALUATION OF INDICATOR PARAMETERS FOR IDAHO CERCLA DISPOSAL FACILITY (ICDF) | RPT-425 | 00 |
| 09-JUL-07 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) | DOE/ID-10881 | 04 |
| 25-JUN-07 | GIBSON, P. L. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN | DOE/ID-11000 | 03 |
| 30-MAY-07 | CAHN, L. S. | ANNUAL GROUNDWATER DETECTION MONITORING REPORT FOR THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) (2006) | DOE/ID-11330 | 00 |
| 22-MAY-07 | MCMANAMON, L. E. | ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 03 |
| 16-MAY-07 | DEQ | RECORD OF DECISION (ROD) FOR TANK FARM SOIL AND IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER, OPERABLE UNIT (OU) 3-14 | DOE/ID-11296 | 00 |
| 27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
| 23-FEB-07 | FORBES, J. R. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT (2006) | DOE/ID-11301 | 00 |
| 15-FEB-07 | NOT SPECIFIED | INTEC OU 3-13, GROUP 3, SITE CPP-03 PRE-FINAL INSPECTION REPORT | PFI-1005 | 0 |
| 03-JAN-07 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - BURIED DEBRIS WITHIN SITE CPP-03 | NSI-25047 | 00 |
| 14-DEC-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10886 | 01 |
| 14-DEC-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) | DOE/ID-10984 | 01 |
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 20-NOV-06 | BRAGASSA, J. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11089 | 02 |
| 20-NOV-06 | RICE, R. S. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11092 | 02 |
| 15-NOV-06 | SHANKLIN, D. E. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10771 | 04 |
| 31-OCT-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 02 |
| 17-OCT-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE PROFILE AND VERIFICATION SAMPLE GUIDANCE | DOE/NE-ID-11175 | 02 |
| 10-OCT-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) | DOE/ID-10881 | 03 |
| 26-SEP-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION (RA) REPORT | DOE/ID-11252 | 00 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 09-AUG-06 | CAHN, L. S. | METHODS TO REDUCE WATER INFILTRATION AND RECHARGE OF THE NORTHERN SHALLOW PERCHED WATER ZONE AT IDAHO NUCLEAR TECHNOLOGIES AND ENGINEERING CENTER (INTEC) | EDF-6868 | 00 |
| 02-AUG-06 | SIMONDS, R. E. (JACK) | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR IDAHO CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS | INEEL/EXT-01-01318 | 03 |
| 28-JUL-06 | SHANKLIN, D. E. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4 - 6 (PHASE II) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11254 | 00 |
| 27-JUL-06 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST FOR AN EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) | 24985 | 00 |
| 27-JUL-06 | SHANKLIN, D. E. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS (PHASE II) FIELD SAMPLING PLAN (FSP) | DOE/ID-11256 | 00 |
| 27-JUL-06 | SCHWENDIMAN, G. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4-6 (PHASE II) WASTE MANAGEMENT PLAN (WMP) | DOE/ID-11258 | 00 |
| 19-JUL-06 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST FOR TIME EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) | 24984 | 00 |
| 19-JUL-06 | SHANKLIN, D. E. | 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-11275 | 01 |
| 13-JUL-06 | JENSEN, N. R. | REQUEST FOR TIME EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) | FMDP-RFDP-06-043 | 00 |
| 13-JUL-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 01 |
| 27-JUN-06 | CAHN, L. S. | ANALYSIS OF BASELINE DATA FROM IDAHO CERCLA DISPOSAL FACILITY (ICDF) DETECTION MONITORING WELLS | INEEL/EXT-03-00251 | 01 |
| 20-JUN-06 | FORBES, J. R. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) 2005 | DOE/ID-11278 | 00 |
| 16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
| 31-MAY-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 00 |
| 11-MAY-06 | DAVISON, R. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS, CPP-37B AND CPP-37C CHARACTERIZATION RESULTS REPORT | RPT-175 | 00 |
| 08-MAY-06 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - SOILS UNDER THE CPP-637 AND CPP-620 FACILITIES | 24948 | 00 |
| 27-MAR-06 | GIBSON, P. L. | WASTE TRACKING PLAN FOR THE IDAHO CERCLA DISPOSAL FACILITY COMPLEX (ICDF) | PLN-914 | 01 |
| 27-FEB-06 | JENSEN, N. R. | COMPLETION NOTIFICATION OF REGULATORY COMMITMENT TO REMOVE ICDF MERCURY CONTAMINATED SOIL STAGING PILE | FMDP-RFDP-06-024 | 00 |
| 23-FEB-06 | SHANKLIN, D. E. | 2005 ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-11275 | 00 |
| 20-FEB-06 | HARVEGO, L. A. | DATA SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS, REMEDIATION SITE CPP-97 CONFIRMATION SAMPLING | RPT-174 | 00 |
| 07-FEB-06 | GIBSON, P. L. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN | DOE/ID-11000 | 02 |
| 19-JAN-06 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-13 - ONE AND HALF INCH (1 1/2") PLA-2069C LEAK WEST OF CPP-750 - SITE CODE CPP-124 | 24926 | 00 |
| 13-JAN-06 | FORBES, J. R. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2005) | DOE/ID-11259 | 00 |
| 13-DEC-05 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM | INEEL/EXT-02-01436 | 02 |
| 29-NOV-05 | VERWOLF, M. C. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-113, CPP-114, CPP-115 AND CPP-116 - SHALLOW INJECTION WELLS NEAR CPP-702 AND SHALLOW INJECTION WELLS LOCATED IN THE OLIVE AVENUE UTILITY TUNNEL | 24922 | 00 |
| 14-NOV-05 | FORBES, J. R. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER | DOE/ID-10746 | 02 |
| 02-NOV-05 | VARVEL, M. D. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER BALANCE REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER | DOE/ID-11248 | 00 |
| 04-OCT-05 | BAILEY, A. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, SITE CPP-03 FIELD SAMPLING PLAN (FSP) | DOE/ID-11246 | 00 |
| 04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 22-SEP-05 | PARKE, C. L. | CANCELLED DUE TO PROJECT CLOSURE - WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION | DOE/ID-10837 | 03 |
| 22-SEP-05 | VARVEL, M. D. | CANCELLED DUE TO PROJECT CLOSURE - REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION | DOE/ID-10838 | 03 |
| 22-SEP-05 | PARKE, C. L. | CANCELLED DUE TO PROJECT CLOSURE - REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION | DOE/NE-ID-11230 | 01 |
| 22-SEP-05 | PARKE, C. L. | CANCELLED DUE TO PROJECT CLOSURE - HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION | INEEL/EXT-2000-00270 | 06 |
| 21-SEP-05 | MYERS, D. R. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) CHARACTERIZATION PLAN | DOE/ID-11090 | 01 |
| 15-SEP-05 | EINAN, D. R. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DOE'S AUGUST 26, 2005 (08/26/05) REQUEST FOR STAGING PILE EXTENSION TO TREAT MERCURY CONTAMINATED SOIL AT THE INL CERCLA DISPOSAL FACILITY (ICDF) | 24917 | 00 |
| 08-SEP-05 | BAILEY, A. L. | CHARACTERIZATION SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 7, VES-SFE-20 HOT WASTE TANK SYSTEM AT IDAHO NUCLEAR TECHNOLOGY ENGINEERING CENTER (INTEC) | ICP/EXT-05-00993 | 00 |
| 26-AUG-05 | JENSEN, N. R. | DOE REQUEST FOR EXTENSION OF SCHEDULE TO TREAT MERCURY CONTAMINATED SOIL AND FOR USE OF STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) SOIL STAGING PILE AT THE INL CERCLA DISPOSAL FACILITY (ICDF) | FMDP-RFDP-05-081 | 00 |
| 26-JUL-05 | GIBSON, P. L. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN | DOE/ID-10851 | 04 |
| 25-JUL-05 | HEILESON, W. M. | IDAHO NATIONAL LABORATORY (INL) CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) | DOE/ID-10881 | 02 |
| 25-JUL-05 | HEILESON, W. M. | IDAHO NATIONAL LABORATORY (INL) CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) | DOE/ID-10881 | 5 |
| 21-JUL-05 | GIBSON, P. L. | ENGINEERING DESIGN FILE (EDF) - IDAHO CERCAL DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN | EDF-ER-286 | 04 |
| 18-JUL-05 | SHANKLIN, D. E. | SITE COMPLETION REPORT FOR AREA CPP-67, WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS | DOE/NE-ID-11234 | 00 |
| 29-JUN-05 | MACCONNEL, M. J. | SUBMITTAL OF ADDITIONAL INFORMATION AND REQUEST FOR APPROVAL OF PERMANENT ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP | 34886 | 00 |
| 23-JUN-05 | SHANKLIN, D. E. | REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM INTERIM ACTION (TFIA), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM SOILS | DOE/NE-ID-11209 | 00 |
| 20-JUN-05 | DOORNBOS, M. H. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-111 - RELEASE IN CPP-604 ACCESS CORRIDOR | 24909 | 00 |
| 20-JUN-05 | HAIN, K. E. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-117, CPP-118, CPP-119, CPP-120, CPP-121, CPP-122 AND CPP-123 - FUEL PROCESSING POTENTIAL RELEASES | 24915 | 00 |
| 15-JUN-05 | VARVEL, M. D. | REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/NE-ID-11230 | 00 |
| 01-JUN-05 | LEWIS, M. G. | ADDITIONAL INFORMATION FOR SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP | ICP/EXT-05-00934 | 00 |
| 26-MAY-05 | EINAN, D. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT | 24907 | 00 |
| 24-MAY-05 | FORBES, J. R. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) 2004 | DOE/NE-ID-11222 | 00 |
| 19-MAY-05 | RODDY, M. S. | ENGINEERING DESIGN FILE (EDF) - GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | EDF-5758 | 00 |
| 12-MAY-05 | PETTENGILL, C. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) HEALTH AND SAFETY PLAN (HSP OR HASP) | INEEL/EXT-03-00628 | 01 |
| 11-MAY-05 | SPOMER, M. | DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) RESPONSE TO DOE REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT | 24906 | 00 |
| 26-APR-05 | VERWOLF, M. C. | TRANSMITTAL OF REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO TREATMENT UNIT AND PROPOSED NEW CONSTITUENTS TO ICDF LANDFILL AND EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) | FMDP-RFDP-05-024 | 00 |
| 13-APR-05 | SHANKLIN, D. E. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10771 | 03 |
| 07-APR-05 | FORBES, J. R. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN | DOE/NE-ID-11207 | 01 |
| 28-FEB-05 | HEILESON, W. M. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE PROFILE AND VERIFICATION SAMPLE GUIDANCE | DOE/NE-ID-11175 | 01 |
| 14-FEB-05 | GIANOTTO, D. F. | CHARACTERIZATION RESULTS REPORT FOR OPERABLE UNIT (OU) 3-13 GROUP 3, OTHER SURFACE SOILS REMEDIATION SET 1 (PHASE 1): CPP-92, CPP-98, CPP-99, AND CPP-97 | ICP/EXT-04-00601 | 00 |
| 31-JAN-05 | HEILESON, W. M. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT | EDF-ER-275 | 04 |
| 27-JAN-05 | JESSMORE, P. J. | ADDENDUM FOR THE CONSTRUCTION WORK PLAN FOR WASTE AREA GROUP (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ATTACHMENT 3 INCLUDES AGENCY REVIEW COMMENTS AND RESOLUTIONS | DOE/ID-11086 | 01 |
| 26-JAN-05 | HEILESON, W. M. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT | EDF-ER-327 | 02 |
| 20-JAN-05 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA) CPP-1789 | DOE/ID-10800 | 05 |
| 20-JAN-05 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY | EDF-ER-274 | 03 |
| 19-JAN-05 | HAIN, K. E. | RESPONSE TO THE JANUARY 6, 2005 (01/06/05) E-MAIL CONCERNING INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS | FMDP-FFA/CO-05-094 | 00 |
| 12-JAN-05 | FORBES, J. R. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN - APPENDIX P TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/NE-ID-11207 | 00 |
| 11-JAN-05 | DOORNBOS, M. H. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY | EDF-ER-264 | 03 |
| 11-JAN-05 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY | EDF-ER-278 | 03 |
| 10-JAN-05 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX | EDF-ER-290 | 03 |
| 06-JAN-05 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER - APPENDIX F TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10749 | 03 |
| 06-JAN-05 | FORBES, J. R. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 03 |
| 22-DEC-04 | FORBES, J. R. | MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) | DOE/ID-11098 | 01 |
| 21-DEC-04 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OF HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER PROJECT - APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | INEEL/EXT-2000-00257 | 02 |
| 17-DEC-04 | FORBES, J. R. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2004) | DOE/NE-ID-11192 | 00 |
| 17-DEC-04 | SHANKLIN, D. E. | FISCAL YEAR 2004 (FY-04) ANNUAL OPERATIONS REPORT FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA) | DOE/NE-ID-11206 | 00 |
| 03-NOV-04 | VERWOLF, M. C. | RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | FMDP-FFA/CO-04-053 | 00 |
| 27-OCT-04 | EDGETT, S. M. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS | INEEL/EXT-01-01318 | 02 |
| 25-OCT-04 | BORSCHEL, T. F. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN | DOE/ID-10851 | 03 |
| 21-OCT-04 | VERWOLF, M. C. | SUMMARY OF AGENCY CONFERENCE CALL HELD OCTOBER 14, 2004 (10/14/04) REGARDING THE GROUP 6 BURIED GAS CYLINDER REMEDIATION APPROACH RELATED TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE INFORMATION REPOSITORY (IR) | FMDP-FFA/CO-04-045 | 00 |
| 12-OCT-04 | VERWOLF, M. C. | RESPONSE TO STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) LETTER CONCERNING IODINE-129 GROUNDWATER AND SOIL RESULTS LIMITATIONS AND VALIDATION (L&V) REPORTS, DATED OCTOBER 1, 2004 | FMDP-FFA/CO-04-036 | 00 |
| 30-SEP-04 | VERWOLF, M. C. | CERTIFICATION OF INSTALLATION OF TANK FARM INFILTRATION BARRIER AND TRANSMITTAL OF PRE-FINAL INSPECTION REPORT FOR OPERABLE UNIT (OU) 3-13, TANK FARM INTERIM ACTION (TFIA), PHASE II (PHASE 2) | FMDP-FFA/CO-04-029 | 00 |
| 30-SEP-04 | SHANKLIN, D. E. | PRE-FINAL INSPECTION REPORT FOR OPERABLE UNIT (OU) 3-13 TANK FARM INTERIM ACTION (TFIA), PHASE II (PHASE 2) | ICP/EXT-04-00602 | 00 |
| 28-SEP-04 | FORBES, J. R. | EVALUATION OF TC-99 IN GROUNDWATER AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC): SUMMARY OF PHASE I (PHASE 1) RESULTS | ICP/EXT-04-00244 | 00 |
| 27-SEP-04 | CAHN, L. S. | ANALYSIS OF PERCHED WATER DATA FROM INEEL CERCLA DISPOSAL FACILITY (ICDF) MONITORING WELLS | INEEL/EXT-03-00250 | 00 |
| 08-SEP-04 | MCMANAMON, L. E. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II | DOE/ID-10771 | 02 |
| 30-AUG-04 | FORSYTHE, H. S. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - ATTACHMENT 1 TO MONITORING REPORT AND DECISION SUMMARY DOE/ID-11098 REVISION 1 (REV.01) | DOE/ID-10783 | 03 |
| 26-AUG-04 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY | EDF-ER-274 | 02 |
| 12-AUG-04 | EDGETT, S. M. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT | EDF-ER-275 | 03 |
| 01-AUG-04 | JASON ASSOCIATES | SUPPORTING DOCUMENTATION FOR CERCLA CLOSURE CERTIFICATION OF THE STAGING AND STORAGE ANNEX (SSA) PURGE WATER STORAGE TANKS | 24886 | 00 |
| 16-JUL-04 | VARVEL, M. D. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/ID-10838 | 02 |
| 15-JUL-04 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 2 (REV.02) | DOE/ID-10837 | 02 |
| 18-JUN-04 | DOORNBOS, M. H. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY | EDF-ER-264 | 02 |
| 18-JUN-04 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY | EDF-ER-278 | 02 |
| 18-JUN-04 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX | EDF-ER-290 | 02 |
| 03-JUN-04 | SMITH, P. N. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - ATTACHMENT 2 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 2 (REV.02) | INEEL/EXT-2000-00270 | 05 |
| 18-MAY-04 | GIBSON, P. L. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN | EDF-ER-286 | 03 |
| 12-MAY-04 | FAULK, D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE THAT THE SCOPE AND OBJECTIVES FOR THE OPERABLE UNIT (OU) 3-13 GROUP 2 PIPING EVALUATION HAS BEEN MET BY DOE/NE-ID-11138 AND DOE/ID-11115 | 24850 | 00 |
| 10-MAY-04 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS | INEEL/EXT-2000-00270 | 04 |
| 15-APR-04 | SCHMITT, E. C. | LOW LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP (LFRG) REVIEW AND APPROVAL OF THE REVISED COMPLIANCE DEMONSTRATION DOCUMENTS, COMPOSITE ANALYSIS AND PERFORMANCE ASSESSMENT FOR THE ICDF LANDFILL | 24845 | 00 |
| 01-APR-04 | HALL, R. C. | TRANSMITTAL OF DRAFT EVALUATION OF TC-99 IN GROUNDWATER AT INTEC - SUMMARY OF PHASE I RESULTS | EM-ER-04-077 | 00 |
| 30-MAR-04 | EINAN, D. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE TO REVISE INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL ACTION (RA) REPORT ENFORCEABLE MILESTONE | 24843 | 00 |
| 16-MAR-04 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) | DOE/ID-10955 | 03 |
| 04-MAR-04 | GIBSON, P. L. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN | EDF-ER-286 | 02 |
| 03-MAR-04 | HALL, R. C. | NOTIFICATION THAT THE OPERABLE UNIT (OU) 3-13 GROUP 2, SOILS UNDER BUILDINGS, PIPING EVALUATION WILL NOT BE PERFORMED | EM-ER-04-048 | 00 |
| 03-MAR-04 | HATHAWAY, C. | REVISION OF INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL ACTION (RA) REPORT ENFORCEABLE MILESTONE | EM-ER-04-049 | 00 |
| 27-FEB-04 | DOE | NOTICE OF AVAILABILITY - AGENCIES ANNOUNCE CHANGES TO CLEANUP REMEDY AT INEEL FACILITY - INTEC OPERABLE UNIT (OU) 3-13 | 24836 | 00 |
| 25-FEB-04 | AR COORDINATOR | OPERABLE UNIT (OU) 3-13 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11109 | AR.INDEX.OU.3-13 | 01 |
| 20-FEB-04 | DOE | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 | DOE/ID-11109 | 00 |
| 11-FEB-04 | HALL, R. C. | TRANSMITTAL OF FINAL OU 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-04-030 | 00 |
| 10-FEB-04 | GIANOTTO, D. F. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX E TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10746 | 01 |
| 10-FEB-04 | BRAGASSA, J. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11089 | 00 |
| 09-FEB-04 | HALL, R. C. | SUBMITTAL OF REVISED LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER (2004) REVISION 1 (REV.01) | EM-ER-04-031 | 00 |
| 06-FEB-04 | BRAGASSA, J. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) CHARACTERIZATION PLAN - ATTACHMENT 3 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11090 | 00 |
| 05-FEB-04 | VARVEL, M. D. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) FIELD SAMPLING PLAN (FSP) - ATTACHMENT 1 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11091 | 00 |
| 02-FEB-04 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - EARTHWORK QUANTITIES FOR SUBPROJECT 6, OPERABLE UNIT (OU) 3-13, GROUP 3 - OTHER SURFACE SOILS PROJECT - ATTACHMENT 5 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3778 | 00 |
| 02-FEB-04 | HALL, R. C. | SUBMITTAL OF FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-13 | EM-ER-04-022 | 00 |
| 29-JAN-04 | RICE, R. S. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11092 | 00 |
| 29-JAN-04 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - ANALYSIS OF POTENTIAL AIR EMISSIONS FROM EXCAVATION OF WASTE AREA GROUP 3 (WAG-3) SOIL CONTAMINATION SITES - ATTACHMENT 2 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3902 | 00 |
| 29-JAN-04 | MCMANAMON, L. E. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) HEALTH AND SAFETY PLAN (HSP OR HASP) - ATTACHMENT 4 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | INEEL/EXT-03-00628 | 00 |
| 27-JAN-04 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM | INEEL/EXT-02-01436 | 01 |
| 24-JAN-04 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REQUEST TO INVOKE INFORMAL DISPUTE PROCESS TO REACH FINALIZATION OF DRAFT FINAL OPERABLE UNIT (OU) 3-13 GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | 24820 | 00 |
| 22-JAN-04 | HALL, R. C. | TRANSMITTAL OF FINAL MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) | EM-ER-04-011 | 00 |
| 19-JAN-04 | FORBES, J. R. | MONITORING REPORT AND DECISION SUMMARY FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) | DOE/ID-11098 | 00 |
| 23-DEC-03 | VARVEL, M. D. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER SYSTEM ENGINEERING STUDY | DOE/ID-11115 | 00 |
| 22-DEC-03 | HALL, R. C. | TRANSMITTAL OF DRAFT FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 AND SUPPORTING DOCUMENTATION | EM-ER-03-314 | 00 |
| 19-DEC-03 | HALL, R. C. | TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 3 OTHER SURFACE SOILS REMEDIATION, SETS 1-3 PHASE I (PHASE 1) | EM-ER-03-316 | 00 |
| 18-DEC-03 | HALL, R. C. | DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES | EM-ER-03-315 | 00 |
| 16-DEC-03 | FORBES, J. R. | ENGINEERING DESIGN FILE (EDF) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INJECTION WELL - SUMMARY OF HISTORICAL INFORMATION AND GROUNDWATER QUALITY TRENDS | EDF-3943 | 00 |
| 15-DEC-03 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER ACCEPTING WASTE ACCEPTANCE CRITERIA (WAC) FOR I-129 AND APPROVING ALL WASTE ACCEPTANCE CRITERIA FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) | 24842 | 00 |
| 09-DEC-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | DOE/ID-10837 | 01 |
| 09-DEC-03 | BRAGASSA, J. L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/ID-10838 | 01 |
| 09-DEC-03 | MCMANAMON, L. E. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - ATTACHMENT 2 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | INEEL/EXT-2000-00270 | 03 |
| 04-DEC-03 | RODDY, M. S. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) 2003 | DOE/ID-11118 | 00 |
| 03-DEC-03 | RODDY, M. S. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) WATER MONITORING REPORT FOR GROUP 4 - PERCHED WATER (2003) | DOE/ID-11117 | 00 |
| 01-DEC-03 | ICP COMMUNITY RELATIONS | IDAHO COMPLETION PROJECT (ICP) COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS FACILITATE SOIL CLEANUP | 24815 | 00 |
| 17-NOV-03 | HAIN, K. E. | EXTENSION OF COMMENT RESOLUTION FOR OPERABLE UNIT (OU) 1-10 RECORD OF DECISION (ROD) AMENDMENT AND OPERABLE UNIT (OU) 3-13 GROUP 3 PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-03-287 | 00 |
| 12-NOV-03 | SAVKRANZ, W. T. | CERCLA CLOSURE PLAN (CP) FOR THE STAGING AND STORAGE ANNEX (SSA) PURGE WATER STORAGE TANKS | ICP/EXT-03-00005 | 00 |
| 06-NOV-03 | NEHER, E. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 02 |
| 30-OCT-03 | GIBSON, P. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN | DOE/ID-11000 | 01 |
| 23-OCT-03 | FORSYTHE, H. S. | SUPPLEMENTAL WORK PLAN FOR TC-99 EVALUATION IN GROUNDWATER, WASTE AREA GROUP 3 (WAG-3) GROUP 4 PERCHED WATER - APPENDIX O TO DOE/ID-10774, REVISION 2 (REV.02) AND REVISION 3 (REV.03) | ICP/EXT-03-00029 | 00 |
| 30-SEP-03 | GIANOTTO, D. F. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER - THIS DOCUMENT IS APPENDIX F TO DOE/ID-10774, REV.01 & REV.02 | DOE/ID-10749 | 02 |
| 30-SEP-03 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC)OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I & II - APPENDIX L TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, R | DOE/ID-10770 | 03 |
| 30-SEP-03 | FORSYTHE, H. S. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II - APPENDIX K TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | DOE/ID-10771 | 01 |
| 30-SEP-03 | FORSYTHE, H. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 1 TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10772 | 01 |
| 29-SEP-03 | GIANOTTO, D. F. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 01 |
| 26-SEP-03 | HALL, R. C. | CERTIFICATION OF CONSTRUCTION COMPLETION OF OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - PHASE I (PHASE 1) | EM-ER-03-245 | 00 |
| 22-SEP-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA) CPP-1789 | DOE/ID-10800 | 04 |
| 09-SEP-03 | RODDY, M. S. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION - APPENDIX N TO DOE/ID-10774, REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) | DOE/ID-11100 | 00 |
| 28-AUG-03 | FITCH, D. R. | THE 2003 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-11112 | 00 |
| 20-AUG-03 | O'NEILL, K. C. | TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF THE DRAFT FINAL ADDENDUM FOR THE CONSTRUCTION WORK PLAN (CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) | EM-ER-03-207 | 00 |
| 31-JUL-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA), CPP-1789 | DOE/ID-10800 | 03 |
| 23-JUL-03 | FRENCH, P. S. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) | DOE/ID-10881 | 01 |
| 23-JUL-03 | O'NEILL, K. C. | ENGINEERING DESIGN FILE (EDF) - ALTERNATIVES FOR PROTECTION OF STAGING AREA LINER SYSTEMS - DOE-ID HAS DECIDED TO USE ALTERNATIVE 4, HOT MIX ASPHALT CONCRETE WITH ASPHALT SURFACE, OF EDF-3434 FOR BULK SOIL STAGING PILE LINER SYSTEM | EM-ER-03-184 | 00 |
| 12-JUL-03 | EDGETT, S. M. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS | INEEL/EXT-01-01318 | 01 |
| 10-JUL-03 | O'NEILL, K. C. | TRANSMITTAL OF INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT COMPACTION DEMONSTRATION TECHNICAL MEMORANDUM | EM-ER-03-176 | 00 |
| 07-JUL-03 | BORSCHEL, T. F. | INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT COMPACTION DEMONSTRATION TECHNICAL MEMORANDUM | 24807 | 00 |
| 01-JUL-03 | FREI, M. W. | ICDF LANDFILL - LFRG REVIEWED INFORMATION SUBMITTED AND FOUND DOCUMENTATION SUBMITTED DEMONSTRATES COMPLIANCE WITH DOE ORDER 435.1 AND HAS RECOMMENDED DISPOSAL AUTHORIZATION (APPROVAL) BE GRANTED | 27978 | 00 |
| 26-JUN-03 | BRAGASSA, J. L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM | DOE/ID-11048 | 00 |
| 26-JUN-03 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN (RD) EXCAVATION ESTIMATES - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3254 | 00 |
| 26-JUN-03 | VAN VOST, R. M. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIATION UNDERGROUND UTILITIES STUDY - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3266 | 00 |
| 26-JUN-03 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK RETRIEVAL AND DEMOLITION STRUCTURAL DESIGN - ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3282 | 00 |
| 26-JUN-03 | HALL, R. C. | TRANSMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-03-168 | 00 |
| 25-JUN-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 9 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11049 | 00 |
| 25-JUN-03 | BRAGASSA, J. L. | ENGINEERING DESIGN FILE (EDF) - TRU CONSTITUENT CALCULATIONS AND THE PROPOSED DISPOSAL PATH FOR THE VES-SFE-20 HOT WASTE TANK AND CONTENTS - ATTACHMENT 6 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3273 | 00 |
| 23-JUN-03 | TUOTT, L. C. | FIELD SAMPLING PLAN (FSP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - ATTACHMENT 8 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11047 | 00 |
| 23-JUN-03 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 10 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | INEEL/EXT-02-01436 | 00 |
| 09-JUN-03 | HALL, R. C. | DOCUMENTATION OF AGREEMENT REACHED DURING WASTE AREA GROUP 3 (WAG-3) CONFERENCE CALL ON MARCH 20, 2003 (03/20/03) TO MODIFY PHASE 1 OF THE TANK FARM INTERIM ACTION (TFIA) | EM-ER-03-140 | 00 |
| 06-JUN-03 | SAMPACO, K. | ENGINEERING DESIGN FILE (EDF) - ALTERNATIVES FOR PROTECTION OF STAGING AREA LINER SYSTEMS | EDF-3434 | 00 |
| 20-MAY-03 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) - APPENDIX M TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | INEEL/EXT-2000-00194 | 04 |
| 19-MAY-03 | ALLRED, C. S. | INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE ACCEPTANCE CRITERIA (WAC) | 24796 | 00 |
| 14-MAY-03 | DOE | PUBLIC NOTICE - PUBLIC INVITED TO WORKSHOP ON INEEL CERCLA DISPOSAL FACILITY (ICDF) | 24790 | 00 |
| 12-MAY-03 | DOE | UPDATE ON THE PROGRESS OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) | 24791 | 00 |
| 06-MAY-03 | CRISP, D. E. | TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II | SPC-1476 | 02 |
| 29-APR-03 | HALL, R. C. | DOCUMENTATION OF AGREEMENT TO DEFER INSTALLATION OF THE OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PHASE II WELLS | EM-ER-03-120 | 00 |
| 25-APR-03 | WESSMAN, D. L. | PATH FORWARD FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER'S (INTEC) VES-SFE-20 HOT WASTE TANK CHARACTERIZATION EFFORT | EM-ER-03-115 | 00 |
| 04-APR-03 | HALL, R. C. | NOTIFICATION THAT A 24 HOUR PUMP TEST FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) PROJECT WILL NOT BE PERFORMED | EM-ER-03-093 | 00 |
| 01-APR-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 TANK FARM INTERIM ACTION (TFIA), PHASE 1 | DOE/ID-10770 | 02 |
| 01-APR-03 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) | INEEL/EXT-2000-00194 | 03 |
| 18-MAR-03 | HAIN, K. E. | TRANSMITTAL OF LONG TERM MONITORING PLAN, REVISION 2 (REV.02), WASTE MANAGEMENT PLAN (WMP), REVISION 3 (REV.03) AND HEALTH AND SAFETY PLAN (HSP OR HASP), REVISION 2 (REV.02) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) | EM-ER-03-079 | 00 |
| 05-MAR-03 | HAIN, K. E. | REQUEST FOR A MILESTONE EXTENSION RELATED TO SUBMISSION OF PHASED WASTE AREA GROUP 3 (WAG-3) GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLANS - POSITION PAPER FOR PHASING THE WAG-3 GROUP 3 RD/RA | EM-ER-03-064 | 00 |
| 04-MAR-03 | BOWHAN, B. R. | RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | OCC-03-025 | 00 |
| 01-MAR-03 | FORSYTHE, H. S. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) | DOE/ID-10783 | 02 |
| 01-MAR-03 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) PROJECT | DOE/ID-10829 | 03 |
| 01-MAR-03 | FORSYTHE, H. S. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) | INEEL/EXT-2000-00817 | 02 |
| 25-FEB-03 | HAIN, K. E. | NOTIFICATION OF UNEXPECTED CONDITIONS AND REQUEST FOR VES-SFE-20 HOT WASTE TANK SYSTEM HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION RECOVERY ACT (RCRA) CLOSURE PLAN (CP) MILESTONE RELIEF | EM-ER-03-055 | 00 |
| 10-FEB-03 | O'NEILL, K. C. | TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) | EM-ER-03-042 | 00 |
| 03-FEB-03 | CRISP, D. E. | ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) AIR COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX L TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF | EDF-2237 | 00 |
| 03-FEB-03 | MORGANS, D. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT - APPENDIX E TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-ER-327 | 00 |
| 01-FEB-03 | GIANOTTO, D. F. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION - APPENDIX B TO DOE/ID-10774, REVISION 2 (REV.02) AND DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10745 | 02 |
| 01-FEB-03 | CRISP, D. E. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10886 | 00 |
| 01-FEB-03 | CRISP, D. E. | TREATABILITY STUDY (TS) TEST PLAN FOR SOIL STABILIZATION - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10903 | 00 |
| 01-FEB-03 | CRISP, D. E. | SAMPLING AND ANALYSIS PLAN (SAP) FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) WASTE STABILIZATION OPERATIONS WAG-3 OU 3-13 - APPENDIX J TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10924 | 00 |
| 01-FEB-03 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED AS APPENDIX P | DOE/ID-10984 | 00 |
| 01-FEB-03 | CRISP, D. E. | INEEL CERCLA DISPOSAL FACILITY (ICDF) GROUNDWATER DETECTION MONITORING PROGRAM DATA ANALYSIS PLAN - APPENDIX H TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10998 | 00 |
| 01-FEB-03 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 1 (VOL.01) OF 2 | DOE/ID-11000 | 00 |
| 01-FEB-03 | CRISP, D. E. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONAL AND MONITORING (O&M) SAMPLING AND ANALYSIS PLAN (SAP) - APPENDIX M TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-11005 | 00 |
| 01-FEB-03 | CRISP, D. E. | ENGINEERING DESIGN FILE (EDF) - NESHAP COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-2236 | 00 |
| 01-FEB-03 | JENKINS, T. W. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX ON-SITE VERSUS OFF-SITE COST COMPARISON - APPENDIX O TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-2385 | 00 |
| 01-FEB-03 | CRISP, D. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS - APPENDIX F TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | INEEL/EXT-01-01318 | 00 |
| 01-FEB-03 | VERNON, D. K. | PLAN (PLN) - TRACKING PLAN FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX C TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | PLN-914 | 00 |
| 14-JAN-03 | TUOTT, L. C. | INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 | DOE/ID-10729 | 03 |
| 14-JAN-03 | TUOTT, L. C. | THE 2002 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-11033 | 00 |
| 13-JAN-03 | MACKEY, C. | ENVIRONMENTAL PROTECTION AGENCY'S (EPA) STATEMENT OF POSITION REGARDING THE NOTICE OF VIOLATION (NOV) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 24769 | 00 |
| 20-DEC-02 | DOE | DEPARTMENT OF ENERGY (DOE) STATEMENT OF DISPUTE, NOTICE OF VIOLATION (NOV) REGARDING THE DRAFT REMEDIAL ACTION (RA) REPORT FOR THE TANK FARM SOILS | 24767 | 00 |
| 20-DEC-02 | BERGHOLZ, W. E. | RESPONSE TO POTENTIAL ADMINISTRATIVE VIOLATIONS AND AREAS OF CONCERN, LETTER DATED DECEMBER 4, 2002 (12/04/02) | EM-ER-02-211 | 00 |
| 19-DEC-02 | HALL, R. C. | TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - REVISION 1 (REV.01), WASTE MANAGEMENT PLAN (WMP), REVISION 1 (REV.01) AND HEALTH & SAFETY PLAN (HSP OR HASP), REVISION 1 (REV.01) | EM-ER-02-214 | 00 |
| 17-DEC-02 | GIANOTTO, D. F. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION | DOE/ID-10745 | 01 |
| 17-DEC-02 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER | DOE/ID-10749 | 01 |
| 17-DEC-02 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OF HASP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774, REV.01 & REV.02 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 PERCHED WATER SYSTEM | INEEL/EXT-2000-00257 | 01 |
| 04-DEC-02 | KREIZENBECK, R. | NOTICE OF VIOLATION (NOV) AND PENALTY ASSESSMENT | 24768 | 00 |
| 27-NOV-02 | DOORNBOS, M. H. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY | EDF-ER-264 | 01 |
| 01-OCT-02 | TUOTT, L. C. | INSTITUTIONAL CONTROL PLAN FOR THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 | DOE/ID-10729 | 02 |
| 19-SEP-02 | DOE | NEW SITE IDENTIFICATION (NSI) - SITE CPP-37C OPERABLE UNIT (OU) 3-13 - CONTAMINATION DISCOVERED SOUTHEAST OF CERCLA SITE CPP-37B | 24750 | 00 |
| 18-SEP-02 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA), CPP-1789 | DOE/ID-10800 | 02 |
| 10-SEP-02 | HURST, C. J. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS, PRIORITIZATION AND SITE GROUPING REPORT | DOE/ID-10996 | 00 |
| 10-SEP-02 | HURST, C. J. | TITLE I 30% REMEDIAL DESIGN (RD) FOR THE GROUP 7, VES-SFE-20 HOT WASTE TANK | DOE/ID-11010 | 00 |
| 30-AUG-02 | BREWER, K. | ENGINEERING DESIGN FILE (EDF) - TRANSURANIC (TRU) CALCULATIONS FOR VES-SFE-20 WASTE TANK - ATTACHMENT 7 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-2360 | 00 |
| 18-JUL-02 | COLLINS, R. L. | TRANSMITTAL OF MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), REVISION 2 (REV.02) | EM-ER-02-121 | 00 |
| 01-JUL-02 | GIANOTTO, D. F. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS MSIP IS THE RD/RA WORK PLAN FOR GROUP 5 | DOE/ID-10782 | 02 |
| 01-JUL-02 | NEHER, E. | PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 | DOE/ID-10784 | 02 |
| 01-JUL-02 | GIANOTTO, D. F. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 | DOE/ID-10829 | 02 |
| 01-JUN-02 | INEEL COMMUNITY RELATIONS | ICDF FACTS - UPDATE ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - JUNE 2002 (06/02) | 24663 | 00 |
| 01-JUN-02 | BRUCE, J. E. | WASTE MANAGEMENT PLAN (WMP) FOR THE STAGING AND STORAGE ANNEX (SSA) CPP-1789 | DOE/ID-10800 | 01 |
| 14-MAY-02 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE | DOE/ID-10848 | 01 |
| 14-MAY-02 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN - APPENDIX X TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | DOE/ID-10851 | 02 |
| 14-MAY-02 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX W TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | DOE/ID-10958 | 00 |
| 14-MAY-02 | FRITZLER, B. E. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | EDF-2899 | 00 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-266 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-267 | 01 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-268 | 01 |
| 14-MAY-02 | BOSE, D. H. | ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | EDF-ER-269 | 01 |
| 14-MAY-02 | BOSE, D. H. | ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-271 | 01 |
| 14-MAY-02 | EVANS, S. K. | ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | EDF-ER-273 | 02 |
| 14-MAY-02 | DAY, R. E. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-274 | 01 |
| 14-MAY-02 | MCMAHON, W. J. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-275 | 02 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5 | EDF-ER-276 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-277 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-278 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-279 | 02 |
| 14-MAY-02 | THOMPSON, B. | ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-280 | 01 |
| 14-MAY-02 | CROUSE, P. | ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-281 | 01 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-282 | 01 |
| 14-MAY-02 | THURSTON, M. | ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-286 | 01 |
| 14-MAY-02 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V | EDF-ER-290 | 01 |
| 14-MAY-02 | DAVISON, R. L. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-311 | 01 |
| 14-MAY-02 | ROUTT, T. M. | ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-315 | 00 |
| 14-MAY-02 | JENKINS, T. W. | TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) TITLE II DESIGN | EM-ER-02-083 | 00 |
| 14-MAY-02 | VERNON, D. K. | STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) STAGE II CONSTRUCTION - APPENDIX V TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | PLN-962 | 00 |
| 14-MAY-02 | DEHNER, J. G. | TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - APPENDIX Y TO ICDF RD/CWP - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | SPC-1476 | 01 |
| 14-MAY-02 | VERNON, D. K. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX CONTROL SYSTEM - APPENDIX DD TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | TFR-2520 | 00 |
| 14-MAY-02 | VERNON, D. K. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WAG-3 INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND - APPENDIX CC TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) O | TFR-71 | 02 |
| 06-MAY-02 | FORSYTHE, H. S. | PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER | DOE/ID-10967 | 00 |
| 01-MAY-02 | INEEL COMMUNITY RELATIONS | ICDF FACTS - UPDATE ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - MAY 2002 (05/02) | 27977 | 00 |
| 01-MAY-02 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) - APPENDIX S TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | DOE/ID-10955 | 00 |
| 18-APR-02 | HAIN, K. E. | TRANSMITTAL OF FINAL PHASE I MONITORING WELL AND TRACER STUDY REPORT FOR OPERABLE UNIT (OU) 3-13, GROUP 4 PERCHED WATER | EM-ER-02-063 | 00 |
| 10-APR-02 | PERKINS, T. L. | DOE COMMENTS ON PUBLIC PARTICIPATION PACKAGE AND HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION RECOVERY ACT (RCRA) CLOSURE PLAN (CP) FOR VES-SFE-20 HOT WASTE TANK SYSTEM AT INEEL INTEC | EM-ER-02-054 | 00 |
| 12-MAR-02 | JENKINS, T. W. | TRANSMITTAL OF THE FINAL REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX | EM-ER-02-037 | 00 |
| 12-MAR-02 | DAVISON, R. L. | A-E PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, AND SIZING TREATMENT FACILITY (SSSTF) SOIL STABILIZATION SYSTEM (SSS) - APPENDIX B OF EDF-ER-296 WHICH IS APPENDIX B-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | SPC-1481 | 00 |
| 11-MAR-02 | NISHIOKA, D. E. | PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - CPP-1689 ADMINISTRATIVE OFFICE TRAILER (AOT) - APPENDIX C-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | SPC-1484 | 00 |
| 07-MAR-02 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DEBRIS TREATMENT PROCESS SELECTION AND DESIGN - APPENDIX B-2 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1730 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ACCESS ROAD AND SITE PAVEMENT BALLAST REQUIREMENTS - APPENDIX B-11 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1913 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - SANITARY SEWER LIFT STATION PUMP DESIGN - APPENDIX B-3 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1937 | 00 |
| 07-MAR-02 | HUNTER, L. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - INTEC FIRE WATER SYSTEM FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX B-5 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) | EDF-1948 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - PROCESS SYSTEMS DRAIN PIPE SIZING - APPENDIX B-6 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2648 | 00 |
| 07-MAR-02 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FLOW AND PRESSURE CALCULATIONS OF THE RAW WATER AND POTABLE WATER SYSTEMS - APPENDIX B-4 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF CO | EDF-2655 | 00 |
| 07-MAR-02 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DECONTAMINATION FACILITY HVAC SYSTEM - APPENDIX B-7 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2676 | 00 |
| 07-MAR-02 | HIPP, T. M. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FIBER OPTIC SELECTION - APPENDIX B-9 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2738 | 00 |
| 07-MAR-02 | DUGGAN, J. E. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ELECTRICAL LOAD STUDY - APPENDIX B-10 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2747 | 00 |
| 07-MAR-02 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - POST-TENSIONED SLAB DESIGN - APPENDIX B-12 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-3061 | 00 |
| 07-MAR-02 | HAEFNER, D. R. | ENGINEERING DESIGN FILE (EDF) - PROCESS AND TREATMENT OVERVIEW FOR THE MINIMUM TREATMENT PROCESS - APPENDIX B-1 TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-296 | 00 |
| 07-MAR-02 | SUMMERS, A. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DESIGN RADIOLOGICAL CONTROL ANALYSIS - APPENDIX B-8 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-302 | 00 |
| 07-MAR-02 | DAVISON, R. L. | STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR CONSTRUCTION ACTIVITIES - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX I TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | PLN-1034 | 00 |
| 07-MAR-02 | NISHIOKA, D. E. | A-E CONSTRUCTION SPECIFICATIONS (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - APPENDIX C TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | SPC-1485 | 00 |
| 07-MAR-02 | DAVISON, R. L. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX A TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | TFR-17 | 02 |
| 01-MAR-02 | DAVISON, R. L. | STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX H TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | DOE/ID-10873 | 00 |
| 01-MAR-02 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) - APPENDIX J TO THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | DOE/ID-10881 | 00 |
| 01-MAR-02 | DAVISON, R. L. | REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WAG-3 STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX | DOE/ID-10889 | 00 |
| 01-MAR-02 | DAVISON, R. L. | HEALTH & SAFETY PLAN (HSP) FOR CONSTRUCTION OF THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX G TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | INEEL/EXT-01-00271 | 00 |
| 01-MAR-02 | THOMPSON, R. G. | PRELIMINARY INSPECTION PLAN FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION ACTIVITIES - APPENDIX F TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | INEEL/EXT-01-00777 | 00 |
| 01-MAR-02 | DAVISON, R. L. | QUALITY PROGRAM PLAN (QPP) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | PLN-873 | 00 |
| 01-FEB-02 | RODDY, M. S. | ANNUAL IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) GROUNDWATER MONITORING REPORT FOR GROUP 5 - SNAKE RIVER PLAIN AQUIFER (SRPA) - 2001 | DOE/ID-10930 | 00 |
| 01-DEC-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR PHASE 2 CONSTRUCTION (60% DESIGN COMPONENT) | DOE/ID-10851 | 01 |
| 30-NOV-01 | EVANS, S. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS (60% DESIGN COMPONENT) | EDF-ER-273(60%) | 01 |
| 30-NOV-01 | MCMAHON, W. J. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT (60% DESIGN COMPONENT | EDF-ER-275(60%) | 01 |
| 30-NOV-01 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - HYDROLOGIC MODELING OF FINAL COVER - (60% DESIGN COMPONENT) | EDF-ER-279(60%) | 01 |
| 30-NOV-01 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING (60% DESIGN COMPONENT) - APPENDIX O TO DRAFT FINAL ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN ( | EDF-ER-290(60%) | 00 |
| 30-NOV-01 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) EVAPORATION POND LINING SYSTEM EQUIVALENCY ANALYSIS (60% DESIGN COMPONENT) | EDF-ER-312(60%) | 00 |
| 30-NOV-01 | NIELSEN, M. R. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT MAPPING PLAN (60% DESIGN COMPONENT) | EDF-ER-322(60%) | 00 |
| 30-NOV-01 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) EVAPORATION POND BERM OVERTOPPING ANALYSIS (60% DESIGN COMPONENT) | EDF-ER-323(60%) | 00 |
| 29-NOV-01 | PERRY, S. W. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) - (60% DESIGN COMPONENT) | EDF-ER-311(60%) | 00 |
| 01-NOV-01 | VERNON, D. K. | RESOLUTION LIST (COMMENT RESPONSES) FOR IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23621 | 00 |
| 01-NOV-01 | VERNON, D. K. | RESOLUTION LIST (COMMENT RESPONSES) FOR ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23623 | 00 |
| 01-NOV-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) - MASTER TABLE OF DOCUMENTS (60% DESIGN COMPONENTS) | DOE/ID-10925 | 00 |
| 22-OCT-01 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23620 | 00 |
| 17-OCT-01 | JENKINS, T. W. | RESPONSE TO INEEL CITIZENS ADVISORY BOARD LETTER 01-CAB-077 DEALING WITH THE INEEL CERCLA DISPOSAL FACILITY (ICDF) | EM-ER-01-162 | 00 |
| 09-OCT-01 | COLLINS, R. L. | RESPONSE TO THE ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE GROUP 6 GAS CYLINDERS AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | EM-ER-01-166 | 00 |
| 03-OCT-01 | JENKINS, T. W. | ON-SITE VERSUS OFF-SITE SOIL AND DEBRIS DISPOSAL COST COMPARISON AT INEEL CERCLA DISPOSAL FACILITY (ICDF) | EM-ER-01-160 | 00 |
| 02-OCT-01 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23622 | 00 |
| 02-OCT-01 | JENKINS, T. W. | RESPONSE TO IDEQ REQUEST FOR 20 (TWENTY) DAY EXTENSION FOR REVIEWS OF DRAFT STAGING, STORAGE, STABILIZATION & TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN & INEEL CERCLA DISPOSAL FACILITY (ICDF) 60% DESIGN COMPONENTS | EM-ER-01-161 | 00 |
| 01-OCT-01 | INEEL COMMUNITY RELATIONS | UPDATE - DESIGN AND WASTE ACCEPTANCE CRITERIA (WAC) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) | 24741 | 00 |
| 01-OCT-01 | LYLE, J. L. | RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER CONCERNING VES-SFE-20 TANK CLOSURE PLAN (CP) | EM-ER-01-156 | 00 |
| 23-AUG-01 | HAIN, K. E. | TRANSMITTAL OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING & TREATMENT FACILITY (SSSTF) | EM-ER-01-136 | 00 |
| 01-AUG-01 | FORSYTHE, H. S. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 | DOE/ID-10880 | 00 |
| 19-JUL-01 | COLLINS, R. L. | TRANSMITTAL OF THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13, REVISION 1 (REV.01) - DOE/ID-10883 | EM-ER-01-124 | 00 |
| 17-JUL-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) EXCAVATION AND TEST PAD CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 (VOL.01) OF 2 | 21374 | 00 |
| 17-JUL-01 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) AIR SPACE VOLUME CALCULATION - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | EDF-ER-265 | 00 |
| 17-JUL-01 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) STORM WATER DRAINAGE CALCULATIONS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | EDF-ER-270 | 00 |
| 17-JUL-01 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SOIL AMENDMENT STUDY - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | EDF-ER-272 | 00 |
| 17-JUL-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) TECHNICAL SPECIFICATIONS (SPC) FOR EXCAVATION AND CONSTRUCTING AND TESTING OF CLAY LINER AND TEST PAD - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | SPC-1475 | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SUBSURFACE CONSOLIDATION CALCULATION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-266(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LANDFILL COMPACTION SUBSIDENCE STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-267(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SLOPE STABILITY ASSESSMENTS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-268(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LEACHATE GENERATION STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-269(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-271(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-273(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LEACHATE AND CONTAMINANT REDUCTION TIME STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-274(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-275(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN AND CONSTRUCTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-276(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-277(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LINER AND LEACHATE COMPATIBILITY STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-278(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-280(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-281(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-282(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - WASTE PLACEMENT PLAN - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-286(30%) | 00 |
| 09-JUL-01 | HAIN, K. E. | TRANSMITTAL OF THE FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE | EM-ER-01-117 | 00 |
| 09-JUL-01 | CH2M HILL | TECHNICAL SPECIFICATIONS (SPC) - OTHER SPECIFICATIONS REQUIRED TO COMPLETE DRAFT TITLE I DESIGN - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 OF 5 - SUBCONTRACT #S01-588058 | SPC-1476 | 00 |
| 01-JUL-01 | CH2M HILL | INEEL CERCLA DISPOSAL FACILITY (ICDF) - MASTER TABLE OF DOCUMENTS (TITLE I) - UMBRELLA DOCUMENT FOR THE TITLE I DESIGN SUBMITTAL FOR DESIGN AND CONSTRUCTION OF THE ICDF - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 (VOL.01) OF 5 | DOE/ID-10847 | 00 |
| 01-JUL-01 | CH2M HILL | INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN TITLE II DESIGN - ANNOTATED OUTLINE (TITLE I) 30% DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | DOE/ID-10848 | 00 |
| 01-JUL-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR EXCAVATION AND CONSTRUCTING AND TESTING OF CLAY LINER AND TEST PAD - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | DOE/ID-10849 | 00 |
| 01-JUL-01 | CH2M HILL | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR INEEL CERCLA DISPOSAL FACILITY - ANNOTATED OUTLINE (TITLE I) - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 OF 5 | DOE/ID-10851 | 00 |
| 01-JUL-01 | CH2M HILL | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX LANDFILL AND EVAPORATION POND OPERATIONS AND MAINTENANCE (O&M) PLAN - ANNOTATED OUTLINE (TITLE I) - 30% DESIGN PACKAGE - INCLUDED IN VOLUME 1 OF 5 | DOE/ID-10852 | 00 |
| 01-JUL-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) FINAL DESIGN EXCAVATION AND TEST PAD - MASTER TABLE OF DOCUMENTS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | DOE/ID-10854 | 00 |
| 01-JUL-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | DOE/ID-10855 | 00 |
| 01-JUL-01 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) FINAL DESIGN EXCAVATION AND TEST PAD DRAWINGS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 2 OF 2 | DOE/ID-10877 | 00 |
| 01-JUL-01 | CH2M HILL | INEEL CERCLA DISPOSAL FACILITY (ICDF) - DRAWINGS - TITLE I 30% DESIGN - VOLUME 5 (VOL.05) OF 5 | DOE/ID-10878 | 00 |
| 01-JUL-01 | TUOTT, L. C. | THE 2001 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-10883 | 01 |
| 01-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-264(30%) | 00 |
| 01-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - HYDROLOGIC MODELING OF FINAL COVER - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-279(30%) | 00 |
| 01-JUL-01 | MCMANAMON, L. E. | HEALTH & SAFETY PLAN (HSP) FOR CONSTRUCTION OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | INEEL/EXT-2000-01424 | 00 |
| 28-JUN-01 | HAIN, K. E. | TRANSMITTAL OF THE DRAFT FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) TITLE II DESIGN PACKAGE | EM-ER-01-112 | 00 |
| 18-JUN-01 | JENKINS, T. W. | SUITABILITY DETERMINATION FOR OFF-SITE FACILITIES TO MANAGE WASTE AREA GROUP 3 (WAG-3) CERCLA WASTES | EM-ER-01-106 | 00 |
| 29-MAY-01 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS AND RESOLUTIONS ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% REMEDIAL DESIGN (RD) PACKAGE AND 90% TEST PAD PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 22510 | 00 |
| 25-MAY-01 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DOCUMENT REVIEW COMMENTS ON THE DRAFT INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) | 22509 | 00 |
| 01-MAY-01 | BECHTEL | DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OPERABLE UNIT (OU) 3-13 GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (REV. | DOE/ID-10836 | 00 |
| 01-MAY-01 | BECHTEL | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) | DOE/ID-10837 | 00 |
| 01-MAY-01 | BECHTEL | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/ID-10838 | 00 |
| 24-APR-01 | JENKINS, T. W. | TRANSMITTAL OF DRAFT INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE AND DRAFT ICDF TITLE II DESIGN PACKAGE | EM-ER-01-075 | 00 |
| 06-APR-01 | JENKINS, T. W. | RESPONSE TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER CONCERNING THE SCHEDULE FOR SFE-20 REMEDIATION | EM-ER-01-061 | 00 |
| 03-APR-01 | SMITH, B. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS, DOE/ID-10838 | 23300 | 00 |
| 03-APR-01 | SMITH, B. D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS, DOE/ID-10838 | 23302 | 00 |
| 01-APR-01 | DOORNBOS, M. H. | HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE PLAN (CP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/ID-10864 | 00 |
| 14-MAR-01 | NYGARD, D. | SCHEDULE FOR GROUP 7, SFE-20 REMEDIAL ACTION (RA), OPERABLE UNIT (OU) 3-13 | 22801 | 00 |
| 01-MAR-01 | RAUNIG, D. E. | PRELIMINARY CHARACTERIZATION PLAN FOR OU 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT 1 TO RD/RA WORK PLAN, REVISION 1 (REV.01) AND REVISION 2 (REV.02) | DOE/ID-10842 | 02 |
| 01-MAR-01 | MCMANAMON, L. E. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) | INEEL/EXT-2000-00270 | 02 |
| 09-JAN-01 | BORSCHEL, T. F. | TRANSMITTAL OF THE FINAL GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | EM-ER-04-01 | 00 |
| 31-DEC-00 | HURST, C. J. | DRAINAGE OBSERVATION REPORT FOR GROUP 2 - SOILS UNDER BUILDINGS FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13 | DOE/ID-10833 | 00 |
| 22-DEC-00 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION TREATMENT PROCESS SELECTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1542(30%) | 00 |
| 22-DEC-00 | HAIN, K. E. | TRANSMITTAL OF FINAL PRELIMINARY 30% DESIGN REPORT FOR STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) | EM-ER-242-00 | 00 |
| 21-DEC-00 | DAVISON, R. L. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 | TFR-17 | 01 |
| 20-DEC-00 | PREUSSNER, B. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE INVENTORY DESIGN BASIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 | EDF-1540(30%) | 00 |
| 19-DEC-00 | GIANOTTO, D. F. | PRELIMINARY CHARACTERIZATION PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT TO RD/RA WORK PLAN | DOE/ID-10842 | 01 |
| 18-DEC-00 | WALSH, S. S. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) AND INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONAL SCENARIO AND PROCESS FLOWS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1547(30%) | 00 |
| 15-DEC-00 | PINTO, A. P. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) BASIS & AQUEOUS WASTE MANAGEMENT - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1549(30%) | 00 |
| 15-DEC-00 | PODGORNEY, A. K. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE ACCEPTANCE CRITERIA (WAC) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 | EDF-1551(30%) | 00 |
| 14-DEC-00 | ABBOTT, C. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE TRANSPORT STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1543(30%) | 00 |
| 14-DEC-00 | FRENCH, P. S. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE VERIFICATION AND TREATED WASTE STATISTICAL APPROACH - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1544(30%) | 00 |
| 14-DEC-00 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE STAGING AND STORAGE CRITERIA - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1545(30%) | 00 |
| 14-DEC-00 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) PRELIMINARY HAZARD CLASSIFICATION ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1546(30%) | 00 |
| 14-DEC-00 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) SITING STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1548(30%) | 00 |
| 13-DEC-00 | HAIN, K. E. | TRANSMITTAL OF FINAL CERCLA WASTE INVENTORY DATABASE FOR OPERABLE UNIT (OU) 3-13 WASTE DISPOSAL COMPLEX | EM-ER-237-00 | 00 |
| 04-DEC-00 | HAIN, K. E. | STATEMENT OF DISPUTE, SFE-20 TANK, REQUEST FOR DECEMBER 18, 2000 (12/18/2000) MEETING | EM-ER-230-00 | 00 |
| 01-DEC-00 | DAVISON, R. L. | PROJECT PLANS - DRAWINGS FOR STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 | 21395(30%) | 00 |
| 01-DEC-00 | BECHTEL | CERCLA WASTE INVENTORY DATABASE REPORT FOR OPERABLE UNIT (OU) 3-13 WASTE DISPOSAL FACILITY (ICDF) | DOE/ID-10803 | 00 |
| 01-DEC-00 | BORSCHEL, T. F. | GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | DOE/ID-10812 | 00 |
| 01-DEC-00 | DAVISON, R. L. | PRELIMINARY DESIGN REPORT FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 | DOE/ID-10825 | 00 |
| 30-NOV-00 | IDEQ | IDEQ COMMENTS & RESOLUTIONS ON THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DRAFT 30% DESIGN - DOE/ID-10825 | 21417 | 00 |
| 30-NOV-00 | HAIN, K. E. | TRANSMITTAL OF FINAL CONCEPTUAL DESIGN REPORT FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND, OPERABLE UNIT (OU) 3-13 | EM-ER-225-00 | 00 |
| 29-NOV-00 | EPA | EPA COMMENTS & RESOLUTIONS ON THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DRAFT 30% DESIGN - DOE/ID-10825 | 21416 | 00 |
| 29-NOV-00 | KELLY, K. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED NOVEMBER 13, 2000 (11/13/2000) CONCERNING STATEMENT OF DISPUTE REGARDING SFE-20 TANK | 22802 | 00 |
| 29-NOV-00 | HAIN, K. E. | TRANSMITTAL OF FINAL MONITORING SYSTEM INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS DOCUMENT IS THE RD/RA WORK PLAN FOR THIS PROJECT | EM-ER-223-00 | 00 |
| 28-NOV-00 | GEARHEARD, M. F. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED NOVEMBER 13, 2000 (11/13/2000) CONCERNING STATEMENT OF DISPUTE REGARDING SFE-20 TANK, FROM KATHLEEN HAIN | 22817 | 00 |
| 24-NOV-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVORONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 22501 | 00 |
| 13-NOV-00 | HAIN, K. E. | SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING SFE-20 TANK, WASTE AREA GROUP 3 (WAG-3), INEEL | EM-ER-216-00 | 00 |
| 09-NOV-00 | JENKINS, T. W. | TRANSMITTAL OF THE DRAFT GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | EM-ER-215-00 | 00 |
| 06-NOV-00 | VERNON, D. K. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND - SUPERSEDES INEEL/EXT-2000-00810, REV.0A | TFR-71 | 01 |
| 01-NOV-00 | ROBERTS, C. J. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) | DOE/ID-10782 | 01 |
| 01-NOV-00 | ROBERTS, C. J. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02 | DOE/ID-10783 | 01 |
| 01-NOV-00 | ROBERTS, C. J. | PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 | DOE/ID-10784 | 01 |
| 01-NOV-00 | LINDBERG, R. D. | REVIEW OF REACTIVE MATERIALS TO SUPPORT THE DESIGN OF AN INEEL CERCLA DISPOSAL FACILITY (ICDF) ATTENUATION BARRIER WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 AT THE INEEL | DOE/ID-10791 | 00 |
| 01-NOV-00 | COLE, M. R. | CONCEPTUAL DESIGN REPORT FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND | DOE/ID-10806 | 00 |
| 01-NOV-00 | LINDBERG, R. D. | COMPILATION OF SORPTION COEFFICIENTS FOR SELECTED ELEMENTS ON BENTONITE AND SMECTITE CLAYS TO SUPPORT THE DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) ATTENUATION BARRIER WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | DOE/ID-10815 | 00 |
| 01-NOV-00 | ROBERTS, C. J. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 | DOE/ID-10829 | 01 |
| 01-NOV-00 | MARTIAN, P. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) CONTAMINANT OF CONCERN (COC) IDENTIFICATION MODELING - SCREENING MODEL RESULTS OF A MIXED LOW LEVEL WASTE (MLLW) DISPOSAL FACILITY PROPOSED FOR THE INEEL - FUNCTIONAL FILE #2000-00 | EDF-ER-170 | 00 |
| 31-OCT-00 | HAIN, K. E. | TRANSMITTAL OF DRAFT PRELIMINARY 30% DESIGN REPORT FOR STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) | EM-ER-209-00 | 00 |
| 16-OCT-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT CONCEPTUAL DESIGN REPORT AND ASSOCIATED DOCUMENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND FOR OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION ( | 22508 | 00 |
| 14-OCT-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS AND RESOLUTIONS ON THE 10% REMEDIAL DESIGN (RD) PACKAGE - CONCEPTUAL DESIGN REPORT AND ASSOCIATED DOCUMENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 | 22507 | 00 |
| 01-OCT-00 | DAVISON, R. L. | CONSTRUCTION SPECIFICATIONS (SPC) FOR 30% DESIGN - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) OU 3-13 (DRAFT) | 23295 | 00 |
| 01-OCT-00 | DAVISON, R. L. | TREATABILITY STUDY (TS) WORK PLAN FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION PROCESS (DRAFT) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 | DOE/ID-10828 | 00 |
| 01-OCT-00 | FORSYTHE, H. S. | HEALTH AND SAFETY PLAN (HSP) FOR OU 3-13 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX G TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 | INEEL/EXT-2000-00817 | 00 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | ROBERTS, C. J. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | INEEL/EXT-2000-00257 | 00 |
| 19-SEP-00 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | EDF-ER-206 | 00 |
| 18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 | EDF-1379 | 00 |
| 18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, | EDF-1387 | 00 |
| 13-SEP-00 | JENKINS, T. W. | TRANSMITTAL OF DRAFT CERCLA WASTE INVENTORY DATABASE FOR OPERABLE UNIT (OU) 3-13 WASTE DISPOSAL COMPLEX | EM-ER-176-00 | 00 |
| 13-SEP-00 | JENKINS, T. W. | TRANSMITTAL OF DRAFT CONCEPTUAL DESIGN REPORT FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) & EVAPORATION POND | EM-ER-177-00 | 00 |
| 05-SEP-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT STAGING AND STORAGE ANNEX (SSA) WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) | 22506 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | FIELD SAMPLING PLAN (FSP) FOR OU 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - THIS DOCUMENT IS APPENDIX B TO DOE/ID-10774, REV.00 & REV.01 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | DOE/ID-10745 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - THIS DOCUMENT IS APPENDIX E TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 4 | DOE/ID-10746 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER -THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | DOE/ID-10749 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | TRACER TEST PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX D TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 0 (REV.00), REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) | DOE/ID-10762 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OU 3-13 GROUP 4 AND GROUP 5, WELL INSTALLATION AND MONITORING PROJECTS - APPENDIX D TO MSIP FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 & REV.02 & APPENDIX J TO GROUP 4 MSIP, DOE/ID-10 | DOE/ID-10768 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 00 |
| 01-SEP-00 | FRENCH, P. S. | WASTE MANAGEMENT PLAN (WMP) FOR STAGING & STORAGE ANNEX (SSA) - THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | DOE/ID-10800 | 00 |
| 20-JUL-00 | HAIN, K. E. | TRANSMITTAL OF FINAL CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) | EM-ER-132-00 | 00 |
| 17-JUL-00 | HAIN, K. E. | TRANSMITTAL OF OPERABLE UNIT (OU) 3-13 GROUP 2 BUILDING DRAINAGE EVALUATION PLAN | EM-ER-129-00 | 00 |
| 12-JUL-00 | DAVISON, R. L. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - THIS DOCUMENT IS REFERENCED AS APPENDIX B OF DOE/ID-10769, REV.01 - CONCEPTUAL DESIGN REPORT | TFR-17,DRF | 00 |
| 01-JUL-00 | BECHTEL | DRAINAGE EVALUATION PLAN FOR GROUP 2 - SOILS UNDER BUILDINGS AND STRUCTURES FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | DOE/ID-10759 | 00 |
| 01-JUL-00 | DAVISON, R. L. | CONCEPTUAL DESIGN REPORT FOR THE STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - APPENDIX E CONTAINS EPA AND IDEQ COMMENTS AND RESOLUTIONS | DOE/ID-10769 | 01 |
| 06-JUN-00 | JENKINS, T. W. | TRANSMITTAL OF THE DRAFT REVIEW OF REACTIVE BARRIER MATERIALS TO SUPPORT THE DESIGN OF AN INEEL CERCLA DISPOSAL FACILITY (ICDF) ATTENUATION BARRIER WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 AT THE INEEL | EM-ER-108-00 | 00 |
| 05-JUN-00 | BORSCHEL, T. F. | GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT CONCEPTUAL DESIGN OF INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 | DOE/ID-10787 | 00 |
| 26-MAY-00 | ENGLISH, M. | STATE OF IDAHO DIVISION OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) | 22444 | 00 |
| 26-MAY-00 | ENGLISH, M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT 10% CONCEPTUAL DESIGN REPORT FOR THE STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) AT INTEC OPERABLE UNIT (OU) | 22505 | 00 |
| 17-MAY-00 | HAIN, K. E. | TRANSMITTAL OF FINAL INITIAL INSTITUTIONAL CONTROL MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | EM-ER-90-00 | 00 |
| 10-MAY-00 | ENGLISH, M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ)TECHNICAL REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) OU 3-13 | 22503 | 00 |
| 10-MAY-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT 10% CONCEPTUAL REMEDIAL DESIGN (RD) REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - DOE/ID-10769 | 22841 | 00 |
| 09-MAY-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 | 22502 | 00 |
| 09-MAY-00 | RAUNIG, D. E. | HAZARD CLASSIFICATION FOR REMEDIATION OF OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES - CPP-84 & CPP-94 - ATTACHMENT 3 TO RD/RA WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (R | INEEL/EXT-2000-00254 | 00 |
| 01-MAY-00 | FRENCH, P. S. | INITIAL INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-10751 | 00 |
| 27-APR-00 | HAIN, K. E. | TRANSMITTAL OF DRAFT CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF), REV.0A | EM-ER-77-00 | 00 |
| 29-FEB-00 | HIGGINS, L. M. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | DOE/ID-10721 | 01 |
| 29-FEB-00 | HAIN, K. E. | TRANSMITTAL OF FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | EM-ER-28-00 | 00 |
| 25-OCT-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | OPE-ER-162-99 | 00 |
| 14-OCT-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OF OU 3-13 | AR.INDEX.OU.3-13 | 00 |
| 13-OCT-99 | FRITZ, K. D. | A-E CONSTRUCTION SPECIFICATION (SPC) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) CERCLA STORAGE PAD AREA CPP-92 AND LOW LEVEL WASTE (LLW) HOLDING AREA - PART OF APPENDIX E TO SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF | SPC-218 | 00 |
| 07-OCT-99 | ALLRED, C. S. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) INVOLVEMENT IN DEVELOPMENT AND REVIEW OF THE RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13, INTEC - CONTINGENT UPON SPECIFIED REGULATORY STANDARDS IDEQ IS SIGNATORY TO THE ROD WITH DOE AND EPA | 24797 | 00 |
| 07-OCT-99 | DOE | FINAL RECORD OF DECISION (ROD) IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 | DOE/ID-10660 | 00 |
| 20-SEP-99 | JENKINS, T. W. | INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 - INDEX OF SAMPLING DATA DOCUMENTS | 10707 | 00 |
| 09-SEP-99 | EPA | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON SUPPLEMENTAL FEASIBILITY STUDY (FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 18077 | 00 |
| 09-SEP-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 18078 | 00 |
| 01-SEP-99 | LMITCO | EVALUATION & SITE SELECTION FOR A NEW SERVICE WASTE DISPOSAL FACILITY FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) | DOE/ID-10705 | 00 |
| 30-AUG-99 | HAIN, K. E. | TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) INEEL | OPE-ER-119-99 | 00 |
| 05-AUG-99 | PIERRE, W. | REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED | 10683 | 00 |
| 04-AUG-99 | KOCH, D. F. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - DOE/ID-10660 | 10682 | 00 |
| 20-JUL-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-99-99 | 00 |
| 14-MAY-99 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW COMMENTS ON DRAFT RECORD OF DECISION (ROD) OPERABLE UNIT (OU) 3-13 IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) - DOE/ID-10660 | 10681 | 00 |
| 14-APR-99 | GREENWELL, R. D. | SOIL RESTORATION DEPARTMENT MANAGEMENT ASSESSMENT OF WAG-3 CERCLA RADIOLOGICAL MANAGEMENT AREA (RMA) & STORAGE YARD | RDG-03-99 | 00 |
| 04-APR-99 | BROSCIOUS, C. | PUBLIC COMMENTS ON ENVIRONMENTAL REMEDIATION AT INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 10696 | 00 |
| 31-MAR-99 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) | OPE-ER-48-99 | 00 |
| 29-MAR-99 | JENKINS, T. W. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-44-99 | 00 |
| 01-MAR-99 | IDHW | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 10679 | 00 |
| 22-FEB-99 | RICHARDSON, B. | RESPONSE TO HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) LETTER - PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) EXTENDED | 18081 | 00 |
| 17-FEB-99 | JENKINS, T. W. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-99 | 00 |
| 11-FEB-99 | ROBERTSON, B. B. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10694 | 00 |
| 09-FEB-99 | CRAPO, M. | PUBLIC COMMENTS ON RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10693 | 00 |
| 08-FEB-99 | HOBSON, S. | PUBLIC COMMENTS ON INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 10692 | 00 |
| 08-FEB-99 | KUEHN, R. M. | PUBLIC COMMENT ON NUCLEAR WASTE CLEANUP AT INEEL - WASTE AREA GROUP 3 (WAG-3) OU 3-13 | 10695 | 00 |
| 01-FEB-99 | OWENDOFF, J. M. | RESPONSE TO CONGRESSWOMAN HELEN CHENOWETH'S DECEMBER 18, 1998 (12/18/98) REQUEST FOR EXTENSION OF PUBLIC COMMENT PERIOD ON PROPOSED PLAN FOR CLEANUP OF INEEL WASTE AREA GROUP 3 (WAG-3) IDAHO NUCLEAR TECHNNOLOGY AND ENGINEERING CENTER (INTEC) | 18080 | 00 |
| 11-JAN-99 | INEEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY - COMMENT PERIOD EXTENDED ON PROPOSED CLEANUP PLAN FOR IDAHO NUCLEAR TECHNOLOGY & ENGINEERING CENTER (INTEC) | 16878 | 00 |
| 08-JAN-99 | PRIESTLEY, F. | PUBLIC COMMENTS ON INEEL CERCLA DISPOSAL FACILITY (ICDF) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10685 | 00 |
| 22-DEC-98 | STEWART, M. M. | PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL | 10701 | 00 |
| 22-DEC-98 | HENSEL, D. | PUBLIC COMMENTS ON CHEMICAL PLANT CLEANUP FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10702 | 00 |
| 22-DEC-98 | BOBO, R. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10703 | 00 |
| 22-DEC-98 | BRAILSFORD, B. | PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL | 10704 | 00 |
| 22-DEC-98 | MCCARTHY, J. M. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10705 | 00 |
| 21-DEC-98 | COPERFIELD, C. | PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10700 | 00 |
| 18-DEC-98 | LEMLEY, J. K. | PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10691 | 00 |
| 18-DEC-98 | CHENOWETH, H. | CONCERN OVER DEPARTMENT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP & TO REQUEST PERSONAL ATTENTION IN REDIRECTING CRITICAL ASPECTS OF EFFORT - REQUEST PUBLIC COMMENT PERIOD BE EXTENDED FOR THIRTY (30) DAYS | 18079 | 00 |
| 17-DEC-98 | CHRISTINNA | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10684 | 00 |
| 15-DEC-98 | VANHORN, R. L. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10686 | 00 |
| 15-DEC-98 | DOE | NEW SITE IDENTIFICATION (NSI) - BOXED SOIL - CPP-99 | 16808 | 00 |
| 01-DEC-98 | COMMANDER, J. | PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10690 | 00 |
| 19-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) | 10678 | 00 |
| 19-NOV-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10699 | 00 |
| 18-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) | 10677 | 00 |
| 18-NOV-98 | CITIZENS ADVISORY BOARD | PUBLIC COMMENTS - CITIZENS ADVISORY BOARD (CAB) FOR PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) ICPP | 10706 | 00 |
| 16-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) | 10675 | 00 |
| 16-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) | 10676 | 00 |
| 03-NOV-98 | DOE | NEW SITE IDENTIFICATION (NSI) - TANK FARM SHORING BOXES - CPP-98 | 16807 | 00 |
| 31-OCT-98 | ANSLEY, S. L. | PUBLIC COMMENTS ON REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10687 | 00 |
| 27-OCT-98 | RANDOLPH, P. | PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 10689 | 00 |
| 22-OCT-98 | INEEL COMMUNITY RELATIONS | NOTICE OF AVAILABILITY - MEETINGS SCHEDULED ON CLEANUP OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 10545 | 00 |
| 16-OCT-98 | DOE | NEW SITE IDENTIFICATION (NSI) - TANK FARM SOIL STOCKPILES, CPP-97 | 16760 | 00 |
| 14-OCT-98 | JESSMORE, P. J. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WINDBLOW AREA - SECTION 9 OF EE/CA FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL - INEL-95/0259,VOL.01 | 10543 | 00 |
| 14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-159-98 | 00 |
| 14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) | OPE-ER-160-98 | 00 |
| 01-OCT-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | 10542 | 00 |
| 01-OCT-98 | GREENWELL, R. D. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 | DOE/ID-10619,VOL.01 | 02 |
| 01-OCT-98 | GREENWELL, R. D. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 | DOE/ID-10619,VOL.02 | 02 |
| 21-SEP-98 | CHAMBERS, R. | MULTI-AGENCY RADIATION SURVEY & SITE INVESTIGATION MANUAL (MARSSIM) INVESTIGATION FOR CPP-709 RADIONUCLIDES | RC-10-98 | 00 |
| 15-SEP-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-148-98 | 00 |
| 01-SEP-98 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - WASTE AREA GROUP 3 (WAG-3) ENVIRONMENTAL INVESTIGATION NEARLY COMPLETE FOR INTEC (FORMERLY ICPP) OU 3-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - FINDINGS OF BASELINE RISK ASSESSMENT (BRA) | 14840 | 00 |
| 17-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) | OPE-ER-133-98 | 00 |
| 14-AUG-98 | TAYLOR, A. E. | PUBLIC COMMENTS ON DRAFT RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10688 | 00 |
| 14-AUG-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10698 | 00 |
| 06-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL- PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT - REVISION 1 (REV.01) | OPE-ER-128-98 | 00 |
| 05-AUG-98 | ROSE, K. A. | RESPONSE TO RECOMMENDATIONS FROM THE NATIONAL REMEDY REVIEW BOARD (NRRB) ON THE PROPOSED REMEDY FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 14842 | 00 |
| 14-JUL-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON DRAFT CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10697 | 00 |
| 22-JUN-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-104-98 | 00 |
| 27-MAY-98 | NYGARD, D. | IDHW CONCURRENCE WITH ENFORCEABLE SCHEDULE EXTENSION FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) | 10446 | 00 |
| 27-MAY-98 | PIERRE, W. | EPA CONCURRENCE ON REQUEST FOR EXTENSION OF ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) | 10447 | 00 |
| 15-MAY-98 | JENKINS, T. W. | REQUEST FOR EXTENSION OF OPERABLE UNIT (OU) 3-13 DRAFT RECORD OF DECISION (ROD) & RELATED DOCUMENTS | OPE-ER-67-98 | 00 |
| 14-MAY-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-78-98 | 00 |
| 12-MAY-98 | LMITCO | INEEL STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - GENERIC PLAN - THIS DOCUMENT IS APPENDIX M TO THE MONITORING SYSTEM & INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), DOE/ID-10782, RE | DOE/ID-10425(98) | 02 |
| 29-APR-98 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED SOILS REPOSITORY AT INEEL | OPE-ER-73-98 | 00 |
| 17-APR-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-68-98 | 00 |
| 26-MAR-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT | 16293 | 00 |
| 12-MAR-98 | JENKINS, T. W. | TRANSMITTAL OF DOCUMENTS FOR REVIEW OF WASTE AREA GROUP 3 (WAG-3) COST ESTIMATES | OPE-ER-40-98 | 00 |
| 06-MAR-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 16292 | 00 |
| 13-FEB-98 | HAIN, K. E. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-98 | 00 |
| 29-JAN-98 | HAIN, K. E. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-13 FEASIBILITY STUDY (FS) SUPPLEMENT TO FINAL OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL | OPE-ER-18-98 | 00 |
| 09-JAN-98 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON WORKING DRAFT OF PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) ICPP, JANUARY 5, 1998 (01/05/98) | 15059 | 00 |
| 05-JAN-98 | DEPPERSCHMIDT, J. D. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 | OPE-ER/SA-98-002 | 00 |
| 30-DEC-97 | ROSE, K. A. | REQUEST FOR 20 DAY EXTENSION OF COMMENT PERIOD ON DRAFT PROPOSED PLAN FOR ICPP AT INEEL | 15057 | 00 |
| 04-DEC-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | OPE-ER-261-97 | 00 |
| 01-DEC-97 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 25-NOV-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANR (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-253-97 | 00 |
| 25-NOV-97 | HAIN, K. E. | TRANSMITTAL OF VALIDATED ANALYTICAL SAMPLING DATA FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS NON TIME CRITICAL REMOVAL ACTION (NTCRA) | OPE-ER-254-97 | 00 |
| 14-NOV-97 | ROBISON, S. A. | DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) | 15054 | 00 |
| 14-NOV-97 | RENO, S. L. | IDHW-DEQ COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL (DRAFT FINAL) | 15055 | 00 |
| 01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - COMPREHENSIVE INVESTIGATION IDENTIFIES EXTENT OF CONTAMINATION WITHIN WASTE AREA GROUP 3 (WAG-3) FOR INTEC (FORMERLY ICPP) OPERABLE UNIT (OU) 3-13 | 14841 | 00 |
| 01-NOV-97 | BURCH, N. A. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | SCHAFER-PERINI, A. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | RAUNIG, D. E. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | VANHORN, R. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | MCCARTHY, J. M. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | BURNS, D. E. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | MARTIAN, P. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | RODRIGUEZ, R. R | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 1 THRU 12) | DOE/ID-10534 BINDER 1 PART 1 | 0 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | BURNS, D. E. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | MCCARTHY, J. M. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | BURCH, N. A. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | RAUNIG, D. E. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | MARTIAN, P. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | SCHAFER-PERINI, A. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | VANHORN, R. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 (CHAPTERS 13 THRU 29) | DOE/ID-10534 BINDER 1 PART 2 | 0 |
| 01-NOV-97 | BURCH, N. A. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | BURNS, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | RODRIGUEZ, R. R | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | MARTIAN, P. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | MCCARTHY, J. M. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | SCHAFER-PERINI, A. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | RAUNIG, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | VANHORN, R. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX A THROUGH APPENDIX F3) | DOE/ID-10534 BINDER 2 PART 1 | 0 |
| 01-NOV-97 | VANHORN, R. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | RAUNIG, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | MARTIAN, P. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | MCCARTHY, J. M. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | SCHAFER-PERINI, A. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | BURCH, N. A. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | BURNS, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 (APPENDIX F4 THROUGH APPENDIX F12) | DOE/ID-10534 BINDER 2 PART 2 | 0 |
| 01-NOV-97 | MARTIAN, P. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | BURNS, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | VANHORN, R. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | MCCARTHY, J. M. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | RAUNIG, D. E. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | SCHAFER-PERINI, A. L. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | RODRIGUEZ, R. R | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | BURCH, N. A. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 3 OF 3 - APPENDIX G THROUGH APPENDIX N | DOE/ID-10534 BINDER 3 | 0 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 1 OF 3 - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL | DOE/ID-10534,BINDER-01 | 00 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX A THROUGH APPENDIX F - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL | DOE/ID-10534,BINDER-02 | 00 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE RI/FS FOR ICPP OU 3-13 PART A ; REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT - BINDER 2 OF 3 - APPENDIX G THROUGH APPENDIX N - (SEE DOE/ID-10572,BINDER-01 & DOE/ID-10572,BINDER-02 FOR PART B) - FINAL | DOE/ID-10534,BINDER-03 | 00 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B ; FEASIBILITY STUDY (FS) REPORT - BINDER 1 OF 2 - (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL | DOE/ID-10572,BINDER-01 | 00 |
| 01-NOV-97 | RODRIGUEZ, R. R. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 PART B FEASIBILITY STUDY (FS) REPORT BINDER 2 OF 2 APPENDIX C THROUGH I (SEE DOE/ID-10534,BINDER-01 & DOE/ID-10534,BINDER-02 DOE/ID-10534,BINDER-03 FOR PART A) - FINAL | DOE/ID-10572,BINDER-02 | 00 |
| 30-OCT-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-174-97 | 00 |
| 13-OCT-97 | BURNS, D. E. | SUMMARY OF ASSUMPTIONS USED DURING DEVELOPMENT OF WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) MICROSHIELD MODELING RESULTS | DEB-20-97 | 00 |
| 07-OCT-97 | HAIN, K. E. | TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-158-97 | 00 |
| 12-SEP-97 | ORLEAN, H. | ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15053 | 00 |
| 03-SEP-97 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) | 15051 | 00 |
| 14-AUG-97 | HAIN, K. E. | DOE-ID TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL - DRAFT ICPP COMPREHENSIVE FACILITY CLOSURE EVALUATION PHASE II (APPENDIX H) FOR REVIEW | OPE-ER-127-97 | 00 |
| 13-AUG-97 | ORLEAN, H. | EPA COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL | 10429 | 00 |
| 11-AUG-97 | RENO, S. L. | IDHW-DEQ EXTENSION OF REVIEW PERIOD ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEEL - DOE/ID-10572 JUNE 1997 (06/97) | 10430 | 00 |
| 01-AUG-97 | JONES, R. W. | FIELD SAMPLING PLAN (FSP) FOR D&D OF CPP-631 RALA BUILDING & CPP-709 & CPP-734 MONITORING STATIONS AT ICPP | INEEL/EXT-97-00805 | 00 |
| 08-JUL-97 | FALCONER, K. L. | LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) | KLF-150-97 | 00 |
| 27-JUN-97 | JINES, A. | TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-106-97 | 00 |
| 24-JUN-97 | JENSEN, N. R. | TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP | OPE-ER-102-97 | 00 |
| 18-JUN-97 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON TECHNOLOGY SCREENING & ALTERNATIVE DEVELOMENT FOR WAG-3 COMPREHENSIVE FEASIBILITY STUDY (FS) REPORT | OPE-ER-101-97 | 00 |
| 12-JUN-97 | JENSEN, N. R. | TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) AND REMOVAL ACTION PLAN FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | OPE-ER-91-97 | 00 |
| 01-JUN-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 01 |
| 01-JUN-97 | JONES, R. K. | LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - CPP-701 PETROLEUM CONTAMINATED SOIL | INEEL/EXT-97-00677 | 00 |
| 01-JUN-97 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR D&D OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 01 |
| 01-JUN-97 | CRAM, A. J. | REMOVAL ACTION PLAN FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | INEL/EXT-97-00116 | 00 |
| 01-MAY-97 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | DOE/ID-10579 | 00 |
| 01-MAY-97 | PARSONS | ACTION MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION - RESPONSE TO PUBLIC COMMENTS ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) INCLUDED AS ATTACHMENT | DOE/ID-10588 | 00 |
| 01-MAY-97 | ARROWOOD, J. R. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | INEL/EXT-97-00132 | 01 |
| 10-APR-97 | WESSMAN, D. L. | REGULATORY POSITION ON STATUS OF CPP-709 & CPP-734 AS THEY RELATE TO APPROVED CLOSURE OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCOLATION PONDS | OPE-EP-131-97 | 00 |
| 27-MAR-97 | RENO, S. L. | IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) | 14351 | 00 |
| 20-MAR-97 | GREENWELL, R. D. | WASTE AREA GROUP 3 (WAG-3) CORE SAMPLES | RDG-03-97 | 00 |
| 05-MAR-97 | JENSEN, N. R. | TRANSMITTAL OF THE REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE | OPE-ER-33-97 | 00 |
| 01-MAR-97 | JONES, R. K. | LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT ICPP | INEL/EXT-97-00341 | 00 |
| 28-FEB-97 | JENSEN, N. R. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | OPE-ER-29-97 | 00 |
| 20-FEB-97 | RAUNIG, D. E. | NEW SITE IDENTIFICATION (NSI) FORM - BURIED CYLINDERS EAST OU 3-13 SITE CPP-94 {APPROVED BY AGENCIES IN FFA/CO PROJECT MANAGER MEETING MINUTES APRIL 2, 1997 (04/02/97)} | 12899 | 00 |
| 01-FEB-97 | NOT SPECIFIED | APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | 10315 | 00 |
| 01-FEB-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 00 |
| 30-JAN-97 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | 18071 | 00 |
| 23-DEC-96 | JENSEN, N. R. | TRANSMITTAL OF THREE TECHNICAL MEMORANDA ON TECHNOLOGY SCREENING REMEDIAL ACTION (RA) OBJECTIVES AND APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARS) | OPE-ER-199-96 | 00 |
| 17-DEC-96 | JINES, A. | RESPONSE TO COMMENTS FOR WASTE AREA GROUP 3 (WAG-3) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT- PART A OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT | OPE-ER-196-96 | 00 |
| 13-NOV-96 | KENOYER, D. J. | TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 | DJK-09-96-A | 00 |
| 13-NOV-96 | JENKINS, T. W. | TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A - REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT FINAL) | OPE-ER-173-96 | 00 |
| 08-OCT-96 | RENO, S. L. | IDHW COMMENTS ON COMPREHENSIVE RI/FS FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - DRAFT DOE/ID-10534 | 12996 | 00 |
| 04-OCT-96 | ORLEAN, H. | EPA COMMENTS ON DRAFT COMPREHENSIVE RI/FS FOR ICPP OU 3-13 - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) - REPORT | 12995 | 00 |
| 29-AUG-96 | RENO, S. L. | IDHW REQUEST FOR EXTENSION OF REVIEW PERIOD ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL - PART A, REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) - (OPE-ER-122-96) | 10298 | 00 |
| 27-AUG-96 | JENSEN, N. R. | TRANSMITTAL OF REVISED WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SCHEDULE | OPE-ER-131-96 | 00 |
| 05-AUG-96 | JENSEN, N. R. | DOE TRANSMITTAL OF COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR ICPP OU 3-13 AT INEL PART A REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT (DRAFT) | OPE-ER-122-96 | 00 |
| 05-DEC-95 | GREEN, L. A. | VALIDATED ANALYTICAL SAMPLING DATA FOR ICPP PERCHED WATER WELLS, SNAKE RIVER PLAIN AQUIFER (SRPA) WELLS, USGS-47 VERTICAL CONTAMINANT PROFILING AND SOIL SAMPLES CONDUCTED WASTE AREA GROUP (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY | OPE-ER-95-222 | 00 |
| 23-OCT-95 | JENKINS, T. W. | DISPOSAL OF DRILL CUTTINGS FOR MONITORING WELL 18 (MW-18) | 18017 | 00 |
| 01-AUG-95 | LITCO | HEALTH AND SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - FINAL | INEL-95/0136 | 00 |
| 01-AUG-95 | LITCO | SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) | INEL-95/0137 | 00 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) | INEL/95-0056, VOL 02 | 0 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) | INEL/95-0056, VOL. 01 | 0 |
| 05-JUL-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-127-95 | 00 |
| 01-JUL-95 | MEYER, T. J. | HEALTH & SAFETY PLAN (HSP) FOR WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILTY STUDY (RI/FS) | INEL-95/0136 | 02 |
| 21-JUN-95 | RODRIGUEZ, R. R. | MODIFICATION TO WASTE AREA GROUP 3 (WAG-3) BASELINE RISK ASSESSMENT (BRA) APPROACH | KLF-210-95 | 00 |
| 19-JUN-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT WASTE AREA GROUP 3 (WAG-3) SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (SLERA) | OPE-ER-117-95 | 00 |
| 05-JUN-95 | GREEN, L. A. | EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-102-95 | 00 |
| 01-JUN-95 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 00 |
| 15-MAY-95 | RAUNIG, D. E. | WAG-3 INVESTIGATION DERIVED WASTE (IDW) AQUIFER WELL PURGE WATER | KLF-159-95 | 00 |
| 01-MAY-95 | RENO, S. L. | IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) | 18023 | 00 |
| 23-MAR-95 | GREEN, L. A. | TRANSMITTAL OF VALIDATED DATA FOR PERCHED WATER SAMPLING, DECEMBER 1994 (12/94) AND JANUARY 1995 (01/95) | OPE-ER-052-95 | 00 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 17-FEB-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 | 15045 | 00 |
| 01-FEB-95 | LITCO | REPORT OF 1993 AND 1994 TANK FARM DRILLING AND SAMPLING INVESTIGATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | INEL-95/0064 | 00 |
| 25-JAN-95 | RAUNIG, D. E. | NEW SITE IDENTIFICATION (NSI) FORM - SIMULATED CALCINE TRENCH NU-1.95 OPERABLE UNIT (OU) 3-13 SITE CODE CPP-93 [ACCEPTED BY AGENCIES IN FFA/CO PROJECT MANAGERS MEETING FEBRUARY 2, 1995 (02/02/95)] | 14345 | 00 |
| 09-JAN-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON DRAFT WASTE AREA GROUP 3 (WAG-3) SATURATED ZONE CONCEPTUAL MODEL | 15044 | 00 |
| 22-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15040 | 00 |
| 22-NOV-94 | GREEN, L. A. | TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 | OPE-ER-308-94 | 00 |
| 18-NOV-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL MEMORANDUM FOR RADIOLOGICALLY CONTAMINATED SOILS - NEW UNIT NU-21.93 | 18066 | 00 |
| 18-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOLOGICALLY CONTAMINATED SOILS (NEW UNIT NU-21.93) OU 3-13 | 18068 | 00 |
| 07-NOV-94 | RENO, S. L. | IDHW-DEQ COMMENTS ON DRAFT TEHCNICAL MEMORANDUM FOR WATER QUALITY TREND ANALYSIS IN SNAKE RIVER PLAIN AQUIFER (SRPA), IDAHO CHEMICAL PROCESSING PLANT (ICPP), OCTOBER 6, 1994 (10/06/94) | 15039 | 00 |
| 01-NOV-94 | RENO, S. L. | IDHW COMMENTS ON DRAFT TECHNICAL MEMORANDUM, WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) METHODOLOGY OPERABLE UNIT (OU) 3-13 SEPTEMBER 28, 1994 (09/28/94) | 15034 | 00 |
| 28-OCT-94 | JENKINS, T. W. | TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 17286 | 00 |
| 21-OCT-94 | GREEN, L. A. | TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-283-94 | 00 |
| 19-OCT-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL WORK PLAN FOR PERCHED WATER PUMPING AND TRACER TESTS | 15038 | 00 |
| 18-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCHED GROUNDWATER PUMPING AND TRACER TEST, SEPTEMBER 16, 1994 (09/16/94) | 15037 | 00 |
| 14-OCT-94 | WINCO | FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5791 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) | 15035 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5785 | 00 |
| 30-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON SEDIMENT LAYERING EFFECT ON CONTAMINANT TRANSPORT FOR NONPERCHED UNSATURATED AREAS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 5779 | 00 |
| 30-AUG-94 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON TECHNICAL MEMORANDUM ASSESSMENT PORFLOW BOUNDARY CONDITIONS FOR USE IN THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) UNSATURATED ZONE MODEL & ATTACHMENT A CYLINDRICAL COORDINATE OPTION PORFLOW | 5784 | 00 |
| 10-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT AQUIFER CHARACTERISTICS TECHNICAL MEMORANDUM | 5778 | 00 |
| 10-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5782 | 00 |
| 08-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5783 | 00 |
| 15-JUL-94 | BURNS, S. M. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA | SMB-05-94 | 00 |
| 17-JUN-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE TECHNICAL MEMORANDUM CONCEPTUAL FLOW & TRANSPORT MODELS OF UNSATURATED ZONES FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILIITY STUDY (RI/FS) | 5776 | 00 |
| 01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
| 26-APR-94 | LYLE, J. L. | TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | OPE-ER-099-94 | 00 |
| 12-APR-94 | WELLS, R. P. | LIMITATIONS & VALIDATION (L&V) REPORT, IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-07 RADIOCHEMICAL ANALYSIS, SDG #3PG10301BG | RPW-44-94 | 00 |
| 01-APR-94 | BUGGER, B. | DOE NEWS - ENGINEERS NEW SENSOR SYSTEM WITH ARMS CONTROL, CLEANUP APPLICATIONS | 7595 | 00 |
| 30-MAR-94 | BUGGER, B. | DOE NEWS - RETECH SIGN AGREEMENT FOR TEST MELT OF CONTAMINATED METAL | 7559 | 00 |
| 22-MAR-94 | LANEY, P. T. | COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | PTL-02-94 | 00 |
| 18-MAR-94 | LIVERMAN, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 5777 | 00 |
| 09-MAR-94 | ROSENBERGER, M. S. | IDHW-DEQ REVIEW OF DRAFT FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP (WAG-3) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 3-08A - COMMENTS INCLUDED | 18040 | 00 |
| 28-FEB-94 | WINCO | BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) | 14143 | 00 |
| 18-FEB-94 | LYLE, J. L. | TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-047-94 | 00 |
| 01-FEB-94 | WENZEL, D. R. | RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL | WINCO-1123 | 01 |
| 19-JAN-94 | STOOPS, T. M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) - COMMENTS INCLUDED | 18041 | 00 |
| 01-DEC-93 | HONEYCUTT, T. K. | TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS | EGG-ER-11101 | 00 |
| 15-NOV-93 | LYLE, J. L. | TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-035-93 | 00 |
| 15-OCT-93 | BUGGER, B. | DOE NEWS - WINCO PRIVATE VENDOR DEMONSTRATES TECHNOLOGY FOR CLEANER DECONTAMINATION | 6836 | 00 |
| 24-SEP-93 | BUGGER, B. | DOE NEWS - REMOVAL ACTIONS TO TAKE PLACE AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6805 | 00 |
| 05-AUG-93 | COE, M. | DOE NEWS - IDAHO CHEMICAL PROCESSING PLANT (ICPP) TRANSITION PLAN MADE AVAILABLE | 6710 | 00 |
| 04-AUG-93 | HUESTIS, G. M. | SOIL TREATABILITY STUDY (TS) OF INEL SOILS INCLUDING ICPP SOILS | GMH-01-93 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | NUTHAK, S. A. | HEALTH & SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | EGG-ER-10922 | 00 |
| 01-JUL-93 | GOLDER ASSOCIATES, INC. | SAMPLING AND ANALYSIS PLAN (SAP) FOR BOXED SOILS FROM SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-58 AND BASEMENT EXIT EXCAVATIONS AT CPP-604 AND CPP-605 AT ICPP, REVISION 1 (REV.01) | 14084 | 00 |
| 24-JUN-93 | COE, M. | DOE NEWS - DOE COMPLETES ENVIRONMENTAL ASSESSMENT (EA) ON UPGRADING CHEMICAL PLANT TANK FARM | 6548 | 00 |
| 09-JUN-93 | STOOPS, T. M. | IDHW REVIEW COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-08 AT ICPP WAG-3 | 18069 | 00 |
| 01-JUN-93 | BUGGER, B. | DOE NEWS - WINCO COORDINATES EFFORT TO RECYLE CONTAMINATED METAL | 6520 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 2 (VOL.02) - ICPP | DOE/ID-10392,VOL.02 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 3 (VOL.03) - ICPP CONT'D & INEL MIDDLE, NORTH & SOUTH | DOE/ID-10392,VOL.03 | 00 |
| 28-MAY-93 | EARLE, O. K. | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 OU 3-12 SITE CPP-81 INEL BUTTE COUNTY, IDAHO | 5280 | 00 |
| 28-MAY-93 | EARLE, O. K. | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), BIN SET #3, IDAHO NATIONAL ENGINEERING LABORATORY (INEL), BUTTE COUNTY, IDAHO | 5281 | 00 |
| 28-MAY-93 | EARLE, O. K. | TRANSMITTAL OF ACTION MEMORANDUM FOR TIME CRITICAL REMOVAL ACTIONS (TCRA) PLANNED FOR FY-93 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FOR INCLUSION INTO THE ADMINISTRATIVE RECORD (AR) FILE | OKE-64-93 | 00 |
| 24-MAR-93 | WASTREN, INC. | SAMPLING AND ANALYSIS PLAN (SAP) FOR ICPP PERCOLATION PONDS #1 AND #2 | 18021 | 00 |
| 24-FEB-93 | MARTY, R. C. | VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 | RM-06-93-A | 00 |
| 08-JAN-93 | RHODES, D. W. | EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 | DWR-01-93 | 00 |
| 26-OCT-92 | STOOPS, T. M. | RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 | 6115 | 00 |
| 22-OCT-92 | DOORNBOS, M. H. | EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 | 6614 | 00 |
| 28-SEP-92 | BATTAGLIA, P. J. | FEASIBILITY STUDY (FS) FOR GAMMA PROFILING AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | FL-92-0234 | 00 |
| 17-AUG-92 | MASCARENAS, C. S. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP), REV.01 FY-92 DRILLING & SAMPLING PROGRAM TRACK 2 INVESTIGATION OF OU 3-07 TANK FARM & OU 3-08 TANK FARM II | 6621 | 00 |
| 17-AUG-92 | RETZLAFF, R. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY | 903-1188 | 00 |
| 31-JUL-92 | LYLE, J. L. | TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) | AM/ERWM-RPO-173-92 | 00 |
| 21-JUL-92 | WINCO | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) | QAPJP-E-035 | 00 |
| 10-JUL-92 | LYLE, J. L. | MODIFICATIONS TO OPERABLE UNIT (OU) 3-07 TANK FARM SAMPLING & ANALYSIS PLAN (SAP) AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | AM/ERWM-RPO-154-92 | 00 |
| 08-JUN-92 | MALIK, L. E. | REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES | 6622 | 00 |
| 15-APR-92 | GOLDER ASSOCIATES, INC. | FINAL REPORT FOR ICPP SAMPLING & ANALYSIS PROGRAM AT SERVICE WASTE PERCOLATION POND #2 | 903-1171 | 00 |
| 07-APR-92 | LYLE, J. L. | TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) | ERD1-098-92 | 00 |
| 31-MAR-92 | CULP, B. | SITE ASSESSMENT DOCUMENT PACKAGES FOR OPERABLE UNIT (OU) 3-08 - CPP-13, CPP-15, CPP-27, CCP-29, CPP-35, CPP-36, CPP-58E AND CPP-58W | 6637 | 00 |
| 19-FEB-92 | URBANSKI, C. J. | SUBSURFACE IMAGING RESULTS FOR HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT | CJU-05-92 | 00 |
| 14-JAN-92 | JONES, K. L. | STATE OF IDAHO, REQUEST FOR INFORMATION | KXJ-9-92 | 00 |
| 10-JAN-92 | LYLE, J. L. | TRANSMITTAL OF SCOPE OF WORK (SOW) FOR TRACK 2 PRELIMINARY SCOPING STUDY AT OPERABLE UNIT (OU) 3-08 | RPO-001-92 | 00 |
| 01-JAN-92 | MOTAZED, B. | PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6623 | 00 |
| 18-DEC-91 | EARLE, O. K. | DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL | 6594 | 00 |
| 16-DEC-91 | GOLDER ASSOCIATES, INC. | SAMPLING & ANALYSIS PLAN (SAP) FOR SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - (TECHNICAL WORK PLAN) REV.02 | 6636 | 00 |
| 02-DEC-91 | JOSTEN, N. E. | FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY | NEJ-28-91 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 29-OCT-91 | MASCARENAS, C. S. | SITES WITHIN OPERABLE UNIT (OU) 3-07 | 6596 | 00 |
| 18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07 TANK FARM | 6590 | 00 |
| 18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM | 6591 | 00 |
| 18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM | 6592 | 00 |
| 13-OCT-91 | EARLE, O. K. | HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT USING DEVICES TO LOCATE UNDERGROUND UTILITIES | 6589 | 00 |
| 10-SEP-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 | SGS-353-91 | 00 |
| 04-SEP-91 | GOLDER ASSOCIATES, INC. | REPORT ON SURFACE GEOPHYSICAL SURVEYS AT ICPP | 893-1195.950 | 00 |
| 22-AUG-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 | SGS-334-91 | 00 |
| 31-JUL-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 | SGS-289-91 | 00 |
| 16-JUL-91 | FORD, J. S. | DOCUMENT REVIEW: CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-40 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL | ERD-102-91 | 00 |
| 13-JUN-91 | BURNS, T. F. | TRANSMITTAL OF CLOSURE PLAN (CP) FOR CPP-48, EXCESS CHEMICAL DUMP TANK FRENCH DRAIN SOUTH OF CPP-633 FOR REVIEW & APPROVAL | ERD-229-91 | 00 |
| 10-JUN-91 | BURNS, T. F. | FINAL CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-48 EXCESS CHEMICAL FRENCH DRAIN | 3090 | 00 |
| 04-JUN-91 | BURNS, T. F. | CLOSURE PLAN (CP) FOR CPP-33 CONTAMINATED SOIL IN TANK FARM AREA NEAR WL-102 NE OF CPP-604 | ERD-210-91 | 00 |
| 30-MAY-91 | BURNS, T. F. | RESPONSE TO REGULATORY COMMENTS ON CLOSURE PLAN (CP) CPP-59, KEROSENE TANK OVERFLOW | ERD-209-91 | 00 |
| 21-MAY-91 | BURNS, T. F. | REQUEST FOR EXTENSION OF CPP-59 CLOSURE PLAN (CP) REVISION SCHEDULE | ERD-197-91 | 00 |
| 09-MAY-91 | LYLE, J. L. | RESPONSE TO INFORMATION REQUESTED BY MR. WALKER HOWELL REGARDING SAMPLING DATA FOR CPP-55-06 SAMPLING & ANALYSIS DATA PACKAGE | ERD-161-91 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 28-MAR-91 | BURNS, T. F. | CHARACTERIZATION DATA & OTHER INFORMATION REGARDING COCA UNITS CPP-39, CPP-51, CPP-54, CPP-59, & CPP-64 | ERD-105-91 | 00 |
| 14-MAR-91 | BURNS, T. F. | NOTIFICATION OF MODIFICATION OF PART A PERMIT FOR INEL - SUMMARY OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) LAND DISPOSAL RESTRICTIONS (LDR) RECLASSIFICATIONS | ERD-075-91 | 00 |
| 27-FEB-91 | SOLECKI, J. E. | SUBMITTAL OF SUMMARY ANALYTICAL DATA FOR INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | ERD-036-91 | 00 |
| 04-FEB-91 | EARLE, O. K. | REVISED LAND DISPOSAL UNITS (LDU) QUESTIONNAIRES | OKE-13-91 | 00 |
| 11-JAN-91 | GOLDER ASSOCIATES, INC. | TECHNICAL WORK PLAN - VOLUME I (VOL.01) SAMPLING & ANALYSIS PROGRAM AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 | 6658 | 00 |
| 11-JAN-91 | GOLDER ASSOCIATES, INC. | TECHNICAL WORK PLAN - VOLUME II QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR DRILLING & SAMPLING ACTIVITIES AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 | 6659 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT | 6625 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEICAL PROCESSING PLANT (ICPP) TANK FARM CONTAMINATED SOIL INVESTIGATION | 6632 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | REPORT FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-39 | 893-1195.310 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-59 | 893-1195.320 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-64 | 893-1195.330 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | CHEMICAL PROCESSING PLANT (CPP) DRILLING & SAMPLING PROGRAM AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-54 | 893-1195.360 | 00 |
| 01-JAN-91 | SOLECKI, J. E. | SUBMITTAL OF SUMMARY ANALYTICAL DATA INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | ERD-011-91 | 00 |
| 06-DEC-90 | EARLE, O. K. | STRONTIUM-90 IN BOREHOLE CPP-55-06 | OKE-21-90 | 00 |
| 05-DEC-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-39, HYDROFLUORIC (HF) ACID STORAGE TANK AND DRY WELL DATED DECEMBER 4, 1990 (12/04/90), TRANSMITTED FOR REVIEW & COMMENT | 611 | 00 |
| 03-DEC-90 | SOLECKI, J. E. | FINAL CLOSURE REPORT FOR CPP-55, MERCURY CONTAMINATED AREA | 610 | 00 |
| 19-NOV-90 | EARLE, O. K. | STRONTIUM-90 IN BOREHOLE CPP-55-06 | OKE-18-90 | 00 |
| 08-NOV-90 | EARLE, O. K. | CPP-59 CLOSURE PLAN (CP) SUBMITTAL | AMU-161-90 | 00 |
| 06-NOV-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-59 KEROSENE SPILL | 965 | 00 |
| 25-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) - LAND DISPOSAL UNIT (LDU) CPP-63 | 6656 | 00 |
| 16-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) - SWMU CPP-14 | 6651 | 00 |
| 16-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-36 INEL | 6652 | 00 |
| 16-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) ICPP LAND DISPOSAL UNIT (LDU) CPP-37 | 6653 | 00 |
| 16-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) LAND DISPOSAL UNIT (LDU) CPP-40 & CPP-47 | 6654 | 00 |
| 16-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) ICPP LAND DISPOSAL UNIT (LDU) CPP-48 | 6655 | 00 |
| 22-AUG-90 | SOLECKI, J. E. | CALIPER LOGS FOR CPP-23 INJECTION WELL | 2820 | 00 |
| 14-AUG-90 | LANE, R. D. | IDHW MEMORANDUM - CLOSURE PLAN (CP) FOR CPP-34 INEL | 15036 | 00 |
| 03-AUG-90 | GEARHEARD, M. F. | INEL REQUEST FOR EXTENSION FOR CLOSURE PLANS (CP) FOR COCA UNITS CPP-64, CPP-59, AND CPP-39 | 905 | 00 |
| 25-JUL-90 | GOLDER ASSOCIATES, INC. | TECHNICAL WORK PLAN FOR ICPP DRILLING AND SAMPLING PROGRAM AT ICPP TANK FARM CPP-33, VOLUME I (VOL.0I) | 893-1195.450,VOL.01 | 00 |
| 25-JUL-90 | GOLDER ASSOCIATES, INC. | TECHNICAL WORK PLAN VOLUME II (VOL.02) - QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR DRILLING AND SAMPLING ACTIVITIES AT ICPP TANK FARM CPP-33 | 893-1195.450,VOL.02 | 00 |
| 19-JUL-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-64 HEXONE SPILL WEST OF CPP-660 | 3077 | 00 |
| 19-JUN-90 | SOLECKI, J. E. | TRANSMITTAL OF CLOSURE PLAN (CP) FOR LDU CPP-34 SOIL STORAGE AREA IN THE NE CORNER OF THE ICPP FOR REVIEW AND APPROVAL | 6722 | 00 |
| 23-MAY-90 | BLUMBERG, D. J. | OCTOBER 16, 1989 (10/16/89) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR ADDITIONAL INFORMATION FOR DELETION OF SELECTED SOLID WASTE MANAGEMENT UNITS (SWMU'S) FROM THE CONSENT ORDER AND COMPLIANCE AGREEMENT (COCA) THROUGH SUMMARY ASSESSMENT PROC | DJB-49-90 | 00 |
| 26-APR-90 | GREEN, L. A. | RESPONSE TO STATE QUESTIONS | 6635 | 00 |
| 17-APR-90 | KOSHUTA, C. R. | REVIEW OF THE REVISED CLOSURE PLAN (CP) FOR CPP-23 | 6725 | 00 |
| 13-MAR-90 | SOLECKI, J. E. | SUPPORTING INFORMATION REQUESTED FOR SUMMARY ASSESSMENTS FOR SOLID WASTE MANAGEMENT UNITS (SWMU'S) | 6036 | 00 |
| 07-MAR-90 | SEHLKE, G. | REVISION OF WINCO'S RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION X'S REVIEW OF SUMMARY ASSESSMENTS CPP-41, CPP-43, CPP-70, CPP-71, CPP-76 AND CPP-77 | GS-04-90 | 00 |
| 12-JAN-90 | BLUMBERG, D. J. | SUMMARY ASSESSMENT REVIEW LETTER FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE | DJB-09-90 | 00 |
| 11-JAN-90 | SOLECKI, J. E. | DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS | 8206 | 00 |
| 22-DEC-89 | BLUMBERG, D. J. | STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION | KHK-147-89 | 00 |
| 11-DEC-89 | MOZES, R. F. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) INJECTION WELL ABANDONMENT REPORT | RFM-41-89 | 00 |
| 07-DEC-89 | SOLECKI, J. E. | IDHW REQUEST FOR INFORMATION CONCERNING STATUS OF "A SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603" - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 | 906 | 00 |
| 15-NOV-89 | SOLECKI, J. E. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE | 10986 | 00 |
| 09-NOV-89 | BLUMBERG, D. J. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE | DJB-40-89 | 00 |
| 09-NOV-89 | BLUMBERG, D. J. | SUMMARY ASSESSMENT REVIEW LETTER FROM EPA & STATE | DJB-41-89 | 00 |
| 08-NOV-89 | SEHLKE, G. | RESPONSE TO EPA'S NOTICE OF DEFICIENCY FOR WINCO'S ACCELERATED CLOSURE PLAN (CP) SCHEDULE | GS-15-89 | 00 |
| 07-NOV-89 | MATULE, A. J. | EPA REGION X REVIEW OF SUMMARY ASSESSMENT CPP-41, CPP-43, CPP-70, CPP-71, CPP-76, AND CPP-77 | 6533 | 00 |
| 06-NOV-89 | NYGARD, D. | COCA UNIT DISCOVERY AT THE ICPP - SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603 - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 | 6630 | 00 |
| 26-OCT-89 | KOSHUTA, C. R. | NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT | 6709 | 00 |
| 16-OCT-89 | GEARHEARD, M. F. | SUMMARY ASSESSMENT REVIEWS | 3537 | 00 |
| 01-OCT-89 | FENIX SCISSON & MK-FIC | REPORT ON PERFORATION & CEMENTING FOR ABANDONMENT OF THE INJECTION WELL MAH-FE-PL-304 | 6638 | 00 |
| 29-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO | 10110 | 00 |
| 27-SEP-89 | FORSBERG, D. L. | REVIEW OF PLAN FOR CPP-34 SOIL STORAGE AREA, CLOSURE PLAN (CP) FOR CPP-55, TECHNICAL SPECIFICATIONS (SPC) FOR DRILLING CONTRACTOR LDU CPP-34 & CPP-55, TECHNICAL SPECIFICATIONS FOR SAMPLING CONTRACTOR | DLF-01-89 | 00 |
| 19-SEP-89 | FINDLEY, C. E. | PUBLIC COMMENT PERIOD FOR THE CLOSURE PLAN (CP) BY THE INEL FOR CPP-55 | 6112 | 00 |
| 01-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) | 8472 | 00 |
| 22-AUG-89 | SOLECKI, J. E. | REVISION OF CLOSURE PLAN (CP) FOR LAND DISPOSAL UNIT (LDU) CPP-63, HEXONE LEAK NEAR BUILDING CPP-710 FOR REVIEW | 6111 | 00 |
| 26-MAY-89 | MATULE, A. J. | EPA REGION X & IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) CONDITIONS FOR CLOSURE OF LAND DISPOSAL UNIT (LDU) CPP-55 - INCLUDES ERRATA LIST FOR CLOSURE PLAN (CP) | AJM-23-89 | 00 |
| 01-NOV-88 | THOMAS, T. R. | MODELING HYPOTHETICAL GROUNDWATER TRANSPORT OF NITRATES, CHROMIUM, & CADMIUM AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | WINCO-1060 | 00 |
| 14-SEP-88 | HANSON, N. W. | FINAL REPORT FOR CPP-42 - LOG NO. 8809145 | 6628 | 00 |
| 05-JAN-88 | FEIGNER, K. D. | REVIEW OF SELECTED SUMMARY ASSESSMENTS | 2494 | 00 |
| 24-DEC-87 | FEIGNER, K. D. | INEL INITIAL ASSESSMENT RANKING UPDATE ON CPP-55 CLOSURE PLAN (CP) REVIEW & CPP-77 SUMMARY ASSESSMENT REVIEW | 2317 | 00 |
| 27-OCT-87 | FEIGNER, K. D. | INEL CLOSURE PLAN (CP) REVIEWS FOR TAN-726, ION EXCHANGE TREATMENT UNIT, TAN-674 TANK, IET CONTAINER STORAGE UNIT, AND HG CONTAMINATED AREA CPP-55 | 2668 | 00 |
| 01-OCT-87 | TETRA TECH, INC. | INITIAL REVIEW OF RCRA CLOSURE PLAN (CP) MERCURY CONTAMINATED AREA CPP-55 INEL | 6318 | 00 |
| 27-AUG-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-63 HEXONE SPILL BY CPP-710 | 2549 | 00 |
| 27-JUL-87 | HUNTER, B. R. | FINAL REPORT FOR 2ND (SECOND) PECR - LOG NO. 87072729 | 6629 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - CPP HF STORAGE TANK (YDB-105) & DRY WELL | 5403 | 00 |
| 08-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - CPP PRESSURIZATION OF SOLID STORAGE CYCLONE NORTHEAST OF THE WASTE CALCINING FACILITY (WCF) | 6679 | 00 |
| 08-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-20 CPP-604 RADIOACTIVE WASTE UNLOADING AREA | 6685 | 00 |
| 07-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - PRESSURIZATION OF SOLID STORAGE CYCLONENE OF CPP-633 | 6645 | 00 |
| 01-JUN-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR HEXONE SPILL WEST OF CPP-660 | 2560 | 00 |
| 27-MAY-87 | MANN, L. J. | USGS COMMENTS - GROUNDWATER MONITORING PLAN (GMP) ICPP INJECTION WELL | 2558 | 00 |
| 27-MAY-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP), ICPP INJECTION WELL | 2559 | 00 |
| 21-MAY-87 | FEIGNER, K. D. | SUMMARY ASSESSMENT REVIEW | 6497 | 00 |
| 29-APR-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-55, MERCURY CONTAMINATED AREA SOUTH OF ICPP T-15 | 2801 | 00 |
| 18-NOV-86 | GEARHEARD, M. F. | NOTICE OF DEFICIENCIES (NOD) FOR SIXTEEN (16) INEL CLOSURE PLANS (CP) - CONTAINS ONLY CLOSURE PLAN REVIEWS FOR TSF DISPOSAL POND, CFA-03, CFA-02, TAN-629 AND CFA MOTOR POOL POND - EPA AND IDHW REVIEWS | 8682 | 00 |
| 24-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) WL-212 CONTAMINATED LIQUID SPILL | WIN-86-0032-CPP | 00 |
| 22-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) INADVERTENT TRANSFER RESULTING IN LOSS OF WASTE SOLUTION | WIN-86-0034-CPP | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - FRENCH DRAIN SOUTH OF CPP-633 | 5412 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOIL CONTAMINATION NORTHWEST OF CPP-642 (EAST OF CPP-603) | 6673 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 BASIN FILTER SYSTEM LINE FAILURE | 6674 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - SOIL CONTAINMENT NEAR NORTHEAST CORNER OF CPP-603 SOUTH BASIN | 6675 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK | 6676 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 SLUDGE & WATER RELEASE | 6677 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED PAINT CHIPS & PAD SOUTH OF CPP-603 | 6678 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOLVENT BURNER EAST OF CPP-605 | 6680 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED SOIL FROM LEAK IN LINE FROM WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 6681 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOIL STORAGE AREA NEAR PEACH BOTTOM FUEL STORAGE AREA | 6682 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP GAS STORAGE BUILDING | 6683 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-19, CPP-603 TO CPP-604 LINE LEAK | 6684 | 00 |
| 08-MAY-86 | VALENTINE, J. H. | MEETING - INJECTION WELL - MAY 8, 1986 (05/08/86) | 6626 | 00 |
| 02-FEB-86 | NEBEKER, R. L. | SOURCES OF INFORMATION FOR CERCLA STUDY | NEB-3-86 | 00 |
| 15-JAN-86 | WALLACE, M. T. | HAZARDOUS WASTE STREAMS AT CPP | 7756 | 00 |
| 09-AUG-85 | SMITH, D. L. | SUMMARY OF RALA D&D STATUS | DLS-31-85 | 00 |
| 01-JUL-85 | MOSER, C. L. | RALA OFF GAS CELL AND STORAGE TANK (CPP-631 & VES-702) DECONTAMINATION AND DECOMMISSIONING (D&D) PLAN | WINCO-1032 | 00 |
| 11-APR-85 | NISHIMOTO, D. D. | IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DDN-01-85 | 00 |
| 26-OCT-84 | MESERVEY, R. H. | TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT | RHM-33-84 | 00 |
| 01-SEP-84 | SCHMIDT, D. A. | RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR VES-SFE-20 WASTE TANK & VAULT | WINCO-1021 | 00 |
| 19-JUL-84 | IKENBERRY, T. A. | RADIOLOGICAL CONTROLS FOR THE DECONTAMINATION OF LOW LEVEL WASTE (LLW) PROJECT EQUIPMENT | TAI-05-84 | 00 |
| 16-APR-84 | ERBEN, J. F. | LOCATION OF CONTAMINATED DIRT BURIAL | JFE-13-84 | 00 |
| 08-DEC-83 | BINGHAM, G. E. | DISPOSITION OF STOCKPILED SOIL | BING-106-83 | 00 |
| 28-NOV-83 | HICKS, F. E. | DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 | MK-83-E-1792 | 00 |
| 01-SEP-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION AND DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) FUEL - ELEMENT CUTTING FACILITY | WM-F1-83-024 | 00 |
| 01-MAY-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) BIF FILTER ROOM | WM-F1-83-006 | 00 |
| 04-FEB-83 | SODERBERG, J. D. | DEMOLITION OF ABANDONED SEWAGE PLANT CPP-703 & CPP-715 | 6648 | 00 |
| 01-MAY-82 | LOW, J. O. | INTERNAL TECHNICAL REPORT - RADIOACTIVE WASTE CHARACTERIZATION OF CHEMICAL PROCESSING PLANT 603 (CPP-603) CLEANUP BASIN SYSTEM CPP-740 | WM-F1-81-023 | 01 |
| 01-MAY-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHARACTERIZATION OF THE RALA OFF GAS CELL, CHEMICAL PROCESSING PLANT 631 (CPP-631) | WM-F1-81-010 | 00 |
| 01-MAR-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION | WM-F1-81-004 | 00 |
| 01-SEP-80 | WINCO | CHARACTERISTICS OF THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) SANITARY WASTE COLLECTION SYSTEMS | 6650 | 00 |
| 01-MAY-80 | WINCO | MAPS FOR CPP-14 | 6660 | 00 |
| 16-JAN-76 | LOHSE, G. E. | ALLIED CHEMICAL CORPORATION OPERATING OCCURRENCE REPORT - WASTE TRANSFER LINE GASKET LEAK | 6634 | 00 |
| 01-APR-73 | NICCUM, M. R. | FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 4962 | 00 |
| 01-JUN-72 | PAIGE, B. E. | BURIED WASTE (BW) LINE REGISTER NATIONAL REACTOR TESTING STATION (NRTS) PART IV CPP | ACI-110 | 00 |
Previous Page | Administrative Record Home Page