Search Within All Documents

File Category is PF190.10

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
20-SEP-07 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25153 00
19-SEP-07 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25155 00
17-SEP-07 JENSEN, N. R. REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT FMDP-RFDP-07-023 00
28-SEP-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25023 00
28-SEP-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO REQUEST TO EXTEND THE ENFORCEABLE MILESTONES FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT 25024 00
27-SEP-06 JENSEN, N. R. REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT OPERABLE UNIT (OU) 1-10 REMEDIAL ACTION (RA) REPORT FMDP-RFDP-06-049 00
27-JUL-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST FOR AN EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) 24985 00
19-JUL-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST FOR TIME EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) 24984 00
13-JUL-06 JENSEN, N. R. REQUEST FOR TIME EXTENSION FOR STORAGE OF DEBRIS IN WASTE BOXES AT THE FULL CONTAINER STORAGE AREA AT THE IDAHO CERCLA DISPOSAL FACILITY (ICDF) FMDP-RFDP-06-043 00
28-APR-06 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO APRIL 19, 2006 (04/19/06) LETTER REQUESTING ELIMINATION OF REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT, OPERABLE UNIT (OU) 1-10 WASTE AREA GROUP 1 (WAG-1 24937 00
28-APR-06 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO ELIMINATE THE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT, OPERABLE UNIT (OU) 1-10, WASTE AREA GROUP 1 (WAG-1), 24938 00
19-APR-06 JENSEN, N. R. REQUEST TO ELIMINATE THE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT FOR OPERABLE UNIT (OU) 1-10, WASTE AREA GROUP 1 (WAG-1) FMDP-RFDP-06-037 00
06-DEC-05 KOCH, D. F. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO ADDITIONAL EXTENSION FOR SUBMITTAL OF THE WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 3 FOR V-TANKS PHASE 2 TREATMENT 24923 00
06-DEC-05 CETO, N. ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL OF REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING THE DRAFT V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADENDUM 3 FOR PHASE 2 TREATMENT OF V-TANKS CONTENTS 24924 00
30-NOV-05 JENSEN, N. R. REQUEST TO EXTEND THE ENFORCEABLE MILESTONE FOR SUBMITTING DRAFT V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 TREATMENT OF V-TANK CONTENTS FMDP-RFDP-05-132 00
15-SEP-05 EINAN, D. R. DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DOE'S AUGUST 26, 2005 (08/26/05) REQUEST FOR STAGING PILE EXTENSION TO TREAT MERCURY CONTAMINATED SOIL AT THE INL CERCLA DISPOSAL FACILITY (ICDF) 24917 00
26-AUG-05 JENSEN, N. R. DOE REQUEST FOR EXTENSION OF SCHEDULE TO TREAT MERCURY CONTAMINATED SOIL AND FOR USE OF STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) SOIL STAGING PILE AT THE INL CERCLA DISPOSAL FACILITY (ICDF) FMDP-RFDP-05-081 00
01-MAR-05 KOCH, D. F. DEQ APPROVAL TO DOE REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 CHEMICAL OXIDATION TREATMENT OF V-TANK CONTENTS FOR WAG-1 OU 1-10 TO DECEMBER 31, 2005 (12/31/05) 24892 00
28-FEB-05 WILKENING, R. M. EPA APPROVAL TO DOE REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 CHEMICAL OXIDATION TREATMENT OF V-TANK CONTENTS FOR WAG-1 OU 1-10 TO DECEMBER 31, 2005 (12/31/05) 24893 00
24-FEB-05 HAIN, K. E. REQUEST TO EXTEND ENFORCEABLE MILESTONE FOR SUBMITTING DRAFT V-TANKS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, ADDENDUM 3 FOR PHASE 2 CHEMICAL OXIDATION TREATMENT OF V-TANK CONTENTS FOR WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 FMDP-FFA/CO-05-128 00
30-JUN-04 KOCH, D. F. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO THE EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT 24875 00
29-JUN-04 SNOOK, J. G. EXTENSION REQUEST FOR THE OPERABLE UNIT (OU) 7-10 REMEDIAL ACTION (RA) REPORT EM-ER-04-137 00
17-NOV-03 HAIN, K. E. EXTENSION OF COMMENT RESOLUTION FOR OPERABLE UNIT (OU) 1-10 RECORD OF DECISION (ROD) AMENDMENT AND OPERABLE UNIT (OU) 3-13 GROUP 3 PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-03-287 00
20-AUG-03 O'NEILL, K. C. TWENTY (20) DAY EXTENSION NOTIFICATION FOR SUBMITTAL OF THE DRAFT FINAL ADDENDUM FOR THE CONSTRUCTION WORK PLAN (CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) EM-ER-03-207 00
05-MAR-03 HAIN, K. E. REQUEST FOR A MILESTONE EXTENSION RELATED TO SUBMISSION OF PHASED WASTE AREA GROUP 3 (WAG-3) GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLANS - POSITION PAPER FOR PHASING THE WAG-3 GROUP 3 RD/RA EM-ER-03-064 00
25-FEB-03 HAIN, K. E. NOTIFICATION OF UNEXPECTED CONDITIONS AND REQUEST FOR VES-SFE-20 HOT WASTE TANK SYSTEM HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION RECOVERY ACT (RCRA) CLOSURE PLAN (CP) MILESTONE RELIEF EM-ER-03-055 00
03-DEC-02 IANI, L. J. INEEL PIT 9 DISPUTE RESOLUTION -CONFIRMATION OF ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) UNDERSTANDING OF MAJOR POINTS DISCUSSED DURING FRIDAY'S TELECONFERENCE 24722 00
06-MAR-02 ABRAHAM, S. LETTER FROM THE SECRETARY OF ENERGY TO THE GOVERNOR OF IDAHO - PROPOSAL TO RESOLVE DISPUTE IS BEING ACTIVELY PURSUED 24730 00
09-JAN-02 KEMPTHORNE, D. LETTER FROM GOVERNOR OF IDAHO TO THE SECRETARY OF ENERGY - CONTROVERSY REGARDING CLEANUP OF PIT 9 - RESOLUTION OF OUTSTANDING ISSUES 24732 00
14-DEC-01 FREI, M. W. EVALUATION OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER DATED JULY 23, 2001 (07/23/01) TO THE GOVERNOR OF IDAHO FOR RESOLUTION - INCLUDED DEPARTMENT OF ENERGY (DOE) POSITION PAPER EM-ER-01-200 00
30-NOV-01 CASTANON, L. A. INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT WITH AN ADDITIONAL EXTENSION TO CURRENT DEADLINE - NEW DEADLINE OF DECEMBER 15, 2001 (12/15/2001) 24721 00
28-NOV-01 ALLRED, C. S. INEEL PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) PROPOSAL FOR SETTLEMENT 24720 00
30-OCT-01 FREI, M. W. EXTENSION OF DISPUTE RESOLUTION FOR PIT 9 RETRIEVAL DEMONSTRATION UNTIL NOVEMBER 30, 2001 (11/30/2001) - CONTAINS LIST OF ENFORCEABLE DEADLINES & MILESTONES EM-ER-01-180 00
25-OCT-01 CASTANON, L. A. INEEL PIT 9 DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) AGREEMENT TO THE NOVEMBER 30, 2001 (11/30/2001) EXTENSION DATE 24718 00
25-OCT-01 HAIN, K. E. RESPONSE TO AUGUST 22, 2001 (08/22/2001) ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUEST FOR INFORMATION PURSUANT TO SECTION 104 0F CERCLA FOR WAG-7 OF THE INEEL EM-ER-01-173 00
15-OCT-01 ALLRED, C. S. PIT 9 DISPUTE RESOLUTION - AGREEMENT TO EXTEND DEADLINE FOR AN ADDITIONAL PERIOD OF TIME CONCLUDING ON NOVEMBER 30, 2001 (11/30/2001) - ENFORCEABLE DEADLINES LISTED 24715 00
12-OCT-01 ALLRED, C. S. PHONE CALL CONFIRMED FIRM DATES FOR FINAL TWO MILESTONES FOR STAGE II OF PIT 9 PROJECT - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEABLE TO EXTENSION OF DISPUTE RESOLUTION DATE TO NOVEMBER 30, 2001 (11/30/01) 24714 00
11-OCT-01 BERGHOLZ, W. E. CONFIRMS TELEPHONE DISCUSSIONS HELD OCTOBER 11, 2001 (10/11/01) BETWEEN STEVE ALLRED AND ASSISTANT SECRETARY ROBERSON CONCERNING EXTENSION OF OCTOBER 12, 2001 (10/12/01) PIT 9 DISPUTE RESOLUTION DEADLINE, DOE REQUESTS EXTENSION TO NOVEMBER 30, 2001 24713 00
10-OCT-01 ROBERSON, J. H. THREE ENFORCEABLE MILESTONES SUCCESSFULLY DEVELOPED BY IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ), ENVIRONMENTAL PROTECTION AGENCY (EPA) AND DOE NEGOTIATING TEAM FOR PIT 9 DISPUTE DURING OCTOBER 3, 2001 (10/03/01) TELECONFERENCE MEETING 24711 00
10-OCT-01 BERGHOLZ, W. E. OCTOBER 3, 2001 (10/03/2001) PIT 9 TELECONFERENCE MEETING RESULTED IN AGREEMENT ON SEVERAL MILESTONES FOR STAGE II WITH DRAFT PROPOSED REVISIONS ATTACHED EM-ER-01-168 00
05-OCT-01 KREIZENBECK, R. DISPUTE RESOLUTION, INEEL OPERABLE UNIT (OU) 7-10, PIT 9 - ENVIRONMENTAL PROTECTION AGENCY (EPA) OBSERVATIONS AND ASSIGNMENT OF STAFF TO NEGOTIATE A RESOLUTION 24708 00
02-OCT-01 JENKINS, T. W. RESPONSE TO IDEQ REQUEST FOR 20 (TWENTY) DAY EXTENSION FOR REVIEWS OF DRAFT STAGING, STORAGE, STABILIZATION & TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN & INEEL CERCLA DISPOSAL FACILITY (ICDF) 60% DESIGN COMPONENTS EM-ER-01-161 00
25-SEP-01 ROBERSON, J. H. LETTER TO IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DIRECTOR FROM DEPARTMENT OF ENERGY (DOE) ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT (EM) - AGREEMENT REACHED ON A CONCEPTUAL PATH FORWARD - FUNDAMENTAL TOPICS OF AGREEMENT FOR PIT 9 24705 00
05-SEP-01 PIERRE, W. PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OU 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) AND IN SITU GROUTING (ISG) TREATABILITY STUDY (TS) - EPA DOES NOT CONCUR WITH EXPANDED SCOPE OF WORK 24706 00
30-AUG-01 LOCKHART, F. R. LETTER FROM DOE ROCKY FLATS FIELD OFFICE TO REGIONAL DIRECTOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) - OPTIMISTIC MEETING NEXT WEEK FOCUSED ON RESOLUTION OF PIT 9 DISPUTE WILL BE SUCCESSFUL 01-DOE-01667 00
29-AUG-01 FINDLEY, C. E. INEEL DISPUTE RESOLUTION OU 7-10 - PIT 9 DISPUTE NEGOTATIONS - ENVIRONMENTAL PROTECTION AGENCY'S (EPA'S) PROPOSAL - GOALS AND PATH FORWARD 24703 00
28-AUG-01 HATHAWAY, C. WASTE AREA GROUP 5 (WAG-5) EXTENSION REQUEST FOR PHASE I PRE-FINAL INSPECTION REPORT AND REMEDIAL ACTION (RA) REPORT FOR OPERABLE UNIT (OU) 5-12 EM-ER-01-143 00
15-AUG-01 FINDLEY, C. E. DISPUTE RESOLUTION OU 7-10 - NEED FOR STAGE I CORING - EXTENT OF ADDITIONAL SAMPLING NEEDED 24700 00
14-AUG-01 BOSTON, R. D. RESPONSE TO REPORT OF J. L. ALVAREZ AND J. A. AUXIER REGARDING WASTE RETRIEVAL FROM PIT 9, THE 90% DESIGN 24695 00
13-AUG-01 FINDLEY, C. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO UNDER SECRETARY OF ENERGY LETTER ON OU 7-10 DISPUTE RESOLUTION NEGOTIATION SCHEDULE EXTENSION TO OCTOBER 12, 2001 (10/12/2001) 24699 00
10-AUG-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO EXTENSION REQUEST FOR PIT 9 DISPUTE RESOLUTION 24698 00
07-AUG-01 CARD, R. G. LETTER FROM UNDER SECRETARY OF ENERGY TO ACTING ADMINISTRATOR OF ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10 (X) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED 24697 00
06-AUG-01 CARD, R. G. LETTER FROM UNDER SECRETARY OF ENERGY TO DIRECTOR OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) - DISPUTE OVER REQUEST BY DOE TO EXTEND SCHEDULE FOR IMPLEMENTATION OF WASTE RETRIEVAL IN PIT 9 - NEW NEGOTIATIONS BEING IMPLEMENTED 23573 00
25-JUL-01 FINDLEY, C. E. OPERABLE UNIT (OU) 7-10 PIT 9 MODIFICATIONS ANALYSIS - INEEL DISPUTE - ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURS WITH IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TO DENY DEPARTMENT OF ENERGY'S (DOE'S) REQUEST FOR AN EXTENSION 21473 00
23-JUL-01 ALLRED, C. S. DETERMINATION OF DISPUTE - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) MEMORANDUM DECISION AND ORDER ON DISPUTE RESOLUTION IN THE MATTER OF DEPARTMENT OF ENERGY'S (DOE'S) MARCH 16, 2001 (03/16/01) STATEMENT OF DISPUTE 24692 00
18-JUL-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) OPTIONS ON HOW TO PROCEED WITH PROJECT AND REACH AGREEMENT ON ACCEPTABLE SCHEDULE AND REMEDIAL APPROACH 24690 00
18-JUL-01 ALLRED, C. S. PIT 9 DISPUTE RESOLUTION - IDAHO DEPARTMENT OF EMVIRONMENTAL QUALITY (IDEQ) DENIAL OF DEPARTMENT OF ENERGY'S (DOE'S) FEBRUARY 26, 2001 (02/26/01) REQUEST FOR EXTENSION OF PIT 9 DEADLINES AND MARCH 16, 2001(03/16/01) STATEMENT OF DISPUTE 24691 00
17-JUL-01 HAIN, K. E. DISPUTE RESOLUTION - DELIVERY OF PIT 9 SCHEDULE DETAILED INFORMATION ON ASSUMPTIONS USED TO DEVELOP THE SCHEDULE SUBMITTED WITH THE FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION OF DEADLINES (EM-ER-01-028) EM-ER-01-123 00
11-JUL-01 HAIN, K. E. JULY 10 AND JULY 11, 2001 (07/11/2001 - 07/12/2001) MEETING ON PIT 9 SCHEDULE EXTENSION DISPUTE- STATEMENT FROM EACH AGENCY LEAD CONCERNING RESULTS OF THE MEETING - SUMMATION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) 24740 00
05-JUL-01 BERGHOLZ, W. E. DISPUTE RESOLUTION - REVISED AGENDA FOR PIT 9 SCHEDULE DISPUTE MEETING TO BE HELD JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ALSO ENCLOSED IS A CONCEPTUAL DESCRIPTION OF AN ALTERNATIVE TO SCHEDULE AND SCOPE OF SCHEDULE PROVIDED BY IDEQ AND EPA OM-01-002 00
03-JUL-01 GREEN, O. D. DISPUTE RESOLUTION - STAGE II VALUE ENGINEERING REVIEW MEETING SCHEDULED JULY 10 AND JULY 11, 2001 (07/10/01 - 07/11/01) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RECEIVED AND REVIEWED PROPOSED SCHED 24689 00
26-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - OPERABLE UNIT (OU) 7-10 ENVIRONMENTAL PROTECTION AGENCY (EPA) SCHEDULE ASSUMPTIONS 24688 00
25-JUN-01 COOK, B. A. AGENDA FOR OU 7-10 STAGE II VALUE ENGINEERING REVIEW EM-ER-01-110 00
15-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) 24686 00
15-JUN-01 ALLRED, C. S. DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREES TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE TO JULY 18, 2001 (07/18/2001) 24687 00
14-JUN-01 FINDLEY, C. E. DISPUTE RESOLUTION - ENVIRONMENTAL PROTECTION AGENCY (EPA) AGREEMENT TO OPERABLE UNIT (OU) 7-10 EXTENSION OF DEADLINE JULY 6, 2001 (07/06/2001) 24684 00
08-JUN-01 FINDLEY, C. E. ENVIRONMENTAL PROTECTION AGENCY (EPA) STATEMENT OF DISPUTE - DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24683 00
08-JUN-01 ALLRED, C. S. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) WILL EXTEND DEADLINE FOR RESOLVING DISPUTE OVER EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24685 00
07-JUN-01 COOK, B. A. CONFIRMATION OF JUNE 7, 2001 (06/07/2001) SENIOR EXECUTIVE COMMITTEE (SEC) CONFERENCE CALL DECISIONS EM-ER-01-098 00
23-MAY-01 ALLRED, C. S. DISPUTE RESOLUTION - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) JOINT COUNTER PROPOSAL 24682 00
20-APR-01 ALLRED, C. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AGREEMENT TO EXTEND TIME FRAME FOR DELIBERATIONS OF THE SENIOR EXECUTIVE COMMITTEE (SEC) 24681 00
19-APR-01 LYLE, J. L. COMMITMENT TO PROVIDE A PROPOSED PATH FORWARD AND PROPOSAL TO EXTEND THE SENIOR EXECUTIVE COMMITTEE (SEC) TIME PERIOD FOR RESOLUTION OF DISPUTE EM-ER-01-073 00
02-APR-01 LYLE, J. L. ELEVATION OF OPERABLE UNIT (OU) 7-10 DISPUTE RESOLUTION TO THE SENIOR EXECUTIVE COMMITTEE (SEC) EM-ER-01-057 00
27-MAR-01 GREEN, O. D. PIT 9 - IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE 24677 00
21-MAR-01 GEARHEARD, M. F. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY'S (DOE'S) INVOCATION OF DISPUTE 24738 00
16-MAR-01 HAIN, K. E. SUBMITTAL OF STATEMENT OF DISPUTE TO DISPUTE RESOLUTION COMMITTEE REGARDING REQUEST FOR EXTENSION OF MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-048 00
12-MAR-01 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) NON-CONCURRENCE OF REQUEST TO EXTEND DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24671 00
09-MAR-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DENIAL OF FEBRUARY 26, 2001 (02/26/2001) REQUEST FOR EXTENSION DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 24670 00
26-FEB-01 EDGERTON, B. G. DEPARTMENT OF ENERGY (DOE) REQUEST FOR EXTENSION OF DEADLINES FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 EM-ER-01-028 00
29-JAN-01 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TABLE DESCRIBING MINIMUM INFORMATION NEEDED TO REACH A SUPPORTABLE DECISION FOR WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) 24669 00
27-SEP-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION EM-ER-188-00 00
25-AUG-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 RECORD OF DECISION (ROD) - REQUEST FOR EXTENSION EM-ER-162-00 00
15-AUG-00 HAIN, K. E. DOE RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY (EPA) LETTER DATED JULY 7, 2000 (07/07/2000) & IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) LETTER DATED JULY 19, 2000 (07/19/2000) - PIT 9 RECORD OF DECISION (ROD) REQUEST FOR EXTENSION EM-ER-153-00 00
19-JUL-00 NYGARD, D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE 30, 2000 (06/30/2000) - OU 7-10 STAGED INTERIM ACTION PROJECT (SIAP) - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN 24667 00
07-JUL-00 PIERRE, W. ENVIRONMENTAL PROTECTION AGENCY (EPA) RESPONSE TO DEPARTMENT OF ENERGY (DOE) LETTER DATED JUNE, 30 2000 (06/30/2000) CONCERNING REQUEST FOR MODIFICATION MILESTONES FOR WASTE AREA GROUP 7 (WAG-7) 24666 00
30-JUN-00 HAIN, K. E. OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT - TRANSMITTAL OF STAGE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - (EXTENSION OF OPERABLE UNIT (OU) 7-10, 7-13 & 7-14 ENFORCEABLE DEADLINES) EM-ER-118-00 00
13-APR-00 HAIN, K. E. WASTE AREA GROUP 7 (WAG-7) REQUEST FOR MODIFICATION OF MILESTONES - OPERABLE UNIT (OU) 7-10 STAGED INTERIM ACTION (SIA) PROJECT, OU 7-13 & 7-14 PITS AND TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) OPE-ER-63-00 00
28-SEP-99 TALLMAN, JANE EXTENSION FOR TEMPORARY USE OF REMEDIATION WELLS FOR INJECTION OF ISB TREATABILITY STUDY AMENDMENTS AND TEMPORARY USE OF INJECTION WELL TAN-49 FOR INJECTING TREATED WATER DURING PHASE B REMEDIATION IR-25286 0
10-SEP-98 PIERRE, W. SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B DRAFT PHASE I & PHASE II FIELD DEMONSTRATION REPORTS (FDRS) 18053 00
03-SEP-98 ENGLISH, M. SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B IN SITU BIOREMEDIATION (ISB) TREATABILITY STUDY (TS) 18060 00
31-AUG-98 SHAW, R. M. SCHEDULE EXTENSION REQUEST FOR OPERABLE UNIT (OU) 1-07B IN SITU BIOREMEDIATION (ISB) TREATABILITY STUDY (TS) OPE-ER-139-98 00