| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 28-AUG-03 | FITCH, D. R. | THE 2003 INSTITUTIONAL CONTROLS MONITORING REPORT FOR OPERABLE UNIT (OU) 3-13 | DOE/ID-11112 | 00 |
| 10-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-09 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-09 | AR.INDEX.OU.3-09 | 00 |
| 24-JUN-97 | JENSEN, N. R. | TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP | OPE-ER-102-97 | 00 |
| 01-JUN-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 01 |
| 01-MAY-97 | ARROWOOD, J. R. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR ICPP RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | INEL/EXT-97-00132 | 01 |
| 27-MAR-97 | RENO, S. L. | IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) | 14351 | 00 |
| 28-FEB-97 | JENSEN, N. R. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | OPE-ER-29-97 | 00 |
| 01-FEB-97 | NOT SPECIFIED | APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | 10315 | 00 |
| 01-FEB-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 00 |
| 30-JAN-97 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | 18071 | 00 |
| 19-OCT-95 | GREEN, L. A. | DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 10445 | 00 |
| 19-OCT-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS | OPE-ER-201-95 | 00 |
| 01-OCT-95 | GREENWELL, R. D. | DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | INEL-94/0171 | 00 |
| 01-AUG-95 | LITCO | SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) | INEL-95/0137 | 00 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) | INEL/95-0056, VOL 02 | 0 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) | INEL/95-0056, VOL. 01 | 0 |
| 05-JUL-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-127-95 | 00 |
| 05-JUN-95 | GREEN, L. A. | EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-102-95 | 00 |
| 01-MAY-95 | RENO, S. L. | IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) | 18023 | 00 |
| 20-APR-95 | DOE | ACTION DETERMINATION FOR OPERABLE UNIT (OU) 3-09 - TO BE FURTHER EVALUATED IN WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 3-13 | 10404 | 00 |
| 17-FEB-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 | 15045 | 00 |
| 01-FEB-95 | LITCO | FINAL PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 | INEL-95/0094 | 04 |
| 23-JAN-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OU 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 10032 | 00 |
| 19-DEC-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 10031 | 00 |
| 22-NOV-94 | GREEN, L. A. | TRANSMITTAL OF REVISED TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 | OPE-ER-308-94 | 00 |
| 21-OCT-94 | GREEN, L. A. | TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-283-94 | 00 |
| 14-OCT-94 | WINCO | FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5791 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) | 15035 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5785 | 00 |
| 10-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5782 | 00 |
| 08-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5783 | 00 |
| 26-APR-94 | LYLE, J. L. | TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | OPE-ER-099-94 | 00 |
| 22-MAR-94 | LANEY, P. T. | COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | PTL-02-94 | 00 |
| 18-MAR-94 | LIVERMAN, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 5777 | 00 |
| 01-MAR-94 | NOT SPECIFIED | ADDENDUM FOR THE SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09 | 5795 | 00 |
| 01-DEC-93 | WINCO | SAMPLING & ANALYSIS PLAN (SAP) FOR THE TRACK 2 CHARACTERIZATION OF ICPP OPERABLE UNIT (OU) 3-09, REV.01 | 5746 | 00 |
| 01-DEC-93 | HONEYCUTT, T. K. | TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS | EGG-ER-11101 | 00 |
| 30-NOV-93 | LIVERMAN, E. | EPA REVIEW COMMENTS FOR DRAFT TRACK 2 SAMPLING & ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-09, ICPP | 5774 | 00 |
| 28-OCT-93 | WINCO | DRAFT TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-09 (CPP-603 AREA), REV.01 | 5747 | 00 |
| 24-SEP-93 | INEL COMMUNITY RELATIONS | PUBLIC NOTICE - THE DEPARTMENT OF ENERGY (DOE) ANNOUNCES A 30 DAY PUBLIC COMMENT PERIOD ON THE REMOVAL ACTIONS AT OU 3-08, 3-09, AND OU 3-12 AT THE ICPP | 5567 | 00 |
| 24-SEP-93 | BUGGER, B. | DOE NEWS - REMOVAL ACTIONS TO TAKE PLACE AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6805 | 00 |
| 30-AUG-93 | WINCO | ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OU 3-09 CPP-740 SETTLING BASIN, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) | 5519 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | NUTHAK, S. A. | HEALTH & SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | EGG-ER-10922 | 00 |
| 28-MAY-93 | EARLE, O. K. | TRANSMITTAL OF ACTION MEMORANDUM FOR TIME CRITICAL REMOVAL ACTIONS (TCRA) PLANNED FOR FY-93 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FOR INCLUSION INTO THE ADMINISTRATIVE RECORD (AR) FILE | OKE-64-93 | 00 |
| 07-DEC-89 | SOLECKI, J. E. | IDHW REQUEST FOR INFORMATION CONCERNING STATUS OF "A SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603" - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 | 906 | 00 |
| 06-NOV-89 | NYGARD, D. | COCA UNIT DISCOVERY AT THE ICPP - SHALLOW SEEPAGE PIT ON WEST SIDE OF CPP-603 - CONCLUDED THAT THE SHALLOW PIT IS SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-2 (CPP-02), FRENCH DRAIN WEST OF CPP-603 | 6630 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL WEST OF CPP-693 EAST OF DRY FUEL STORAGE AREA | 5442 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-01, CONCRETE SETTLING BASIN, VAULT, AND DRY WELLS E. OF CPP-603 | 5365 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - FRENCH DRAIN W. OF CPP-603 | 5366 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - TEMPORARY STORAGE AREA SE OF CPP-603 | 5367 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING TANK | 5368 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING BASIN | 5369 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - TRENCH E. OF CPP-603 FUEL STORAGE BASIN | 5370 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-08, CPP-603 BASIN FILTER SYSTEM LINE FAILURE | 5372 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOIL CONTAMINATION NEAR THE NE CORNER OF CPP-603 S. BASIN | 5373 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK | 5374 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-603 SLUDGE AND WATER RELEASE | 5375 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOIL STORAGE AREA SOUTH OF CPP PEACH BOTTOM FUEL STORAGE AREA | 5381 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-603 TO CPP-604 LINE LEAK | 5383 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - PARTICULATE AIR RELEASE SOUTH OF CPP-603 | 5386 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - ABANDONED LIQUID RADIOACTIVE WASTE STORAGE TANK CPP VES-SFE-20 | 5433 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 BASIN FILTER SYSTEM LINE FAILURE | 6674 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - SOIL CONTAINMENT NEAR NORTHEAST CORNER OF CPP-603 SOUTH BASIN | 6675 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK | 6676 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 SLUDGE & WATER RELEASE | 6677 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOIL STORAGE AREA NEAR PEACH BOTTOM FUEL STORAGE AREA | 6682 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-19, CPP-603 TO CPP-604 LINE LEAK | 6684 | 00 |
| 01-SEP-84 | SCHMIDT, D. A. | RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR VES-SFE-20 WASTE TANK & VAULT | WINCO-1021 | 00 |
| 01-MAY-82 | LOW, J. O. | INTERNAL TECHNICAL REPORT - RADIOACTIVE WASTE CHARACTERIZATION OF CHEMICAL PROCESSING PLANT 603 (CPP-603) CLEANUP BASIN SYSTEM CPP-740 | WM-F1-81-023 | 01 |
Previous Page | Administrative Record Home Page