| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 26-APR-10 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE TRA RETENTION BASIN | EDF-9489 | 0 |
| 27-JAN-10 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR EBR-II CLOSURE | EDF-9374 | 1 |
| 20-JAN-10 | NOT SPECIFIED | TECHNICAL FEASIBILITY FOR ALTERNATIVE 4 EBR-II ENGINEERING EVALUATION/COST ANALYSIS | EDF-9455 | 0 |
| 10-NOV-09 | NOT SPECIFIED | EBR-II PROPOSED REMOVAL ACTION: HUMAN AND ECOLOGICAL RISK ASSESSMENT | EDF-9359 | 0 |
| 02-NOV-09 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR EBR-II CLOSURE | EDF-9374 | 0 |
| 11-JUL-07 | HOWELL, W. F. | ENGINEERING DESIGN FILE - MATERIALS TEST REACTOR (MTR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6244 | 02 |
| 10-JUL-07 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE - GROUNDWATER PATHWAY RISK ASSESSMENT FOR MATERIALS TEST REACTOR (MTR) CLOSURE | EDF-5186 | 01 |
| 20-JUN-07 | NESSHOEFER, C. A. | MATERIALS TEST REACTOR (MTR) COMPLEX ACTIVITY VS. DEPTH | EDF-6381 | 01 |
| 04-MAY-07 | STALEY, C. S. | STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY | EDF-7433 | 01 |
| 16-APR-07 | MCCARTHY, J. M. | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE | EDF-7618 | 01 |
| 14-FEB-07 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SOIL RISK ASSESSMENT FOR TEST AREA NORTH (TAN)-607: HOT SHOP AREA | EDF-7538 | 01 |
| 29-JAN-07 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SOIL RISK ASSESSMENT FOR TAN-607: HOT SHOP AREA | EDF-7538 | 00 |
| 11-DEC-06 | MCCARTHY, J. M. | GROUNDWATER ASSESSMENT FOR TEST AREA NORTH (TAN)-607: HOT SHOP AREA | EDF-7515 | 00 |
| 31-OCT-06 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE ENGINEERING TEST REACTOR (ETR) COMPLEX CLOSURE | EDF-5142 | 02 |
| 31-OCT-06 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR DECONTAMINATING AND DISMANTLING (D&D) OF THE ENGINEERING TEST REACTOR (ETR) FACILITY | EDF-7243 | 01 |
| 02-OCT-06 | PARRY, J. R. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) BERYLLIUM REFLECTOR AND VESSEL TRANSURANIC INVENTORIES | EDF-7222 | 00 |
| 28-SEP-06 | NESSHOEFER, C. A. | POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS | EDF-7000 | 00 |
| 13-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) RADIONUCLIDES AND THE RADIONUCLIDE RELATIVE RATIOS | EDF-6958 | 01 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) VESSEL SOURCE TERM AND EXTERNAL DOSE RATES | EDF-6133 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX EXTERNAL SURFACES | EDF-6138 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX INTERNAL SURFACES | EDF-6291 | 01 |
| 30-JAN-06 | HOWELL, W. F. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6225 | 01 |
| 15-DEC-05 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX ACTIVITY VS. DEPTH | EDF-6304 | 00 |
| 05-DEC-05 | CORNETT, T. C. | ENGINEERING DESIGN FILE (EDF) - LOSS OF FLUID TEST (LOFT) CHARACTERIZATION STUDY | EDF-6355 | 00 |
| 21-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 01 |
| 17-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 01 |
| 10-MAR-04 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 01 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 00 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 00 |
| 09-DEC-03 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 00 |
| 09-DEC-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - QUANTIFICATION OF THREE DEBRIS OBJECTS FROM THE SOUTH BASIN OF CPP-603 USING THE UNDERWATER GAMMA SPECTROMETER SYSTEM (TUGS) | EDF-4271 | 00 |
| 20-AUG-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - CPP-603 BASINS - FISSILE MATERIAL IN PARTICULATE FORM BASED ON 137CS TO 235U RATIO | EDF-3535 | 00 |
| 15-MAY-03 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - ACCEPTABLE RESIDUAL INVENTORY CALCULATIONS FOR CPP-603 | EDF-3684 | 00 |
| 09-MAY-01 | PYLE, J. D. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL AIR EMISSIONS ASSOCIATED WITH DEACTIVATION, DECOMMISSIONING AND DISMANTLEMENT (D&D&D) OF CPP-603A BASIN PROJECT | EDF-1931 | 00 |
| 08-MAY-01 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 | EDF-1962 | 00 |
| 29-SEP-86 | MILLER, C. L. | EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT | EDF-263 | 00 |
Previous Page | Administrative Record Home Page