| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 21-AUG-06 | MAXAND, J. | SNAKE RIVER ALLIANCE REQUEST FOR EXTENSION TO COMMENT PERIOD ON THE PROPOSED PLAN FOR REMEDIATION OF CONTAMINATED TANK FARM SOIL AND GROUNDWATER | 25015 | 00 |
| 23-APR-96 | AR COORDINATOR | OPERABLE UNIT (OU) 3-08 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-08 | AR.INDEX.OU.3-08 | 00 |
| 19-OCT-95 | GREEN, L. A. | DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 10445 | 00 |
| 19-OCT-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS | OPE-ER-201-95 | 00 |
| 01-OCT-95 | GREENWELL, R. D. | DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | INEL-94/0171 | 00 |
| 01-AUG-95 | LITCO | SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) | INEL-95/0137 | 00 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) | INEL/95-0056, VOL 02 | 0 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) | INEL/95-0056, VOL. 01 | 0 |
| 05-JUL-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-127-95 | 00 |
| 05-JUN-95 | GREEN, L. A. | EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-102-95 | 00 |
| 01-MAY-95 | RENO, S. L. | IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) | 18023 | 00 |
| 17-FEB-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 | 15045 | 00 |
| 26-OCT-94 | DOE, EPA, IDHW | DECISION STATEMENT FOR TRACK 2 SUMMARY REPORT, OU 3-08 TANK FARM AREA II, REV.03 - CPP-15 CPP-29 NO FURTHER ACTION DETERMINATION - CPP-13, CPP-27, CPP-35 AND CPP-36 TO BE INCLUDED IN OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/ | 5810 | 00 |
| 21-OCT-94 | GREEN, L. A. | TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-283-94 | 00 |
| 14-OCT-94 | WINCO | FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5791 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) | 15035 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5785 | 00 |
| 10-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5782 | 00 |
| 08-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5783 | 00 |
| 26-APR-94 | LYLE, J. L. | TRANSMITTAL OF DRAFT FINAL TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | OPE-ER-099-94 | 00 |
| 22-MAR-94 | LANEY, P. T. | COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP-10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | PTL-02-94 | 00 |
| 18-MAR-94 | LIVERMAN, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR WAG-3 & WAG-10 RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 5777 | 00 |
| 28-FEB-94 | WINCO | BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) | 14143 | 00 |
| 01-DEC-93 | HONEYCUTT, T. K. | TECHNICAL MEMORANDUM FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) SOILS TREATABILITY STUDY (TS): PHYSICAL SEPARATION OF RADIONUCLIDES IN SOILS | EGG-ER-11101 | 00 |
| 24-SEP-93 | INEL COMMUNITY RELATIONS | PUBLIC NOTICE - THE DEPARTMENT OF ENERGY (DOE) ANNOUNCES A 30 DAY PUBLIC COMMENT PERIOD ON THE REMOVAL ACTIONS AT OU 3-08, 3-09, AND OU 3-12 AT THE ICPP | 5567 | 00 |
| 30-AUG-93 | WINCO | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), WASTE AREA GROUP 3 (WAG-3), BIN SET #3, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) | 5518 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | NUTHAK, S. A. | HEALTH & SAFETY PLAN (HSP) FOR WASTE AREA GROUP 3 (WAG-3) AND WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | EGG-ER-10922 | 00 |
| 28-JUL-93 | WINCO | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) | QAPJP-E-035 | 01 |
| 16-JUL-93 | WINCO | FINAL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-08, TANK FARM AREA II, REVISION 3 (REV.03) | 5786 | 00 |
| 09-JUN-93 | STOOPS, T. M. | IDHW REVIEW COMMENTS ON DRAFT TRACK 2 SUMMARY REPORT FOR OU 3-08 AT ICPP WAG-3 | 18069 | 00 |
| 28-MAY-93 | EARLE, O. K. | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), BIN SET #3, IDAHO NATIONAL ENGINEERING LABORATORY (INEL), BUTTE COUNTY, IDAHO | 5281 | 00 |
| 28-MAY-93 | EARLE, O. K. | TRANSMITTAL OF ACTION MEMORANDUM FOR TIME CRITICAL REMOVAL ACTIONS (TCRA) PLANNED FOR FY-93 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FOR INCLUSION INTO THE ADMINISTRATIVE RECORD (AR) FILE | OKE-64-93 | 00 |
| 05-MAY-93 | WINCO | TRACK 2 SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-11 - CPP-45 CPP-621 CHEMICAL STORAGE AREA SPILL AND CPP-58 PEW OVERHEAD PIPELINE SPILL, REV.01 | 5302 | 00 |
| 24-FEB-93 | MARTY, R. C. | VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 | RM-06-93-A | 00 |
| 26-OCT-92 | STOOPS, T. M. | RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 | 6115 | 00 |
| 28-SEP-92 | LYLE, J. L. | NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNIT (OU) 3-07 AND 3-08 | AM/ERWM-RPO-202-92-A | 00 |
| 17-AUG-92 | MASCARENAS, C. S. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP), REV.01 FY-92 DRILLING & SAMPLING PROGRAM TRACK 2 INVESTIGATION OF OU 3-07 TANK FARM & OU 3-08 TANK FARM II | 6621 | 00 |
| 17-AUG-92 | RETZLAFF, R. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY | 903-1188 | 00 |
| 06-AUG-92 | WINCO | FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS | 5516 | 00 |
| 31-JUL-92 | LYLE, J. L. | TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) | AM/ERWM-RPO-173-92 | 00 |
| 21-JUL-92 | WINCO | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) | QAPJP-E-035 | 00 |
| 03-JUN-92 | LYLE, J. L. | TRANSMITTAL OF THE ADDENDUM FOR RESPONSE TO COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-08 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | RPO-129-92 | 00 |
| 27-MAY-92 | WINCO | WINCO ENVIRONMENTAL RESTORATION (ER) ADDENDUM TO DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 TANK FARM AREA II (DATED 03/31/92) | 4697 | 00 |
| 07-APR-92 | LYLE, J. L. | TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) | ERD1-098-92 | 00 |
| 31-MAR-92 | WINCO | SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-08 TANK FARM AREA II IDAHO CHEMICAL PROCESSING PLANT (ICPP), REV.01 | 5276 | 00 |
| 31-MAR-92 | CULP, B. | SITE ASSESSMENT DOCUMENT PACKAGES FOR OPERABLE UNIT (OU) 3-08 - CPP-13, CPP-15, CPP-27, CCP-29, CPP-35, CPP-36, CPP-58E AND CPP-58W | 6637 | 00 |
| 10-JAN-92 | LYLE, J. L. | TRANSMITTAL OF SCOPE OF WORK (SOW) FOR TRACK 2 PRELIMINARY SCOPING STUDY AT OPERABLE UNIT (OU) 3-08 | RPO-001-92 | 00 |
| 19-DEC-91 | GOLDER ASSOCIATES, INC. | REPORT OF ICPP DRILLING & SAMPLING PROGRAM AT HIGH LEVEL LIQUID WASTE (HLLW) TANK FARM & LDU CPP-33 | 893-1195.530 | 00 |
| 04-SEP-91 | GOLDER ASSOCIATES, INC. | REPORT ON SURFACE GEOPHYSICAL SURVEYS AT ICPP | 893-1195.950 | 00 |
| 16-OCT-90 | ALCALDE, A. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP) SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-36 INEL | 6652 | 00 |
| 01-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) | 8472 | 00 |
| 08-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - CPP PRESSURIZATION OF SOLID STORAGE CYCLONE NORTHEAST OF THE WASTE CALCINING FACILITY (WCF) | 6679 | 00 |
| 07-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - PRESSURIZATION OF SOLID STORAGE CYCLONENE OF CPP-633 | 6645 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-633 DECONTAMINATION SPILL | 5399 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - TRANSFER LINE LEAK FROM CPP-633 TO WL-102 | 5400 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA EAST OF CPP-604 | 5391 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN NORTH & WEST OF THE MAIN STACK (CPP-708) | 5393 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - PRESSURIZATION OF THE SOLID STORAGE CYCLONE NE OF CPP-633 | 5377 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOLVENT BURNER EAST OF CPP-605 | 5379 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOLVENT BURNER EAST OF CPP-605 | 6680 | 00 |
Previous Page | Administrative Record Home Page