| 08-FEB-12 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-601, CPP-602, CPP-627, AND CPP-640 FUEL REPROCESSING COMPLEX NON-TIME-CRITICAL REMOVAL ACTION | EDF-10195 | 1 |
| 08-FEB-12 | NOT SPECIFIED | RESIDUAL RADIOACTIVE INVENTORY FOR FUEL REPROCESSING COMPLEX NON-TIME CRITICAL REMOVAL ACTION REPORT | EDF-10239 | 0 |
| 04-SEP-08 | CAHN, LORIE S. | PROPOSED PLAN FOR SITEWIDE GROUNDWATER, MISCELLANEOUS SITES, AND PROCESS FOR FUTURE SITES, OPERABLE UNIT 10-08 | DOE/ID-11366 | 0 |
| 04-SEP-08 | LJUNGBERG, CHARLES | REQUEST FOR EXTENSION OF THE SUBMITTAL OF THE DRAFT RECORD OF DECISION FOR SITEWIDE GROUNDWATER, MISCELLANEOUS SITES, AND PROCESS FOR FUTURE SITES, OPERABLE UNIT (OU) 10-08 | WDP-RWMC-08-047 | 0 |
| 11-AUG-08 | EATON, D. L. | ACTION MEMORANDUM FOR DECOMMISSIONING CPP-601/640 FUEL REPROCESSING FACILITIES | DOE/ID-11360 | 0 |
| 14-JAN-08 | EATON, D. L. | ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES | DOE/ID-11346 | 02 |
| 29-NOV-07 | CETO, N. | CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE | 25184 | 00 |
| 28-NOV-07 | KOCH, D. F. | CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE | 25183 | 00 |
| 19-NOV-07 | HERNANDEZ, N. K. | REQUEST FOR CONCURRENCE ON USE OF CHEMICAL PROCESSING PLANT (CPP)-67 FOR DISPOSAL OF COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) GENERATED INDUSTRIAL WASTE | FMDP-RFDP-07-027 | 00 |
| 08-SEP-06 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - REV. 0 OF THIS EDF IS PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 01 |
| 05-JUN-06 | RICHARDS, B. T. | REMOVAL ACTION WORK PLAN (RAWP) FOR THE CHEMICAL PROCESSING PLANT (CPP-603A) BASIN FACILITY | DOE/NE-ID-11214 | 02 |
| 08-MAR-06 | PROVENCHER, R. B. | APPROVAL TO PROCEED WITH THE PREPARATION OF AN ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE FINAL DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT 601 (CPP-601) FUEL REPROCESSING COMPLEX AT THE IDAHO NATIONAL LABORATORY (INL) SITE | FMDP-RFDP-06-028 | 00 |
| 01-DEC-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 00 |
| 08-SEP-05 | HAIN, K. E. | NEW SITE IDENTIFICATION (NSI) - CHEMICAL PROCESSING PLANT (CPP) PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS - ADDITIONAL INFORMATION | 24921 | 00 |
| 06-JUL-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - EVALUATION OF NECESSITY OF OFF GAS SCRUBBER FOR V-TANKS TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 | EDF-5905 | 00 |
| 20-JUN-05 | HAIN, K. E. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-117, CPP-118, CPP-119, CPP-120, CPP-121, CPP-122 AND CPP-123 - FUEL PROCESSING POTENTIAL RELEASES | 24915 | 00 |
| 09-JUN-05 | KUHNS, D. J. | NEW SITE IDENTIFICATION (NSI) FORM FOR CPP-112 - WM-184 CHEMICAL PROCESSING PLANT (CPP) TANK FARM CONTAINMENT VAULT POTENTIAL RELEASE | 24908 | 00 |
| 19-MAY-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - TANK V-14 AIR STRIPPING CALCULATIONS AND PROCESS SIZING - MAY ALSO BE FOUND AS ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 - DOE/NE-ID-11233 | EDF-5558 | 02 |
| 27-APR-05 | JOSTEN, N. E. | TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 | INEEL/EXT-02-00558 | 02 |
| 07-MAR-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4928 | 02 |
| 27-JAN-05 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.03 | EDF-4604 | 02 |
| 06-DEC-04 | HAIN, K. E. | REVISIONS TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) PROCESS FOR INCLUSION OF NEWLY IDENTIFIED SITES | FMDP-FFA/CO-04-041 | 00 |
| 10-SEP-04 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4604 | 01 |
| 09-SEP-04 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS FOR INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.0 | EDF-4928 | 00 |
| 24-JAN-04 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REQUEST TO INVOKE INFORMAL DISPUTE PROCESS TO REACH FINALIZATION OF DRAFT FINAL OPERABLE UNIT (OU) 3-13 GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | 24820 | 00 |
| 02-SEP-03 | NISHIOKA, D. E. | ENGINEERING DESIGN FILE (EDF) - WASTE RETRIEVAL PROCESS TECHNOLOGY SEARCH FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT | EDF-4025 | 00 |
| 30-APR-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR IN SITU VITRIFICATION (ISV) PROCESSING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL | INEEL/EXT-03-00207 | 00 |
| 21-JAN-03 | SHAW, R. M. | PROPOSAL TO DISPOSE OF TEST AREA NORTH (TAN) V-TANK LIQUID IN THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PROCESS EQUIPMENT WASTE EVAPORATOR (PEWE) | EM-AM-03-02 | 00 |
| 07-MAR-02 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DEBRIS TREATMENT PROCESS SELECTION AND DESIGN - APPENDIX B-2 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1730 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - PROCESS SYSTEMS DRAIN PIPE SIZING - APPENDIX B-6 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2648 | 00 |
| 07-MAR-02 | HAEFNER, D. R. | ENGINEERING DESIGN FILE (EDF) - PROCESS AND TREATMENT OVERVIEW FOR THE MINIMUM TREATMENT PROCESS - APPENDIX B-1 TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-296 | 00 |
| 08-JAN-02 | DOE | NEW SITE IDENTIFICATION (NSI) - OPERABLE UNIT (OU) 3-14, CHEMICAL PROCESSING PLANT 58 (CPP-58) - NITRIC ACID CONTAMINATION IN PROXIMITY TO GROUP 1 INTERIM ACTION (IA) TRENCH NEAR CPP-604 | 10958 | 00 |
| 22-DEC-00 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION TREATMENT PROCESS SELECTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1542(30%) | 00 |
| 18-DEC-00 | WALSH, S. S. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) AND INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONAL SCENARIO AND PROCESS FLOWS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1547(30%) | 00 |
| 01-OCT-00 | DAVISON, R. L. | TREATABILITY STUDY (TS) WORK PLAN FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION PROCESS (DRAFT) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 | DOE/ID-10828 | 00 |
| 09-SEP-99 | EPA | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON SUPPLEMENTAL FEASIBILITY STUDY (FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 18077 | 00 |
| 09-SEP-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 18078 | 00 |
| 10-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-02 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR CHEMICAL PROCESSING PLANT (CPP) OU 3-02 | AR.INDEX.OU.3-02 | 00 |
| 10-AUG-99 | AR COORDINATOR | OPERABLE UNIT (OU) 3-03 - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) ADMINISTRATIVE RECORD (AR) INDEX FOR THE TRACK 1 INVESTIGATION FOR CHEMICAL PROCESSING PLANT (CPP) OU 3-03 | AR.INDEX.OU.3-03 | 00 |
| 05-AUG-99 | PIERRE, W. | REVIEW OF DRAFT FINAL RECORD OF DECISION (ROD) FOR OPERABLE UNIT OU 3-13, IDAHO CHEMICAL PROCESSING PLANT (ICPP) - EPA COMMENTS ATTACHED | 10683 | 00 |
| 01-JUN-99 | WAGNER, E. P. | PROCESS DESCRIPTION AND OPERATING HISTORY FOR CPP-601, CPP-604 AND CPP-627 FUEL REPROCESSING COMPLEX AT INEEL | INEEL/EXT-99-00400 | 00 |
| 04-APR-99 | BROSCIOUS, C. | PUBLIC COMMENTS ON ENVIRONMENTAL REMEDIATION AT INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 10696 | 00 |
| 31-MAR-99 | JENKINS, T. W. | RESPONSE TO RECOMMENDATION ON PROPOSED PLAN FOR REMEDIAL ACTION (RA) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) | OPE-ER-48-99 | 00 |
| 22-DEC-98 | STEWART, M. M. | PUBLIC COMMENTS ON CLEANUP PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL | 10701 | 00 |
| 22-DEC-98 | BRAILSFORD, B. | PUBLIC COMMENTS - SNAKE RIVER ALLIANCE ON PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEEL | 10704 | 00 |
| 21-DEC-98 | COPERFIELD, C. | PUBLIC COMMENTS ON PROPOSED PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10700 | 00 |
| 18-DEC-98 | LEMLEY, J. K. | PUBLIC COMMENTS ON PROPOSED CLEANUP PLAN FOR INEEL CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10691 | 00 |
| 01-DEC-98 | COMMANDER, J. | PUBLIC COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED PLAN FOR OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10690 | 00 |
| 19-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - MOSCOW, IDAHO - NOVEMBER 19, 1998 (11/19/98) | 10678 | 00 |
| 19-NOV-98 | BROSCIOUS, C. | PUBLIC COMMENTS ON DEPARTMENT OF ENERGY (DOE) INEEL IDAHO CHEMICAL PROCESSING PLANT (ICPP) PROPOSED CLEANUP PLAN OPERABLE UNIT (OU) 3-13 WASTE AREA GROUP 3 (WAG-3) | 10699 | 00 |
| 18-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - BOISE, IDAHO - NOVEMBER 18, 1998 (11/18/98) | 10677 | 00 |
| 16-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 16, 1998 (11/16/98) | 10675 | 00 |
| 16-NOV-98 | SCHWARTZ, N. | PUBLIC MEETING TRANSCRIPT - PROPOSED CLEANUP PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - IDAHO FALLS, IDAHO - NOVEMBER 17, 1998 (11/17/98) | 10676 | 00 |
| 14-OCT-98 | JESSMORE, P. J. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WINDBLOW AREA - SECTION 9 OF EE/CA FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL - INEL-95/0259,VOL.01 | 10543 | 00 |
| 14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-159-98 | 00 |
| 14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B, FEASIBILITY STUDY (FS) SUPPLEMENT REPORT REVISION 2 (REV.02) | OPE-ER-160-98 | 00 |
| 01-OCT-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | 10542 | 00 |
| 01-OCT-98 | GREENWELL, R. D. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 1 (VOL.01) OF 2 | DOE/ID-10619,VOL.01 | 02 |
| 01-OCT-98 | GREENWELL, R. D. | COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL - PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT, VOLUME 2 (VOL.02) OF 2 | DOE/ID-10619,VOL.02 | 02 |
| 15-SEP-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-148-98 | 00 |
| 17-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) | OPE-ER-133-98 | 00 |
| 06-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL- PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT - REVISION 1 (REV.01) | OPE-ER-128-98 | 00 |
| 08-JUL-98 | DOE | PRELIMINARY DRAFT - ENVIRONMENTAL ASSESSMENT (EA) AND DEACTIVATION PLAN FOR OBSOLETE SPENT NUCLEAR FUEL (SNF) PROCESSING, STORAGE, AND SUPPORT FACILITIES AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | DOE/EA-1244 | 00 |
| 22-JUN-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-104-98 | 00 |
| 14-MAY-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-78-98 | 00 |
| 17-APR-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-68-98 | 00 |
| 06-MAR-98 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 16292 | 00 |
| 13-FEB-98 | HAIN, K. E. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-98 | 00 |
| 29-JAN-98 | HAIN, K. E. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-13 FEASIBILITY STUDY (FS) SUPPLEMENT TO FINAL OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL | OPE-ER-18-98 | 00 |
| 26-JAN-98 | RENO, S. L. | COMPREHENSIVE FACILITY CLOSURE EVALUATION PROCESS | 10799 | 00 |
| 05-JAN-98 | DEPPERSCHMIDT, J. D. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL AND DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) - OPE-ER&SA-98-002 | OPE-ER/SA-98-002 | 00 |
| 04-DEC-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | OPE-ER-261-97 | 00 |
| 25-NOV-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANR (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-253-97 | 00 |
| 25-NOV-97 | HAIN, K. E. | TRANSMITTAL OF VALIDATED ANALYTICAL SAMPLING DATA FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS NON TIME CRITICAL REMOVAL ACTION (NTCRA) | OPE-ER-254-97 | 00 |
| 14-NOV-97 | RENO, S. L. | IDHW-DEQ COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL (DRAFT FINAL) | 15055 | 00 |
| 30-OCT-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT FINAL COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-174-97 | 00 |
| 07-OCT-97 | HAIN, K. E. | TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL | OPE-ER-158-97 | 00 |
| 12-SEP-97 | ORLEAN, H. | ADDITIONAL ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15053 | 00 |
| 03-SEP-97 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL (DRAFT) JUNE 1997 (06/97) | 15051 | 00 |
| 21-AUG-97 | AR COORDINATOR | CHEMICAL PROCESSING PLANT (CPP) NO ACTION SITES - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) ADMINISTRATIVE RECORD (AR) INDEX FOR NO ACTION SITES FOR CPP WASTE AREA GROUP 3 (WAG-3) | AR.INDEX.CPP.3-NA | 00 |
| 08-JUL-97 | FALCONER, K. L. | LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) | KLF-150-97 | 00 |
| 01-JUN-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 01 |
| 01-JUN-97 | JONES, R. K. | LIMITED SCOPE & HAZARD CHARACTERIZATION PLAN FOR SOIL DISTURBANCE CERCLA RADIOLOGICAL CHARACTERIZATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - CPP-701 PETROLEUM CONTAMINATED SOIL | INEEL/EXT-97-00677 | 00 |
| 01-JUN-97 | CRAM, A. J. | REMOVAL ACTION PLAN FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | INEL/EXT-97-00116 | 00 |
| 01-MAY-97 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | DOE/ID-10579 | 00 |
| 01-MAY-97 | PARSONS | ACTION MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION - RESPONSE TO PUBLIC COMMENTS ON THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) INCLUDED AS ATTACHMENT | DOE/ID-10588 | 00 |
| 10-APR-97 | WESSMAN, D. L. | REGULATORY POSITION ON STATUS OF CPP-709 & CPP-734 AS THEY RELATE TO APPROVED CLOSURE OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCOLATION PONDS | OPE-EP-131-97 | 00 |
| 28-FEB-97 | JENSEN, N. R. | TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | OPE-ER-29-97 | 00 |
| 01-FEB-97 | NOT SPECIFIED | APPROVAL MEMORANDUM FOR THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION | 10315 | 00 |
| 01-FEB-97 | FRANCIS, C. S. | ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10568 | 00 |
| 30-JAN-97 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | 18071 | 00 |
| 06-SEP-96 | BARNES, C. M. | EDF - ENGINEERING DESIGN FILE - ENGINEERING SUPPORT FILLING DATA GAPS FOR PROCESSES & TECHNOLOGIES - COLLECTION OF TECHNOLOGY & PROCESS INFORMATION FOR USE IN OU 7-13 & 7-14 FEASIBILITY STUDY (FS) | ER-WAG7-92 | 00 |
| 01-FEB-95 | LITCO | REPORT OF 1993 AND 1994 TANK FARM DRILLING AND SAMPLING INVESTIGATION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | INEL-95/0064 | 00 |
| 23-JAN-95 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OU 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 10032 | 00 |
| 19-DEC-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON INEL TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-09 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 10031 | 00 |
| 22-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 | 15040 | 00 |
| 18-NOV-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL MEMORANDUM FOR RADIOLOGICALLY CONTAMINATED SOILS - NEW UNIT NU-21.93 | 18066 | 00 |
| 18-NOV-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON TECHNICAL MEMORANDUM FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) RADIOLOGICALLY CONTAMINATED SOILS (NEW UNIT NU-21.93) OU 3-13 | 18068 | 00 |
| 07-NOV-94 | RENO, S. L. | IDHW-DEQ COMMENTS ON DRAFT TEHCNICAL MEMORANDUM FOR WATER QUALITY TREND ANALYSIS IN SNAKE RIVER PLAIN AQUIFER (SRPA), IDAHO CHEMICAL PROCESSING PLANT (ICPP), OCTOBER 6, 1994 (10/06/94) | 15039 | 00 |
| 28-OCT-94 | JENKINS, T. W. | TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM ON THE HYDROGEOLOGY AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 17286 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 19-OCT-94 | JONES, E. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL WASTE AREA GROUP 3 (WAG-3) TECHNICAL WORK PLAN FOR PERCHED WATER PUMPING AND TRACER TESTS | 15038 | 00 |
| 18-OCT-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS ON DRAFT TECHNICAL WORK PLAN FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) PERCHED GROUNDWATER PUMPING AND TRACER TEST, SEPTEMBER 16, 1994 (09/16/94) | 15037 | 00 |
| 12-OCT-94 | MEYER, L. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT FOR OU 3-02 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 10033 | 00 |
| 30-AUG-94 | RENO, S. L. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEPARTMENT OF ENVIRONMENTAL QUALITY (IDHW-DEQ) INFORMAL COMMENTS ON SEDIMENT LAYERING EFFECT ON CONTAMINANT TRANSPORT FOR NONPERCHED UNSATURATED AREAS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 5779 | 00 |
| 30-AUG-94 | RENO, S. L. | IDHW-DEQ INFORMAL COMMENTS ON TECHNICAL MEMORANDUM ASSESSMENT PORFLOW BOUNDARY CONDITIONS FOR USE IN THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) UNSATURATED ZONE MODEL & ATTACHMENT A CYLINDRICAL COORDINATE OPTION PORFLOW | 5784 | 00 |
| 25-JUL-94 | RUST GEOTECH, INC. | TRACK 1 INVESTIGATION OF WASTE AREA GROUP 9, (WAG-9) SITE CODE ANL-36 TREAT PHOTO PROCESSING DISCHARGE DITCH - NO FURTHER ACTION DETERMINATION - DECISION DOCUMENTATION PACKAGE | 10302 | 00 |
| 15-JUL-94 | BURNS, S. M. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA | SMB-05-94 | 00 |
| 01-JUL-94 | RENO, S. L. | IDHW-DEQ COMMENTS, DRAFT PRELIMINARY SCOPING TRACK 2 SUMMARY REPORT, OU 3-02 IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 5808 | 00 |
| 07-JUN-94 | DOE | TRACK 1 INVESTIGATION - DECISION DOCUMENTATION PACKAGE, REVISION 3 (REV.03) - CHEMICAL PROCESSING PLANT (CPP) PERCOLATION PONDS 1 & 2 SITE SHOULD BE SCOPED UNDER THE CPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 5734 | 00 |
| 01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
| 12-APR-94 | WELLS, R. P. | LIMITATIONS & VALIDATION (L&V) REPORT, IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-07 RADIOCHEMICAL ANALYSIS, SDG #3PG10301BG | RPW-44-94 | 00 |
| 18-FEB-94 | LYLE, J. L. | TRANSMITTAL OF DRAFT FINAL SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-047-94 | 00 |
| 19-JAN-94 | STOOPS, T. M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF DRAFT SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) - COMMENTS INCLUDED | 18041 | 00 |
| 15-NOV-93 | LYLE, J. L. | TRANSMITTAL OF DRAFT SCOPE OF WORK (SOW) FOR OPERABLE UNIT (OU) 3-08A IDAHO CHEMICAL PROCESSING PLANT (ICPP) NORTH AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | OPE-ER-035-93 | 00 |
| 24-SEP-93 | BUGGER, B. | DOE NEWS - REMOVAL ACTIONS TO TAKE PLACE AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6805 | 00 |
| 30-AUG-93 | WINCO | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), WASTE AREA GROUP 3 (WAG-3), BIN SET #3, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) | 5518 | 00 |
| 30-AUG-93 | WINCO | ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OU 3-09 CPP-740 SETTLING BASIN, INEL, BUTTE COUNTY, IDAHO, REVISION 1 (REV.01) | 5519 | 00 |
| 30-AUG-93 | WINCO | ACTION MEMORANDUM FOR A REMOVAL ACTION AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-12 SITE CPP-81, INEL, BUTTE COUNTY, IDAHO, REV.01 | 5520 | 00 |
| 05-AUG-93 | COE, M. | DOE NEWS - IDAHO CHEMICAL PROCESSING PLANT (ICPP) TRANSITION PLAN MADE AVAILABLE | 6710 | 00 |
| 28-MAY-93 | EARLE, O. K. | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 OU 3-12 SITE CPP-81 INEL BUTTE COUNTY, IDAHO | 5280 | 00 |
| 28-MAY-93 | EARLE, O. K. | ACTION MEMORANDUM FOR A REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP), BIN SET #3, IDAHO NATIONAL ENGINEERING LABORATORY (INEL), BUTTE COUNTY, IDAHO | 5281 | 00 |
| 28-MAY-93 | EARLE, O. K. | TRANSMITTAL OF ACTION MEMORANDUM FOR TIME CRITICAL REMOVAL ACTIONS (TCRA) PLANNED FOR FY-93 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) FOR INCLUSION INTO THE ADMINISTRATIVE RECORD (AR) FILE | OKE-64-93 | 00 |
| 24-FEB-93 | MARTY, R. C. | VALIDATION OF ORGANOCHLORINE HERBICIDE DATA FOURTH (4TH) QUARTER 1992 GROUNDWATER SAMPLING EFFORT AT WESTINGHOUSE IDAHO CHEMICAL PROCESSING PLANT (ICPP): SAMPLE DELIVERY GROUP (SDG) #GW00801W4 4GW00101W4 4GW00201W4 4GW01001W4 | RM-06-93-A | 00 |
| 29-OCT-92 | BURTON, B. N. | EDF - ENGINEERING DESIGN FILE - SUMMARY PROCESS DESCRIPTION OF PROPOSED REMEDIAL ALTERNATIVES FOR A CLEANUP OF PIT 9 AT THE INEL RWMC | ERD-BWP-077 | 00 |
| 28-SEP-92 | BATTAGLIA, P. J. | FEASIBILITY STUDY (FS) FOR GAMMA PROFILING AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | FL-92-0234 | 00 |
| 17-AUG-92 | RETZLAFF, R. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY | 903-1188 | 00 |
| 10-JUL-92 | LYLE, J. L. | MODIFICATIONS TO OPERABLE UNIT (OU) 3-07 TANK FARM SAMPLING & ANALYSIS PLAN (SAP) AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | AM/ERWM-RPO-154-92 | 00 |
| 03-JUN-92 | LYLE, J. L. | TRANSMITTAL OF THE ADDENDUM FOR RESPONSE TO COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-08 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | RPO-129-92 | 00 |
| 01-MAY-92 | INEL COMMUNITY RELATIONS | CITIZENS' GUIDE - CITIZENS CAN INFLUENCE PUBLIC INVOLVEMENT IN CLEANUP PROCESS | 7760 | 00 |
| 24-APR-92 | LYLE, J. L. | TRANSMITTAL OF THE ADDENDUM FOR THE RESPONSE TO EPA AND IDHW COMMENTS FOR THE DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | RPO-091-92 | 00 |
| 07-APR-92 | LYLE, J. L. | TRANSMITTAL OF SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-08 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP 3 (WAG-3) | ERD1-098-92 | 00 |
| 31-MAR-92 | WINCO | SAMPLING AND ANALYSIS PLAN (SAP) FOR OPERABLE UNIT (OU) 3-08 TANK FARM AREA II IDAHO CHEMICAL PROCESSING PLANT (ICPP), REV.01 | 5276 | 00 |
| 02-MAR-92 | LYLE, J. L. | TRANSMITTAL OF THE SAMPLING AND ANALYSIS PLAN (SAP) FOR OU 3-07 AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) WAG-3 | RPO-047-92 | 00 |
| 28-FEB-92 | WINCO | SEE OKE-75-92 FOR MODIFICATIONS - DRAFT IDAHO CHEMICAL PROCESSING PLANT (ICPP) SAMPLING & ANALYSIS PLAN (SAP) FOR OU 3-07 TANK FARM AREA | 4413 | 00 |
| 01-JAN-92 | MOTAZED, B. | PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6623 | 00 |
| 01-JAN-92 | FINDLEY, J. E. | ENERGY & COSTS SCOPING STUDY FOR PLASMA PYROLYSIS THERMAL PROCESSING SYSTEM | EGG-WTD-9993 | 00 |
| 16-DEC-91 | GOLDER ASSOCIATES, INC. | SAMPLING & ANALYSIS PLAN (SAP) FOR SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-14 AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) - (TECHNICAL WORK PLAN) REV.02 | 6636 | 00 |
| 10-SEP-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 | SGS-353-91 | 00 |
| 22-AUG-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 | SGS-334-91 | 00 |
| 31-JUL-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 | SGS-289-91 | 00 |
| 16-JUL-91 | FORD, J. S. | DOCUMENT REVIEW: CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-40 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL | ERD-102-91 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 04-APR-91 | NOT SPECIFIED | DEAR CITIZEN LETTER - WORKSHOPS CONCERNING DOE FIVE (5) YEAR PLANNING PROCESS 03/91 | 3442 | 00 |
| 14-MAR-91 | BURNS, T. F. | NOTIFICATION OF MODIFICATION OF PART A PERMIT FOR INEL - SUMMARY OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) LAND DISPOSAL RESTRICTIONS (LDR) RECLASSIFICATIONS | ERD-075-91 | 00 |
| 01-MAR-91 | DOE | WORKSHOP SUMMARY: DOE FIVE (5) YEAR PLANNING PROCESS INEL 03/91 | 2952 | 00 |
| 27-FEB-91 | SOLECKI, J. E. | SUBMITTAL OF SUMMARY ANALYTICAL DATA FOR INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | ERD-036-91 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT | 6625 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEICAL PROCESSING PLANT (ICPP) TANK FARM CONTAMINATED SOIL INVESTIGATION | 6632 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | REPORT FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-39 | 893-1195.310 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-59 | 893-1195.320 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) DRILLING AND SAMPLING PROGRAM AT LAND DISPOSAL UNIT (LDU) CPP-64 | 893-1195.330 | 00 |
| 01-JAN-91 | GOLDER ASSOCIATES, INC. | CHEMICAL PROCESSING PLANT (CPP) DRILLING & SAMPLING PROGRAM AT SOLID WASTE MANAGEMENT UNIT (SWMU) CPP-54 | 893-1195.360 | 00 |
| 01-JAN-91 | SOLECKI, J. E. | SUBMITTAL OF SUMMARY ANALYTICAL DATA INVESTIGATIONS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | ERD-011-91 | 00 |
| 27-JUN-90 | BRUSH, P. N. | ENVIRONMENTAL ASSESSMENT (EA) FOR PROCESS EQUIPMENT WASTE (PEW) & PROCESS WASTE LIQUID COLLECTION SYSTEM TASKS AT INEL | 2944 | 00 |
| 01-JUN-90 | NOT SPECIFIED | ENVIRONMENTAL ASSESSMENT (EA) PROCESS EQUIPMENT WASTE (PEW) AND PROCESS WASTE LIQUID COLLECTION SYSTEMS DOE EA NO. 0437 | 2942 | 00 |
| 08-MAY-90 | MIYASAKI, D. H. | ENGINEERING DESIGN FILE (EDF) - CALCULATION OF OFF GAS CONCENTRATIONS DURING IN SITU VITRIFICATION (ISV) PROCESS - INTERMEDIATE FIELD TEST | ERP-ISV-034 | 00 |
| 11-DEC-89 | MOZES, R. F. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) INJECTION WELL ABANDONMENT REPORT | RFM-41-89 | 00 |
| 01-NOV-88 | THOMAS, T. R. | MODELING HYPOTHETICAL GROUNDWATER TRANSPORT OF NITRATES, CHROMIUM, & CADMIUM AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) | WINCO-1060 | 00 |
| 21-JUL-87 | ANL-W | INITIAL ASSESSMENT - TREAT PHOTO PROCESSING DISCHARGE DITCH | 5500 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS | 5422 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL FROM LEAK IN LINE FROM CPP WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 5380 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED SOIL FROM LEAK IN LINE FROM WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 6681 | 00 |
| 11-APR-85 | NISHIMOTO, D. D. | IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DDN-01-85 | 00 |
| 26-OCT-84 | MESERVEY, R. H. | TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT | RHM-33-84 | 00 |
| 28-NOV-83 | HICKS, F. E. | DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 | MK-83-E-1792 | 00 |
| 01-SEP-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION AND DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) FUEL - ELEMENT CUTTING FACILITY | WM-F1-83-024 | 00 |
| 01-MAY-83 | SCHMIDT, D. A. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR CHEMICAL PROCESSING PLANT 603 (CPP-603) BIF FILTER ROOM | WM-F1-83-006 | 00 |
| 01-MAY-82 | LOW, J. O. | INTERNAL TECHNICAL REPORT - RADIOACTIVE WASTE CHARACTERIZATION OF CHEMICAL PROCESSING PLANT 603 (CPP-603) CLEANUP BASIN SYSTEM CPP-740 | WM-F1-81-023 | 01 |
| 01-MAY-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHARACTERIZATION OF THE RALA OFF GAS CELL, CHEMICAL PROCESSING PLANT 631 (CPP-631) | WM-F1-81-010 | 00 |
| 01-MAR-81 | BRADFORD, D. J. | INTERNAL TECHNICAL REPORT - CHEMICAL PROCESSING PLANT 633 (CPP-633) NAK FURNACE CHARACTERIZATION | WM-F1-81-004 | 00 |
| 01-SEP-80 | WINCO | CHARACTERISTICS OF THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) SANITARY WASTE COLLECTION SYSTEMS | 6650 | 00 |
| 01-APR-73 | NICCUM, M. R. | FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 4962 | 00 |
| 17-APR-62 | LATCHUM, J. W. | REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) | LA-53-62A | 00 |