Search Within General INEEL Documents

File Category is AR2.3

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
17-APR-09 COOPER, JAMES R. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR-II VESSEL DISPOSITION AND CONTAINMENT BUILDING END-STATE EM-FMDP-09-029 0
08-MAR-06 PROVENCHER, R. B. APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT 601 (CPP-601) FUEL REPROCESSING COMPLEX AT THE IDAHO NATIONAL LABORATORY (INL) SITE FMDP-RFDP-06-028 00
02-MAR-06 PROVENCHER, R. B. APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSES (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT OF THE TEST AREA NORTH 607 (TAN-607) HOT SHOP FACILITY AT THE IDAHO NATIONAL LABORATORY (INL) SITE FMDP-RFDP-06-025 00
16-DEC-05 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION COST ANALYSES (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF BOTH ENGINEERING TEST REACTOR (ETR) AND MATERIALS TEST REACTOR (MTR) AT THE IDAHO NATIONAL LABORATORY (INL) FMDP-RFDP-05-138 00
24-OCT-05 PROVENCHER, R. B. APPROVAL TO PROCEED WITH PREPARATION OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF TAN-630 AND TAN-650 LOSS OF FLUID TEST (LOFT) COMPLEX AT IDAHO NATIONAL LABORATORY (INL) SITE FMDP-RFDP-05-117 00
28-MAY-04 HOLMES, F. C. APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) 24887 00
31-MAR-04 HOLMES, F. C. APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF CPP-627, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INEEL 24838 00
19-DEC-03 HOLMES, F. C. DOE MEMORANDUM - APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR FUEL STORAGE BASIN COMPLEX AT CPP-603, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), INEEL 24818 00
19-DEC-03 HOLMES, F. C. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DEACTIVATION OF CPP-603 FUEL STORAGE BASINS EM-ER-03-318 00


Send Questions and Comments to: tua@inel.gov

Previous Page | Administrative Record Home Page