| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 20-JAN-10 | NOT SPECIFIED | TECHNICAL FEASIBILITY FOR ALTERNATIVE 4 EBR-II ENGINEERING EVALUATION/COST ANALYSIS | EDF-9455 | 0 |
| 19-JAN-10 | NOT SPECIFIED | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR II FINAL END-STATE | DOE/ID-11398 | 0 |
| 10-SEP-09 | NOT SPECIFIED | ENGINEERING EVALUATION/COST (EE/CA) ANALYSIS FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS | DOE/ID-11397 | 0 |
| 17-APR-09 | COOPER, JAMES R. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR-II VESSEL DISPOSITION AND CONTAINMENT BUILDING END-STATE | EM-FMDP-09-029 | 0 |
| 14-JAN-08 | EATON, D. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES | DOE/ID-11346 | 02 |
| 12-JUL-07 | RENO, S. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL | DOE/ID-11328 | 00 |
| 01-MAY-07 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL | DOE/ID-11309 | 00 |
| 31-JAN-07 | PINZEL, M. A. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE TEST AREA NORTH (TAN)-607 HOT SHOP AREA | DOE/ID-11302 | 00 |
| 24-OCT-06 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX | DOE/ID-11272 | 00 |
| 17-JUL-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TEST AREA NORTH 607A (TAN-607A) | RPT-214 | 00 |
| 08-MAR-06 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT 601 (CPP-601) FUEL REPROCESSING COMPLEX AT THE IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-06-028 | 00 |
| 19-JAN-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TAN-630 AND TAN-650 AT THE LOSS OF FLUID TEST (LOFT) AREA | DOE/ID-11253 | 00 |
| 24-OCT-05 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH PREPARATION OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF TAN-630 AND TAN-650 LOSS OF FLUID TEST (LOFT) COMPLEX AT IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-05-117 | 00 |
| 15-FEB-05 | HARKER, W. S. | DOE RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #120 ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 OF DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | EM-FMDP-05-007 | 00 |
| 17-DEC-04 | RENO, S. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | DOE/NE-ID-11196 | 00 |
| 26-AUG-04 | RICHARDS, B. T. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/NE-ID-11140 | 01 |
| 03-AUG-04 | HAIN, K. E. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED | EM-ER-04-172 | 00 |
| 02-AUG-04 | HAIN, K. E. | DOE APPROVAL OF REQUEST FOR EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE CPP-603A BASIN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EM-ER-04-166 | 00 |
| 02-AUG-04 | HAIN, K. E. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) | EM-ER-04-171 | 00 |
| 01-AUG-04 | PRATT, M. B. | DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) | DOE/NE-ID-11187 | 0A |
| 22-JUL-04 | CLOUGH, M. K. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DRAFT CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 24876 | 00 |
| 22-JUL-04 | CLOUGH, M. K. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A NON TIME CRITICAL REMOVAL ACTION (NTCRA), DRAFT DOCUMENT (DOE/NE-ID-11140) | 24877 | 00 |
| 21-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 01 |
| 17-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 01 |
| 17-JUN-04 | HONSINGER, R. R. | CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) ALTERNATIVES | RRH-11-04 | 00 |
| 17-JUN-04 | PETERSON, D. T. | CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) ALTERNATIVES | RRH-11-04 | 00 |
| 28-MAY-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | 24887 | 00 |
| 15-APR-04 | BRAGASSA, J. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11157 | 01 |
| 31-MAR-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF CPP-627, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INEEL | 24838 | 00 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 00 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 00 |
| 19-DEC-03 | HOLMES, F. C. | DOE MEMORANDUM - APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR FUEL STORAGE BASIN COMPLEX AT CPP-603, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), INEEL | 24818 | 00 |
| 19-DEC-03 | HOLMES, F. C. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DEACTIVATION OF CPP-603 FUEL STORAGE BASINS | EM-ER-03-318 | 00 |
| 01-FEB-94 | WENZEL, D. R. | RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL | WINCO-1123 | 01 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-MAY-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) BIF FILTER ROOM | WM-F1-83-006 | 00 |
Previous Page | Administrative Record Home Page