| 17-APR-08 | JESSMORE, J. J. | REMEDIAL ACTION REPORT FOR OU 1-10 SITES AT TEST AREA NORTH, WAG 1 | DOE/ID-11262 | 00 |
| 30-OCT-07 | NELSON, L. O. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2007 | DOE/ID-11350 | 00 |
| 20-SEP-07 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT | 25153 | 00 |
| 19-SEP-07 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT | 25155 | 00 |
| 17-SEP-07 | JENSEN, N. R. | REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT | FMDP-RFDP-07-023 | 00 |
| 08-MAY-07 | WILKENING, R. M. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE TO THE MINOR CHANGE TO REMEDY FOR TANK V-9 WASTE TREATMENT FOR WASTE AREA GROUP (WAG) 1, OPERABLE UNIT (OU) 1-10 | 25111 | 00 |
| 03-MAY-07 | LIVIERATOS, T. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CONCURRENCE TO THE MINOR CHANGE TO REMEDY FOR TANK V-9 WASTE TREATMENT FOR WASTE AREA GROUP (WAG) 1, OPERABLE UNIT (OU) 1-10 | 25112 | 00 |
| 03-MAY-07 | JENSEN, N. R. | MINOR CHANGE TO REMEDY FOR TANK V-9 WASTE TREATMENT FOR WASTE AREA GROUP (WAG) 1, OPERABLE UNIT (OU) 1-10 | FMDP-RFDP-07-007 | 00 |
| 27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
| 18-JAN-07 | EPA | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DOE/ID-11300 | 00 |
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 02-OCT-06 | OLAVESON, B. E. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS - FY 2006 | DOE/ID-11294 | 00 |
| 28-SEP-06 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT | 25023 | 00 |
| 28-SEP-06 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT | 25024 | 00 |
| 27-SEP-06 | JENSEN, N. R. | REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT | FMDP-RFDP-06-049 | 00 |
| 21-SEP-06 | NOT SPECIFIED | ACTION MEMORANDUM FOR DECOMMISSIONING OF TEST AREA NORTH (TAN)-607A | DOE/ID-11290 | 00 |
| 11-SEP-06 | JESSMORE, J. J. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE V-TANKS AREA COMPREHENSIVE ENVIRONMENTAL, RESPONSE, COMPENSATION AND LIABILITY ACT (CERLCA) SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 06 |
| 08-SEP-06 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - REV. 0 OF THIS EDF IS PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 01 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 10-AUG-06 | BUTLER, J. L. | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 1-10 - TEST AREA NORTH (TAN-633) AREA SOIL | 25008 | 00 |
| 17-JUL-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TEST AREA NORTH 607A (TAN-607A) | RPT-214 | 00 |
| 16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
| 12-JUN-06 | JANTZ, A. E. | FLEXIBILITY OF CLEANUP AREA BOUNDARY - OPERABLE UNIT (OU) 1-10 V-TANK AREA SITES | 24961 | 00 |
| 17-MAY-06 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TRANSPORT TIE DOWN ANALYSIS | EDF-5734 | 02 |
| 11-MAY-06 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TRANSPORT TIE DOWN ANALYSIS | EDF-5734 | 01 |
| 28-APR-06 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO APRIL 19, 2006 (04/19/06) LETTER REQUESTING ELIMINATION OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT, OPERABLE UNIT (OU) 1-10 WASTE AREA GROUP 1 (WAG-1 | 24937 | 00 |
| 28-APR-06 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO ELIMINATE THE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT, OPERABLE UNIT (OU) 1-10, WASTE AREA GROUP 1 (WAG-1), | 24938 | 00 |
| 19-APR-06 | JENSEN, N. R. | REQUEST TO ELIMINATE THE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT FOR OPERABLE UNIT (OU) 1-10, WASTE AREA GROUP 1 (WAG-1) | FMDP-RFDP-06-037 | 00 |
| 19-JAN-06 | TYSON, D. R. | FIELD SAMPLING PLAN (FSP) FOR TSF-09 AND TSF-18 V-TANKS PHASE I TREATMENT | ICP/EXT-04-00659 | 01 |
| 22-DEC-05 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - V-9 TANK MACROENCAPSULATION & LIFTING DESIGN - STRUCTURAL ANALYSIS & LIFT PLAN - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, RE | EDF-6306 | 00 |
| 15-DEC-05 | BAKER, E. L. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION PUMP SEAL EVALUATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6259 | 00 |
| 06-DEC-05 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO ADDITIONAL EXTENSION FOR SUBMITTAL OF THE WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT | 24923 | 00 |
| 06-DEC-05 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL OF REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADENDUM 3 FOR PHASE 2 TREATMENT OF V-TANKS CONTENTS | 24924 | 00 |
| 01-DEC-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 00 |
| 30-NOV-05 | JENSEN, N. R. | REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING DRAFT V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 TREATMENT OF V-TANK CONTENTS | FMDP-RFDP-05-132 | 00 |
| 29-NOV-05 | JESSMORE, J. J. | FIELD SAMPLING PLAN (FSP) FOR THE V-TANK AREA NEW SITES, FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11156 | 01 |
| 21-NOV-05 | HALEY, D. J. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION AT TEST AREA NORTH (TAN) WAG-1 OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11150 | 03 |
| 17-NOV-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - REVISED SOURCE TERM INVENTORY FOR THE V-TANK WASTE - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6326 | 00 |
| 17-NOV-05 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - APAD SUPPORT CALCULATIONS FOR REVISED SOURCE TERM FOR TAN V-TANKS REMEDEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, R | EDF-6332 | 00 |
| 16-NOV-05 | JESSMORE, J. J. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE V-TANKS AREA COMPREHENSIVE ENVIRONMENTAL, RESPONSE, COMPENSATION AND LIABILITY ACT (CERLCA) SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 05 |
| 15-NOV-05 | FARNSWORTH, R. K. | EDF - EVALUATING AIR SAFETY FOR CO-LOCATED WORKER DURING CONTROLLED AIR SPARGING OF CONSOLIDATED TAN V-TANK WASTE, WITHOUT ACTIVATED CARBON ADSORPTION - PART OF ATTACHMENT 3 RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, | EDF-6327 | 00 |
| 01-NOV-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - V-TANK OFF GAS DATA EVALUATION AND REMAINING INVENTORY DETERMINATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6364 | 00 |
| 04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
| 11-SEP-05 | NICKELSON, D. F. | FIELD SAMPLING PLAN (FSP) FOR THE TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL AND SITE REMEDIATION TEST AREA NORTH (TAN), WAG 1, OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00289 | 03 |
| 30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
| 29-AUG-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION CRANE VERIFICATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 AND TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6099 | 00 |
| 23-AUG-05 | NICKELSON, D. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE V-TANKS AREA COMPREHENSIVE ENVIRONMENTAL, RESPONSE, COMPENSATION AND LIABILITY ACT (CERLCA) SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 04 |
| 16-AUG-05 | HALEY, D. J. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION AT TEST AREA NORTH (TAN) WAG-1 OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11150 | 02 |
| 16-AUG-05 | SHAW, R. M. | TRANSMITTAL OF WASTE AREA GROUP 1 (WAG-1) DOCUMENTS FOR OPERABLE UNIT (OU) 1-10 | FMDP-RFDP-05-078 | 00 |
| 16-AUG-05 | SOTO, R. | WASTE MANAGEMENT PLAN (WMP) FOR THE TSF-09 & TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00270 | 01 |
| 16-AUG-05 | HALEY, D. J. | DECONTAMINATION PLAN FOR THE TSF-09 AND TSF-18 V-TANKS AND CONTENT REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00428 | 01 |
| 02-AUG-05 | JANTZ, A. E. | FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANK V-14 TREATED CONTENTS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-05-00827 | 02 |
| 26-JUL-05 | JANTZ, A. E. | FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANK V-14 TREATED CONTENTS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-05-00827 | 01 |
| 06-JUL-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - EVALUATION OF NECESSITY OF OFF GAS SCRUBBER FOR V-TANKS TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 | EDF-5905 | 00 |
| 23-JUN-05 | BONNEMA, B. E. | ENGINEERING DESIGN FILE (EDF) - SUBSIDENCE EVALUATION FOR V-1, V-2, V-3, AND V-14 TANKS IN IDAHO CERCLA DISPOSAL FACILITY (ICDF) CELL - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND RE | EDF-5786 | 00 |
| 23-JUN-05 | HALEY, D. J. | FIELD SAMPLING PLAN (FSP) FOR THE TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL AND SITE REMEDIATION TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00289 | 02 |
| 23-JUN-05 | NICKELSON, D. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE V-TANKS AREA COMPREHENSIVE ENVIRONMENTAL, RESPONSE, COMPENSATION AND LIABILITY ACT (CERLCA) SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 03 |
| 26-MAY-05 | EINAN, D. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT | 24907 | 00 |
| 23-MAY-05 | JANTZ, A. E. | DATA QUALITY ASSESSMENT & DATA SUMMARY FOR THE HWMA RCRA CLOSURE OF THE TEST AREA NORTH (TAN) TECHNICAL SUPPORT FACILITY (TSF) INTERMEDIATE LEVEL RADIOACTIVE WASTE (ILRW) HOLDING TANK SUBSYSTEM (PM-2A TANKS) TSF-26, CERCLA OPERABLE UNIT (OU) 1-10 | ICP/EXT-05-00876 | 00 |
| 19-MAY-05 | YONK, A. K. | GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-26, PM-2A TANKS - PHASE 2 (PHASE II) TANK V-14 TREATMENT AND DISPOSAL FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11233 | 00 |
| 19-MAY-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - TANK V-14 AIR STRIPPING CALCULATIONS AND PROCESS SIZING - MAY ALSO BE FOUND AS ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 - DOE/NE-ID-11233 | EDF-5558 | 02 |
| 11-MAY-05 | SPOMER, M. | DEPARTMENT OF ENVIRONMENTAL QUALITY'S (DEQ) RESPONSE TO DOE REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO A TEMPORARY UNIT | 24906 | 00 |
| 11-MAY-05 | JANTZ, A. E. | DECONTAMINATION PLAN FOR GROUP 3, PM-2A TANK V-14 TREATMENT, TEST AREA NORTH (TAN), WASTE AREA GOUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-05-00819 | 00 |
| 10-MAY-05 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 | 24902 | 00 |
| 10-MAY-05 | JANTZ, A. E. | WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00284 | 03 |
| 04-MAY-05 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) APPROVAL TO DEPARTMENT OF ENERGY (DOE) REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 | 24901 | 00 |
| 03-MAY-05 | HAIN, K. E. | DEPARTMENT OF ENERGY (DOE) APPROVAL - DOE REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 | FMDP-RFDP-05-028 | 00 |
| 03-MAY-05 | JESSMORE, J. J. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE V-TANKS AREA CERCLA SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG -1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 02 |
| 26-APR-05 | VERWOLF, M. C. | TRANSMITTAL OF REQUEST TO CHANGE THE EXISTING PM-2A V-14 STAGING AREA TO TREATMENT UNIT AND PROPOSED NEW CONSTITUENTS TO ICDF LANDFILL AND EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) | FMDP-RFDP-05-024 | 00 |
| 25-APR-05 | NORBY, B. C. | ENGINEERING DESIGN FILE (EDF) - CORROSION EVALUATION FOR STAINLESS STEEL V-TANKS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV.03 | EDF-5727 | 00 |
| 25-APR-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TRANSPORT TIE DOWN ANALYSIS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV. | EDF-5734 | 00 |
| 18-APR-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TANK LIFTING DESIGN - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV.03 | EDF-5595 | 00 |
| 07-MAR-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4928 | 02 |
| 01-MAR-05 | KOCH, D. F. | DEQ APPROVAL TO DOE REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 CHEMICAL OXIDATION TREATMENT OF V-TANK CONTENTS FOR WAG-1 OU 1-10 TO DECEMBER 31, 2005 (12/31/05) | 24892 | 00 |
| 28-FEB-05 | WILKENING, R. M. | EPA APPROVAL TO DOE REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 CHEMICAL OXIDATION TREATMENT OF V-TANK CONTENTS FOR WAG-1 OU 1-10 TO DECEMBER 31, 2005 (12/31/05) | 24893 | 00 |
| 24-FEB-05 | HAIN, K. E. | REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING DRAFT V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 CHEMICAL OXIDATION TREATMENT OF V-TANK CONTENTS FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | FMDP-FFA/CO-05-128 | 00 |
| 27-JAN-05 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.03 | EDF-4604 | 02 |
| 24-JAN-05 | YONK, A. K. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 07 |
| 19-JAN-05 | SHAW, R. M. | COMPLETION OF ENFORCEABLE MILESTONE TO COMPLETE DISPOSAL OF TSF-06 AND TSF-26 SURFACE SOILS FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | FMDP-FFA/CO-05-103 | 00 |
| 11-JAN-05 | AR COORDINATOR | OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DARIN LEACH FIELD OU 1-10 | AR.INDEX.OU.1-10 | 02 |
| 11-JAN-05 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - RISK BASED APPROACH FOR MANAGEMENT OF POLYCHLORINATED BIPHENYL (PCB) REMEDIATION WASTE FROM V-TANKS | EDF-3077 | 02 |
| 05-JAN-05 | DOE | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11199 | 00 |
| 04-JAN-05 | FARNSWORTH, R. K. | FIELD SAMPLING PLAN (FSP) FOR THE TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00289 | 01 |
| 03-JAN-05 | ADAMS-WATERSON, P. | FIELD SAMPLING PLAN (FSP) FOR TSF-09 AND TSF-18 V-TANKS PHASE I TREATMENT | ICP/EXT-04-00659 | 00 |
| 14-DEC-04 | NORTH WIND ENVIRONMENTAL | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE V-TANKS AREA CERCLA SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG -1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 01 |
| 13-DEC-04 | SHAW, R. M. | TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AND SIGNATURE READY COPIES OF ESD FOR THE ROD FOR POWER BURST FACILITY AUXILARY REACTOR AREA (PBF/ARA) OU 5 | FMDP-FFA/CO-04-085 | 00 |
| 09-DEC-04 | YONK, A. K. | WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00284 | 02 |
| 08-DEC-04 | JANTZ, A. E. | GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL & SITE REMEDIATION FOR TAN, WASTE AREA GROUP 1 (WAG-1), OU 1-10 - DOE, EPA & DEQ COMMENTS ARE INCLUDED IN APPENDIX F & APPEN | DOE/NE-ID-11161 | 01 |
| 02-DEC-04 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - RISK BASED APPROACH FOR MANAGEMENT OF POLYCHLORINATED BIPHENYL (PCB) REMEDIATION WASTE FROM V-TANKS | EDF-3077 | 01 |
| 17-NOV-04 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - V-TANKS CONTENTS REMEDIATION MECHANICAL DESIGN PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV.03 | EDF-4751 | 01 |
| 17-NOV-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4956 | 01 |
| 17-NOV-04 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-5017 | 01 |
| 16-NOV-04 | HALEY, D. J. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 & TSF-18 V-TANKS & CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, & SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11150 | 01 |
| 06-OCT-04 | NORTH WIND ENVIRONMENTAL | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE TSF-09 & TSF-18 V-TANKS AND CONTENTS REMOVAL AND SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG -1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00429 | 00 |
| 22-SEP-04 | SCHWENDIMAN, G. L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR THE V-TANKS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/ID-11119 | 00 |
| 20-SEP-04 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - V-TANKS CONTENTS REMEDIATION MECHANICAL DESIGN - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 | EDF-4751 | 00 |
| 16-SEP-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4602 | 01 |
| 16-SEP-04 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - SITEWORK DESIGN - PART OF ATTACHMENT 3 TO THE RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & REV.03 | EDF-4672 | 00 |
| 16-SEP-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 AND R | EDF-4956 | 00 |
| 14-SEP-04 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - SUPPORTING CALCULATIONS FOR APAD-04-53 TEST AREA NORTH (TAN) V-TANKS REMEDIATION OF TSF-09 & TSF-18 - PART OF ATTACHMENT 3 OF RD/RA WORK PLAN ADDENDUM 2, DOE/NE-ID-11150, REV.01 AND REV.02 AND REV.03 | EDF-5196 | 00 |
| 10-SEP-04 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4604 | 01 |
| 09-SEP-04 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS FOR INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.0 | EDF-4928 | 00 |
| 09-SEP-04 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 | EDF-5017 | 00 |
| 09-SEP-04 | SOTO, R. | WASTE MANAGEMENT PLAN (WMP) FOR THE TSF-09 & TSF-18 V-TANKS AND CONTENTS REMOVAL AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00270 | 00 |
| 09-SEP-04 | HALEY, D. J. | DECONTAMINATION PLAN FOR THE TSF-09 AND TSF-18 V-TANKS AND CONTENT REMOVAL AND SITE REMEDIATION TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00428 | 00 |
| 30-AUG-04 | TYSON, D. R. | V-TANKS TSF-09 AND TSF-18 CALENDAR YEAR 2003 (CY-03) AND CALENDAR YEAR 2004 (CY-04) EARLY REMEDIAL ACTION (RA) ACTIVITIES SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-03-00080 | 00 |
| 19-AUG-04 | SCHWENDIMAN, G. L. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR THE ASSESSMENT AND CLEANUP OF V-TANK AREA NEW SITES, FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11152 | 00 |
| 19-AUG-04 | SCHWENDIMAN, G. L. | WASTE MANAGEMENT PLAN (WMP) FOR THE V-TANK AREA NEW SITES, FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00360 | 00 |
| 19-AUG-04 | JESSMORE, J. J. | CONSTRUCTION SPECIFICATION (SPC) - TSF-09 AND TSF-18 V-TANKS REMEDIATION - APPROVED FOR CONSTRUCTION - ATTACHMENT 2 OF DOE/NE-ID-11150, REV.01, DOE/NE-ID-11152, REV.00, DOE/NE-ID-11150, REV.02 AND DOE/NE-ID-11150, REV.03 | SPC-555 | 00 |
| 12-AUG-04 | SHAW, R. M. | REQUEST FOR CONCURRENCE ON THE APPROACH FOR APPLYING LAND DISPOSAL RESTRICTION (LDR) TREATMENT STANDARDS FOR TSF-09 AND TSF-18 V-TANKS CONTENTS AT TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | EM-ER-04-176 | 00 |
| 09-AUG-04 | MCDANNEL, G. E. | FIELD SAMPLING PLAN (FSP) FOR THE V-TANK AREA NEW SITES, FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11156 | 00 |
| 09-AUG-04 | FARNSWORTH, R. K. | ENGINEERING DESIGN FILE (EDF) - REEAVALUATION OF CHARACTERISTIC TOXICITY DESIGNATION FOR V-TANK WASTE USING EXISITING SAMPLE DATA PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & RE | EDF-4885 | 01 |
| 29-JUL-04 | EVANS, S. K. | HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) CLOSURE PLAN (CP) FOR THE TEST AREA NORTH (TAN) TECHNICAL SUPPORT FACILITY (TSF) INTERMEDIATE LEVEL RADIOACTIVE WASTE MANAGEMENT SYSTEM PHASE II: FEED SUBSYSTEM (V-TA | DOE/ID-11053 | 03 |
| 30-JUN-04 | SCHWENDIMAN, G. L. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE FIELD SAMPLING AND REMEDIATION OF THE V-TANK AREA NEW SITES AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-04-00359 | 00 |
| 21-JUN-04 | JANTZ, A. E. | FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANKS FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11078 | 01 |
| 21-JUN-04 | JANTZ, A. E. | GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11161 | 00 |
| 21-JUN-04 | JANTZ, A. E. | WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00284 | 01 |
| 10-JUN-04 | ELLIOTT, M. D. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 06 |
| 07-JUN-04 | SLOAN, P. A. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR TSF-09 & TSF-18 (V-TANKS) AND TSF-21 EARLY REMEDIAL ACTION (RA) FIELD SAMPLING, EQUIPMENT REMOVAL AND DISPOSAL AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01508 | 03 |
| 01-JUN-04 | HANEY, T. J. | LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2004 | ICP/EXT-04-00165 | 00 |
| 20-MAY-04 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR TSF-09 & TSF-18 (V-TANKS) AND TSF-21 EARLY REMEDIAL ACTION (RA) FIELD SAMPLING, EQUIPMENT REMOVAL AND DISPOSAL AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01508 | 02 |
| 17-MAY-04 | EINAN, D. R. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE FOR VERIFICATION SAMPLING FOR ARSENIC AND THALLIUM IN TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | 24856 | 00 |
| 13-MAY-04 | HATHAWAY, C. | DISCUSSION OF VERIFICATION SAMPLING FOR ARSENIC AND THALLIUM IN TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | EM-ER-04-102 | 00 |
| 12-MAY-04 | VANHORN, R. L. | RISK BASED SCREENING AND ASSESSMENT APPROACH FOR WASTE AREA GROUP 1 (WAG-1) SOILS | INEEL/EXT-03-00540 | 00 |
| 28-APR-04 | DOE | NEW SITE IDENTIFICATION (NSI) FOR TSF-48 (TAN-615 EAST AND WEST SUMP AND PIT SOILS) - OPERABLE UNIT (OU) 1-11 DELETED MAY 19, 2005 (05/19/05) | 24858 | 00 |
| 28-APR-04 | DOE | NEW SITE IDENTIFICATION (NSI) FOR TSF-47 - TEST AREA NORTH (TAN) CONTAMINATED SOIL ADJACENT TO 6 (SIX) INCH SANITARY SEWER LINE ON WEST SIDE OF TAN-615 | 24888 | 00 |
| 19-APR-04 | MCDANNEL, G. E. | FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-10725 | 04 |
| 14-APR-04 | CRESAP, D. A. | COLD BENCH SCALE TEST REPORT FOR CHEMICAL OXIDATION AND STABILIZATION OF SURROGATE V-TANK WASTE AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | ICP/EXT-03-00019 | 00 |
| 29-MAR-04 | DOE | NOTICE OF AVAILABILITY - AGENCIES ISSUE AMENDMENT TO INEEL OPERABLE UNIT (OU) 1-10 RECORD OF DECISION (ROD) | 24835 | 00 |
| 25-MAR-04 | ELLIOTT, M. D. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 05 |
| 17-MAR-04 | HAIN, K. E. | TRANSMITTAL OF RECORD OF DECISION (ROD) AMENDMENT FOR V-TANKS TSF-09 AND TSF-18 AND EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PM-2A TANKS TSF-26 AND TSF-06, AREA 10, AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | EM-ER-04-058 | 00 |
| 16-MAR-04 | ELLIOTT, M. D. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 04 |
| 15-MAR-04 | ICP COMMUNITY RELATIONS | IDAHO COMPLETION PROJECT (ICP) COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - AGENCIES ISSUE AMENDMENT TO RECORD OF DECISON (ROD) FOR TEST AREA NORTH (TAN) V-TANKS | 24834 | 00 |
| 15-MAR-04 | AR COORDINATOR | OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDING TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 | AR.INDEX.OU.1-10-AMENDMENT | 00 |
| 10-MAR-04 | JESSMORE, J. J. | SUSPENDED - FIELD SAMPLING PLAN (FSP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11065 | 01 |
| 10-MAR-04 | JESSMORE, J. J. | SUSPENDED - CONCEPTUAL DESIGN FOR V-TANK ISOLATION AND SAND FILTER REMOVAL FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01165 | 01 |
| 10-MAR-04 | JESSMORE, J. J. | SUSPENDED - CONCEPTUAL DESIGN REPORT FOR REMOVAL, TREATMENT, AND DISPOSAL OF LIQUID FROM TECHNICAL SUPPORT FACILITY 09 (TSF-09) TANK V-3 FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01166 | 01 |
| 10-MAR-04 | JESSMORE, J. J. | SUSPENDED - WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | INEEL/EXT-02-01608 | 01 |
| 09-MAR-04 | TYSON, D. R. | SUSPENDED - LABORATORY STUDY WORK PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF V-TANKS' CONTENTS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11083 | 01 |
| 09-MAR-04 | JESSMORE, J. J. | SUSPENDED - WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) | INEEL/EXT-01-00759 | 01 |
| 09-MAR-04 | JESSMORE, J. J. | SUSPENDED - COLD BENCH SCALE TEST PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF SURROGATE V-TANK WASTE (TSF-09 & TSF-18) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00860 | 01 |
| 08-MAR-04 | JESSMORE, J. J. | SUSPENDED - DECONTAMINATION PLAN, V-TANKS, OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) | INEEL/EXT-01-01566 | 01 |
| 20-FEB-04 | EPA | RECORD OF DECISION (ROD) AMENDMENT FOR V-TANKS TSF-09 AND TSF-18 AND EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PM-2A TANKS TSF-26 AND TSF-06, AREA 10, AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DOE/ID-10682,AMENDMENT | 00 |
| 09-DEC-03 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - RISK BASED APPROACH FOR MANAGEMENT OF POLYCHLORINATED BIPHENYL (PCB) REMEDIATION WASTE FROM V-TANKS | EDF-3077 | 00 |
| 09-DEC-03 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - V-TANK ANALYTICAL DATA: CALCULATED AVERAGES AND UPPER CONFIDENCE LIMITS | EDF-3868 | 01 |
| 06-DEC-03 | BRUCE, J. E. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX G CONTAINS AGENCY REVIEW COMMENTS | DOE/ID-11073 | 00 |
| 06-DEC-03 | BRUCE, J. E. | FIELD SAMPLING PLAN (FSP) FOR GROUP 3, TSF-03 BURN PITS FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11094 | 00 |
| 06-DEC-03 | BRUCE, J. E. | WASTE MANAGEMENT PLAN (WMP) FOR GROUP 3, PM-2A TANKS AND BURN PITS, FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00284 | 00 |
| 05-DEC-03 | BRUCE, J. E. | FIELD SAMPLING PLAN (FSP) FOR GROUP 3, PM-2A TANKS FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11078 | 00 |
| 05-DEC-03 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - USE OF TANKS V-1, V-2, AND V-3 FOR STORING, BLENDING, AND ACCUMULATING WASTE DURING REMEDIATION OF THE V-TANKS | EDF-3948 | 00 |
| 05-DEC-03 | BRUCE, J. E. | CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-26 PM-2A TANKS REMEDIAL DESIGN - ATTACHMENT 1 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 | SPC-475 | 00 |
| 05-DEC-03 | BRUCE, J. E. | CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-03 BURN PIT REMEDIAL DESIGN - ATTACHMENT 2 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 | SPC-476 | 00 |
| 05-DEC-03 | BRUCE, J. E. | CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, WRRTF-01 BURN PITS REMEDIAL DESIGN - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 | SPC-477 | 00 |
| 17-NOV-03 | HAIN, K. E. | EXTENSION OF COMMENT RESOLUTION FOR OPERABLE UNIT (OU) 1-10 RECORD OF DECISION (ROD) AMENDMENT AND OPERABLE UNIT (OU) 3-13 GROUP 3 PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-03-287 | 00 |
| 04-NOV-03 | ELLIOTT, M. D. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G | DOE/ID-10712 | 02 |
| 04-NOV-03 | MCDANNEL, G. E. | FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-10725 | 03 |
| 30-OCT-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 03 |
| 10-SEP-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR REMEDIAL ACTION (RA) SAMPLING, FIELD SCREENING, SOIL EXCAVATION, BACKFILL, PACKAGING AND SHIPMENT OF TSF-06 AND TSF-26 SITES AT WASTE AREA GROUP (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01399 | 03 |
| 04-SEP-03 | HANEY, D. F. | FIELD SAMPLING PLAN (FSP) FOR THE TSF-26, PM-2A TANK CONTENTS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX B CONTAINS EPA, IDEQ AND DOE REVIEW COMMENTS AND RESOLUTIONS | INEEL/EXT-03-00304 | 03 |
| 20-AUG-03 | SHAW, R. M. | TRANSMITTAL OF DRAFT V-TANKS RECORD OF DECISION (ROD) AMENDMENT AND SUPPORTING ENGINEERING DESIGN FILES (EDF) FOR OPERABLE UNIT (OU) 1-10, WASTE AREA GROUP 1 (WAG-1) AT TEST AREA NORTH (TAN) | EM-ER-03-206 | 00 |
| 19-AUG-03 | FITCH, D. R. | FY 2003 (FY-03) INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR WASTE AREA GROUP 1 (WAG-1) | DOE/ID-11105 | 00 |
| 14-AUG-03 | HANEY, D. F. | FIELD SAMPLING PLAN (FSP) FOR THE TSF-26, PM-2A TANK CONTENTS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX B CONTAINS EPA, IDEQ AND DOE REVIEW COMMENTS AND RESOLUTIONS | INEEL/EXT-03-00304 | 02 |
| 11-AUG-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 02 |
| 16-JUL-03 | SHAW, R. M. | TRANSMITTAL OF FINAL LABORATORY STUDY WORK PLAN FOR V-TANKS CONTENTS AND FINAL COLD BENCH SCALE TEST PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF SURROGATE V-TANK WASTE (TSF-09 & TSF-18) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | EM-ER-03-179 | 00 |
| 14-JUL-03 | TYSON, D. R. | LABORATORY STUDY WORK PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF V-TANKS' CONTENTS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - APPENDIX A INCLUDES EPA AND IDEQ REVIEW COMMENTS AND RESOLUTIONS | DOE/ID-11083 | 00 |
| 14-JUL-03 | JESSMORE, J. J. | COLD BENCH SCALE TEST PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF SURROGATE V-TANK WASTE (TSF-09 & TSF-18) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00860 | 00 |
| 30-JUN-03 | HAIN, K. E. | TRANSMITTAL OF THE CONCEPTUAL DESIGN REPORT FOR EX SITU CHEMICAL OXIDATION, REDUCTION AND STABILIZATION OF THE V-TANKS AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - INEEL/EXT-03-00438, JUNE 2003 (06/03) | EM-ER-03-170 | 00 |
| 25-JUN-03 | JESSMORE, J. J. | CONCEPTUAL DESIGN REPORT FOR EX SITU CHEMICAL OXIDATION, REDUCTION AND STABILIZATION OF THE V-TANKS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00438 | 00 |
| 12-JUN-03 | HANEY, D. F. | FIELD SAMPLING PLAN (FSP) FOR THE TSF-26, PM-2A TANK CONTENTS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX B INCLUDES EPA, IDEQ AND DOE REVIEW COMMENTS AND RESOLUTIONS | INEEL/EXT-03-00304 | 01 |
| 29-MAY-03 | HARRIS, J. D. | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES REMEDIAL ACTION (RA) | INEEL/EXT-99-00910 | 01 |
| 28-MAY-03 | BRUCE, J. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 01 |
| 27-MAY-03 | SHAW, R. M. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM AND SUPPORTING DOCUMENTS FOR V-TANKS EARLY REMEDIAL ACTION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES | EM-ER-03-136 | 00 |
| 23-MAY-03 | JESSMORE, J. J. | FIELD SAMPLING PLAN (FSP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - SUPPORTING DOCUMENT FOR THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (RD/RAWP) AND ADDENDUM | DOE/ID-11065 | 00 |
| 23-MAY-03 | JESSMORE, J. J. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR V-TANKS EARLY REMEDIAL ACTION FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | DOE/ID-11075 | 00 |
| 23-MAY-03 | HARRIS, J. D. | WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES - SUPPORTING DOCUMENT FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND ADDENDU | INEEL/EXT-02-01608 | 00 |
| 22-MAY-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR TSF-09 & TSF-18 (V-TANKS) AND TSF-21 EARLY REMEDIAL ACTION FIELD SAMPLING, EQUIPMENT REMOVAL AND DISPOSAL AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT(OU) 1-10 | INEEL/EXT-02-01508 | 00 |
| 05-MAY-03 | BRUCE, J. E. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G | DOE/ID-10712 | 01 |
| 30-APR-03 | AR COORDINATOR | OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) DOCUMENT ID #DOE/ID-11050 | AR.INDEX.OU.1-10 | 01 |
| 28-APR-03 | DOE | NOTICE OF AVAILABILITY - AGENCIES ANNOUNCE CHANGES TO CLEANUP WORK AT TEST AREA NORTH (TAN) | 24788 | 00 |
| 23-APR-03 | SHAW, R. M. | TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | EM-ER-03-111 | 00 |
| 16-APR-03 | SHAW, R. M. | TRANSMITTAL OF THE FINAL TECHNOLOGY EVALUATION REPORT FOR THE V-TANKS, TSF-09 AND TSF-18, AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 AND THE NEW PROPOSED PLAN FOR THE V-TANKS CONTENTS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN) OU 1-10 | EM-ER-03-105 | 00 |
| 15-APR-03 | DOE | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DOE/ID-11050 | 00 |
| 10-APR-03 | DOE | NOTICE OF AVAILABILITY - AGENCIES ANNOUNCE PUBLIC COMMENT PERIOD FOR TEST AREA NORTH (TAN) V-TANKS CLEANUP SITE | 24786 | 00 |
| 03-APR-03 | BRUCE, J. E. | FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-10725 | 02 |
| 03-APR-03 | TYSON, D. R. | TECHNOLOGY EVALUATION REPORT FOR THE V-TANKS, TSF-09 AND TSF-18, AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11038 | 00 |
| 01-APR-03 | DOE | NEW PROPOSED PLAN FOR THE V-TANKS CONTENTS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | 24783 | 00 |
| 01-APR-03 | RICHARDSON, J. G. | V-TANKS DECISION SUPPORT MODEL DESIGN REPORT | INEEL/EXT-02-01448 | 00 |
| 21-MAR-03 | DOE | DEPARTMENT OF ENERGY (DOE) RESOLUTIONS TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE NEW PROPOSED PLAN FOR THE V-TANKS CONTENTS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | 24784 | 00 |
| 21-MAR-03 | DOE | DEPARTMENT OF ENERGY (DOE) RESOLUTIONS TO ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE NEW PROPOSED PLAN FOR THE V-TANKS CONTENTS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | 24785 | 00 |
| 13-MAR-03 | SHAW, R. M. | TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 - V-TANKS SITES | EM-ER-03-073 | 00 |
| 11-MAR-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SAMPLING, EXCAVATION, BACKFILLING, PACKAGING, AND SHIPMENT OF SOIL AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00046 | 00 |
| 28-FEB-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR REMEDIAL ACTION (RA) SAMPLING, FIELD SCREENING, SOIL EXCAVATION, BACKFILL, PACKAGING AND SHIPMENT OF TSF-06 AND TSF-26 SITES AT WASTE AREA GROUP (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01399 | 02 |
| 21-FEB-03 | HAIN, K. E. | DEPARTMENT OF ENERGY (DOE) RESPONSE TO INEEL CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #102 CONCERNING REMEDIATION OF TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) V-TANKS | EM-ER-03-050 | 00 |
| 19-FEB-03 | SHAW, R. M. | TRANSMITTAL OF FIELD SAMPLING PLAN (FSP) FOR REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | EM-ER-03-051 | 00 |
| 12-FEB-03 | DOE | DOE, IDEQ AND EPA COMMENT RESOLUTION FORMS ON THE EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | 24031 | 00 |
| 11-FEB-03 | BRUCE, J. E. | FIELD SAMPLING PLAN (FSP) FOR THE REMEDIAL ACTION (RA) SAMPLING AND FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-10725 | 01 |
| 24-JAN-03 | WILSON, M. D. | INEEL CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #102, ADDRESSING COMMENTS ON THE PROPOSED APPROACH FOR TREATING AND DISPOSITION OF CONTENTS OF THE V-TANKS LOCATED IN WASTE AREA GROUP 1 (WAG-1) AT TEST AREA NORTH (TAN) AT INEEL | 03-CAB-024 | 00 |
| 21-JAN-03 | SHAW, R. M. | PROPOSAL TO DISPOSE OF TEST AREA NORTH (TAN) V-TANK LIQUID IN THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PROCESS EQUIPMENT WASTE EVAPORATOR (PEWE) | EM-AM-03-02 | 00 |
| 14-JAN-03 | LEWIS, T. F. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR REMEDIAL ACTION (RA) SAMPLING, FIELD SCREENING, SOIL EXCAVATION, BACKFILL, PACKAGING AND SHIPMENT OF TSF-06 AND TSF-26 SITES AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01399 | 01 |
| 14-JAN-03 | MCDANNEL, G. E. | CONCEPTUAL DESIGN STUDY REPORT FOR TSF-26 PM-2A TANKS FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01412 | 00 |
| 17-DEC-02 | SHAW, R. M. | TRANSMITTAL OF DRAFT EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 V-TANKS SITE | EM-ER-02-210 | 00 |
| 04-DEC-02 | SHAW, R. M. | TRANSMITTAL OF DRAFT CONCEPTUAL DESIGN STUDY REPORT FOR TSF-26 PM-2A TANKS FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | EM-ER-02-205 | 00 |
| 25-NOV-02 | MCDANNEL, G. E. | PRECONCEPTUAL DESIGNS OF VARIOUS ALTERNATIVES FOR V-TANKS TSF-09 AND TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01310 | 00 |
| 05-NOV-02 | WARD, K. R. | CONCEPTUAL DESIGN FOR V-TANK ISOLATION AND SAND FILTER REMOVAL FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01165 | 00 |
| 05-NOV-02 | WARD, K. R. | CONCEPTUAL DESIGN REPORT FOR REMOVAL, TREATMENT, AND DISPOSAL OF LIQUID FROM TECHNICAL SUPPORT FACILITY 09 (TSF-09) TANK V-3 FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01166 | 00 |
| 29-OCT-02 | SHAW, R. M. | TRANSMITTAL OF TECHNICAL SUPPORT FACILITY-06 (TSF-06) AND TECHNICAL SUPPORT FACILITY-26 (TSF-26) CALENDAR YEAR 2000 (CY-2000) SAMPLING AND REMEDIATION SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | EM-ER-02-185 | 00 |
| 17-OCT-02 | MCDANNEL, G. E. | TECHNICAL SUPPORT FACILITY-06 (TSF-06) AND TECHNICAL SUPPORT FACILITY-26 (TSF-26) CALENDAR YEAR 2000 (CY-2000) SAMPLING AND REMEDIATION SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01135 | 00 |
| 16-SEP-02 | HAIN, K. E. | REQUEST TO SET UP ADMINISTRATIVE RECORD (AR) FILE FOR V-TANK RECORD OF DECISION (ROD) AMENDMENT FOR OPERABLE UNIT (OU) 1-10 | 24746 | 00 |
| 01-AUG-02 | INEEL COMMUNITY RELATIONS | A COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - NEW ALTERNATIVES CONSIDERED FOR V-TANKS AT WASTE AREA GROUP 1 (WAG-1) | 24747 | 00 |
| 31-JUL-02 | FITCH, D. R. | 2002 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) | DOE/ID-11011 | 00 |
| 10-JUL-02 | MCDANNEL, G. E. | TRANSMITTAL OF THE TECHNOLOGY EVALUATION SCOPE OF WORK FOR THE V-TANKS, TECHNICAL SUPPORT FACILITY 09 AND 18 (TSF-09 & TSF-18) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DKJ-141-02 | 00 |
| 10-JUL-02 | MCDANNEL, G. E. | TECHNOLOGY EVALUATION SCOPE OF WORK FOR THE V-TANKS, TECHNICAL SUPPORT FACILITY 09 AND 18 (TSF-09 & TSF-18), AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/ID-10999 | 00 |
| 10-JUL-02 | SHAW, R. M. | TRANSMITTAL OF TECHNOLOGY EVALUATION SCOPE OF WORK FOR THE V-TANKS, TECHNICAL SUPPORT FACILITY 09 AND 18 (TSF-09 & TSF-18), FOR THE TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-10 | EM-ER-02-116 | 00 |
| 18-APR-02 | SHAW, R. M. | REQUEST FOR CONCURRENCE WITH V-TANKS PATH FORWARD | EM-ER-02-058 | 00 |
| 14-MAR-02 | HAIN, K. E. | CONCURRENCE WITH V-TANKS PATH FORWARD | EM-ER-02-040 | 00 |
| 04-MAR-02 | JANTZ, A. E. | RECOMMENDED PATH FORWARD FOR OPERABLE UNIT (OU) 1-10 V-TANKS REMEDIAL ACTION (RA) | DKJ-42-02 | 00 |
| 01-MAR-02 | MCDANNEL, G. E. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | DOE/ID-10875 | 01 |
| 26-NOV-01 | SHAW, R. M. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES AND SUPPORTING DOCUMENTS | EM-ER-01-192 | 00 |
| 20-NOV-01 | ENGLE, M. A. | CONFIRMATION FIELD SAMPLING PLAN (FSP) FOR V-TANKS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) | DOE/ID-10876 | 00 |
| 12-NOV-01 | POPE, M. I. | WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) | INEEL/EXT-01-00759 | 00 |
| 09-NOV-01 | ROY F. WESTON, INC. | DECONTAMINATION PLAN, V-TANKS, OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) | INEEL/EXT-01-01566 | 00 |
| 02-NOV-01 | FITCH, D. R. | OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DOE/ID-10711 | 01 |
| 01-NOV-01 | ROY F. WESTON, INC. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | DOE/ID-10875 | 00 |
| 29-AUG-01 | SHAW, R. M. | TRANSMITTAL OF 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) | EM-ER-01-146 | 00 |
| 28-AUG-01 | FITCH, D. R. | 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) | DOE/ID-10899 | 00 |
| 20-FEB-01 | GREEN, C. J. | ENGINEERING DESIGN FILE (EDF) - TEST AREA NORTH 616 (TAN-616) PUMP ROOM PERSONNEL PROTECTIVE EQUIPMENT (PPE) RADIOACTIVE SOURCE TERM DETERMINATION - OPERABLE UNIT (OU) 1-11 DELETED MAY 19, 2005 (05/19/05) | TAN-2001-002 | 00 |
| 18-JAN-01 | SHAW, R. M. | TRANSMITTAL OF FINAL TAN-616 TRACK 1 DECISION DOCUMENTATION PACKAGE - OPERABLE UNIT (OU) 1-11 DELETED MAY 19, 2005 (05/19/05) | EM-ER-01-011 | 00 |
| 17-JAN-01 | HAIN, K. E. | TEST AREA NORTH 616 (TAN-616) TRACK 1 DECISION DOCUMENTATION PACKAGE - OPERABLE UNIT (OU) 1-11 DELETED MAY 19, 2005 (05/19/05) | DOE/ID-10846 | 00 |
| 01-DEC-00 | SHAW, R. M. | PATH FORWARD FOR DISPOSING OF NON POLYCHLORINATED BIPHENYL (PCB) MIXED LOW LEVEL WASTE (MLLW) | EM-ER-226 | 00 |
| 22-NOV-00 | PIERRE, W. | ACCELERATION OF THE V-TANK REMEDIAL ACTION | 22185 | 00 |
| 16-NOV-00 | SHAW, R. M. | REQUEST FOR CONCURRENCE ON ACCELERATING THE V-TANKS REMEDIAL ACTION (RA) | EM-ER-218 | 00 |
| 04-OCT-00 | SHAW, R. M. | TRANSMITTAL OF FINAL INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | EM-ER-194-00 | 00 |
| 28-SEP-00 | KUHNS, D. J. | INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | INEEL/EXT-2000-00917 | 00 |
| 30-AUG-00 | SHAW, R. M. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 1-10 GROUP 1 SITES & SUPPORTING DOCUMENTS | EM-ER-167 | 00 |
| 17-AUG-00 | JANTZ, A. E. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES | DOE/ID-10712 | 00 |
| 17-AUG-00 | JANTZ, A. E. | FIELD SAMPLING PLAN (FSP) FOR REMEDIAL ACTION (RA) SAMPLING & FIELD SCREENING OF GROUP 1 SITES AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-10725 | 00 |
| 11-MAY-00 | FITCH, D. R. | INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | DOE/ID-10750 | 00 |
| 22-FEB-00 | SHAW, R. M. | TRANSMITTAL OF TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | EM-ER-24-00 | 00 |
| 18-FEB-00 | REESE, C. L. | TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | DOE/ID-10723 | 00 |
| 19-JAN-00 | AR COORDINATOR | OPERABLE UNIT (OU) 1-10 - INEEL ADMINISTRATIVE RECORD (AR) INDEX FOR THE WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - INCLUDES TECHNICAL SUPPORT FACILITY (TSF) PAINT SHOP FLOOR DRAIN LEACH FIELD OU 1-10 | AR.INDEX.OU.1-10 | 00 |
| 18-JAN-00 | DOE | NOTICE OF AVAILABILITY - AGENCIES SIGN RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | 10822 | 00 |
| 14-DEC-99 | EPA | FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-10 | DOE/ID-10682 | 00 |
| 18-NOV-99 | SHAW, R. M. | INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR TAN OPERABLE UNIT (OU) 1-10 - INDEX OF SAMPLING DATA DOCUMENTS | 10802 | 00 |
| 25-OCT-99 | HAIN, K. E. | TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS | OPE-ER-165-99 | 00 |
| 23-SEP-99 | FOLKER, J. D. | COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE ECONOMY OF SCALE | JDF-26-99 | 00 |
| 23-SEP-99 | FOLKER, J. D. | COST ESTIMATE - TAN OPERABLE UNIT (OU) 1-10 INVESTIGATION DERIVED WASTE (IDW) | JDF-27-99 | 00 |
| 07-SEP-99 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL RECORD OF DECISION (ROD) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AT INEEL - IDHW & EPA COMMENTS & RESOLUTIONS | OPE-ER-125-99 | 00 |
| 26-AUG-99 | SIVILL, T. E. | WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 INSTITUTIONAL CONTROL SITES COST ESTIMATE | TES-07-99 | 00 |
| 26-JUL-99 | SIVILL, T. E. | WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 SITE V-9 TANK TSF-18 DRAFT RECORD OF DECISION (ROD) COST ESTIMATE | TES-05-99 | 00 |
| 26-JUL-99 | SIVILL, T. E. | WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 SITE V-9 TANK TSF-18 DRAFT RECORD OF DECISION (ROD) COST ESTIMATE | TES-06-99 | 00 |
| 24-MAY-99 | SHAW, R. M. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) FOR TAN OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) AT INEEL | OPE-ER-75-99 | 00 |
| 11-NOV-98 | KUHNS, D. J. | COST ESTIMATES FOR CONTAINMENT ALTERNATIVES FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 SITES | 10555 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | UPDATE FACT SHEET - TEST AREA NORTH (TAN) REVISED PROPOSED PLAN TO BE ISSUED IN EARLY NOVEMBER - WASTE AREA GROUP 1 (WAG-1) | 10552 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) AT INEEL | 10553 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 01-NOV-98 | MICHAEL, D. L. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) SUPPLEMENT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL | DOE/ID-10557,SUPPLEMENT | 00 |
| 19-OCT-98 | DOE | NEW SITE IDENTIFICATION (NSI) - TEST AREA NORTH 616 (TAN-616) BUILDING | 10547 | 00 |
| 01-OCT-98 | MICHAEL, D. L. | TREATABILITY STUDY (TS) FOR PLANAR IN SITU VITRIFICATION (ISV) OF INEEL TAN V-TANKS | INEEL/EXT-98-00854 | 00 |
| 01-SEP-98 | RICHARDSON, C. | FINAL REPORT - TREATABILITY STUDY (TS) FOR LMITCO TSF-09 V-1, V-2 & V-3 TANK WASTE | INEEL/EXT-98-00739 | 00 |
| 01-JUN-98 | BLACKMORE, C. S. | HEALTH AND SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 1-10 WASTE AREA GROUP 1 (WAG-1) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-95/0333 | 03 |
| 26-FEB-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 26, 1998 (02/26/98) AT MOSCOW, IDAHO | 10815 | 00 |
| 24-FEB-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 24, 1998 (02/24/98) AT BOISE, IDAHO | 10814 | 00 |
| 23-FEB-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT FOR TAN COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) PROPOSED PLAN HELD FEBRUARY 23, 1998 (02/23/98) AT IDAHO FALLS, IDAHO | 10816 | 00 |
| 01-FEB-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 1-10 | 10443 | 00 |
| 18-DEC-97 | HAIN, K. E. | REGULATORY STATUS OF TAN V-TANKS & OU 1-10 PROPOSED PLAN SCHEDULE | OPE-ER-286-97 | 00 |
| 06-NOV-97 | HAIN, K. E. | TRANSMITTAL OF FINAL COMPREHENSIVE FEASIBILITY STUDY (FS) FOR OU 1-10 | OPE-ER-184-97 | 00 |
| 01-NOV-97 | BLACKMORE, C. S. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 AT INEEL | DOE/ID-10557 | 00 |
| 07-OCT-97 | HAIN, K. E. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR TAN OU 1-10 | OPE-ER-159-97 | 00 |
| 06-OCT-97 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL FEASIBILITY STUDY (FS) FOR TAN OU 1-10 | OPE-ER-157-07 | 00 |
| 08-SEP-97 | MICHAEL, D. L. | REPLACEMENT PAGES FOR APPENDIX J (COST ESTIMATES) TO DOE/ID-10557, COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 AT INEEL | 10817 | 00 |
| 16-JUN-97 | JENSEN, N. R. | TRANSMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TAN OU 1-10 | OPE-ER-99-97 | 00 |
| 13-FEB-97 | JENSEN, N. R. | TRANSMITTAL OF THE COMPREHENSIVE REMEDIAL INVESTIGATION BASELINE RISK ASSESSMENT (RI/BRA) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | OPE-ER-15-97 | 00 |
| 15-MAY-96 | DOE, EPA, IDHW | TRACK 1 DECISION DOCUMENTATION PACKAGE FOR ATOMIC ENERGY COMMISSION (AEC) BURIAL PIT - NO FURTHER ACTION DETERMINATION | 10281 | 00 |
| 15-MAY-96 | DOE, EPA, IDHW | TRACK 1 DECISION DOCUMENTATION PACKAGE FOR LANDFILL ON NE SIDE OF LOFT-02 DISPOSAL POND BERM - NO FURTHER ACTION DETERMINATION | 10282 | 00 |
| 22-MAR-96 | DOE | NO FURTHER ACTION DETERMINATION FOR TECHNICAL SUPPORT FACILITY (TSF) DIESEL FUEL PIPELINE LEAK TSF-44 OU 1-10 - TRACK 1 SITES | 10272 | 00 |
| 01-MAR-96 | LEWIS, S. M. | WORK PLAN FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | DOE/ID-10527 | 00 |
| 01-MAR-96 | MICHAEL, D. L. | FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 1-10: TEST AREA NORTH (TAN) | INEL-95/0304 | 00 |
| 01-DEC-95 | INEL COMMUNITY RELATIONS | INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION BEGINS FOR WAG-1 | 11382 | 00 |
| 01-OCT-95 | MICHAEL, D. L. | SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 1-10 WAG-1 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEL-95/0165 | 00 |
| 28-JUN-95 | DOE, EPA, IDHW | LOSS OF FLUID TEST LOFT-12 (LOFT XFMR YARD #2 PCB SPILL) TRACK 1 - NO FURTHER ACTION DETERMINATION - DECISION DOCUMENTATION PACKAGE | 10029 | 00 |
| 27-JUL-94 | NOT SPECIFIED | TRACK 1 INVESTIGATION FOR THE TSF PAINT SHOP FLOOR DRAIN LEACH FIELD (W. OF TAN-636) - NO FURTHER ACTION DETERMINATION | 5736 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-27 PAINT SHOP FLOOR DRAIN LEACH FIELD | 2697 | 00 |