| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 04-AUG-10 | NOT SPECIFIED | ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009 | DOE/ID-11428 | 1 |
| 26-JUL-10 | FAULK, DENNIS | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE REGARDING IN SITU BIOREMEDICATION REMEDIAL ACTION REPORT, TEST AREA NORTH, OU 1-07B | CCN 310562 | 0 |
| 15-JUL-10 | JOHANSEN, PETE | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CONCURRENCE REGARDING IN SITU BIOREMEDICATION REMEDIAL ACTION REPORT, TEST AREA NORTH, OU 1-07B | CCN 310517 | 0 |
| 30-JUN-10 | ARENAZ, MARK R. | NOTIFICATION FOR IN SITU BIOREMEDIATION REMEDIAL ACTION REPORT, TEST AREA NORTH, OPERABLE UNIT 1-07B | WDP-RWMC-10-044 | 0 |
| 29-JUN-10 | JOHANSEN, PETE | AGENCY AGREEMENT TO DISCONTINUE AIR SAMPLING AT THE NEW PUMP AND TREAT FACILITY AT TEST AREA NORTH, OPERABLE UNIT 1-07B | IR-25245 | 0 |
| 07-JUN-10 | BROWN, MEL E. | AGENCY AGREEMENT TO DISCONTINUE AIR SAMPLING AT THE NEW PUMP AND TREAT FACILITY AT TEST AREA NORTH, OPERABLE UNIT 1-07B | CCN 310343 | 0 |
| 10-APR-10 | STALEY, CHRIS | AIR EMISSIONS ANALYSIS FOR THE OU 1-07B AIR STRIPPER TREATMENT UNIT AND NEW PUMP AND TREAT FACILITY AT TAN | EDF-9474 | 0 |
| 26-MAR-10 | MONSON, BRIAN | MARCH 3, 2010 REQUEST FOR A NO-LONGER CONTAINED-IN DETERMINATION FOR OPERABLE UNIT 1-07B REMEDIATED WATER FROM THE AIR STRIPPER TREATMENT UNIT (ASTU) | IR-25289 | 0 |
| 26-MAR-10 | MONSON, BRIAN | MARCH 3, 2010 REQUEST FOR A NO-LONGER CONTAINED-IN DETERMINATION FOR OPERABLE UNIT 1-07B REMEDIATED WATER FROM THE AIR STRIPPER TREATMENT UNIT (ASTU) | IR-25298 | 0 |
| 20-JAN-10 | NOT SPECIFIED | DOCUMENTATION OF MINOR CHANGE TO ROD AMENDMENT FOR THE TSF-05 AND TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION, INL SITE, IDAHO | AR-25279 | 0 |
| 17-AUG-09 | NOT SPECIFIED | MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING, AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B | DOE/ID-11066 | 3 |
| 17-AUG-09 | NOT SPECIFIED | IN SITU BIOREMEDIATION REMEDIAL ACTION GROUNDWATER MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B | INEEL/EXT-2002-00779 | 5 |
| 06-AUG-09 | NELSON, LEE | IN SITU BIOREMEDIATION (ISB) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/NE-ID-11221 | 3 |
| 21-JUL-09 | NOT SPECIFIED | ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2008 | DOE/ID-11392 | 0 |
| 02-JUL-09 | NELSON, LEE | NEW PUMP AND TREAT FACILITY OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT 1-07B | DOE/ID-10684 | 5 |
| 02-JUL-09 | NOT SPECIFIED | REMEDIAL DESIGN/REMEDIAL ACTION SCOPE OF WORK TEST AREA NORTH FINAL GROUNDWATER REMEDIATION OPERABLE UNIT 1-07B | DOE/ID-10905 | 2 |
| 02-JUL-09 | NOT SPECIFIED | IN SITU BIOREMEDIATION OPERATIONS AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B | DOE/ID-11012 | 3 |
| 02-JUL-09 | NOT SPECIFIED | IN SITU BIOREMEDIATION REMEDIAL ACTION WORK PLAN FOR TAN FINAL GROUNDWATER REMEDIATION, OU 1-07B | DOE/ID-11015 | 3 |
| 02-JUL-09 | NOT SPECIFIED | MONITORED NATURAL ATTENUATION REMEDIAL ACTION WORK PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT 1-07B | DOE/ID-11055 | 1 |
| 02-JUL-09 | NOT SPECIFIED | MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING, AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B | DOE/ID-11066 | 2 |
| 02-JUL-09 | NOT SPECIFIED | IN SITU BIOREMEDIATION INTERIM REMEDIAL ACTION REPORT, TEST AREA NORTH, OPERABLE UNIT 1-07B | DOE/NE-ID-11221 | 2 |
| 02-JUL-09 | NOT SPECIFIED | MONITORED NATURAL ATTENUATION INTERIM REMEDIAL ACTION REPORT, TEST AREA NORTH OPERABLE UNIT 1-07B | DOE/NE-ID-11229 | 1 |
| 02-JUL-09 | NOT SPECIFIED | MONITORED NATURAL ATTENUATION INTERIM MONITORED NATURAL ATTENUATION FINAL INSPECTION REPORT | ICP/EXT-03-00089 | 1 |
| 02-JUL-09 | NOT SPECIFIED | IN SITU BIOREMEDIATION FINAL INSPECTION REPORT | ICP/EXT-03-00116 | 1 |
| 09-MAR-09 | ARMSTRONG, A. T. | MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING, AND MAINTENANCE PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B | DOE/ID-11066 | 1 |
| 09-MAR-09 | NELSON, LEE O. | IN SITU BIOREMEDIATION REMEDIAL ACTION GROUNDWATER MONITORING PLAN FOR TEST AREA NORTH, OPERABLE UNIT 1-07B | INEEL/EXT-2002-00779 | 4 |
| 03-SEP-08 | NELSON, LEE O. | ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 107B | RPT-488 | 01 |
| 28-MAY-08 | NOT SPECIFIED | ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 107B | RPT-488 | 0 |
| 16-AUG-07 | NELSON, L. O. | REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B, FISCAL YEAR 2006 (FY-06) | RPT-430 | 00 |
| 12-JUN-07 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10679 | 02 |
| 12-JUN-07 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10684 | 04 |
| 12-JUN-07 | NELSON, L. O. | MONITORED NATURAL ATTENUATION 2006 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | RPT-383 | 00 |
| 22-MAY-07 | NELSON, L. O. | ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS OCTOBER 2005 TO SEPTEMBER 2006 (10/05 - 09/06), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | RPT-372 | 00 |
| 27-FEB-07 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 03 |
| 22-JAN-07 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT, OCTOBER 2005 THROUGH SEPTEMBER 2006 (10/05 - 09/06), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B | RPT-311 | 00 |
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 01-AUG-06 | NELSON, L. O. | FISCAL YEAR 2005 (FY-05) REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | RPT-233 | 00 |
| 16-JUN-06 | JOLLEY, W. L. | FIVE (5) YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 01 |
| 19-MAY-06 | NELSON, L. O. | MONITORED NATURAL ATTENUATION (MNA) 2005 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | RPT-199 | 00 |
| 16-MAY-06 | NELSON, L. O. | ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS, OCTOBER 2004 TO SEPTEMBER 2005 (10/04 - 09/05), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | RPT-192 | 00 |
| 19-DEC-05 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT, OCTOBER 2004 THROUGH SEPTEMBER 2005 (10/04 - 09/05), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B | ICP/EXT-05-01088 | 00 |
| 19-DEC-05 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2002-00779 | 03 |
| 04-OCT-05 | JOLLEY, W. L. | FIVE YEAR REVIEW OF CERCLA RESPONSE ACTIONS AT THE IDAHO NATIONAL LABORATORY (INL) | DOE/NE-ID-11201 | 00 |
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
| 30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
| 29-AUG-05 | NELSON, L. O. | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00267 | 06 |
| 24-AUG-05 | NELSON, L. O. | MONITORED NATURAL ATTENUATION (MNA) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/NE-ID-11229 | 00 |
| 26-JUL-05 | CARROLL, R. E. | TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) | INEEL/EXT-99-00020 | 03 |
| 21-JUN-05 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/NE-ID-11221 | 01 |
| 20-MAY-05 | MACBETH, T. W. | ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS NOVEMBER 2003 TO SEPTEMBER 2004 (11/03 - 09/04), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | ICP/EXT-05-00787 | 00 |
| 28-APR-05 | NELSON, L. O. | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00267 | 05 |
| 27-APR-05 | HARRIS, K. L. | MONITORED NATURAL ATTENUATION (MNA) 2004 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | ICP/EXT-05-00818 | 00 |
| 24-FEB-05 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) INTERIM REMEDIAL ACTION (RA) REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/NE-ID-11221 | 00 |
| 12-JAN-05 | NELSON, L. O. | CLOSURE REPORT FOR THE GROUNDWATER TREATMENT FACILITY (GWTF), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | ICP/EXT-04-00634 | 01 |
| 05-JAN-05 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT, OCTOBER 2003 THROUGH SEPTEMBER 2004 (10/03 - 09/04), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B | ICP/EXT-04-00708 | 00 |
| 16-NOV-04 | WYMORE, R. A. | NEW PUMP AND TREAT FACILITY (NPTF) MEDIAL ZONE REBOUND TEST PLAN, OPERABLE UNIT (OU) 1-07B TEST AREA NORTH (TAN) | ICP/EXT-04-00557 | 01 |
| 07-OCT-04 | NELSON, L. O. | CLOSURE REPORT FOR THE GROUNDWATER TREATMENT FACILITY (GWTF), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | ICP/EXT-04-00634 | 00 |
| 08-SEP-04 | NELSON, L. O. | REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B, FISCAL YEAR 2003 (FY-03) | ICP/EXT-04-00464 | 00 |
| 02-SEP-04 | WYMORE, R. A. | MEDIAL ZONE REBOUND TEST FOR OPERABLE UNIT (OU) 1-07B TEST AREA NORTH (TAN) | ICP/EXT-04-00557 | 00 |
| 26-JUL-04 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B - APPENDIX A AND APPENDIX B ARE AGENCY REVIEW COMMENTS AND RESOLUTIONS FOR THE DRAFT AND DRAFT FINAL | DOE/ID-11015 | 02 |
| 21-JUL-04 | ESPINOSA, JOHN M. | REEVALUATION OF APPLICABLE HAZARDOUS WASTE NUMBERS AT HISTORICAL TAN FACILITIES | EDF-4714 | 01 |
| 12-JUL-04 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) OPERATIONS AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/ID-11012 | 02 |
| 15-JUN-04 | NELSON, L. O. | MONITORED NATURAL ATTENUATION (MNA) 2003 PERFORMANCE AND COMPLIANCE MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/NE-ID-11148 | 00 |
| 27-APR-04 | ARMSTRONG, A. T. | ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS NOVEMBER 2002 (11/02) TO OCTOBER 2003 (10/03), TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | ICP/EXT-04-00122 | 00 |
| 05-APR-04 | HARRIS, K. L. | ALTERNATE ELECTRON DONOR OPTIMIZATION PLAN FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | ICP/EXT-04-00243 | 00 |
| 12-MAR-04 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) OPERATIONS AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/ID-11012 | 01 |
| 23-FEB-04 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT - OCTOBER 2002 THROUGH SEPTEMBER 2003 (10/02 - 09/03) - TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY - OPERABLE UNIT (OU) 1-07B | ICP/EXT-04-00148 | 00 |
| 22-JAN-04 | HALL, K. A. | MONITORED NATURAL ATTENUATION (MNA) FINAL INSPECTION REPORT | ICP/EXT-03-00089 | 00 |
| 22-JAN-04 | KIMMELL, K. K. | IN SITU BIOREMEDIATION (ISB) FINAL INSPECTION REPORT | ICP/EXT-03-00116 | 00 |
| 22-DEC-03 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2002-00779 | 02 |
| 25-NOV-03 | ARMSTRONG, A. T. | REMEDY PERFORMANCE SUMMARY REPORT FOR THE FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B, FISCAL YEAR 2002 (FY-02) | INEEL/EXT-03-01086 | 00 |
| 30-SEP-03 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) OPERATIONS & MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10684 | 03 |
| 29-SEP-03 | VANDEL, D. S. | NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10679 | 01 |
| 25-SEP-03 | NELSON, L. O. | DECONTAMINATION AND DISMANTLEMENT (D&D) PLAN FOR GROUNDWATER TREATMENT FACILITY (GWTF) | INEEL/EXT-03-00286 | 00 |
| 15-SEP-03 | WYMORE, R. A. | ANNUAL PERFORMANCE REPORT FOR IN SITU BIOREMEDIATION (ISB) OPERATIONS AUGUST 2001 (08/2001) TO OCTOBER 2002 (10/02), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-03-00371 | 00 |
| 31-AUG-03 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) ANNUAL OPERATIONS REPORT OCTOBER 2001 THROUGH SEPTEMBER 2002 (10/2001-09/02), TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDY, OPERABLE UNIT (OU) 1-07B | INEEL/EXT-03-00198 | 00 |
| 19-AUG-03 | FITCH, D. R. | FY 2003 (FY-03) INSTITUTIONAL CONTROLS ASSESSMENT REPORT FOR WASTE AREA GROUP 1 (WAG-1) | DOE/ID-11105 | 00 |
| 13-AUG-03 | SHANKLIN, D. E. | FISCAL YEAR 2002 (FY-02) GROUNDWATER MONITORING ANNUAL REPORT, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-03-00195 | 00 |
| 30-JUN-03 | ORR, B. R. | MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B | DOE/ID-11055 | 00 |
| 30-JUN-03 | ARMSTRONG, A. T. | MONITORED NATURAL ATTENUATION (MNA) OPERATIONS, MONITORING, AND MAINTENANCE (OM&M) PLAN FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B - APPENDIX C CONTAINS AGENCY COMMENTS AND RESOLUTIONS | DOE/ID-11066 | 00 |
| 09-APR-03 | SHAW, R. M. | MANAGEMENT OF WASTES GENERATED DURING OPERABLE UNIT (OU) 1-07B WELL DRILLING | EM-ER-03-102 | 00 |
| 03-FEB-03 | SHAW, R. M. | TRANSMITTAL OF DRAFT MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) AND DRAFT MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | EM-ER-02-036-A | 00 |
| 23-JAN-03 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) OPERATIONS AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B - APPENDIX D CONTAINS EPA AND IDEQ COMMENTS AND RESOLUTIONS | DOE/ID-11012 | 00 |
| 23-JAN-03 | MECHAM, G. D. | IN SITU BIOREMEDIATION (ISB) REMEDIAL DESIGN (RD), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/ID-11013 | 00 |
| 06-JAN-03 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B | DOE/ID-11015 | 01 |
| 03-JAN-03 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2002-00779 | 01 |
| 05-NOV-02 | NELSON, L. O. | TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) | INEEL/EXT-99-00020 | 02 |
| 31-OCT-02 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B | DOE/ID-11015 | 00 |
| 31-OCT-02 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION (RA) GROUNDWATER MONITORING PLAN (GMP) FOR TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2002-00779 | 00 |
| 15-OCT-02 | SHAW, R. M. | CURTAILMENT OF GROUNDWATER TREATMENT FACILITY (GWTF) DAILY INSPECTIONS | EM-ER-02-173 | 00 |
| 14-OCT-02 | MECHAM, G. D. | NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION (RA) REPORT, TAN FINAL GROUNDWATER REMEDIATION | DOE/ID-11031 | 00 |
| 11-OCT-02 | SHAW, R. M. | TRANSMITTAL OF NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION (RA) REPORT, TAN FINAL GROUNDWATER REMEDIATION | EM-ER-02-177 | 00 |
| 31-JUL-02 | FITCH, D. R. | 2002 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) | DOE/ID-11011 | 00 |
| 15-JUL-02 | SORENSON, K. S. | IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B - APPENDIX A IS THE 2002 TRACER TEST | INEEL/EXT-2000-00647 | 01 |
| 20-JUN-02 | NELSON, L. O. | SECOND (2ND) QUARTER FY 2001 (FY-2001) OPERATIONS REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-02-00468 | 00 |
| 20-JUN-02 | NELSON, L. O. | THIRD (3RD) QUARTER FISCAL YEAR 2001 (FY-2001) OPERATIONS REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-02-00469 | 00 |
| 20-JUN-02 | NELSON, L. O. | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00267 | 04 |
| 26-FEB-02 | SHAW, R. M. | ADDITIONAL INFORMATION REGARDING THE CURTAILMENT OF AIR STRIPPER TREATMENT UNIT (ASTU) DAILY INSPECTIONS | EM-ER-02-030 | 00 |
| 19-FEB-02 | SHAW, R. M. | CURTAILMENT OF AIR STRIPPER TREATMENT UNIT (ASTU) DAILY INSPECTIONS | EM-ER-02-024 | 00 |
| 06-NOV-01 | AR COORDINATOR | OPERABLE UNIT (OU) 1-07B - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR TEST AREA NORTH (TAN) INJECTION WELL OU 1-07B RECORD OF DECISION (ROD) AMENDMENT | AR.INDEX.OU.1-07B | 01 |
| 01-NOV-01 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B - REPLACEMENT PAGES 6 AND 8 ERRONEOUSLY DATED NOVEMBER 9, 2002 (11/09/02) - SHOULD BE NOVEMBER 9, 2001 (11/09/01) | DOE/ID-10905 | 01 |
| 20-SEP-01 | NOT SPECIFIED | RECORD OF DECISION (ROD) AMENDMENT - TECHNICAL SUPPORT FACILITY INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) | DOE/ID-10139,AMENDMENT | 0 |
| 20-SEP-01 | FINDLEY, C. E. | RECORD OF DECISION (ROD) AMENDMENT - TECHNICAL SUPPORT FACILITY INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) | DOE/ID-10139,AMENDMENT | 00 |
| 10-SEP-01 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - RECORD OF DECISION (ROD) COST ESTIMATE SUPPORT DATA RECAPITULATION - WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B ROD AMENDMENT | EDF-ER-201 | 02 |
| 01-SEP-01 | SHANKLIN, D. E. | FISCAL YEAR 2000 (FY-2000) GROUNDWATER MONITORING ANNUAL REPORT TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B | INEEL/EXT-01-00767 | 00 |
| 29-AUG-01 | SHAW, R. M. | TRANSMITTAL OF 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) | EM-ER-01-146 | 00 |
| 28-AUG-01 | FITCH, D. R. | 2001 INSTITUTIONAL CONTROLS INSPECTION, ENVIRONMENTAL MONITORING, AND SITE MAINTENANCE REPORT FOR WASTE AREA GROUP 1 (WAG-1) | DOE/ID-10899 | 00 |
| 08-AUG-01 | HAIN, K. E. | TRANSMITTAL OF FINAL RECORD OF DECISION (ROD) AMENDMENT FOR TECHNICAL SUPPORT FACILITY INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) | EM-ER-01-128 | 00 |
| 18-MAY-01 | SHAW, R. M. | TWENTY (20) DAY EXTENSION TO THE SUBMITTAL DATE OF THE RECORD OF DECISION (ROD) AMENDMENT FOR OPERABLE UNIT (OU) 1-07B | EM-ER-01-081 | 00 |
| 01-MAY-01 | KECK, J. F. | SAMPLING AND ANALYSIS PLAN (SAP) FOR ENHANCED IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00925 | 01 |
| 30-APR-01 | KECK, J. F. | IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00647 | 00 |
| 05-APR-01 | NELSON, L. O. | TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) | INEEL/EXT-99-00020 | 01 |
| 03-APR-01 | DREHER, K. J. | INJECTION OF AMENDMENTS AND TREATED GROUNDWATER INTO THE EASTERN SNAKE PLAIN AQUIFER (ESPA) IN SUPPORT OF REMEDIAL ACTIONS (RA) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B, INEEL | 10941 | 00 |
| 12-MAR-01 | BULLOCK, H. | SAMPLING AND ANALYSIS PLAN (SAP) FOR ENHANCED IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00925 | 00 |
| 28-FEB-01 | HAIN, K. E. | TRANSMITTAL OF DRAFT RECORD OF DECISION (ROD) AMENDMENT FOR THE TECHNICAL SUPPORT FACILITY (TSF) INJECTION WELL (TSF-05) AND SURROUNDING GROUNDWATER CONTAMINATION (TSF-23) AND MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION | EM-ER-01-042 | 00 |
| 06-FEB-01 | ROTHERMEL, J. S. | NECESSITY TO EXTEND ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 1-07B DRAFT RECORD OF DECISION (ROD) AMENDMENT | FLS-114-01 | 00 |
| 25-JAN-01 | NELSON, L. O. | PRELIMINARY HAZARD ASSESSMENT TAN GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEL-95/0588 | 02 |
| 15-JAN-01 | FOLKER, J. D. | ENGINEERING DESIGN FILE (EDF) - WAG-1 OU 1-07B RECORD OF DECISION (ROD) AMENDMENT COST ESTIMATE SUPPORT DATA RECAPITULATION | EDF-ER-201 | 01 |
| 02-JAN-01 | WYMORE, R. A. | SITE CONCEPTUAL MODEL: 1998 AND 1999 ACTIVITIES, DATA ANALYSIS, AND INTERPRETATION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00188 | 00 |
| 13-DEC-00 | NELSON, L. O. | TRANSMITTAL OF AGENCY COMMENTS AND RESOLUTIONS ON DRAFT IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | FLS-878-00 | 00 |
| 11-DEC-00 | SHAW, R. M. | GOOD CAUSE FOR EXTENDING ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 1-07B DRAFT RECORD OF DECISION (ROD) AMENDMENT | EM-ER-233 | 00 |
| 05-DEC-00 | SCHWIND, P. J. | DEVELOPMENT OF A NUMERICAL MODEL WITH PHYSICALLY BASED VERTICAL DISCRETIZATION TO SUPPORT IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION AT TEST AREA NORTH (TAN) | INEEL/EXT-98-00367 | 00 |
| 05-DEC-00 | SONDRUP, A. J. | IN SITU BIOREMEDIATION (ISB) MODELING REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00418 | 00 |
| 17-NOV-00 | NELSON, L. O. | NO LONGER CONTAINED IN (NLCI) REQUEST FOR NEW PUMP AND TREAT FACILITY (NPTF) | FLS-796-00 | 00 |
| 16-NOV-00 | SHAW, R. M. | REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR OPERABLE UNIT (OU) 1-07B DRAFT RECORD OF DECISION AMENDMENT | EM-ER-219 | 00 |
| 14-NOV-00 | BARNES, J. M. | MICROBIAL STUDIES SUPPORTING IMPLEMENTATION OF IN SITU BIOREMEDIATION (ISB) AT TEST AREA NORTH (TAN) | INEEL/EXT-98-00474 | 00 |
| 01-NOV-00 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B - FINAL REMEDIAL ACTION (RA) AT TSF INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 | 21251 | 00 |
| 01-NOV-00 | INEEL COMMUNITY RELATIONS | INEEL COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - NEW REMEDY PROPOSED FOR TRICHLOROETHENE (TCE) PLUME AT WASTE AREA GROUP 1 (WAG-1) | 21898 | 00 |
| 04-OCT-00 | SHAW, R. M. | TRANSMITTAL OF FINAL INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | EM-ER-194-00 | 00 |
| 01-OCT-00 | SORENSON, K. S. | SAMPLING & ANALYSIS PLAN (SAP) FOR ENHANCED IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00421 | 02 |
| 28-SEP-00 | KUHNS, D. J. | INSTITUTIONAL CONTROL PLAN FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | INEEL/EXT-2000-00917 | 00 |
| 25-SEP-00 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - METALS ANALYSIS OF SELECTED OPERABLE UNIT (OU) 1-07B GROUNDWATER MONITORING WELLS | EDF-ER-200 | 00 |
| 21-SEP-00 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B SAMPLE RESULTS SUMMARY FOR 40 CFR 264 APPENDIX IX VOLATILE ORGANIC COMPOUNDS (VOC) AND SEMI-VOLATILE ORGANIC COMPOUNDS (SVOC) - FUNCTIONAL FILE NUMBER INEEL/EXT-2000-00816 | EDF-ER-197 | 00 |
| 11-SEP-00 | DOE | AGENCY COMMENTS AND RESOLUTIONS ON DRAFT IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | 10925 | 00 |
| 01-SEP-00 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - WAG-1 OU 1-07B RECORD OF DECISION (ROD) AMENDMENT COST ESTIMATE SUPPORT DATA RECAPITULATION - FUNCTIONAL FILE #INEEL/EXT-2000-01105 | EDF-ER-201 | 00 |
| 13-JUL-00 | SORENSON, K. S. | FIELD EVALUATION REPORT OF ENHANCED IN SITU BIOREMEDIATION (ISB), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00258 | 00 |
| 12-JUL-00 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B FIELD DEMONSTRATION REPORT - NEW GROUNDWATER TREATMENT FACILITY (NGWTF) PLANNING CONCEPTUAL DESIGN & COST ESTIMATE | EDF-ER-185 | 00 |
| 12-JUL-00 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B FIELD DEMONSTRATION REPORT - IN SITU BIOREMEDIATION (ISB) TREATMENT SYSTEM FACILITY PLANNING CONCEPTUAL DESIGN & COST ESTIMATE | EDF-ER-186 | 00 |
| 11-JUL-00 | SORENSON, K. S. | TRANSMITTAL OF FIELD EVALUATION REPORT OF ENHANCED IN SITU BIOREMEDIATION (ISB), TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | FLS-451-00 | 00 |
| 10-JUL-00 | ROTHERMEL, J. S. | AGENCY COMMENTS AND CORRESPONDING INEEL RESOLUTIONS TO DRAFT PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B | 10837 | 00 |
| 10-JUL-00 | ROTHERMEL, J. S. | TRANSMITTAL OF AGENCY COMMENTS AND CORRESPONDING INEEL RESOLUTIONS TO DRAFT PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B | FLS-449-00 | 00 |
| 05-JUN-00 | GUYMON, R. H. | POSITION ON NO LONGER CONTAINED IN (NLCI) REQUIREMENTS FOR THREE (3) NEW WELLS AT TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B - DE-AC07-991D1327 | RHG-83-00 | 00 |
| 01-JUN-00 | JOLLEY, W. L. | STATEMENT OF WORK (SOW) FOR FISCAL YEAR 2000 (FY-2000) - WELL DRILLING ACTIVITIES AT TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00187 | 01 |
| 01-JUN-00 | JOLLEY, W. L. | SAMPLING AND ANALYSIS PLAN (SAP) FOR P-Q INTERBED TESTING AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00196 | 01 |
| 30-MAY-00 | JOLLEY, W. L. | SAMPLING AND ANALYSIS PLAN (SAP) FOR P-Q INTERBED TESTING AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00196 | 00 |
| 11-MAY-00 | FITCH, D. R. | INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | DOE/ID-10750 | 00 |
| 11-MAY-00 | MONTGOMERY, R. A. | REQUEST FOR A NO LONGER CONTAINED IN (NLCI) DETERMINATION (NLCID) FOR WELL DRILLING WATER, DRILL CUTTINGS, & SECONDARY CONTAINMENT PADS FOR OPERABLE UNIT (OU) 1-07B | RHG-71-00 | 00 |
| 06-APR-00 | BARNES, J. M. | AEROBIC BIODEGRADATION LABORATORY STUDIES AT TAN OU 1-07B | INEEL/EXT-99-00736 | 00 |
| 01-APR-00 | JOLLEY, W. L. | STATEMENT OF WORK (SOW) FOR FISCAL YEAR 2000 (FY-2000) - WELL DRILLING ACTIVITIES AT TAN WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00187 | 00 |
| 29-MAR-00 | JANTZ, A. E. | TRANSMITTAL OF FINAL FIELD DEMONSTRATION REPORT FOR OU 1-07B | FLS-193-00 | 00 |
| 27-MAR-00 | PETERSON, L. N. | FIELD DEMONSTRATION REPORT TAN FINAL GROUNDWATER REMEDIATION OU 1-07B | DOE/ID-10718 | 00 |
| 07-MAR-00 | ROTHERMEL, J. S. | NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL DESIGN (RD) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/ID-10661 | 01 |
| 08-FEB-00 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - IN SITU BIOREMEDIATION (ISB) SODIUM LACTATE V. S. MOLASSES COST COMPARISON | EDF-ER-127 | 00 |
| 26-JAN-00 | BUKOWSKI, J. M. | FISCAL YEAR 1999 (FY-99) GROUNDWATER MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-99-01255 | 00 |
| 01-DEC-99 | INEEL COMMUNITY RELATIONS | UPDATE FACT SHEET - BIOREMEDIATION OF GROUNDWATER SPEEDS CLEANUP AT TEST AREA NORTH (TAN) | 10963 | 00 |
| 01-NOV-99 | JANTZ, A. E. | IN SITU CHEMICAL OXIDATION (ISCO) FIELD EVALUATION WORK PLAN FOR TSF-05 HOT SPOT TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10698 | 00 |
| 01-OCT-99 | INEEL COMMUNITY RELATIONS | UPDATE FACT SHEET - BIOREMEDIATION OF GROUNDWATER PLUME SHOWS PROMISE AT WASTE AREA GROUP 1 (WAG-1) | 10961 | 00 |
| 01-OCT-99 | ROTHERMEL, J. S. | PHASE C REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10679 | 00 |
| 01-OCT-99 | ROTHERMEL, J. S. | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00267 | 02 |
| 01-OCT-99 | ROTHERMEL, J. S. | TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B FINAL GROUNDWATER REMEDIAL ACTION (RA) HEALTH AND SAFETY PLAN (HSP OR HASP) | INEEL/EXT-99-00020 | 00 |
| 01-OCT-99 | ROTHERMEL, J. S. | PHASE C GROUNDWATER MONITORING PLAN (GMP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-99-00021 | 00 |
| 29-SEP-99 | SHAW, R. M. | DECISION TO PROCEED WITH IN SITU BIOREMEDIATION (ISB) OPTIMIZATION PHASE AND TO DISCONTINUE IN SITU CHEMICAL OXIDATION (ISCO) | OPE-ER-138-99 | 00 |
| 28-SEP-99 | TALLMAN, JANE | EXTENSION FOR TEMPORARY USE OF REMEDIATION WELLS FOR INJECTION OF ISB TREATABILITY STUDY AMENDMENTS AND TEMPORARY USE OF INJECTION WELL TAN-49 FOR INJECTING TREATED WATER DURING PHASE B REMEDIATION | IR-25286 | 0 |
| 01-JUL-99 | JANTZ, A. E. | REMEDIAL ACTION WORK PLAN (RAWP) TAN FINAL GROUNDWATER REMEDIATION - PHASE B FOR OPERABLE UNIT (OU) 1-07B | DOE/ID-10629 | 00 |
| 01-MAY-99 | BUKOWSKI, J. M. | FISCAL YEAR 1999 (FY-99) & 2000 (FY-2000) GROUNDWATER MONITORING PLAN (GMP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-99-00359 | 00 |
| 01-APR-99 | PARSONS | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00267 | 01 |
| 01-APR-99 | STARR, R. C. | LABORATORY EVALUATION OF IN SITU CHEMICAL OXIDATION (ISCO) FOR GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B, INEEL | ORNL/TM-13711 | 00 |
| 01-JAN-99 | MARTIAN, P. | NUMERICAL MODELING SUPPORT OF NATURAL ATTENUATION FIELD EVALUATION FOR TRICHLOROETHENE (TCE) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B AT INEEL | INEEL/EXT-97-01284 | 01 |
| 30-NOV-98 | AR COORDINATOR | OPERABLE UNIT (OU) 1-07B - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR TEST AREA NORTH (TAN) INJECTION WELL REMEDIAL INVESTIGATION FEASABILITY STUDY (RI/FS) OU 1-07B | AR.INDEX.OU.1-07B | 00 |
| 01-OCT-98 | TOMLINSON, P. F. | WASTE MANAGEMENT PLAN (WMP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00267 | 00 |
| 10-SEP-98 | PIERRE, W. | SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B DRAFT PHASE I & PHASE II FIELD DEMONSTRATION REPORTS (FDRS) | 18053 | 00 |
| 03-SEP-98 | ENGLISH, M. | SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B IN SITU BIOREMEDIATION (ISB) TREATABILITY STUDY (TS) | 18060 | 00 |
| 01-SEP-98 | JANTZ, A. E. | ENHANCED IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | DOE/ID-10639 | 00 |
| 31-AUG-98 | SHAW, R. M. | SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B IN SITU BIOREMEDIATION (ISB) TREATABILITY STUDY (TS) | OPE-ER-139-98 | 00 |
| 01-AUG-98 | BUKOWSKI, J. M. | SITE CONCEPTUAL MODEL 1997 ACTIVITIES, DATA ANALYSIS AND INTERPRETATION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00575 | 00 |
| 01-FEB-98 | PETERSON, L. N. | NATURAL ATTENUATION FIELD EVALUATION WORK PLAN FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU)1-07B | DOE/ID-10606 | 00 |
| 01-FEB-98 | BUKOWSKI, J. M. | SITE CONCEPTUAL MODEL: 1996 ACTIVITIES DATA ANALYSIS & INTERPRETATION TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEL/EXT-97-00556 | 00 |
| 01-JAN-98 | JANTZ, A. E. | WELL CHARACTERIZATION & EVALUATION (WCE) REPORT SUPPORTING FUNCTIONAL & OPERATIONAL REQUIREMENTS (F&OR) FOR NEW PUMP AND TREAT FACILITY (NPTF) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-97-01356 | 00 |
| 01-NOV-97 | JANTZ, A. E. | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FROM RECORD OF DECISION (ROD) FOR TSF INJECTION WELL (TSF-05) & SURROUNDING GROUNDWATER CONTAMINATION (TSF-23) & MISCELLANEOUS NO ACTION SITES, FINAL REMEDIAL ACTION (RA) | INEEL/EXT-97-00931 | 00 |
| 01-AUG-97 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10522 | 05 |
| 18-MAR-97 | DOE, EPA, IDHW | AGREEMENT TO RESOLVE DISPUTES | 1088-06-29-120-A | 00 |
| 01-MAR-97 | PETERSON, L. N. | TECHNOLOGY EVALUATION WORK PLAN TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10562 | 00 |
| 01-MAY-96 | SORENSON, K. S. | TEST AREA NORTH (TAN) SITE CONCEPTUAL MODEL & PROPOSED HYDROGEOLOGIC STUDIES OPERABLE UNIT (OU) 1-07B | INEL-96/0105 | 00 |
| 08-DEC-95 | NOT SPECIFIED | DESIGN DOCUMENT REVIEW RECORD FOR DRAFT RD/RA SCOPE OF WORK FOR OU 1-07B, REVISION 3 (REV.03) | 11378 | 00 |
| 01-DEC-95 | NOT SPECIFIED | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK TAN FINAL GROUNDWATER REMEDIATION OU 1-07B | DOE/ID-10522 | 04 |
| 18-AUG-95 | DOE, EPA, IDHW | RECORD OF DECISION (ROD) FOR TSF-05 INJECTION WELL AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES FINAL REMEDIAL ACTION (RA) | 10139 | 00 |
| 18-AUG-95 | DOE, DEQ, EPA | RECORD OF DECISION (ROD) FOR TSF-05 INJECTION WELL AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 AND MISCELLANEOUS NO ACTION SITES FINAL REMEDIAL ACTION (RA) | 10139 | 0 |
| 01-JAN-95 | INEL COMMUNITY RELATIONS | UPDATE FACT SHEET - AGENCIES EVALUATE GROUNDWATER TREATMENT | 8907 | 00 |
| 30-JUN-94 | DOE | SUPPLEMENTARY EVALUATION OF ENVIRONMENTAL CONSEQUENCES FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT THE INEL | 5617 | 00 |
| 09-JUN-94 | GRAHAM, D. | TRANSCRIPTS - PUBLIC MEETING IN MOSCOW, IDAHO ON THE PROPOSED PLAN FOR TAN GROUNDWATER CONTAMINATION | 5718 | 00 |
| 08-JUN-94 | GRAHAM, D. | TRANSCRIPTS - PUBLIC MEETING IN BOISE, IDAHO ON THE PROPOSED PLAN FOR TAN GROUNDWATER CONTAMINATION | 5717 | 00 |
| 06-JUN-94 | SCHWARTZ, N. | TRANSCRIPTS - PUBLIC MEETING IN IDAHO FALLS ON THE PROPOSED PLAN FOR THE TAN GROUNDWATER CONTAMINATION | 5716 | 00 |
| 20-MAY-94 | INEL COMMUNITY RELATIONS | DOE SEEKS PUBLIC COMMENT ON THE PROPOSED PLAN FOR TEST AREA NORTH (TAN) | 5700 | 00 |
| 03-MAY-94 | SHUNKO, D. P. | POTENTIAL REMEDIATION STUDIES FOR ENHANCEMENT EXTRACTION TECHNOLOGIES MARKET SURVEY QUESTIONAIRE PACKAGE | MK-FIC-94-P-364 | 00 |
| 01-MAY-94 | INEL COMMUNITY RELATIONS | PROPOSED PLAN FOR THE GROUNDWATER CONTAMINATION OPERABLE UNIT (OU) 1-07B AND NO ACTION SITES OU 1-01, 1-02, 1-06 AND 1-09 | 5711 | 00 |
| 15-APR-94 | LYLE, J. L. | TRANSMITTAL OF THE REVISED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) | OPE-ER-082-94 | 00 |
| 01-APR-94 | HARELSON, D. B. | SUPPLEMENT TO THE OPERABLE UNIT (OU) 1-07B REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT | 5695 | 00 |
| 28-MAR-94 | LIVERMAN, E. | EPA REVIEW OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) GROUNDWATER, OPERABLE UNIT 1-07B | 5698 | 00 |
| 17-MAR-94 | GREEN, L. A. | TRANSMITTAL OF THE SUPPLEMENT TO THE OPERABLE UNIT (OU) 1-07B REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-63-94 | 00 |
| 14-MAR-94 | ENGLISH, M. | IDHW REVIEW OF DRAFT PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B | 5683 | 00 |
| 28-JAN-94 | NYGARD, D. | IDHW COMMENTS ON EXTENSION REQUEST FOR TAN OU 1-07B DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/S) REPORT | 5684 | 00 |
| 28-JAN-94 | LYLE, J. L. | RECISION OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER & PROPOSED PLAN FOR THE TRACK 1 SITES DESIGNATED FOR NO FURTHER ACTION | OPE-ER-027-94 | 00 |
| 26-JAN-94 | PIERRE, W. | RESOLUTION OF EPA'S COMMENTS ON TAN OU 1-07B DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5682 | 00 |
| 17-JAN-94 | WRIGHT, J. | TECHNICAL MEMORANDUM FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B | C10017 | 00 |
| 13-JAN-94 | LYLE, J. L. | TRANSMITTAL OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER INVESTIGATION | OPE-ER-008-94 | 00 |
| 12-JAN-94 | LIVERMAN, E. | EPA REVIEW OF THE DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B | 5697 | 00 |
| 11-JAN-94 | ENGLISH, M. | IDHW REVIEW OF THE DRAFT FINAL REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 1-07B | 5699 | 00 |
| 01-JAN-94 | KAMINSKY, J. F. | REMEDIAL INVESTIGATION (RI) FINAL REPORT WITH ADDENDA FOR THE TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT THE INEL VOLUME I (VOL.01) | EGG-ER-10643,VOL.01 | 00 |
| 01-JAN-94 | KAMINSKY, J. F. | REMEDIAL INVESTIGATION (RI) FINAL REPORT WITH ADDENDA FOR THE TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT THE INEL VOLUME II (VOL.02) | EGG-ER-10643,VOL.02 | 00 |
| 01-JAN-94 | DUNNIVANT, F. M. | FEASIBILITY STUDY (FS) REPORT FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT INEL | EGG-ER-10802 | 00 |
| 30-NOV-93 | GEOTRANS, INC. | LETTER REPORT - TECHNICAL EVALUATION OF THE TAN OU 1-07B RI/FS & PROPOSED PLAN | 5694 | 00 |
| 05-NOV-93 | LIVERMAN, E. | REVIEW OF DRAFT REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B | 5573 | 00 |
| 29-OCT-93 | ENGLISH, M. | REVIEW OF DRAFT REMEDIAL INVESTIGATION REPORT FEASIBILITY STUDY (RI/FS) FOR OPERABLE UNIT (OU) 1-07B | 5574 | 00 |
| 09-JUL-93 | LIVERMAN, E. | REVIEW COMMENTS FOR DRAFT REMEDIAL INVESTIGATION (RI) REPORT WITH ADDENDA FOR THE TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) AT THE INEL | 5341 | 00 |
| 02-JUL-93 | ENGLISH, M. | REVIEW OF THE DRAFT REMEDIAL INVESTIGATION (RI) REPORT FOR OPERABLE UNIT (OU) 1-07B | 5340 | 00 |
| 01-JUL-93 | MEDINA, S. M. | EVALUATION OF HISTORICAL & ANALYTICAL DATA ON THE TAN TSF-07 DISPOSAL POND | EGG-ERD-10422 | 00 |
| 05-APR-93 | MK-FIC | INEL ENVIRONMENTAL RESTORATION PROGRAM (ERP) GROUNDWATER COLLECTION SYSTEM DESIGN TECHNICAL MEMORANDUM WAG-1 OU 1-07A | 6531 | 00 |
| 01-SEP-92 | HARELSON, D. B. | SUITABILITY EVALUATION FOR INTERIM ACTION (IA) DISCHARGE TO THE TSF-07 DISPOSAL POND | 5171 | 00 |
| 30-JUL-92 | NITSCHKE, R. L. | SR-90 DISCHARGE CALCULATION | RLN-51-92 | 00 |
| 29-JUL-92 | NOT SPECIFIED | ASSESSMENT OF THE GROUNDWATER PATHWAY FROM THE LEACHING OF SURFICIAL & BURIED CONTAMINATION | 5169 | 00 |
| 01-JUL-92 | MANN, L. J. | PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT THE INEL, IDAHO 1990 & 1991 - USGS OPEN FILE REPORT 92-174 | DOE/ID-22104 | 00 |
| 01-MAY-92 | ZIMMERLE, J. R. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN AND ADDENDA FOR TAN GROUNDWATER OPERABLE UNIT (OU) AT INEL - INCLUDES EPA & STATE OF IDAHO COMMENTS & RESOLUTIONS | EGG-WM-9905 | 00 |
| 20-APR-92 | NOT SPECIFIED | EVALUATION OF CHEMICALS USED AT TEST AREA NORTH (TAN) | 5701 | 00 |
| 01-MAR-92 | KNOBEL, L. L. | CHEMICAL CONSTITUENTS IN THE DISSOLVED AND SUSPENDED FRACTIONS OF GROUNDWATER FROM SELECTED SITES, INEL AND VICINITY, IDAHO, 1989 - USGS OPEN FILE REPORT 92-51 | DOE/ID-22101 | 00 |
| 06-FEB-92 | LEDBETTER, L. | PUBLIC MEETING TRANSCRIPT - TAN GROUNDWATER SCOPING, BURLEY, IDAHO 02/06/92 | 4599 | 00 |
| 06-FEB-92 | LEDBETTER, L. | PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN TO REDUCE CONTAMINATION NEAR THE INJECTION WELL & SURROUNDING GROUNDWATER AT TAN BURLEY, IDAHO 02/06/92 | 4605 | 00 |
| 05-FEB-92 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - TAN GROUNDWATER SCOPING, BOISE, IDAHO 02/05/92 | 4601 | 00 |
| 05-FEB-92 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN TO REDUCE CONTAMINATION NEAR THE INJECTION WELL & SURROUNDING GROUNDWATER AT TAN - BOISE, IDAHO - 02/05/92 | 4602 | 00 |
| 04-FEB-92 | GRAHAM, D. | PUBLIC MEETING TRANSCRIPT - TAN GROUNDWATER SCOPING, IDAHO FALLS, IDAHO 02/04/92 | 4600 | 00 |
| 04-FEB-92 | GRAHAM, D. | PUBLIC MEETING TRANSCRIPT - PROPOSED PLAN TO REDUCE CONTAMINATION NEAR THE INJECTION WELL & SURROUNDING GROUNDWATER AT TAN, IDAHO FALLS 02/04/92 | 4603 | 00 |
| 08-JAN-92 | ZIMMERLE, J. R. | SUMMARY OF RCRA FACILITY INVESTIGATION (RFI) ACTIVITIES AT TAN | 3534 | 00 |
| 01-SEP-91 | ZIMMERLE, J. R. | SCOPE OF WORK TAN GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EGG-WM-9809 | 02 |
| 01-JUL-90 | MANN, L. J. | PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT THE INEL, IDAHO 1988 & 1989 - USGS OPEN FILE REPORT 90-367 | DOE/ID-22089 | 00 |
| 01-APR-90 | NICHOLS, N. | FACT SHEET - INEL INVESTIGATES INJECTION WELL AT TEST AREA NORTH (TAN) | 1033 | 00 |
| 01-DEC-88 | KNOBEL, L. L. | RADIONUCLIDES IN GROUNDWATER AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL), IDAHO - USGS OPEN FILE REPORT 88-731 | DOE/ID-22077 | 00 |
| 01-SEP-88 | MARKHAM, O. D. | PLUTONIUM, AM, CM & SR IN DUCKS MAINTAINED ON RADIOACTIVE LEACHING PONDS IN SOUTHEASTERN IDAHO | 5172 | 00 |
| 01-DEC-87 | MANN, L. J. | REF - PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT INEL, IDAHO - USGS OPEN FILE REPORT 87-766 | DOE/ID-22074 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF INJECTION WELL | 1034 | 00 |
| 01-MAR-82 | LEENHEER & JEFFERSON | ORGANIC SOLUTES IN GROUNDWATER AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | IDO-22061 | 00 |
| 01-DEC-52 | NACE, R. L. | GEOLOGY, GROUNDWATER & WASTE DISPOSAL AT THE AIRCRAFT NUCLEAR PROPULSION PROJECT SITE, NATIONAL REACTOR TESTING STATION (NRTS), IDAHO | IDO-22023 | 00 |
| 05-SEP-52 | NACE, R. L. | WATER SUPPLY AND FLUID WASTE DISPOSAL AT THE AIRCRAFT NUCLEAR PROPULSION REACTOR (ANPR) SITE | IDO-22021 | 00 |
Previous Page | Administrative Record Home Page