Search Within General INEEL Documents

Keyword in Title is INTEC

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
06-JAN-05 RICHARDS, B. T. ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE CPP-603A BASINS, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/NE-ID-11194 00
26-AUG-04 RICHARDS, B. T. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/NE-ID-11140 01
02-AUG-04 HAIN, K. E. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) EM-ER-04-171 00
22-JUL-04 CLOUGH, M. K. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DRAFT CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 24876 00
10-JUN-04 TOMLINSON, G. E. DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES 24881 00
08-APR-04 ROSENBERGER, M. S. VICINITY DISCHARGES ELIMINATION WORK PLAN FOR THE HAZARDOUS WASTE MANAGEMENT ACT (HWMA) AND THE RESOURCE CONSERVATION RECOVERY ACT (RCRA) POST CLOSURE PERMIT FOR INTEC WASTE CALCINING FACILITY (WCF) AT THE INEEL DOE/NE-ID-11138 00
31-MAR-04 HOLMES, F. C. APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF CPP-627, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INEEL 24838 00
27-JAN-04 ARROWOOD, J. R. DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES 24837 00
19-DEC-03 HOLMES, F. C. DOE MEMORANDUM - APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR FUEL STORAGE BASIN COMPLEX AT CPP-603, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), INEEL 24818 00
08-MAY-01 MCCARTHY, J. M. ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 EDF-1962 00
08-JUL-98 DOE PRELIMINARY DRAFT - ENVIRONMENTAL ASSESSMENT (EA) AND DEACTIVATION PLAN FOR OBSOLETE SPENT NUCLEAR FUEL (SNF) PROCESSING, STORAGE, AND SUPPORT FACILITIES AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/EA-1244 00


Send Questions and Comments to: tua@inel.gov

Previous Page | Administrative Record Home Page