| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 30-OCT-07 | NELSON, L. O. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 | DOE/ID-11350 | 00 |
| 21-SEP-07 | RODDY, M. S. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2007 (FY-07) - SEPTEMBER 2007 | RPT-406 | 00 |
| 27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
| 23-FEB-07 | WELLS, R. P. | GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10626 | 06 |
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 02-OCT-06 | OLAVESON, B. E. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 | DOE/ID-11294 | 00 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 07-AUG-06 | RODDY, M. S. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2006 (FY-06) | RPT-237 | 00 |
| 16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
| 10-APR-06 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) OF THE ENGINEERING TEST REACTOR AND MATERIALS TESTING REACTOR (ETR/MTR) REMOVAL ALTERNATIVES | EDF-6705 | 00 |
| 04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
| 30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
| 17-AUG-05 | RODDY, M. S. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2005 (FY-05) | ICP/EXT-05-00967 | 00 |
| 06-MAY-05 | HANEY, T. J. | LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2005 | ICP/EXT-05-00778 | 00 |
| 04-MAY-05 | WHITMORE, E. J. | RESPONSE TO THE FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | DOE/NE-ID-11189 | 00 |
| 09-SEP-04 | SMITH, D. M. | GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10626 | 05 |
| 30-AUG-04 | HOWICK, M. F. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2004 (FY-04) | ICP/EXT-04-00484 | 00 |
| 22-MAR-04 | WOOD, T. R. | FIELD SAMPLING PLAN (FSP) FOR CHARACTERIZATION OF DIESEL CONTAMINATION IN THE TEST REACTOR AREA (TRA) PERCHED WATER WELL PW-13 | ICP/EXT-04-00246 | 00 |
| 05-MAR-04 | NELSON, G. E. | SUBMITTAL OF CHARACTERIZATION PLAN FOR DIESEL CONTAMINATION IN TEST REACTOR AREA (TRA) PERCHED WATER WELL PW-13 - FEBRUARY 2004 (02/04) | EM-ER-04-051 | 00 |
| 23-FEB-04 | DOOLEY, K. J. | GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10626 | 04 |
| 23-FEB-04 | WOOD, T. R. | CHARACTERIZATION PLAN FOR DIESEL CONTAMINATION IN TEST REACTOR AREA (TRA) PERCHED WATER WELL PW-13 | ICP/EXT-04-00131 | 00 |
| 30-OCT-03 | JOLLEY, W. L. | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 (WAG-2) FOR FISCAL YEAR 2003 (FY-03) | INEEL/EXT-03-01082 | 00 |
| 06-OCT-03 | WELLS, R. P. | FIRST FIVE YEAR REVIEW REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | DOE/ID-11099 | 00 |
| 25-SEP-03 | WELLS, R. P. | GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10626 | 03 |
| 30-JUL-03 | JOLLEY, W. L. | FY-2003 (FY-03) ANNUAL INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-11108 | 00 |
| 10-JUN-03 | NELSON, G. E. | DRAFT FIRST FIVE YEAR REVIEW REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - DOE/ID-11099, REVISION C (REV.0C) JUNE 2003 (06/03) FOR REVIEW | EM-ER-03-150 | 00 |
| 10-JUN-03 | NELSON, G. E. | IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 SUBMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR POST FIVE YEAR REMEDY REVIEW WORK PLAN FOR REVIEW | EM-ER-03-174 | 00 |
| 16-APR-03 | NELSON, G. E. | INEEL WASTE AREA GROUP 2 (WAG-2) - AGREEMENTS CONCERNING FINALIZING THE WAG-2 FIVE YEAR REMEDY REVIEW, TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | EM-ER-03-103 | 00 |
| 28-FEB-03 | MCGUIRE, M. J. | GROUNDWATER MONITORING PLAN (GMP) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10626 | 02 |
| 21-NOV-02 | JAMES, R. E. | FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) | INEEL/EXT-02-00933 | 00 |
| 04-NOV-02 | NELSON, G. E. | TRANSMITTAL OF FY-2002 (FY-02) ANNUAL INSTITUTIONAL CONTROLS INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNITS (OU) 2-13 AND 2-14 (FINAL) | EM-ER-02-187 | 00 |
| 08-APR-02 | MCGUIRE, M. J. | FISCAL YEAR 2001 (FY-2001) INSTITUTIONAL CONTROL INSPECTION REPORT FOR THE TEST REACTOR AREA (TRA), OPERABLE UNIT (OU) 2-13 | INEEL/EXT-01-00772 | 00 |
| 26-FEB-01 | SEELEY, V. T. | INSTITUTIONAL CONTROLS ANNUAL MONITORING REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | INEEL/EXT-2000-01413 | 00 |
| 19-OCT-00 | SHERWOOD, J. A. | RESOLUTION OF EPA AND IDHW COMMENTS & TRANSMITTAL OF OPERABLE UNIT (OU) 2-14 TRACK 2 CHARACTERIZATION SCOPE OF WORK (SOW) INEEL/EXT-2000-00824 AND FIELD SAMPLING PLAN (FSP) INEEL/EXT-2000-00807 FOR SITES TRA-56 THROUGH TRA-60 | FLS-741-00 | 00 |
| 19-OCT-00 | SHERWOOD, J. A. | OPERABLE UNIT (OU) 2-14 FIELD SAMPLING PLAN (FSP) FOR SITES TRA-56, TRA-57, TRA-58, TRA-59 & TRA-60 | INEEL/EXT-2000-00807 | 00 |
| 24-JUL-00 | LANDIS, J. A. | REMEDIAL ACTION (RA) REPORT FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10720 | 00 |
| 26-JUN-00 | AR COORDINATOR | OPERABLE UNIT (OU) 2-13 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 | AR.INDEX.OU.2-13 | 00 |
| 13-JUN-00 | POETON, R. W. | EPA REVIEW OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FROM THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 - EPA STATING THAT THEY "CONCUR WITH THE RELEASE OF THIS ESD TO THE PUBLIC" | 10836 | 00 |
| 17-MAY-00 | SHERWOOD, J. A. | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) TO THE RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10744 | 00 |
| 10-MAR-00 | WIGGINS, D. J. | OPERATIONS AND MAINTENANCE (O&M) PLAN FOR FINAL SELECTED REMEDIES & INSTITUTIONAL CONTROLS AT TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10658 | 03 |
| 01-SEP-98 | REESE, C. L. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10643 | 00 |
| 01-SEP-98 | REESE, C. L. | FIELD SAMPLING PLAN (FSP) FOR CONFIRMATION SAMPLING & FIELD SCREENING OF SELECTED SITES AT WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 | DOE/ID-10657 | 00 |
| 01-SEP-98 | REESE, C. L. | OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10658 | 00 |
| 01-SEP-98 | REESE, C. L. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 2-13 REMEDIAL ACTION FOR TEST REACTOR AREA (TRA) | INEEL/EXT-98-00423 | 00 |
| 31-JUL-98 | WINTER, G. | IDHW REVIEW COMMENTS ON COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TRA OU 2-13 (DRAFT) REVISION B (REV.0B) | 16780 | 00 |
| 30-JUL-98 | POETON, R. W. | EPA COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 2-13 AT INEEL | 16779 | 00 |
| 01-MAR-98 | REESE, C. L. | HEALTH & SAFETY PLAN (HSP) FOR POST RECORD OF DECISION (ROD) SAMPLING OF WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 | INEEL/EXT-98-00229 | 00 |
| 24-FEB-98 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON TEST REACTOR AREA (TRA) WASTE AREA GROUP 2 (WAG-2) DRAFT FIELD SAMPLING PLAN (FSP) | 15112 | 00 |
| 20-FEB-98 | POETON, R. W. | EPA COMMENTS ON POST RECORD OF DECISION (ROD) SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | 15219 | 00 |
| 01-FEB-98 | PARSONS | TRA WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | DOE/ID-10592 | 02 |
| 23-JAN-98 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | 15104 | 00 |
| 22-JAN-98 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT INEEL | 15105 | 00 |
| 07-JAN-98 | DOE | WORDING CHANGES MADE FOR CLARITY & CONSISTENCY TO FINAL RECORD OF DECISION (ROD) FOR OU 2-13 COMPREHENSIVE ROD FOR WAG-2 | OPE-ER-02-98 | 00 |
| 22-DEC-97 | DOE | FINAL RECORD OF DECISION (ROD) FOR TEST REACTOR AREA (TRA) FOR OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | DOE/ID-10586 | 00 |
| 03-DEC-97 | HAIN, K. E. | TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 2-13 COMPREHENSIVE ROD FOR WAG-2 AT INEEL | OPE-ER-257-97 | 00 |
| 13-NOV-97 | JENSEN, N. R. | DOE RESPONSE TO EPA COMMENTS TO OPERABLE UNIT (OU) 2-13 DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) RECORD OF DECISION (ROD) | 10438 | 00 |
| 13-NOV-97 | JENSEN, N. R. | DOE RESPONSE TO IDHW-DEQ COMMENTS TO OPERABLE UNIT (OU) 2-13 DRAFT FINAL RECORD OF DECISION (ROD) | 10439 | 00 |
| 13-NOV-97 | HAIN, K. E. | FIFTEEN (15) DAY EXTENSION TO PERIOD FOR FINALIZING WAG-2 COMPREHENSIVE RECORD OF DECISION (ROD) OU 2-13 AT INEEL | OPE-ER-214-97 | 00 |
| 04-NOV-97 | KOSHUTA, C. R. | TRA LISTED WASTE DETERMINATION REPORT | CRK-92-97 | 00 |
| 31-OCT-97 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT FINAL RECORD OF DECISION (ROD) | 10436 | 00 |
| 29-OCT-97 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL RECORD OF DECISION (ROD) RESULTING FROM WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 2-13 AT INEEL | 10435 | 00 |
| 15-OCT-97 | HAIN, K. E. | DOE RESPONSE TO EPA COMMENTS ON OU 2-13 DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) RECORD OF DECISION (ROD) | 10433 | 00 |
| 15-OCT-97 | HAIN, K. E. | DOE RESPONSE TO IDHW-DEQ COMMENTS ON OU 2-13 DRAFT RECORD OF DECISION (ROD) | 10434 | 00 |
| 15-OCT-97 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OU 2-13, THE COMPREHENSIVE ROD FOR WAG-2 AT INEEL | OPE-ER-163-97 | 00 |
| 11-AUG-97 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON WAG-2 DRAFT RECORD OF DECISION (ROD) | 10427 | 00 |
| 01-AUG-97 | POETON, R. W. | EPA COMMENTS ON DRAFT RECORD OF DECISION (ROD) RESULTING FROM WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT INEEL | 10426 | 00 |
| 25-JUN-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) RESULTING FROM WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OU 2-13 AT INEEL | OPE-ER-103-97 | 00 |
| 27-MAR-97 | HUNTER, J. L. | PUBLIC MEETING TRANSCRIPT - PUBLIC MEETING IN MOSCOW, IDAHO ON THE PROPOSED PLAN FOR TEST REACTOR AREA (TRA), MARCH 27, 1997 (03/27/97) | 10424 | 00 |
| 26-MAR-97 | INEEL COMMUNITY RELATIONS | TRANSCRIPT FROM PUBLIC MEETING FOR WASTE AREA GROUP 2 (WAG -2) TRA PROPOSED PLAN HELD IN BOISE, IDAHO MARCH 26, 1997 (03/26/97) | 10419 | 00 |
| 25-MAR-97 | STEFFLER, L. | TRANSCRIPT FROM PUBLIC MEETING FOR WASTE AREA GROUP 2 (WAG-2) TRA PROPOSED PLAN HELD IN IDAHO FALLS, IDAHO MARCH 25, 1997 (03/25/97) | 10431 | 00 |
| 24-MAR-97 | INEEL COMMUNITY RELATIONS | PUBLIC NOTICE - COMMENT PERIOD EXTENDED - AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) | 10405 | 00 |
| 23-MAR-97 | INEEL COMMUNITY RELATIONS | PUBLIC NOTICE - COMMENT PERIOD EXTENDED - MARCH 10 TO MAY 9, 1997 (03/10/97 - 05/09/97) AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) | 10406 | 00 |
| 09-MAR-97 | INEEL COMMUNITY RELATIONS | PUBLIC NOTICE - NOTICE OF AVAILABILITY - AGENCIES PROPOSE TO REMEDIATE EIGHT SITES AT THE TEST REACTOR AREA (TRA) | 10407 | 00 |
| 01-MAR-97 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 2 (WAG-2) - TEST REACTOR AREA (TRA) IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 10408 | 00 |
| 01-MAR-97 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES COMPLETE LAST INVESTIGATION FOR TRA WAG-2 OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 13944 | 00 |
| 26-FEB-97 | JENSEN, N. R. | DOE-ID TRANSMITTAL OF RESPONSES TO EPA & IDHW REVIEW COMMENTS ON THE DRAFT PROPOSED PLAN FOR THE WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-20-97 | 00 |
| 14-FEB-97 | JENSEN, N. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON MARCH 1997 (03/97) DRAFT PROPOSED PLAN FOR THE WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPERABLE UNIT (OU) 2-13 AT INEEL | 10397 | 00 |
| 07-FEB-97 | JENSEN, N. R. | TRANSMITTAL FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-11-97 | 00 |
| 03-FEB-97 | JENSEN, N. R. | TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-10-97 | 00 |
| 01-FEB-97 | BURNS, D. E. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | DOE/ID-10531 | 00 |
| 27-JAN-97 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT PROPOSED PLAN OU 2-13 | 10313 | 00 |
| 24-JAN-97 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PROPOSED PLAN FOR THE WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | 10314 | 00 |
| 15-JAN-97 | JENSEN, N. R. | FIFTEEN (15) DAY EXTENSION FOR FINALIZATION OF WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT OPERABLE UNIT (OU) 2-13 AT INEL | OPE-ER-01-97 | 00 |
| 06-JAN-97 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) OPERABLE UNIT (OU) 2-12 THIRD (3RD) ANNUAL TECHNICAL MEMORANDUM & THIRD YEAR REVIEW (OU 2-13 RECORD PER DOE-ID REQUEST) | 10308 | 00 |
| 02-JAN-97 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON WASTE AREA GROUP (WAG-2) DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT | 10310 | 00 |
| 16-DEC-96 | JENSEN, N. R. | TRANSMITTAL OF DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY, OPERABLE UNIT (OU) 2-13, AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-191-96 | 00 |
| 12-NOV-96 | JENSEN, N. R. | TWENTY DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF WASTE AREA GROUP 2 (WAG-2) DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT, OPERABLE UNIT (OU) 2-13 AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-169-96 | 00 |
| 08-NOV-96 | SMITH, R. F. | U. S. EPA REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP THREE YEAR REVIEW, IDAHO NATIONAL ENGINEERING LABORATORY (INEL) TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12 | 10304 | 00 |
| 10-OCT-96 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT | 10301 | 00 |
| 09-OCT-96 | POETON, R. W. | EPA COMMENTS ON DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY REPORT FOR WAG-2 COMPREHENSIVE RI/FS OPERABLE UNIT (OU) 2-13 AT THE INEL | 10300 | 00 |
| 04-SEP-96 | RICE, R. S. | CLOSURE REPORT FOR SAMPLING OF TRA COLD WASTE POND; EMS-010-96 | RSR-79-96 | 00 |
| 22-AUG-96 | JENSEN, N. R. | TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) REPORT FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE RI/FS, OPERABLE UNIT (OU) 2-13, AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-129-96 | 00 |
| 01-AUG-96 | ARNETT, R. C. | POST RECORD OF DECISION (ROD) MONITORING FOR TRA PERCHED WATER SYSTEM OU 2-12 THIRD (3RD) ANNUAL TECHNICAL MEMORANDUM (OU 2-13 RECORD PER DOE-ID REQUEST) | INEL-96/0305 | 00 |
| 12-JUL-96 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) REPORT | 10289 | 00 |
| 10-JUL-96 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR THE WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OU 2-13 AT INEL | 10288 | 00 |
| 24-MAY-96 | JENSEN, N. R. | TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR WASTE AREA GROUP (WAG-2) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS), OPERABLE UNIT (OU) 2-13, AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | OPE-ER-90-96 | 00 |
| 05-OCT-95 | UNDERWOOD, E. J. | SECOND ANNUAL TECHNICAL MEMORANDUM - POST RECORD OF DECISION (ROD) MONITORING FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12, IDHW COMMENTS (OU 2-13 RECORD PER DOE-ID REQUEST) | 10149 | 00 |
| 22-SEP-95 | MEYER, L. | SECOND ANNUAL TECHNICAL MEMORANDUM - POST RECORD OF DECISION (ROD) MONITORING FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12, EPA COMMENTS (OU 2-13 RECORD PER DOE-ID REQUEST) | 10148 | 00 |
| 01-AUG-95 | ARNETT, R. C. | POST RECORD OF DECISION (ROD) MONITORING FOR THE TEST REACTOR AREA (TRA) PERCHED WATER SYSTEM OPERABLE UNIT (OU) 2-12 SECOND ANNUAL TECHNICAL MEMORANDUM (OU 2-13 RECORD PER DOE-ID REQUEST) | INEL-95/0408 | 00 |
| 26-APR-95 | JENSEN, N. R. | TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN FOR WASTE AREA GROUP 2 (WAG-2) COMPREHENSIVE RI/FS, OPERABLE UNIT (OU) 2-13 AT INEL | OPE-ER-076-95 | 00 |
| 01-APR-95 | SHERWOOD, J. A. | HEALTH & SAFETY PLAN (HSP) FOR TRA OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEL | INEL-94/0002 | 00 |
| 01-APR-95 | GREEN, T. S. | WORK PLAN FOR WAG-2 OPERABLE UNIT (OU) 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-94/0026 | 00 |
| 13-FEB-95 | UNDERWOOD, E. J. | IDHW-DEQ REVIEW COMMENTS ON WASTE AREA GROUP (WAG-2) DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN | 10006 | 00 |
| 10-FEB-95 | BLOOD, H. R. | EPA COMMENTS ON DRAFT WORK PLAN FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 10005 | 00 |
| 19-JAN-95 | DOE, EPA, IDHW | TRACK 2 DECISION STATEMENT FOR OU 2-09 TRACK 2 SUMMARY REPORT FOR TRA-08 COLD WASTE POND & TRA SEWAGE TREATMENT AREA - ACTION DETERMINATION - FURTHER EVALUATION REQUIRED IN OU 2-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5860 | 00 |
| 01-NOV-94 | LIENTZ, A. R. | SCOPE OF WORK OPERABLE UNIT (OU) 2-13 WAG-2 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-94/0013 | 00 |
| 18-AUG-94 | DOE, EPA, IDHW | WAG-2 COMPREHENSIVE SCOPING MEETING MINUTES - AUGUST 18 & AUGUST 19, 1994 (08/18/94 - 08/19/94) | 5865 | 00 |
| 15-JUN-94 | MK-FIC | REMEDIAL ACTION (RA) REPORT TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 (OU 2-13 RECORD PER DOE-ID REQUEST) | 02.010.2.1.209.01 | 01 |
| 01-JUN-94 | JESSMORE, P. J. | TECHNICAL MEMORANDUM POST RECORD OF DECISION (ROD) MONITORING FOR TRA PERCHED WATER SYSTEM OU 2-12 (OU 2-13 RECORD PER DOE-ID REQUEST) | 7782 | 00 |
| 01-AUG-93 | DAMES & MOORE | POST RECORD OF DECISION (ROD) MONITORING PLAN FOR TRA PERCHED WATER SYSTEM OU 2-12 (OU 2-13 RECORD PER DOE-ID REQUEST) | EGG-ER-10547 | 01 |
| 23-JAN-92 | VANDEUSEN, L. C. | DECISION DOCUMENTATION PACKAGE FOR TRACK 1 FOR CHEMICAL WASTE POND TRA-06 OU 2-13 - DRAFT, BACKGROUND INFORMATION ONLY | 10269 | 00 |
| 01-OCT-90 | STANISICH, S. N. | CLOSURE PLAN (CP) FOR TRA CHEMICAL WASTE POND COCA UNIT TRA-06 | EGG-WM-9193 | 00 |
| 11-JAN-90 | SOLECKI, J. E. | DETAILED SCHEDULES FOR PREPARATION OF CLOSURE PLANS (CP) FOR COCA WASTE MANAGEMENT UNITS | 8206 | 00 |
| 22-DEC-89 | BLUMBERG, D. J. | STATUS REPORT FOR DECEMBER 1989 (12/89) CLOSURE PLAN (CP) PREPARATION | KHK-147-89 | 00 |
| 15-NOV-89 | SOLECKI, J. E. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE | 10986 | 00 |
| 09-NOV-89 | BLUMBERG, D. J. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM ENVIRONMENTAL PROTECTION AGENCY (EPA) AND STATE | DJB-40-89 | 00 |
| 26-OCT-89 | KOSHUTA, C. R. | NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL - EPA AND IDHW REVIEWED DOE'S REVISED CLOSURE PLAN SCHEDULE AND FEEL THE SCHEDULE IS DEFICIENT | 6709 | 00 |
| 29-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) SCHEDULE FOR EIGHT (8) LDU'S FOR EG&G AND THREE (3) LDU'S FOR WINCO | 10110 | 00 |
| 15-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-06 CHEMICAL WASTE POND TRA-701 | 2863 | 00 |
| 13-NOV-85 | SHELDON, D. E. | UNUSUAL OCCURRENCE REPORT (UOR) - FACILITY NUMBER ATR-85-3 | EGG-85-17 | 00 |
| 13-NOV-85 | SHELDON, D. E. | UNUSUAL OCCURRENCE REPORT (UOR) - FACILITY NUMBER ATR-85-8 | EGG-85-41 | 00 |
Previous Page | Administrative Record Home Page