| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 19-JAN-10 | NOT SPECIFIED | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR II FINAL END-STATE | DOE/ID-11398 | 0 |
| 10-SEP-09 | NOT SPECIFIED | ENGINEERING EVALUATION/COST (EE/CA) ANALYSIS FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS | DOE/ID-11397 | 0 |
| 14-JAN-08 | EATON, D. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES | DOE/ID-11346 | 02 |
| 12-JUL-07 | RENO, S. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL | DOE/ID-11328 | 00 |
| 01-MAY-07 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL | DOE/ID-11309 | 00 |
| 31-JAN-07 | PINZEL, M. A. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE TEST AREA NORTH (TAN)-607 HOT SHOP AREA | DOE/ID-11302 | 00 |
| 24-OCT-06 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX | DOE/ID-11272 | 00 |
| 17-JUL-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TEST AREA NORTH 607A (TAN-607A) | RPT-214 | 00 |
| 19-JAN-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TAN-630 AND TAN-650 AT THE LOSS OF FLUID TEST (LOFT) AREA | DOE/ID-11253 | 00 |
| 17-DEC-04 | RENO, S. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | DOE/NE-ID-11196 | 00 |
| 26-AUG-04 | RICHARDS, B. T. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/NE-ID-11140 | 01 |
| 02-AUG-04 | HAIN, K. E. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) | EM-ER-04-171 | 00 |
| 22-JUL-04 | CLOUGH, M. K. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A NON TIME CRITICAL REMOVAL ACTION (NTCRA), DRAFT DOCUMENT (DOE/NE-ID-11140) | 24877 | 00 |
| 15-APR-04 | BRAGASSA, J. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11157 | 01 |
Previous Page | Administrative Record Home Page