| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 06-MAY-10 | NOT SPECIFIED | ACTION MEMORANDUM FOR THE EBR-II FINAL END STATE | DOE/ID-11426 | 0 |
| 26-APR-10 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE TRA RETENTION BASIN | EDF-9489 | 0 |
| 27-JAN-10 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR EBR-II CLOSURE | EDF-9374 | 1 |
| 26-JAN-10 | NOT SPECIFIED | EBR-II PRE-DEMOLITION SOURCE TERM | TBL-194 | 01 |
| 20-JAN-10 | NOT SPECIFIED | TECHNICAL FEASIBILITY FOR ALTERNATIVE 4 EBR-II ENGINEERING EVALUATION/COST ANALYSIS | EDF-9455 | 0 |
| 19-JAN-10 | NOT SPECIFIED | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR II FINAL END-STATE | DOE/ID-11398 | 0 |
| 21-DEC-09 | NOT SPECIFIED | ACTION MEMORANDUM FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS | DOE/ID-11413 | 0 |
| 10-NOV-09 | NOT SPECIFIED | EBR-II PROPOSED REMOVAL ACTION: HUMAN AND ECOLOGICAL RISK ASSESSMENT | EDF-9359 | 0 |
| 02-NOV-09 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR EBR-II CLOSURE | EDF-9374 | 0 |
| 20-OCT-09 | FORSYTHE, HOWARD S | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 | RPT-651 | 0 |
| 20-OCT-09 | FORSYTHE, HOWARD S | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 | RPT-651 | 0 |
| 21-SEP-09 | NOT SPECIFIED | ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 2009 | RPT-651 | 1 |
| 10-SEP-09 | NOT SPECIFIED | ENGINEERING EVALUATION/COST (EE/CA) ANALYSIS FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS | DOE/ID-11397 | 0 |
| 17-AUG-09 | NESSHOEFER, CRAIG A. | EBR-II PRE-DEMOLITION SOURCE TERM | TBL-194 | 0 |
| 25-JUN-09 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10881 | 7 |
| 20-APR-09 | KOEPPEN, L. DON | FISCAL YEAR 2008 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX | RPT-620 | 0 |
| 17-APR-09 | COOPER, JAMES R. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR-II VESSEL DISPOSITION AND CONTAINMENT BUILDING END-STATE | EM-FMDP-09-029 | 0 |
| 19-FEB-09 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10881 | 6 |
| 14-JAN-09 | WELLS, RICHARD P. | WASTE AREA GROUP 10 ANNUAL OPERATIONS AND MAINTENANCE REPORT - FY 2008 | DOE/ID-11380 | 0 |
| 16-SEP-08 | NOT SPECIFIED | FINAL REMOVAL ACTION REPORT FOR TEST AREA NORTH (TAN)607A AND 607 | DOE/ID-11362 | 0 |
| 11-AUG-08 | EATON, D. L. | ACTION MEMORANDUM FOR DECOMMISSIONING CPP-601/640 FUEL REPROCESSING FACILITIES | DOE/ID-11360 | 0 |
| 08-JUL-08 | CAHN, L. S. | ICDF DETECTION MONITORING BIENNIAL REPORT (2006-2007) | DOE/ID-11373 | 0 |
| 08-JUL-08 | CAHN, L. S. | ICDF DETECTION MONITORING BIENNIAL REPORT (2006-2007) | DOE/ID-11373 | 0 |
| 05-JUN-08 | NOT SPECIFIED | ICDF COMPLEX WASTE ACCEPTANCE CRITERIA | DOE/ID-10661 | 5 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 05-FEB-08 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE (O&M) PLAN FOR COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) RESPONSE ACTIONS | DOE/ID-11042 | 04 |
| 21-JAN-08 | PINZEL, M. A. | FINAL REMOVAL ACTION REPORT FOR THE LOSS-OF-FLUID TEST (LOFT) FACILITY | DOE/ID-11321 | 00 |
| 14-JAN-08 | EATON, D. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES | DOE/ID-11346 | 02 |
| 30-AUG-07 | RENO, S. L. | ACTION MEMORANDUM FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL | DOE/ID-11340 | 00 |
| 31-JUL-07 | VANHORN, R. L. | LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 | DOE/ID-11316 | 01 |
| 31-JUL-07 | VANHORN, R. L. | LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 | DOE/ID-11316 | 01 |
| 31-JUL-07 | VANHORN, R. L. | LONG-TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2007 | DOE/ID-11316 | 01 |
| 12-JUL-07 | RENO, S. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL | DOE/ID-11328 | 00 |
| 11-JUL-07 | HOWELL, W. F. | ENGINEERING DESIGN FILE - MATERIALS TEST REACTOR (MTR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6244 | 02 |
| 10-JUL-07 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE - GROUNDWATER PATHWAY RISK ASSESSMENT FOR MATERIALS TEST REACTOR (MTR) CLOSURE | EDF-5186 | 01 |
| 09-JUL-07 | CULP, B. | ACTION MEMORANDUM FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND PBF VESSEL DISPOSAL | DOE/ID-11331 | 00 |
| 25-JUN-07 | MEAGHER, B. G. | FISCAL YEAR 2006 (FY-06) ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | RPT-339 | 00 |
| 20-JUN-07 | NESSHOEFER, C. A. | MATERIALS TEST REACTOR (MTR) COMPLEX ACTIVITY VS. DEPTH | EDF-6381 | 01 |
| 06-JUN-07 | EPA | ACTION MEMORANDUM FOR DECOMMISSIONING OF TEST AREA NORTH (TAN)-607 HOT SHOP AREA | DOE/ID-11322 | 00 |
| 22-MAY-07 | MCMANAMON, L. E. | ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 03 |
| 22-MAY-07 | MCMANAMON, L. E. | ENVIRONMENTAL RESTORATION PROJECT HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 03 |
| 04-MAY-07 | STALEY, C. S. | STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY | EDF-7433 | 01 |
| 01-MAY-07 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL | DOE/ID-11309 | 00 |
| 16-APR-07 | MCCARTHY, J. M. | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE | EDF-7618 | 01 |
| 14-FEB-07 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SOIL RISK ASSESSMENT FOR TEST AREA NORTH (TAN)-607: HOT SHOP AREA | EDF-7538 | 01 |
| 01-FEB-07 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX UNDER THE IDAHO CLEANUP PROJECT (ICP) | DOE/ID-11303 | 00 |
| 31-JAN-07 | PINZEL, M. A. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE TEST AREA NORTH (TAN)-607 HOT SHOP AREA | DOE/ID-11302 | 00 |
| 29-JAN-07 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SOIL RISK ASSESSMENT FOR TAN-607: HOT SHOP AREA | EDF-7538 | 00 |
| 04-JAN-07 | CROSON, D. V. | FINAL REMOVAL ACTION REPORT FOR THE CPP-603A BASIN FACILITY | DOE/ID-11306 | 01 |
| 15-DEC-06 | CROSON, D. V. | FINAL REMOVAL ACTION REPORT FOR THE CPP-603A BASIN FACILITY | DOE/ID-11306 | 00 |
| 14-DEC-06 | BORSCHEL, T. F. | LOSS-OF-FLUID TEST (LOFT) DEMOLITION COMPLETION REPORT | RPT-312 | 00 |
| 11-DEC-06 | MCCARTHY, J. M. | GROUNDWATER ASSESSMENT FOR TEST AREA NORTH (TAN)-607: HOT SHOP AREA | EDF-7515 | 00 |
| 31-OCT-06 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE ENGINEERING TEST REACTOR (ETR) COMPLEX CLOSURE | EDF-5142 | 02 |
| 31-OCT-06 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR DECONTAMINATING AND DISMANTLING (D&D) OF THE ENGINEERING TEST REACTOR (ETR) FACILITY | EDF-7243 | 01 |
| 31-OCT-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 02 |
| 31-OCT-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 02 |
| 24-OCT-06 | CULP, B. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX | DOE/ID-11272 | 00 |
| 02-OCT-06 | PARRY, J. R. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) BERYLLIUM REFLECTOR AND VESSEL TRANSURANIC INVENTORIES | EDF-7222 | 00 |
| 28-SEP-06 | NESSHOEFER, C. A. | POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS | EDF-7000 | 00 |
| 21-SEP-06 | NOT SPECIFIED | ACTION MEMORANDUM FOR DECOMMISSIONING OF TEST AREA NORTH (TAN)-607A | DOE/ID-11290 | 00 |
| 13-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) RADIONUCLIDES AND THE RADIONUCLIDE RELATIVE RATIOS | EDF-6958 | 01 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) VESSEL SOURCE TERM AND EXTERNAL DOSE RATES | EDF-6133 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX EXTERNAL SURFACES | EDF-6138 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX INTERNAL SURFACES | EDF-6291 | 01 |
| 06-SEP-06 | ROUSSEAU, J. P. | RESPONSE TO COMMENTS ALLEGING IDAHO NATIONAL LABORATORY (INL) RELATED CS-137 AND SR-90 CONTAMINATION IN THE MICHAUD FLATS AREA NEAR POCATELLO, IDAHO | CCN 304024 | 00 |
| 16-AUG-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2006 (FY-06) | DOE/ID-11289 | 00 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 27-JUL-06 | JOLLEY, W. L. | IDAHO NATIONAL LABORATORY (INL) SITEWIDE INSTITUTIONAL CONTROLS PLAN | DOE/ID-11042 | 03 |
| 17-JUL-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TEST AREA NORTH 607A (TAN-607A) | RPT-214 | 00 |
| 13-JUL-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 01 |
| 13-JUL-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 01 |
| 05-JUN-06 | RICHARDS, B. T. | REMOVAL ACTION WORK PLAN (RAWP) FOR THE CHEMICAL PROCESSING PLANT (CPP-603A) BASIN FACILITY | DOE/NE-ID-11214 | 02 |
| 31-MAY-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 00 |
| 31-MAY-06 | MCMANAMON, L. E. | MISCELLANEOUS SITES CLEANUP PROJECT (MSCP) HEALTH AND SAFETY PLAN (HSP OR HASP) | PLN-2128 | 00 |
| 01-MAY-06 | VANHORN, R. L. | LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2006 | ICP/EXT-06-01130 | 00 |
| 01-MAY-06 | VANHORN, R. L. | LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2006 | ICP/EXT-06-01130 | 00 |
| 01-MAY-06 | VANHORN, R. L. | LONG TERM ECOLOGICAL MONITORING FIELD SAMPLING PLAN (FSP) FOR 2006 | ICP/EXT-06-01130 | 00 |
| 28-MAR-06 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR DECOMMISSIONING OF TAN-630 AND TAN-650 AT THE LOSS-OF-FLUID TEST (LOFT) AREA | DOE/ID-11276 | 00 |
| 24-MAR-06 | PROVENCHER, R. B. | EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR RECORD OF DECISION (ROD) FOR EXPERIMENTAL BREEDER REACTOR I BOILING WATER REACTOR EXPERIMENT AREA (EBR-I/BORAX) AND MISCELLANEOUS SITES | DOE/ID-11264 | 00 |
| 08-MAR-06 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT 601 (CPP-601) FUEL REPROCESSING COMPLEX AT THE IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-06-028 | 00 |
| 02-MAR-06 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSES (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT OF THE TEST AREA NORTH 607 (TAN-607) HOT SHOP FACILITY AT THE IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-06-025 | 00 |
| 07-FEB-06 | COLE, M. R. | FINAL REPORT FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-627 REMOTE ANALYTICAL FACILITY | ICP/EXT-06-01145 | 00 |
| 30-JAN-06 | HOWELL, W. F. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6225 | 01 |
| 19-JAN-06 | PINZEL, M. A. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TAN-630 AND TAN-650 AT THE LOSS OF FLUID TEST (LOFT) AREA | DOE/ID-11253 | 00 |
| 16-DEC-05 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION COST ANALYSES (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF BOTH ENGINEERING TEST REACTOR (ETR) AND MATERIALS TEST REACTOR (MTR) AT THE IDAHO NATIONAL LABORATORY (INL) | FMDP-RFDP-05-138 | 00 |
| 15-DEC-05 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX ACTIVITY VS. DEPTH | EDF-6304 | 00 |
| 05-DEC-05 | CORNETT, T. C. | ENGINEERING DESIGN FILE (EDF) - LOSS OF FLUID TEST (LOFT) CHARACTERIZATION STUDY | EDF-6355 | 00 |
| 24-OCT-05 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH PREPARATION OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING AND DISMANTLEMENT (D&D) OF TAN-630 AND TAN-650 LOSS OF FLUID TEST (LOFT) COMPLEX AT IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-05-117 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 23-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE INSTITUTIONAL CONTROLS ANNUAL REPORT - FY 2005 (FY-05) | DOE/ID-11250 | 00 |
| 22-SEP-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2005 (FY-05) | DOE/ID-11249 | 00 |
| 30-AUG-05 | FITCH, D. R. | IDAHO NATIONAL LABORATORY (INL) SITE WIDE OPERATIONS AND MAINTENANCE (O&M) REPORT FOR CERCLA RESPONSE ACTIONS - FY 2004 (FY-04) | DOE/NE-ID-11200 | 00 |
| 29-JUN-05 | MACCONNEL, M. J. | SUBMITTAL OF ADDITIONAL INFORMATION AND REQUEST FOR APPROVAL OF PERMANENT ABANDONMENT FOR CLASS V SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP | 34886 | 00 |
| 01-JUN-05 | LEWIS, M. G. | ADDITIONAL INFORMATION FOR SHALLOW INJECTION WELLS MAH-CA-CT-319, 40-CPP, 45-CPP, AND 46-CPP | ICP/EXT-05-00934 | 00 |
| 28-APR-05 | LENGYEL, A. L. | SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FROM 1953 TO 1999 | ICP/EXT-05-00833 | 00 |
| 25-MAR-05 | WOOD, T. R. | BOREHOLE AND WELL MIDDLE-1823 AND ITS RELATIONSHIP TO THE STRATIGRAPHY OF THE SOUTH-CENTRAL IDAHO NATIONAL LABORATORY (INL) | ICP/EXT-05-00790 | 00 |
| 16-FEB-05 | AR COORDINATOR | PER-620 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | AR.INDEX.NTCRA.PER-620 | 00 |
| 15-FEB-05 | RENO, S. L. | ACTION MEMORANDUM FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) - PUBLIC COMMENTS AND RESPONSES TO SIGNIFICANT COMMENTS ARE INCLUDED IN APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D | DOE/NE-ID-11213 | 00 |
| 15-FEB-05 | RICHARDS, B. T. | REMOVAL ACTION WORK PLAN FOR THE CPP-603 BASIN FACILITY | DOE/NE-ID-11214 | 00 |
| 15-FEB-05 | HARKER, W. S. | DOE RESPONSE TO CITIZENS ADVISORY BOARD (CAB) RECOMMENDATION #120 ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 OF DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | EM-FMDP-05-007 | 00 |
| 06-JAN-05 | RICHARDS, B. T. | ACTION MEMORANDUM FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE CPP-603A BASINS, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/NE-ID-11194 | 00 |
| 17-DEC-04 | RENO, S. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) | DOE/NE-ID-11196 | 00 |
| 07-DEC-04 | AR COORDINATOR | CPP-603 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR THE NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (NEEL) FUEL STORAGE BASIN COMPLEX AT CPP-630 | AR.INDEX.NTCRA.CPP-603 | 00 |
| 31-AUG-04 | ICP COMMUNITY RELATIONS | AGENCIES EXTEND COMMENT PERIOD ON PLAN TO REMOVE WATER FROM OLD INEEL SPENT FUEL BASINS | 24883 | 00 |
| 26-AUG-04 | RICHARDS, B. T. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/NE-ID-11140 | 01 |
| 04-AUG-04 | DOE | NOTICE OF AVAILABILITY - AGENCIES PROPOSE REMOVING WATER FROM OLD INEEL SPENT FUEL BASIN TO REMOVE POTENTIAL RISK TO AQUIFER | 24878 | 00 |
| 03-AUG-04 | HAIN, K. E. | TRANSMITTAL OF DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR POWER BURST FACILITY (PBF) REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) - ISSUE PAPER INCLUDED | EM-ER-04-172 | 00 |
| 02-AUG-04 | HAIN, K. E. | DOE APPROVAL OF REQUEST FOR EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE CPP-603A BASIN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EM-ER-04-166 | 00 |
| 02-AUG-04 | HAIN, K. E. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) | EM-ER-04-171 | 00 |
| 01-AUG-04 | PRATT, M. B. | DRAFT ENGINEERING EVALUATION COST ANALYSIS (EC/CA) FOR PBF REACTOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) | DOE/NE-ID-11187 | 0A |
| 22-JUL-04 | CLOUGH, M. K. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DRAFT CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 24876 | 00 |
| 22-JUL-04 | CLOUGH, M. K. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A NON TIME CRITICAL REMOVAL ACTION (NTCRA), DRAFT DOCUMENT (DOE/NE-ID-11140) | 24877 | 00 |
| 21-JUN-04 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) CONCURRENCE ON A SUITABILITY DETERMINATION FOR AN OFF-SITE FACILITY TO MANAGE WASTE AREA GROUP 3 (WAG-3) WASTE | 24870 | 00 |
| 21-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 01 |
| 18-JUN-04 | HAIN, K. E. | TRANSMITTAL OF REMOVAL ACTION WORK PLAN, ACTION MEMORANDUM, AND WASTE MANAGEMENT PLAN (WMP) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | EM-ER-04-125 | 00 |
| 17-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 01 |
| 17-JUN-04 | PETERSON, D. T. | CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) ALTERNATIVES | RRH-11-04 | 00 |
| 16-JUN-04 | BRAGASSA, J. L. | REMOVAL ACTION WORK PLAN FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11158 | 00 |
| 16-JUN-04 | BRAGASSA, J. L. | CPP-627 CERCLA REMOVAL ACTION WASTE MANAGEMENT PLAN (WMP) | DOE/NE-ID-11171 | 00 |
| 14-JUN-04 | AR COORDINATOR | CPP-627 REMOVAL ACTION - IDAHO COMPLETION PROJECT (ICP) ADMINISTRATIVE RECORD (AR) INDEX FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) SP-6 CPP-627 DECONTAMINATION AND DECOMMISSION (D&D) | AR.INDEX.NTCRA.CPP-627 | 00 |
| 10-JUN-04 | TOMLINSON, G. E. | DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES | 24881 | 00 |
| 04-JUN-04 | RASCH, D. N. | SLUDGE REMOVAL FROM THE CPP-603 BASINS | TS-ETSD-04-113 | 00 |
| 01-JUN-04 | PROVENCHER, R. B. | ACTION MEMORANDUM FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11164 | 00 |
| 28-MAY-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF PBF-620 (PER-620) , POWER BURST FACILITY (PBF) REACTOR, IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | 24887 | 00 |
| 19-APR-04 | DOE | NOTICE OF AVAILABILITY - DEPARTMENT OF ENERGY (DOE) PROPOSES DEMOLITION OF REMOTE ANALYTICAL FACILITY BUILDING (CPP-627) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 24839 | 00 |
| 15-APR-04 | BRAGASSA, J. L. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY | DOE/NE-ID-11157 | 01 |
| 08-APR-04 | ROSENBERGER, M. S. | VICINITY DISCHARGES ELIMINATION WORK PLAN FOR THE HAZARDOUS WASTE MANAGEMENT ACT (HWMA) AND THE RESOURCE CONSERVATION RECOVERY ACT (RCRA) POST CLOSURE PERMIT FOR INTEC WASTE CALCINING FACILITY (WCF) AT THE INEEL | DOE/NE-ID-11138 | 00 |
| 31-MAR-04 | HOLMES, F. C. | APPROVAL TO PROCEED WITH PREPARATION OF ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR DECOMMISSION AND DISMANTLEMENT (D&D) OF CPP-627, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INEEL | 24838 | 00 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 23-MAR-04 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND DEACTIVATION, DECONTAMINATION, AND DECOMMISSIONING (D&D&D) - APPENDIX C TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/ID-10587 | 08 |
| 10-MAR-04 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 01 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 00 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 00 |
| 16-FEB-04 | DOORNBOS, M. H. | WHITE PAPER - BUILDING CPP-627 DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) CAN BE PERFORMED UNDER THE DEPARTMENT OF ENERGY'S (DOE) CERCLA REMOVAL ACTION AUTHORITY | 24828 | 00 |
| 16-FEB-04 | DOORNBOS, M. H. | APPROVAL NEEDED OF CERCLA TIME CRITICAL REMOVAL ACTION (TCRA) FOR DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) OF BUILDING CPP-627 AND TRANSMITTAL OF WHITE PAPER | JHV-019-04 | 00 |
| 27-JAN-04 | ARROWOOD, J. R. | DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES | 24837 | 00 |
| 19-DEC-03 | HOLMES, F. C. | DOE MEMORANDUM - APPROVAL TO PROCEED WITH PREPARATION OF AN ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR FUEL STORAGE BASIN COMPLEX AT CPP-603, IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), INEEL | 24818 | 00 |
| 19-DEC-03 | HOLMES, F. C. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DEACTIVATION OF CPP-603 FUEL STORAGE BASINS | EM-ER-03-318 | 00 |
| 09-DEC-03 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 00 |
| 09-DEC-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - QUANTIFICATION OF THREE DEBRIS OBJECTS FROM THE SOUTH BASIN OF CPP-603 USING THE UNDERWATER GAMMA SPECTROMETER SYSTEM (TUGS) | EDF-4271 | 00 |
| 30-SEP-03 | WELLS, R. P. | PROJECT CLOSEOUT REPORT FOR WASTE AREA GROUP 2 (WAG-2), TEST REACTOR AREA (TRA) | INEEL/EXT-03-00028 | 00 |
| 20-AUG-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - CPP-603 BASINS - FISSILE MATERIAL IN PARTICULATE FORM BASED ON 137CS TO 235U RATIO | EDF-3535 | 00 |
| 16-JUL-03 | DOE | PUBLIC NOTICE - PUBLIC INVITED TO COMMENT ON TEST AREA NORTH (TAN) LANDFILL | 24806 | 00 |
| 15-MAY-03 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - ACCEPTABLE RESIDUAL INVENTORY CALCULATIONS FOR CPP-603 | EDF-3684 | 00 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 12-SEP-02 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 AND INACTIVE SITES - ALSO APPENDIX C TO DOE/ID-10774, REV.02 | DOE/ID-10587 | 07 |
| 10-APR-02 | MONSON, B. R. | APPROVAL OF PUBLIC COMMENT PERIOD FOR PARTIAL CLOSURE PLANS (CP) AT TEST REACTOR AREA (TRA) AND WASTE EXPERIMENTAL REDUCTION FACILITY (WERF) LOCATED AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - EPA ID #ID4890008952 | 24753 | 00 |
| 01-JUN-01 | DOE | DRAFT ENVIRONMENTAL ASSESSMENT (EA) - DEACTIVATION, DECOMMISSIONING, AND DISMANTLEMENT (D&D&D) OF CPP-603 BASIN PROJECT | DOE/EA-1368 | 00 |
| 09-MAY-01 | PYLE, J. D. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL AIR EMISSIONS ASSOCIATED WITH DEACTIVATION, DECOMMISSIONING AND DISMANTLEMENT (D&D&D) OF CPP-603A BASIN PROJECT | EDF-1931 | 00 |
| 08-MAY-01 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 | EDF-1962 | 00 |
| 27-OCT-00 | HATHAWAY, C. | DISPOSAL OF WASTE AREA GROUP 5 (WAG-5) AUXILIARY REACTOR AREA 16 (ARA-16) AND ARA-25 SOILS AND PIPING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | OPE-EM-ER-205 | 00 |
| 01-OCT-00 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - ON-GOING PROBING CAMPAIGN YIELDING VALUABLE INFORMATION ABOUT BURIED WASTE - OCTOBER 2000 - NOVEMBER 2000 (10/2000 - 11/2000) | 21900 | 00 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 01-JUN-00 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - WASTE AREA GROUP 5 (WAG-5) CLEANUP UNDERWAY WITH GOAL OF SAVING $2.4 MILLION - JUNE 2000 - JULY 2000 (06/2000 - 07/2000) | 21213 | 00 |
| 01-APR-00 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES TO DECIDE FATE OF THE CALCINER - APRIL 2000 - MAY 2000 (04/2000 - 05/2000) | 21216 | 00 |
| 01-DEC-99 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1999 AND DECEMBER 1999 (11/99 & 12/99) - INEEL INSERTS PROBE TUBE INTO BURIED WASTE PIT | 10964 | 00 |
| 01-OCT-99 | INEEL COMMUNITY RELATIONS | UPDATE FACT SHEET - TREATABILITY STUDIES (TS) BEING CONDUCTED AT WASTE AREA GROUP 7 (WAG-7) | 10962 | 00 |
| 01-JUN-99 | WAGNER, E. P. | PROCESS DESCRIPTION AND OPERATING HISTORY FOR CPP-601, CPP-604 AND CPP-627 FUEL REPROCESSING COMPLEX AT INEEL | INEEL/EXT-99-00400 | 00 |
| 01-JUN-99 | WAGNER, E. P. | PROCESS DESCRIPTION AND OPERATING HISTORY FOR CPP-601, CPP-604 AND CPP-627 FUEL REPROCESSING COMPLEX AT INEEL | INEEL/EXT-99-00400 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - AGENCIES ISSUE REVISED CLEANUP PLAN FOR TEST AREA NORTH (TAN) - NOVEMBER 1998 (11/98) & DECEMBER 1998 (12/98) | 17370 | 00 |
| 21-SEP-98 | CHAMBERS, R. | MULTI-AGENCY RADIATION SURVEY & SITE INVESTIGATION MANUAL (MARSSIM) INVESTIGATION FOR CPP-709 RADIONUCLIDES | RC-10-98 | 00 |
| 01-SEP-98 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - TRANSURANIC WASTE PROGRAM UNDERGOES INSPECTION | 16781 | 00 |
| 08-JUL-98 | DOE | PRELIMINARY DRAFT - ENVIRONMENTAL ASSESSMENT (EA) AND DEACTIVATION PLAN FOR OBSOLETE SPENT NUCLEAR FUEL (SNF) PROCESSING, STORAGE, AND SUPPORT FACILITIES AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/EA-1244 | 00 |
| 29-APR-98 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED SOILS REPOSITORY AT INEEL | OPE-ER-73-98 | 00 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-DEC-97 | WATKINS, C. S. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 & INACTIVE SITES (FORMERLY INEL-95/0086) | DOE/ID-10587 | 05 |
| 01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI | 14284 | 00 |
| 01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI | 14284 | 00 |
| 01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI | 14284 | 00 |
| 01-NOV-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - NOVEMBER 1997 & DECEMBER 1997 (11/97 & 12/97) - CITIZENS ASK FOR INPUT ON FOUR COMPREHENSIVE INVESTIGATIONS, PIPELINE FOR TRANSURANIC (TRU) WASTE, TECHNOLOGY ON ACID PIT & NOTICE OF INTENT (NOI) FOR ENVIRONMENTAL IMPACT STATEMENT (EI | 14284 | 00 |
| 01-SEP-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - SEPTEMBER & OCTOBER 1997 (09/97 & 10/97) - DOE TO SUBMIT PROPOSAL OF PIT 9 CLEANUP, AGENCIES SIGN TRA ROD, WROC INCREASES VOLUME OF WASTE TREATED & CITIZENS ADVISORY BOARD (CAB) REVIEWS, PROVIDES COMMENTS ON DRAFT ERP FACT SHEET | 14283 | 00 |
| 01-AUG-97 | JONES, R. W. | FIELD SAMPLING PLAN (FSP) FOR D&D OF CPP-631 RALA BUILDING & CPP-709 & CPP-734 MONITORING STATIONS AT ICPP | INEEL/EXT-97-00805 | 00 |
| 08-JUL-97 | FALCONER, K. L. | LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) | KLF-150-97 | 00 |
| 01-JUN-97 | INEEL COMMUNITY RELATIONS | INEEL REPORTER - JUNE & JULY 1995 (06/97 & 07/97) - AGENCIES RESOLVE DISPUTES ON PIT 9 & TEST AREA NORTH (TAN) PROJECTS | 14315 | 00 |
| 01-JUN-97 | WILLIS, B. J. | LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - CPP-701 PETROLEUM CONTAMINATED SOIL | INEEL/EXT-97-00677 | 00 |
| 01-JUN-97 | PETERSON, D. A. | HEALTH & SAFETY PLAN (HSP) FOR D&D OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 01 |
| 23-DEC-96 | JENSEN, N. R. | TRANSMITTAL OF THREE TECHNICAL MEMORANDA ON TECHNOLOGY SCREENING REMEDIAL ACTION (RA) OBJECTIVES AND APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARS) | OPE-ER-199-96 | 00 |
| 10-MAY-96 | GREEN, L. A. | REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | OPE-ER-96-84 | 00 |
| 01-DEC-95 | INEL COMMUNITY RELATIONS | INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - COMPREHENSIVE INVESTIGATION BEGINS FOR WAG-1 | 11382 | 00 |
| 01-NOV-95 | INEL COMMUNITY RELATIONS | INEL REPORTER - 11/95 - 12/95 - MILESTONE ACHIEVED AHEAD OF SCHEDULE | 11381 | 00 |
| 19-OCT-95 | GREEN, L. A. | DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 10445 | 00 |
| 19-OCT-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL SUMMARY REPORT FOR WASTE AREA GROUP 3 (WAG-3) & WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) & DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY ( EPA) COMMENTS | OPE-ER-201-95 | 00 |
| 01-OCT-95 | INEL COMMUNITY RELATIONS | INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - LAST INVESTIGATION BEGINS AT RWMC WAG-7 | 10879 | 00 |
| 01-SEP-95 | INEL COMMUNITY RELATIONS | INEL REPORTER - 09/95 - 10/95 - AGENCIES AGREE TO REDUCE GROUNDWATER CONTAMINATION AT TEST AREA NORTH (TAN) | 11380 | 00 |
| 19-JUN-95 | GREEN, L. A. | TRANSMITTAL OF DRAFT WASTE AREA GROUP 3 (WAG-3) SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (SLERA) | OPE-ER-117-95 | 00 |
| 01-JUN-95 | LABUY, S. A. | HEALTH & SAFETY PLAN (HSP) FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF CPP-631, CPP-709 & CPP-734 | INEL-95/0292 | 00 |
| 23-MAR-95 | GREEN, L. A. | TRANSMITTAL OF VALIDATED DATA FOR PERCHED WATER SAMPLING, DECEMBER 1994 (12/94) AND JANUARY 1995 (01/95) | OPE-ER-052-95 | 00 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 01-MAR-95 | BAUMER, A. R. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1, WAG-2, WAG-3, WAG-4, WAG-5, WAG-6, WAG-7 & WAG-10 - EFFECTIVE 12/97 DOCUMENT ID NUMBER IS DOE/ID-10587, REV.05 | INEL-95/0086 | 04 |
| 09-JAN-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON DRAFT WASTE AREA GROUP 3 (WAG-3) SATURATED ZONE CONCEPTUAL MODEL | 15044 | 00 |
| 22-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15040 | 00 |
| 28-OCT-94 | JENKINS, T. W. | TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 17286 | 00 |
| 14-OCT-94 | INEL COMMUNITY RELATIONS | COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - CITIZENS INVITED TO GIVE EARLY INPUT | 8028 | 00 |
| 14-OCT-94 | INEL COMMUNITY RELATIONS | COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - CITIZENS INVITED TO GIVE EARLY INPUT | 8028 | 00 |
| 01-SEP-94 | INEL COMMUNITY RELATIONS | INEL COMMUNITY RELATIONS PLAN KICKOFF FACT SHEET - DOE STUDIES TWO (2) RADIONUCLIDE BURIAL GROUNDS | 7865 | 00 |
| 30-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON SEDIMENT LAYERING EFFECT ON CONTAMINANT TRANSPORT FOR NONPERCHED UNSATURATED AREAS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 5779 | 00 |
| 30-AUG-94 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON TECHNICAL MEMORANDUM ASSESSMENT PORFLOW BOUNDARY CONDITIONS FOR USE IN THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) UNSATURATED ZONE MODEL & ATTACHMENT A CYLINDRICAL COORDINATE OPTION PORFLOW | 5784 | 00 |
| 10-AUG-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT AQUIFER CHARACTERISTICS TECHNICAL MEMORANDUM | 5778 | 00 |
| 15-JUL-94 | BURNS, S. M. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA | SMB-05-94 | 00 |
| 01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
| 01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
| 01-APR-94 | BUGGER, B. | DOE NEWS - ENGINEERS NEW SENSOR SYSTEM WITH ARMS CONTROL, CLEANUP APPLICATIONS | 7595 | 00 |
| 01-APR-94 | INEL COMMUNITY RELATIONS | COMMUNITY RELATIONS PLAN FACT SHEET - 04/94 REMOVAL ACTIONS CONSIDERED FOR THE NAVAL REACTORS FACILITY (NRF) | 7609 | 00 |
| 31-MAR-94 | NEWBRY, R. D. E. | RADIOACTIVITY CONTROLS IN PROTOTYPE PLANTS AT THE NAVAL REACTORS FACILITY (NRF) | NR-IBO-94/076 | 00 |
| 30-MAR-94 | BUGGER, B. | DOE NEWS - RETECH SIGN AGREEMENT FOR TEST MELT OF CONTAMINATED METAL | 7559 | 00 |
| 28-FEB-94 | WINCO | BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) | 14143 | 00 |
| 01-FEB-94 | WENZEL, D. R. | RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL | WINCO-1123 | 01 |
| 15-OCT-93 | BUGGER, B. | DOE NEWS - WINCO PRIVATE VENDOR DEMONSTRATES TECHNOLOGY FOR CLEANER DECONTAMINATION | 6836 | 00 |
| 05-AUG-93 | COE, M. | DOE NEWS - IDAHO CHEMICAL PROCESSING PLANT (ICPP) TRANSITION PLAN MADE AVAILABLE | 6710 | 00 |
| 04-AUG-93 | HUESTIS, G. M. | SOIL TREATABILITY STUDY (TS) OF INEL SOILS INCLUDING ICPP SOILS | GMH-01-93 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 02-AUG-93 | BARRY, G. A. | TRANSMITTAL OF DRAFT SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) | 93MSE/ID-225 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 01-AUG-93 | BARRY, G. A. | SAMPLING & ANALYSIS PLAN (SAP) FOR THE WASTE AREA GROUP 3 (WAG-3) THROUGH WASTE AREA GROUP 10 (WAG-10) RADIONUCLIDE CONTAMINATED SOILS TREATABILITY STUDY (TS) | 6744 | 00 |
| 24-JUN-93 | COE, M. | DOE NEWS - DOE COMPLETES ENVIRONMENTAL ASSESSMENT (EA) ON UPGRADING CHEMICAL PLANT TANK FARM | 6548 | 00 |
| 01-JUN-93 | BUGGER, B. | DOE NEWS - WINCO COORDINATES EFFORT TO RECYLE CONTAMINATED METAL | 6520 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 2 (VOL.02) - ICPP | DOE/ID-10392,VOL.02 | 00 |
| 01-JUN-93 | WILLIAMS, J. A. | WELL FITNESS EVALUATION FOR INEL, VOLUME 3 (VOL.03) - ICPP CONT'D & INEL MIDDLE, NORTH & SOUTH | DOE/ID-10392,VOL.03 | 00 |
| 08-JAN-93 | RHODES, D. W. | EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 | DWR-01-93 | 00 |
| 08-JAN-93 | RHODES, D. W. | EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 | DWR-01-93 | 00 |
| 14-JAN-92 | JONES, K. L. | STATE OF IDAHO, REQUEST FOR INFORMATION | KXJ-9-92 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 1 (VOL.01) | EGG-WM-9707,VOL.01 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 2 (VOL.02) | EGG-WM-9707,VOL.02 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 3 (VOL.03) | EGG-WM-9707,VOL.03 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 4 (VOL.04) | EGG-WM-9707,VOL.04 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 13-OCT-91 | EARLE, O. K. | HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT USING DEVICES TO LOCATE UNDERGROUND UTILITIES | 6589 | 00 |
| 10-SEP-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 | SGS-353-91 | 00 |
| 22-AUG-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 | SGS-334-91 | 00 |
| 31-JUL-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 | SGS-289-91 | 00 |
| 01-JUL-91 | DONEHEY, A. J. | IN SITU TECHNOLOGY EVALUATION & FUNCTIONAL & OPERATIONAL GUIDELINES FOR TREATABILITY STUDIES AT RWMC AT THE INEL | EGG-WTD-9799 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT | 6625 | 00 |
| 26-APR-90 | GREEN, L. A. | RESPONSE TO STATE QUESTIONS | 6635 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 08-NOV-89 | SEHLKE, G. | RESPONSE TO EPA'S NOTICE OF DEFICIENCY FOR WINCO'S ACCELERATED CLOSURE PLAN (CP) SCHEDULE | GS-15-89 | 00 |
| 16-OCT-89 | GEARHEARD, M. F. | SUMMARY ASSESSMENT REVIEWS | 3537 | 00 |
| 01-MAY-89 | LEWIS, B. D. | REF - STRATIGRAPHY OF UNSATURATED ZONE AT RWMC, INEL, IDAHO | DOE/ID-22080 | 00 |
| 01-NOV-88 | THOMAS, T. R. | MODELING HYPOTHETICAL GROUNDWATER TRANSPORT OF NITRATES, CHROMIUM, & CADMIUM AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | WINCO-1060 | 00 |
| 01-DEC-87 | MANN, L. J. | REF - PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT INEL, IDAHO - USGS OPEN FILE REPORT 87-766 | DOE/ID-22074 | 00 |
| 01-NOV-87 | LEWIS, B. D. | HYDROGEOLOGY & GEOCHEMISTRY OF UNSATURATED ZONE RWMC, INEL | DOE/ID-22073 | 00 |
| 27-OCT-87 | FEIGNER, K. D. | INEL CLOSURE PLAN (CP) REVIEWS FOR TAN-726, ION EXCHANGE TREATMENT UNIT, TAN-674 TANK, IET CONTAINER STORAGE UNIT, AND HG CONTAMINATED AREA CPP-55 | 2668 | 00 |
| 27-JUL-87 | HUNTER, B. R. | FINAL REPORT FOR 2ND (SECOND) PECR - LOG NO. 87072729 | 6629 | 00 |
| 24-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) WL-212 CONTAMINATED LIQUID SPILL | WIN-86-0032-CPP | 00 |
| 22-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) INADVERTENT TRANSFER RESULTING IN LOSS OF WASTE SOLUTION | WIN-86-0034-CPP | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - RWMC SUBSURFACE DISPOSAL AREA (SDA) | 2837 | 00 |
| 29-SEP-86 | MILLER, C. L. | EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT | EDF-263 | 00 |
| 02-FEB-86 | NEBEKER, R. L. | SOURCES OF INFORMATION FOR CERCLA STUDY | NEB-3-86 | 00 |
| 15-JAN-86 | WALLACE, M. T. | HAZARDOUS WASTE STREAMS AT CPP | 7756 | 00 |
| 09-AUG-85 | SMITH, D. L. | SUMMARY OF RALA D&D STATUS | DLS-31-85 | 00 |
| 01-AUG-85 | REYES, B. D. | ENVIRONMENTAL SURVEILLANCE FOR THE INEL RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND OTHER AREAS - ANNUAL REPORT 1984 | EGG-2386 | 00 |
| 01-JUL-85 | MOSER, C. L. | RALA OFF GAS CELL AND STORAGE TANK (CPP-631 & VES-702) DECONTAMINATION AND DECOMMISSIONING (D&D) PLAN | WINCO-1032 | 00 |
| 11-APR-85 | NISHIMOTO, D. D. | IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DDN-01-85 | 00 |
| 26-OCT-84 | MESERVEY, R. H. | TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT | RHM-33-84 | 00 |
| 19-JUL-84 | IKENBERRY, T. A. | RADIOLOGICAL CONTROLS FOR THE DECONTAMINATION OF LOW LEVEL WASTE (LLW) PROJECT EQUIPMENT | TAI-05-84 | 00 |
| 28-NOV-83 | HICKS, F. E. | DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 | MK-83-E-1792 | 00 |
| 01-MAY-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) BIF FILTER ROOM | WM-F1-83-006 | 00 |
| 01-MAR-82 | SCHUMAN, R. P. | IMMOBILIZATION OF TRANSURANIC (TRU) SLUDGE IN GLASS CERAMIC MATERIALS (REPORT) | EGG-FM-5709 | 00 |
| 01-MAY-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHARACTERIZATION OF THE RALA OFF GAS CELL, CHEMICAL PROCESSING PLANT 631 (CPP-631) | WM-F1-81-010 | 00 |
| 01-MAR-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION | WM-F1-81-004 | 00 |
| 01-APR-73 | NICCUM, M. R. | FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 4962 | 00 |
| 01-JUN-72 | PAIGE, B. E. | BURIED WASTE (BW) LINE REGISTER NATIONAL REACTOR TESTING STATION (NRTS) PART IV CPP | ACI-110 | 00 |
Previous Page | Administrative Record Home Page