| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 10-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-07 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 2 INVESTIGATION OF OU 3-07 | AR.INDEX.OU.3-07 | 00 |
| 24-JUN-97 | JENSEN, N. R. | TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP | OPE-ER-102-97 | 00 |
| 01-JUN-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 01 |
| 27-MAR-97 | RENO, S. L. | IDHW-DEQ COMMENTS ON ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP - DOE/ID-10568 FEBRUARY 1997 (02/97) | 14351 | 00 |
| 28-FEB-97 | JENSEN, N. R. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | OPE-ER-29-97 | 00 |
| 01-FEB-97 | NOT SPECIFIED | APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | 10315 | 00 |
| 01-FEB-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 00 |
| 30-JAN-97 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | 18071 | 00 |
| 01-AUG-95 | LITCO | SAMPLING AND ANALYSIS PLAN (SAP) FOR WAG-3 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (FINAL) | INEL-95/0137 | 00 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN VOLUME II (VOL.02) | INEL/95-0056, VOL 02 | 0 |
| 01-AUG-95 | NOT SPECIFIED | WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN, VOLUME I (VOL.01) | INEL/95-0056, VOL. 01 | 0 |
| 05-JUL-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-127-95 | 00 |
| 05-JUN-95 | GREEN, L. A. | EXTENSION OF COMMENT RESOLUTION PERIOD ON WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | OPE-ER-102-95 | 00 |
| 01-MAY-95 | RENO, S. L. | IDHW-DEQ COMMENTS ON WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN (DRAFT) | 18023 | 00 |
| 17-FEB-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW AND COMMENT PERIOD FOR DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INEL-95/0137 | 15045 | 00 |
| 01-FEB-95 | LITCO | REPORT OF 1993 AND 1994 TANK FARM DRILLING AND SAMPLING INVESTIGATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | INEL-95/0064 | 00 |
| 26-OCT-94 | DOE, EPA, IDHW | TRACK 2 DECISION STATEMENT - ACTION DETERMINATION FOR OU 3-07 TANK FARM AREA, CPP-16, CPP-20, CPP-24, CPP-25, CPP-30 CPP-32E NO FURTHER ACTION DETERMINATION - CPP-26, CPP-28, CPP-31, CPP-32W, CPP-79 AND CPP-83 SHOULD BE INCLUDED IN WAG-3 COMPREHENSIV | 5809 | 00 |
| 21-OCT-94 | GREEN, L. A. | TRANSMITTAL OF FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-283-94 | 00 |
| 19-OCT-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL WORK PLAN FOR PERCHED WATER PUMPING AND TRACER TESTS | 15038 | 00 |
| 18-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCHED GROUNDWATER PUMPING AND TRACER TEST, SEPTEMBER 16, 1994 (09/16/94) | 15037 | 00 |
| 14-OCT-94 | WINCO | FINAL SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5791 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW) WAG-3 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY (RI/FS) | 15035 | 00 |
| 06-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) CONCURRENCE WITH DRAFT FINAL SCOPE OF WORK (SOW), WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5785 | 00 |
| 10-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5782 | 00 |
| 08-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS, DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5783 | 00 |
| 12-APR-94 | WELLS, R. P. | LIMITATIONS & VALIDATION (L&V) REPORT, IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-07 RADIOCHEMICAL ANALYSIS, SDG #3PG10301BG | RPW-44-94 | 00 |
| 08-MAY-93 | WINCO | TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-07, TANK FARM AREA I, REVISION 2 (REV.02) | 5764 | 00 |
| 24-FEB-93 | MARTY, R. C. | VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 | RM-06-93-A | 00 |
| 26-OCT-92 | STOOPS, T. M. | RECEIPT OF YOUR NOTICE OF DELAY DATED 09/28/92 FOR SUBMISSION OF TRACK 2 SUMMARY REPORT FOR OU 3-07 & 3-08 | 6115 | 00 |
| 22-OCT-92 | DOORNBOS, M. H. | EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 | 6614 | 00 |
| 28-SEP-92 | LYLE, J. L. | NOTICE OF DELAY IN SCHEDULE FOR SUBMITTAL OF TWO SECONDARY DOCUMENTS: THE SUMMARY REPORTS FOR OPERABLE UNITS OU 3-07 AND 3-08 | AM/ERWM-RPO-202-92 | 00 |
| 17-AUG-92 | MASCARENAS, C. S. | SITE SPECIFIC HEALTH & SAFETY PLAN (HSP), REV.01 FY-92 DRILLING & SAMPLING PROGRAM TRACK 2 INVESTIGATION OF OU 3-07 TANK FARM & OU 3-08 TANK FARM II | 6621 | 00 |
| 17-AUG-92 | RETZLAFF, R. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY | 903-1188 | 00 |
| 06-AUG-92 | WINCO | FIELD IMPLEMENTATION DOCUMENT - OPERABLE UNITS (OU) 3-07, 3-08, AND BACKGROUND SOIL INVESTIGATIONS | 5516 | 00 |
| 31-JUL-92 | LYLE, J. L. | TRANSMITTAL OF CLOSURE ADDENDUM FOR SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-07 AND 3-08 (TANK FARM II & III RESPECTIVELY) AND WASTE AREA GROUP 3 (WAG-3) QUALITY ASSURANCE PROJECT PLAN (QAPJP) | AM/ERWM-RPO-173-92 | 00 |
| 21-JUL-92 | WINCO | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR CHARACTERIZATION ACTIVITIES AT WASTE AREA GROUP 3 (WAG-3) | QAPJP-E-035 | 00 |
| 10-JUL-92 | LYLE, J. L. | MODIFICATIONS TO OPERABLE UNIT (OU) 3-07 TANK FARM SAMPLING & ANALYSIS PLAN (SAP) AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | AM/ERWM-RPO-154-92 | 00 |
| 08-JUN-92 | MALIK, L. E. | REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES | 6622 | 00 |
| 24-APR-92 | LYLE, J. L. | TRANSMITTAL OF THE ADDENDUM FOR THE RESPONSE TO EPA AND IDHW COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | RPO-091-92 | 00 |
| 02-MAR-92 | LYLE, J. L. | TRANSMITTAL OF THE SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | RPO-047-92 | 00 |
| 28-FEB-92 | WINCO | SEE OKE-75-92 FOR MODIFICATIONS - DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-07 TANK FARM AREA | 4413 | 00 |
| 19-FEB-92 | URBANSKI, C. J. | SUBSURFACE IMAGING RESULTS FOR HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT | CJU-05-92 | 00 |
| 01-JAN-92 | MOTAZED, B. | PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6623 | 00 |
| 18-DEC-91 | EARLE, O. K. | DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL | 6594 | 00 |
| 17-DEC-91 | EARLE, O. K. | SCOPE OF WORK FOR THE TRACK 2 STUDY OF OU 3-07: TANK FARM 1 | 5274 | 00 |
| 02-DEC-91 | JOSTEN, N. E. | FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY | NEJ-28-91 | 00 |
| 29-OCT-91 | MASCARENAS, C. S. | SITES WITHIN OPERABLE UNIT (OU) 3-07 | 6596 | 00 |
| 18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07 TANK FARM | 6590 | 00 |
| 18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM | 6591 | 00 |
| 18-OCT-91 | MEJIA, C. | REVIEW OF DRAFT SCOPE OF WORK FOR OPERABLE UNIT (OU) 3-07, TANK FARM | 6592 | 00 |
| 09-MAY-91 | LYLE, J. L. | RESPONSE TO INFORMATION REQUESTED BY MR. WALKER HOWELL REGARDING SAMPLING DATA FOR CPP-55-06 SAMPLING & ANALYSIS DATA PACKAGE | ERD-161-91 | 00 |
| 06-DEC-90 | EARLE, O. K. | STRONTIUM-90 IN BOREHOLE CPP-55-06 | OKE-21-90 | 00 |
| 19-NOV-90 | EARLE, O. K. | STRONTIUM-90 IN BOREHOLE CPP-55-06 | OKE-18-90 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - CPP-604 RADIOACTIVE WASTE UNLOADING AREA | 5384 | 00 |
| 08-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-20 CPP-604 RADIOACTIVE WASTE UNLOADING AREA | 6685 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SW AND NW OF VALVE BOX B-4 | 5396 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP CONTAMINATED SOIL TANK FARM AREA BUCKET SPILL | 5388 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NORTH OF CPP-604 | 5389 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NEAR VALVE BOX B-9 | 5394 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SOUTH OF TANK WM-183 | 5395 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL FROM LEAK IN LINE FROM CPP WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 5380 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED SOIL FROM LEAK IN LINE FROM WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 6681 | 00 |
| 16-JAN-76 | LOHSE, G. E. | ALLIED CHEMICAL CORPORATION OPERATING OCCURRENCE REPORT - WASTE TRANSFER LINE GASKET LEAK | 6634 | 00 |
| 17-APR-62 | LATCHUM, J. W. | REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) | LA-53-62A | 00 |
Previous Page | Administrative Record Home Page