| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 04-DEC-06 | OPALSKI, D. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) CONCURRENCE WITH THE IDAHO NATIONAL LABORATORY (INL) FIVE (5) YEAR REVIEW, 2006 | 25063 | 00 |
| 06-SEP-06 | ROUSSEAU, J. P. | RESPONSE TO COMMENTS ALLEGING IDAHO NATIONAL LABORATORY (INL) RELATED CS-137 AND SR-90 CONTAMINATION IN THE MICHAUD FLATS AREA NEAR POCATELLO, IDAHO | CCN 304024 | 00 |
| 01-JUN-05 | PORTAGE ENVIRONMENTAL | REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 9 (WAG-9) OPERABLE UNIT (OU) 9-04 AT THE IDAHO NATIONAL LABORATORY (INL) - APPENDIX B CONTAINS AGENCY REVIEW COMMENTS AND COMMENT RESOLUTIONS | PORTAGE-05-002 | 01 |
| 15-APR-04 | SCHMITT, E. C. | LOW LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP (LFRG) REVIEW AND APPROVAL OF THE REVISED COMPLIANCE DEMONSTRATION DOCUMENTS, COMPOSITE ANALYSIS AND PERFORMANCE ASSESSMENT FOR THE ICDF LANDFILL | 24845 | 00 |
| 14-APR-04 | CODY, C. A. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) TECHNICAL REVIEW COMMENTS FOR DRAFT REMEDIAL ACTION (RA) REPORT FOR THE INEEL, CENTRAL FACILITIES AREA (CFA) CFA-04 POND MERCURY CONTAMINATED SOILS OPERABLE UNIT (OU) 4-13 | 24844 | 00 |
| 11-FEB-04 | HALL, R. C. | TRANSMITTAL OF FINAL OU 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-04-030 | 00 |
| 14-JUL-03 | JEFFERS, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE SAMPLING AND ANALYSIS PLAN (SAP) FOR POST-PHYTOREMEDIATION CHARACTERIZATION OF ANL-WEST (ANL-W) CERCLA SITES OPERABLE UNIT (OU) 9-04 | 24808 | 00 |
| 27-MAY-03 | IDEQ | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS TO CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II, AND III ANNUAL MONITORING REPORT (2002) | 24810 | 00 |
| 27-MAY-03 | EPA | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS TO CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II, AND III ANNUAL MONITORING REPORT (2002) | 24811 | 00 |
| 20-MAY-03 | JEFFERS, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON DRAFT SAMPLING AND ANALYSIS PLAN (SAP) FOR POST-PHYTOREMEDIATION CHARACTERIZATION OF FOUR CERCLA SITES AT ANL-WEST (ANL-W) OPERABLE UNIT (OU) 9-04 | 24799 | 00 |
| 31-MAR-03 | CODY, C. A. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON DRAFT CONSTRUCTION COMPLETE REPORT FOR CENTRAL FACILITIES AREA 08 (CFA-08) | 24781 | 00 |
| 31-MAR-03 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) MARCH 2003 (03/03) REVIEW COMMENTS ON FEBRUARY 2003 (02/03) DRAFT CONSTRUCTION COMPLETE REPORT FOR INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13, CFA-08 SEWAGE PLANT DRAINFIELD | 24782 | 00 |
| 25-MAR-03 | IDEQ | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II | 24792 | 00 |
| 25-MAR-03 | IDEQ | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | 24793 | 00 |
| 25-MAR-03 | EPA | U. S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS AND RESOLUTIONS - WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, PHASE II | 24794 | 00 |
| 25-MAR-03 | IDEQ | STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS - WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, PHASE II | 24795 | 00 |
| 18-FEB-03 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW OF FISCAL YEAR 2002 (FY-02) OPERATIONS AND MAINTENANCE (O&M) REPORT FOR THE CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 | 24787 | 00 |
| 10-FEB-03 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PHASE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | 24770 | 00 |
| 10-FEB-03 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE DRAFT FINAL GROUNDWATER MONITORING PLAN (GMP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) | 24772 | 00 |
| 10-FEB-03 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS ON THE FIELD SAMPLING PLAN (FSP) FOR WASTE AREA GROUP 5 (WAG-5) REMEDIAL ACTION (RA) PHASE II | 24773 | 00 |
| 06-FEB-03 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT FINAL WASTE AREA GROUP 5 (WAG-5) PHASE II REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | 24771 | 00 |
| 10-JAN-03 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DECEMBER 2002 (12/02) DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 4-13 CFA-04 POND | 24765 | 00 |
| 22-NOV-02 | CODY, C. A. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS FOR WASTE AREA GROUP 4 (WAG-4) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA-04 POND MERCURY CONTAMINATED SOIL, OPERABLE UNIT (OU) 4-13 | 24764 | 00 |
| 14-NOV-02 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW OF 2002 DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA ) WORK PLAN AND FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 4-13, CFA -04 POND | 24760 | 00 |
| 02-AUG-02 | NEITZEL, S. | LETTER FROM THE IDAHO STATE HISTORICAL SOCIETY - REVIEW COMMENTS ON THE GLOVEBOX EXCAVATOR METHOD PROJECT AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 24754 | 00 |
| 21-JUN-02 | EPA | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS AND RESOLUTIONS FOR FIELD SAMPLING PLAN (FSP) FOR PRE-REMEDIATION OF CENTRAL FACILITIES AREA 04 (CFA-04) POND | 24679 | 00 |
| 21-JUN-02 | IDEQ | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS FOR FIELD SAMPLING PLAN (FSP) FOR PRE-REMEDIATION OF CENTRAL FACILITIES AREA 04 (CFA-04) POND | 24680 | 00 |
| 11-JUN-02 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS FOR THE FIELD SAMPLING PLAN (FSP) FOR THE PRE-REMEDIATION SAMPLING OF THE CENTRAL FACILITIES AREA-04 (CFA-04) POND | 24664 | 00 |
| 10-APR-02 | PERKINS, T. L. | DOE COMMENTS ON PUBLIC PARTICIPATION PACKAGE AND HAZARDOUS WASTE MANAGEMENT ACT (HWMA) RESOURCE CONSERVATION RECOVERY ACT (RCRA) CLOSURE PLAN (CP) FOR VES-SFE-20 HOT WASTE TANK SYSTEM AT INEEL INTEC | EM-ER-02-054 | 00 |
| 04-APR-02 | ENGLISH, B. L. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON CLOSURE PLAN (CP) FOR TRANSURANIC STORAGE AREA (TSA) INTERIM STATUS UNITS (PADS 1, 2, AND R) LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) ON THE INEEL (EPA ID NOS. ID489000895 | 24734 | 00 |
| 29-MAR-02 | CODY, C. A. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS FOR DRAFT CONSTRUCTION COMPLETE REPORT FOR CENTRAL FACILITIES AREA (CFA) OU 4-13 TRANSFORMER YARD CFA-10 | 10969 | 00 |
| 25-MAR-02 | IVY, K. | EPA REVIEW COMMENTS - DRAFT CONSTRUCTION COMPLETE REPORT FOR INEEL CFA OU 4-13 TRANSFORMER YARD - CFA-10 | 10968 | 00 |
| 25-MAR-02 | HAIN, K. E. | COMMENTS SUBMITTED BY DOE-ID PROGRAMMATIC SAFETY REVIEW GROUP ON PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT AND RESPONSES TO EPA AND IDEQ COMMENTS ON CONCEPTUAL DESIGN REPORT (CDR) | EM-ER-02-043 | 00 |
| 14-MAR-02 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON WASTE AREA GROUP 5 (WAG-5) INSTITUTIONAL CONTROLS STATUS REPORT FOR POWER BURST FACILITY (PBF) AND AUXILIARY REACTOR AREA (ARA) OPERABLE UNIT (OU) 5-12 (PBF/ARA) FOR YEAR 2 | 10967 | 00 |
| 11-MAR-02 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4) CFA-08 SEWAGE PLANT DRAINFIELD OPERABLE UNIT (OU) 4-13 | 10966 | 00 |
| 25-JAN-02 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW OF THE FISCAL YEAR 2001 (FY-2001) INSTITUTIONAL CONTROL INSPECTION REPORT FOR THE CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 | 10959 | 00 |
| 24-JAN-02 | NYGARD, D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON PIT 9 10% CONCEPTUAL DESIGN FOR GLOVEBOX EXCAVATOR METHOD | 24724 | 00 |
| 23-JAN-02 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT 10% REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR STAGE II PIT 9 GLOVEBOX EXCAVATOR METHOD OPERABLE UNIT (OU) 7-10 | 24723 | 00 |
| 09-JAN-02 | LIVIERATOS, T. | IDEQ REVIEW COMMENTS AND RESOLUTIONS ON REMEDIAL ACTION (RA) REPORT FOR WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT FINAL) | 10953 | 00 |
| 07-JAN-02 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) GENERAL, SPECIFIC AND EDITORIAL REVIEW COMMENTS ON THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4), CFA-08 SEWAGE PLANT DRAINFIELD, OPERABLE UNIT (OU) 4-13 (DRAFT) | 10954 | 00 |
| 03-DEC-01 | LIVIERATOS, T. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) GENERAL AND SPECIFIC COMMENTS ON REMEDIAL ACTION (RA) REPORT FOR WAG-5 OU 5-12 PHASE I REMEDIAL ACTION (RA); SITES ARA-02, ARA-16, ARA-25, AND INACTIVE SITES ARA-07, ARA-08, ARA-13 AND ARA-21 (DRAFT) | 21566 | 00 |
| 01-NOV-01 | VERNON, D. K. | RESOLUTION LIST (COMMENT RESPONSES) FOR IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23621 | 00 |
| 01-NOV-01 | VERNON, D. K. | RESOLUTION LIST (COMMENT RESPONSES) FOR ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23623 | 00 |
| 22-OCT-01 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23620 | 00 |
| 09-OCT-01 | COLLINS, R. L. | RESPONSE TO THE ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE GROUP 6 GAS CYLINDERS AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | EM-ER-01-166 | 00 |
| 02-OCT-01 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON THE 60% REMEDIAL DESIGN (RD) COMPONENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 23622 | 00 |
| 17-AUG-01 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REMEDIAL ACTION (RA) REVIEW - INEEL STATIONARY LOW POWER REACTOR 1 (SL-1) AND BOILING WATER REACTOR 1 (BORAX I) BURIAL GROUNDS | 23603 | 00 |
| 29-MAY-01 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS AND RESOLUTIONS ON THE INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% REMEDIAL DESIGN (RD) PACKAGE AND 90% TEST PAD PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 22510 | 00 |
| 25-MAY-01 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) DOCUMENT REVIEW COMMENTS ON THE DRAFT INEEL CERCLA DISPOSAL FACILITY (ICDF) 30% DESIGN PACKAGE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) | 22509 | 00 |
| 03-APR-01 | SMITH, B. D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS AND RESOLUTIONS FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS, DOE/ID-10838 | 23300 | 00 |
| 03-APR-01 | SMITH, B. D. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS AND RESOLUTIONS FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS, DOE/ID-10838 | 23302 | 00 |
| 21-FEB-01 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW OF STATUS OF OPERABLE UNIT (OU) 4-13 COMPREHENSIVE RECORD OF DECISION (ROD) INSTITUTIONAL CONTROLS SITES AND FINAL DOCUMENTATION FOR NO ACTION SITES | 22347 | 00 |
| 29-JAN-01 | IVY, K. | EPA REVIEW OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 | 22346 | 00 |
| 22-JAN-01 | CODY, C. A. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON DRAFT FIELD SAMPLING PLAN (FSP) FOR INEEL CENTRAL FACILITIES AREA (CFA) AT OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 | 21895 | 00 |
| 19-JAN-01 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON THE DRAFT FIELD SAMPLING PLAN (FSP) FOR INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 | 21894 | 00 |
| 30-NOV-00 | IDEQ | IDEQ COMMENTS & RESOLUTIONS ON THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DRAFT 30% DESIGN - DOE/ID-10825 | 21417 | 00 |
| 29-NOV-00 | EPA | EPA COMMENTS & RESOLUTIONS ON THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DRAFT 30% DESIGN - DOE/ID-10825 | 21416 | 00 |
| 24-NOV-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVORONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL REPORT FOR THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | 22501 | 00 |
| 31-OCT-00 | HAIN, K. E. | DOE RESPONSES TO AGENCY COMMENTS ON STAGE II DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-10 PIT 9 INTERIM RECORD OF DECISION (ROD) | EM-ER-00-206 | 00 |
| 26-OCT-00 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON WASTE AREA GROUP 5 (WAG-5) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II | 21902 | 00 |
| 16-OCT-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT CONCEPTUAL DESIGN REPORT AND ASSOCIATED DOCUMENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AND EVAPORATION POND FOR OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION ( | 22508 | 00 |
| 14-OCT-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS AND RESOLUTIONS ON THE 10% REMEDIAL DESIGN (RD) PACKAGE - CONCEPTUAL DESIGN REPORT AND ASSOCIATED DOCUMENTS FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 | 22507 | 00 |
| 05-SEP-00 | ENGLISH, M. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT STAGING AND STORAGE ANNEX (SSA) WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) | 22506 | 00 |
| 26-MAY-00 | ENGLISH, M. | STATE OF IDAHO DIVISION OF ENVIRONMENTAL QUALITY (IDEQ) COMMENTS ON DRAFT CONCEPTUAL DESIGN REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 REMEDIAL ACTION (RA) | 22444 | 00 |
| 26-MAY-00 | ENGLISH, M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) TECHNICAL REVIEW COMMENTS ON THE DRAFT 10% CONCEPTUAL DESIGN REPORT FOR THE STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) AT INTEC OPERABLE UNIT (OU) | 22505 | 00 |
| 10-MAY-00 | ENGLISH, M. | IDAHO DEPARTMENT OF HEALTH AND WELFARE DEVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ)TECHNICAL REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) OU 3-13 | 22503 | 00 |
| 10-MAY-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS ON DRAFT 10% CONCEPTUAL REMEDIAL DESIGN (RD) REPORT FOR STAGING, STORAGE, STABILIZATION AND TREATMENT FACILITY (SSSTF) - DOE/ID-10769 | 22841 | 00 |
| 09-MAY-00 | PIERRE, W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) DOCUMENT REVIEW COMMENTS ON THE DRAFT GEOTECHNICAL FIELD SAMPLING PLAN (FSP) TO SUPPORT THE CONCEPTUAL DESIGN OF THE INEEL CERCLA DISPOSAL FACILITY (ICDF) AT OPERABLE UNIT (OU) 3-13 | 22502 | 00 |
| 30-NOV-99 | CODY, C. A. | IDWH-DEQ TECHNICAL REVIEW COMMENTS ON POST RECORD OF DECISION (ROD) MONITORING REPORT AT OPERABLE UNIT (OU) 4-12 CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II, AND III (CFA-01, CFA-02, AND CFA-03) - DRAFT | 10965 | 00 |
| 06-OCT-99 | ROSE, K. A. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT POST RECORD OF DECISION (ROD) MONITORING REPORT AT OPERABLE UNIT (OU) 4-12 CENTRAL FACILITIES AREA (CFA) LANDFILL I, II & III | 18145 | 00 |
| 31-JUL-98 | WINTER, G. | IDHW REVIEW COMMENTS ON COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TRA OU 2-13 (DRAFT) REVISION B (REV.0B) | 16780 | 00 |
| 30-JUL-98 | POETON, R. W. | EPA COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 2-13 AT INEEL | 16779 | 00 |
| 24-FEB-98 | UNDERWOOD, E. J. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON TEST REACTOR AREA (TRA) WASTE AREA GROUP 2 (WAG-2) DRAFT FIELD SAMPLING PLAN (FSP) | 15112 | 00 |
| 20-FEB-98 | POETON, R. W. | EPA COMMENTS ON POST RECORD OF DECISION (ROD) SAMPLING & ANALYSIS PLAN (SAP) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) | 15219 | 00 |
| 01-FEB-98 | PARSONS | TRA WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | DOE/ID-10592 | 02 |
| 23-JAN-98 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON WASTE AREA GROUP 2 (WAG-2) DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) | 15104 | 00 |
| 22-JAN-98 | POETON, R. W. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR WASTE AREA GROUP 2 (WAG-2) OPERABLE UNIT (OU) 2-13 AT INEEL | 15105 | 00 |
| 30-DEC-97 | HAIN, K. E. | TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-08 FINAL PHASE II REMEDIATION STRATEGY FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) | OPE-ER-292-97 | 00 |
| 18-DEC-97 | EPA | IDAHO DEPARTMENT OF HEALTH AND WELFARE (IDHW) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) REVIEW COMMENTS AND COMMENT RESOLUTIONS FOR OPERABLE UNIT (OU) 7-08 FINAL PHASE II REMEDIATION STRATEGY FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) | 16060 | 00 |
| 11-DEC-97 | WILKENING, R. M. | EPA, IDHW & DOE REVIEW COMMENTS ON DRAFT FINAL PHASE II REMEDIATION STRATEGY FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 | 15103 | 00 |
| 01-OCT-97 | CODY, C. A. | IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) REVIEW OF DRAFT FINAL REMEDIAL ACTION (RA) REPORT OPERABLE UNIT (OU) 4-12 CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II & III NATIVE SOIL COVER PROJECT | 15231 | 00 |
| 20-AUG-97 | CODY, C. A. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) COMMENTS ON DRAFT REMEDIAL ACTION (RA) REPORT FOR CFA LANDFILLS, I, II & III NATIVE SOIL COVER PROJECT OPERABLE UNIT (OU) 4-12 | 15227 | 00 |
| 19-AUG-97 | ORLEAN, H. | ENVIRONMENTAL PROTECTION AGENCY (EPA) COMMENTS ON DRAFT REMEDIAL ACTION (RA) REPORT FOR CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II & III NATIVE SOIL COVER PROJECT OPERABLE UNIT (OU) 4-12 | 15225 | 00 |
| 13-NOV-95 | UNDERWOOD, E. J. | IDHW REVIEW COMMENTS ON OU 5-05 AND 6-01 DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK | 11486 | 00 |
| 03-NOV-95 | ROSENBERGER, M. S. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REVIEW COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) FOR CENTRAL FACILITIES AREA (CFA) LANDFILLS OPERABLE UNIT (OU) 4-12 | 15223 | 00 |
| 24-JUL-95 | GREEN, L. A. | PAD-A LIMITED ACTION DOCUMENTATION | 9965 | 00 |
| 10-AUG-94 | MEYER, L. | EPA COMMENTS ON DRAFT TECHNICAL MEMORANDUM POST RECORD OF DECISION (ROD) MONITORING FOR TRA PERCHED WATER SYSTEM OU 2-12 | 9107 | 00 |
| 28-JUL-94 | KOCH, D. F. | IDHW TECHNICAL REVIEW COMMENTS FOR ANNUAL TECHNICAL MEMORANDUM FOR THE FIRST (1ST) YEAR OF POST RECORD OF DECISION (ROD) GROUNDWATER MONITORING TRA PERCHED WATER OU 2-12 | OPE-ER-182-94 | 00 |
| 18-JUL-94 | NYGARD, D. | REVIEW COMMENTS ON THE INEL COMMUNITY RELATIONS PLAN, APRIL 1994 (04/94) | 8110 | 00 |
| 30-MAR-94 | MEYER, L. | EPA COMMENTS - PRELIMINARY DRAFT TRACK 2 SUMMARY REPORT COMMENTS FOR THE NAVAL REACTORS FACILITY (NRF) OU 8-06 & POSITION STATEMENT FOR 8-06 UNITS | 5667 | 00 |
| 18-MAR-94 | LIVERMAN, E. | EPA REVIEW COMMENTS OF DRAFT LIMITED ACTION PAD-A REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK | 9966 | 00 |
| 09-NOV-93 | MK-FIC | DOE, EPA AND IDHW REVIEW COMMENTS AND RESOLUTIONS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REV.01 FOR PBF INTERIM ACTION (IA) OU 5-13 | 7212 | 00 |
| 29-SEP-93 | ENGLISH, M. | REVIEW OF THE DRAFT REMEDIAL (PRE-FINAL) DESIGN FOR OU 1-07A GROUNDWATER TREATMENT FACILITY (GWTF) | 6896 | 00 |
| 04-MAR-93 | LIVERMAN, E. | REVIEW COMMENTS OU 1-07A DRAFT TECHNICAL MEMORANDUM - GROUNDWATER COLLECTION SYSTEM | 6763 | 00 |
| 26-FEB-93 | ENGLISH, M. | REVIEW OF DRAFT GROUNDWATER COLLECTION SYSTEM DESIGN TECHNICAL MEMORANDUM FOR OPERABLE UNIT (OU) 1-07A INTERIM ACTION (IA) | 6764 | 00 |
| 15-AUG-92 | ASI | SUMMARY OF PUBLIC SCOPING COMMENTS CONCERNING PROPOSED CLEANUP OF PERCHED WATER AT TRA | 6042 | 00 |
| 01-JAN-92 | DOE | RESPONSE TO PUBLIC COMMENTS ON INEL SITE SPECIFIC PLAN (SSP) | 4424 | 00 |
| 22-OCT-91 | NIELSEN, L. E. | WRITTEN COMMENTS FROM PUBLIC ON INEL FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) COMMENT PERIOD 10/91 | 3294 | 00 |
| 25-SEP-91 | NAGEL, J. | EXTENSION OF PUBLIC COMMENT PERIOD REGARDING PROPOSED INEL FEDERAL FACILITY AGREEMENT & CONSENT ORDER (FFA/CO) | 3305 | 00 |
Previous Page | Administrative Record Home Page