| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 21-DEC-09 | NOT SPECIFIED | ACTION MEMORANDUM FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS | DOE/ID-11413 | 0 |
| 20-OCT-09 | FORSYTHE, HOWARD S | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 | RPT-651 | 0 |
| 21-SEP-09 | NOT SPECIFIED | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 | RPT-651 | 1 |
| 10-SEP-09 | NOT SPECIFIED | ENGINEERING EVALUATION/COST (EE/CA) ANALYSIS FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS | DOE/ID-11397 | 0 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 30-AUG-07 | RENO, S. L. | ACTION MEMORANDUM FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL | DOE/ID-11340 | 00 |
| 12-JUL-07 | RENO, S. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL | DOE/ID-11328 | 00 |
| 11-JUL-07 | HOWELL, W. F. | ENGINEERING DESIGN FILE - MATERIALS TEST REACTOR (MTR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6244 | 02 |
| 10-JUL-07 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE - GROUNDWATER PATHWAY RISK ASSESSMENT FOR MATERIALS TEST REACTOR (MTR) CLOSURE | EDF-5186 | 01 |
| 20-JUN-07 | NESSHOEFER, C. A. | MATERIALS TEST REACTOR (MTR) COMPLEX ACTIVITY VS. DEPTH | EDF-6381 | 01 |
| 01-FEB-07 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX UNDER THE IDAHO CLEANUP PROJECT (ICP) | DOE/ID-11303 | 00 |
| 31-OCT-06 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE ENGINEERING TEST REACTOR (ETR) COMPLEX CLOSURE | EDF-5142 | 02 |
| 31-OCT-06 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR DECONTAMINATING AND DISMANTLING (D&D) OF THE ENGINEERING TEST REACTOR (ETR) FACILITY | EDF-7243 | 01 |
| 24-OCT-06 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX | DOE/ID-11272 | 00 |
| 02-OCT-06 | PARRY, J. R. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) BERYLLIUM REFLECTOR AND VESSEL TRANSURANIC INVENTORIES | EDF-7222 | 00 |
| 13-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) RADIONUCLIDES AND THE RADIONUCLIDE RELATIVE RATIOS | EDF-6958 | 01 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) VESSEL SOURCE TERM AND EXTERNAL DOSE RATES | EDF-6133 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX EXTERNAL SURFACES | EDF-6138 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX INTERNAL SURFACES | EDF-6291 | 01 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 30-JAN-06 | HOWELL, W. F. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6225 | 01 |
| 16-DEC-05 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION COST ANALYSES (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF BOTH ENGINEERING TEST REACTOR (ETR) AND MATERIALS TEST REACTOR (MTR) AT THE IDAHO NATIONAL LABORATORY (INL) | FMDP-RFDP-05-138 | 00 |
| 15-DEC-05 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX ACTIVITY VS. DEPTH | EDF-6304 | 00 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 25-MAR-05 | HELM-CLARK, C. M. | BOREHOLE AND WELL MIDDLE-1823 AND ITS RELATIONSHIP TO THE STRATIGRAPHY OF THE SOUTH-CENTRAL IDAHO NATIONAL LABORATORY (INL) | ICP/EXT-05-00790 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 30-SEP-03 | WELLS, R. P. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 2 (WAG-2), TEST REACTOR AREA (TRA) | INEEL/EXT-03-00028 | 00 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 10-APR-02 | MONSON, B. R. | APPROVAL OF PUBLIC COMMENT PERIOD FOR PARTIAL CLOSURE PLANS (CP) AT TEST REACTOR AREA (TRA) AND WASTE EXPERIMENTAL REDUCTION FACILITY (WERF) LOCATED AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - EPA ID #ID4890008952 | 24753 | 00 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 01-DEC-97 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-SEP-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - SEPTEMBER & OCTOBER 1997 (09/97 & 10/97) - DOE TO SUBMIT PROPOSAL OF PIT 9 CLEANUP, AGENCIES SIGN TRA ROD, WROC INCREASES VOLUME OF WASTE TREATED & CITIZENS ADVISORY BOARD (CAB) REVIEWS, PROVIDES COMMENTS ON DRAFT ERP FACT SHEET | 14283 | 00 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 14-OCT-94 | INEL COMMUNITY RELATIONS | COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - CITIZENS INVITED TO GIVE EARLY INPUT | 8028 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
Previous Page | Administrative Record Home Page