| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 09-AUG-10 | NOT SPECIFIED | PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11389 | 1 |
| 27-JAN-10 | NOT SPECIFIED | PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11405 PART 1 | 0 |
| 27-JAN-10 | NOT SPECIFIED | PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11405 PART 2 | 0 |
| 19-AUG-09 | NOT SPECIFIED | PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 | DOE/ID-11389 | 0 |
| 02-JUL-09 | NOT SPECIFIED | IN SITU BIOREMEDIATION REMEDIAL ACTION WORK PLAN FOR TAN FINAL GROUNDWATER REMEDIATION, OU 1-07B | DOE/ID-11015 | 3 |
| 02-JUL-09 | NOT SPECIFIED | MONITORED NATURAL ATTENUATION REMEDIAL ACTION WORK PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT 1-07B | DOE/ID-11055 | 1 |
| 30-JAN-08 | DAVISON, L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM | DOE/ID-11048 | 02 |
| 15-NOV-07 | SCHWENDIMAN, G. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4-6 (PHASE II) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN APPENDIX F-1, NEW SITE CPP-130 - SOILS AND BURIED DEBRIS - NOVEMBER 2007 | DOE/ID-11342 | 00 |
| 01-OCT-07 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II | DOE/NE-ID-11127 | 01 |
| 12-JUN-07 | NELSON, L. O. | NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10679 | 02 |
| 14-DEC-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10886 | 01 |
| 14-DEC-06 | HEILESON, W. M. | IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) | DOE/ID-10984 | 01 |
| 20-NOV-06 | BRAGASSA, J. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11089 | 02 |
| 20-NOV-06 | RICE, R. S. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11092 | 02 |
| 14-NOV-06 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 6-05 AND 10-04 PHASE IV | DOE/ID-11261 | 00 |
| 19-SEP-06 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III | DOE/NE-ID-11202 | 01 |
| 08-SEP-06 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - REV. 0 OF THIS EDF IS PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 01 |
| 28-JUL-06 | SHANKLIN, D. E. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4 - 6 (PHASE II) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11254 | 00 |
| 22-DEC-05 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - V-9 TANK MACROENCAPSULATION & LIFTING DESIGN - STRUCTURAL ANALYSIS & LIFT PLAN - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, RE | EDF-6306 | 00 |
| 15-DEC-05 | BAKER, E. L. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION PUMP SEAL EVALUATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6259 | 00 |
| 01-DEC-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 00 |
| 21-NOV-05 | HALEY, D. J. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION AT TEST AREA NORTH (TAN) WAG-1 OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11150 | 03 |
| 17-NOV-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - REVISED SOURCE TERM INVENTORY FOR THE V-TANK WASTE - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6326 | 00 |
| 17-NOV-05 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - APAD SUPPORT CALCULATIONS FOR REVISED SOURCE TERM FOR TAN V-TANKS REMEDEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, R | EDF-6332 | 00 |
| 15-NOV-05 | FARNSWORTH, R. K. | EDF - EVALUATING AIR SAFETY FOR CO-LOCATED WORKER DURING CONTROLLED AIR SPARGING OF CONSOLIDATED TAN V-TANK WASTE, WITHOUT ACTIVATED CARBON ADSORPTION - PART OF ATTACHMENT 3 RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, | EDF-6327 | 00 |
| 01-NOV-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - V-TANK OFF GAS DATA EVALUATION AND REMAINING INVENTORY DETERMINATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6364 | 00 |
| 22-SEP-05 | VARVEL, M. D. | CANCELLED DUE TO PROJECT CLOSURE - REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION | DOE/ID-10838 | 03 |
| 14-SEP-05 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III | DOE/NE-ID-11202 | 00 |
| 29-AUG-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION CRANE VERIFICATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 AND TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6099 | 00 |
| 16-AUG-05 | HALEY, D. J. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION AT TEST AREA NORTH (TAN) WAG-1 OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11150 | 02 |
| 16-AUG-05 | SHAW, R. M. | TRANSMITTAL OF WASTE AREA GROUP 1 (WAG-1) DOCUMENTS FOR OPERABLE UNIT (OU) 1-10 | FMDP-RFDP-05-078 | 00 |
| 19-MAY-05 | YONK, A. K. | GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-26, PM-2A TANKS - PHASE 2 (PHASE II) TANK V-14 TREATMENT AND DISPOSAL FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11233 | 00 |
| 07-MAR-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4928 | 02 |
| 27-JAN-05 | JESSMORE, P. J. | ADDENDUM FOR THE CONSTRUCTION WORK PLAN FOR WASTE AREA GROUP (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ATTACHMENT 3 INCLUDES AGENCY REVIEW COMMENTS AND RESOLUTIONS | DOE/ID-11086 | 01 |
| 12-JAN-05 | FORBES, J. R. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN - APPENDIX P TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) | DOE/NE-ID-11207 | 00 |
| 06-JAN-05 | FORBES, J. R. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 03 |
| 08-DEC-04 | JANTZ, A. E. | GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL & SITE REMEDIATION FOR TAN, WASTE AREA GROUP 1 (WAG-1), OU 1-10 - DOE, EPA & DEQ COMMENTS ARE INCLUDED IN APPENDIX F & APPEN | DOE/NE-ID-11161 | 01 |
| 17-NOV-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4956 | 01 |
| 17-NOV-04 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-5017 | 01 |
| 16-NOV-04 | HALEY, D. J. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 & TSF-18 V-TANKS & CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, & SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11150 | 01 |
| 20-SEP-04 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - V-TANKS CONTENTS REMEDIATION MECHANICAL DESIGN - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 | EDF-4751 | 00 |
| 16-SEP-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4602 | 01 |
| 16-SEP-04 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - SITEWORK DESIGN - PART OF ATTACHMENT 3 TO THE RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & REV.03 | EDF-4672 | 00 |
| 16-SEP-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 AND R | EDF-4956 | 00 |
| 14-SEP-04 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - SUPPORTING CALCULATIONS FOR APAD-04-53 TEST AREA NORTH (TAN) V-TANKS REMEDIATION OF TSF-09 & TSF-18 - PART OF ATTACHMENT 3 OF RD/RA WORK PLAN ADDENDUM 2, DOE/NE-ID-11150, REV.01 AND REV.02 AND REV.03 | EDF-5196 | 00 |
| 10-SEP-04 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4604 | 01 |
| 09-SEP-04 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS FOR INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.0 | EDF-4928 | 00 |
| 09-SEP-04 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 | EDF-5017 | 00 |
| 19-AUG-04 | SCHWENDIMAN, G. L. | GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR THE ASSESSMENT AND CLEANUP OF V-TANK AREA NEW SITES, FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11152 | 00 |
| 19-AUG-04 | JESSMORE, J. J. | CONSTRUCTION SPECIFICATION (SPC) - TSF-09 AND TSF-18 V-TANKS REMEDIATION - APPROVED FOR CONSTRUCTION - ATTACHMENT 2 OF DOE/NE-ID-11150, REV.01, DOE/NE-ID-11152, REV.00, DOE/NE-ID-11150, REV.02 AND DOE/NE-ID-11150, REV.03 | SPC-555 | 00 |
| 09-AUG-04 | FARNSWORTH, R. K. | ENGINEERING DESIGN FILE (EDF) - REEAVALUATION OF CHARACTERISTIC TOXICITY DESIGNATION FOR V-TANK WASTE USING EXISITING SAMPLE DATA PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & RE | EDF-4885 | 01 |
| 04-AUG-04 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II | DOE/NE-ID-11127 | 00 |
| 01-AUG-04 | DOE | FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 9 (WAG-9) OPERABLE UNIT (OU) 9-04 | W7500-0550-ES-00 | 01 |
| 26-JUL-04 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B - APPENDIX A AND APPENDIX B ARE AGENCY REVIEW COMMENTS AND RESOLUTIONS FOR THE DRAFT AND DRAFT FINAL | DOE/ID-11015 | 02 |
| 16-JUL-04 | VARVEL, M. D. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/ID-10838 | 02 |
| 15-JUL-04 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 2 (REV.02) | DOE/ID-10837 | 02 |
| 21-JUN-04 | JANTZ, A. E. | GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | DOE/NE-ID-11161 | 00 |
| 08-APR-04 | ROSENBERGER, M. S. | VICINITY DISCHARGES ELIMINATION WORK PLAN FOR THE HAZARDOUS WASTE MANAGEMENT ACT (HWMA) AND THE RESOURCE CONSERVATION RECOVERY ACT (RCRA) POST CLOSURE PERMIT FOR INTEC WASTE CALCINING FACILITY (WCF) AT THE INEEL | DOE/NE-ID-11138 | 00 |
| 09-MAR-04 | TYSON, D. R. | SUSPENDED - LABORATORY STUDY WORK PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF V-TANKS' CONTENTS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11083 | 01 |
| 11-FEB-04 | HALL, R. C. | TRANSMITTAL OF FINAL OU 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-04-030 | 00 |
| 10-FEB-04 | BRAGASSA, J. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11089 | 00 |
| 09-FEB-04 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I | DOE/ID-11101 | 00 |
| 06-FEB-04 | BRAGASSA, J. L. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) CHARACTERIZATION PLAN - ATTACHMENT 3 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11090 | 00 |
| 05-FEB-04 | VARVEL, M. D. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) FIELD SAMPLING PLAN (FSP) - ATTACHMENT 1 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11091 | 00 |
| 02-FEB-04 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - EARTHWORK QUANTITIES FOR SUBPROJECT 6, OPERABLE UNIT (OU) 3-13, GROUP 3 - OTHER SURFACE SOILS PROJECT - ATTACHMENT 5 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3778 | 00 |
| 29-JAN-04 | RICE, R. S. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11092 | 00 |
| 29-JAN-04 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - ANALYSIS OF POTENTIAL AIR EMISSIONS FROM EXCAVATION OF WASTE AREA GROUP 3 (WAG-3) SOIL CONTAMINATION SITES - ATTACHMENT 2 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3902 | 00 |
| 29-JAN-04 | MCMANAMON, L. E. | OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) HEALTH AND SAFETY PLAN (HSP OR HASP) - ATTACHMENT 4 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | INEEL/EXT-03-00628 | 00 |
| 19-DEC-03 | HALL, R. C. | TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 3 OTHER SURFACE SOILS REMEDIATION, SETS 1-3 PHASE I (PHASE 1) | EM-ER-03-316 | 00 |
| 09-DEC-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | DOE/ID-10837 | 01 |
| 09-DEC-03 | BRAGASSA, J. L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/ID-10838 | 01 |
| 09-DEC-03 | MCMANAMON, L. E. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - ATTACHMENT 2 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) | INEEL/EXT-2000-00270 | 03 |
| 06-DEC-03 | BRUCE, J. E. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX G CONTAINS AGENCY REVIEW COMMENTS | DOE/ID-11073 | 00 |
| 05-DEC-03 | BRUCE, J. E. | CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-26 PM-2A TANKS REMEDIAL DESIGN - ATTACHMENT 1 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 | SPC-475 | 00 |
| 05-DEC-03 | BRUCE, J. E. | CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-03 BURN PIT REMEDIAL DESIGN - ATTACHMENT 2 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 | SPC-476 | 00 |
| 05-DEC-03 | BRUCE, J. E. | CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, WRRTF-01 BURN PITS REMEDIAL DESIGN - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 | SPC-477 | 00 |
| 06-NOV-03 | NEHER, E. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 02 |
| 04-NOV-03 | ELLIOTT, M. D. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G | DOE/ID-10712 | 02 |
| 23-OCT-03 | FORSYTHE, H. S. | SUPPLEMENTAL WORK PLAN FOR TC-99 EVALUATION IN GROUNDWATER, WASTE AREA GROUP 3 (WAG-3) GROUP 4 PERCHED WATER - APPENDIX O TO DOE/ID-10774, REVISION 2 (REV.02) AND REVISION 3 (REV.03) | ICP/EXT-03-00029 | 00 |
| 13-OCT-03 | WAGONER, D. W. | POST RECORD OF DECISION (ROD) MONITORING WORK PLAN FOR THE CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II AND III OPERABLE UNIT (OU) 4-12 | INEL-95/0579 | 05 |
| 30-SEP-03 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC)OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I & II - APPENDIX L TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, R | DOE/ID-10770 | 03 |
| 30-SEP-03 | FORSYTHE, H. S. | OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II - APPENDIX K TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | DOE/ID-10771 | 01 |
| 30-SEP-03 | FORSYTHE, H. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 1 TANK FARM INTERIM ACTION (TFIA) | DOE/ID-10772 | 01 |
| 29-SEP-03 | VANDEL, D. S. | NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10679 | 01 |
| 29-SEP-03 | GIANOTTO, D. F. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 01 |
| 16-JUL-03 | SHAW, R. M. | TRANSMITTAL OF FINAL LABORATORY STUDY WORK PLAN FOR V-TANKS CONTENTS AND FINAL COLD BENCH SCALE TEST PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF SURROGATE V-TANK WASTE (TSF-09 & TSF-18) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | EM-ER-03-179 | 00 |
| 14-JUL-03 | TYSON, D. R. | LABORATORY STUDY WORK PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF V-TANKS' CONTENTS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - APPENDIX A INCLUDES EPA AND IDEQ REVIEW COMMENTS AND RESOLUTIONS | DOE/ID-11083 | 00 |
| 30-JUN-03 | ORR, B. R. | MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B | DOE/ID-11055 | 00 |
| 26-JUN-03 | BRAGASSA, J. L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM | DOE/ID-11048 | 00 |
| 26-JUN-03 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN (RD) EXCAVATION ESTIMATES - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3254 | 00 |
| 26-JUN-03 | VAN VOST, R. M. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIATION UNDERGROUND UTILITIES STUDY - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3266 | 00 |
| 26-JUN-03 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK RETRIEVAL AND DEMOLITION STRUCTURAL DESIGN - ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3282 | 00 |
| 26-JUN-03 | HALL, R. C. | TRANSMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-03-168 | 00 |
| 25-JUN-03 | RICE, R. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 9 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11049 | 00 |
| 25-JUN-03 | BRAGASSA, J. L. | ENGINEERING DESIGN FILE (EDF) - TRU CONSTITUENT CALCULATIONS AND THE PROPOSED DISPOSAL PATH FOR THE VES-SFE-20 HOT WASTE TANK AND CONTENTS - ATTACHMENT 6 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3273 | 00 |
| 23-JUN-03 | TUOTT, L. C. | FIELD SAMPLING PLAN (FSP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - ATTACHMENT 8 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | DOE/ID-11047 | 00 |
| 23-JUN-03 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 10 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | INEEL/EXT-02-01436 | 00 |
| 27-MAY-03 | SHAW, R. M. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM AND SUPPORTING DOCUMENTS FOR V-TANKS EARLY REMEDIAL ACTION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES | EM-ER-03-136 | 00 |
| 23-MAY-03 | JESSMORE, J. J. | FIELD SAMPLING PLAN (FSP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - SUPPORTING DOCUMENT FOR THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (RD/RAWP) AND ADDENDUM | DOE/ID-11065 | 00 |
| 23-MAY-03 | JESSMORE, J. J. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR V-TANKS EARLY REMEDIAL ACTION FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | DOE/ID-11075 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 23-MAY-03 | HARRIS, J. D. | WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES - SUPPORTING DOCUMENT FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND ADDENDU | INEEL/EXT-02-01608 | 00 |
| 20-MAY-03 | MCMANAMON, L. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) - APPENDIX M TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | INEEL/EXT-2000-00194 | 04 |
| 05-MAY-03 | BRUCE, J. E. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G | DOE/ID-10712 | 01 |
| 01-APR-03 | WELLS, R. P. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II FOR WASTE AREA GROUP 5 (WAG-5) | DOE/ID-10798 | 01 |
| 05-MAR-03 | HAIN, K. E. | REQUEST FOR A MILESTONE EXTENSION RELATED TO SUBMISSION OF PHASED WASTE AREA GROUP 3 (WAG-3) GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLANS - POSITION PAPER FOR PHASING THE WAG-3 GROUP 3 RD/RA | EM-ER-03-064 | 00 |
| 12-FEB-03 | WAGONER, D. W. | WASTE AREA GROUP 4 (WAG-4) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN CENTRAL FACILITIES AREA 04 (CFA-04) POND MERCURY CONTAMINATED SOILS OPERABLE UNIT (OU) 4-13 | DOE/ID-11028 | 00 |
| 10-FEB-03 | O'NEILL, K. C. | TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) | EM-ER-03-042 | 00 |
| 03-FEB-03 | CRISP, D. E. | ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) AIR COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX L TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF | EDF-2237 | 00 |
| 03-FEB-03 | MORGANS, D. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT - APPENDIX E TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-ER-327 | 00 |
| 03-FEB-03 | SHAW, R. M. | TRANSMITTAL OF DRAFT MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) AND DRAFT MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | EM-ER-02-036-A | 00 |
| 01-FEB-03 | CRISP, D. E. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10886 | 00 |
| 01-FEB-03 | CRISP, D. E. | TREATABILITY STUDY (TS) TEST PLAN FOR SOIL STABILIZATION - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10903 | 00 |
| 01-FEB-03 | CRISP, D. E. | SAMPLING AND ANALYSIS PLAN (SAP) FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) WASTE STABILIZATION OPERATIONS WAG-3 OU 3-13 - APPENDIX J TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10924 | 00 |
| 01-FEB-03 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED AS APPENDIX P | DOE/ID-10984 | 00 |
| 01-FEB-03 | CRISP, D. E. | INEEL CERCLA DISPOSAL FACILITY (ICDF) GROUNDWATER DETECTION MONITORING PROGRAM DATA ANALYSIS PLAN - APPENDIX H TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-10998 | 00 |
| 01-FEB-03 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 1 (VOL.01) OF 2 | DOE/ID-11000 | 00 |
| 01-FEB-03 | CRISP, D. E. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONAL AND MONITORING (O&M) SAMPLING AND ANALYSIS PLAN (SAP) - APPENDIX M TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | DOE/ID-11005 | 00 |
| 01-FEB-03 | CRISP, D. E. | ENGINEERING DESIGN FILE (EDF) - NESHAP COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-2236 | 00 |
| 01-FEB-03 | JENKINS, T. W. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX ON-SITE VERSUS OFF-SITE COST COMPARISON - APPENDIX O TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-2385 | 00 |
| 01-FEB-03 | CRISP, D. E. | HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS - APPENDIX F TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | INEEL/EXT-01-01318 | 00 |
| 01-FEB-03 | VERNON, D. K. | PLAN (PLN) - TRACKING PLAN FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX C TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | PLN-914 | 00 |
| 06-JAN-03 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B | DOE/ID-11015 | 01 |
| 24-DEC-02 | HATHAWAY, C. | TRANSMITTAL OF DRAFT FINAL CFA-04 MERCURY POND REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND FIELD SAMPLING PLAN (FSP) | EM-ER-02-217 | 00 |
| 31-OCT-02 | NELSON, L. O. | IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B | DOE/ID-11015 | 00 |
| 30-AUG-02 | BREWER, K. | ENGINEERING DESIGN FILE (EDF) - TRANSURANIC (TRU) CALCULATIONS FOR VES-SFE-20 WASTE TANK - ATTACHMENT 7 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-2360 | 00 |
| 01-AUG-02 | NRF | PHASE II (TWO) REMEDIAL DESIGN (RD) REPORT AND REMEDIAL ACTION (RA) WORK PLAN OPERABLE UNIT (OU) 8-08 - NAVAL REACTORS FACILITY (NRF) | 24885 | 00 |
| 18-JUL-02 | COLLINS, R. L. | TRANSMITTAL OF MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), REVISION 2 (REV.02) | EM-ER-02-121 | 00 |
| 15-JUL-02 | SORENSON, K. S. | IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B - APPENDIX A IS THE 2002 TRACER TEST | INEEL/EXT-2000-00647 | 01 |
| 01-JUL-02 | GIANOTTO, D. F. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS MSIP IS THE RD/RA WORK PLAN FOR GROUP 5 | DOE/ID-10782 | 02 |
| 01-JUL-02 | NEHER, E. | PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 | DOE/ID-10784 | 02 |
| 01-JUL-02 | GIANOTTO, D. F. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 | DOE/ID-10829 | 02 |
| 14-MAY-02 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE | DOE/ID-10848 | 01 |
| 14-MAY-02 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN - APPENDIX X TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | DOE/ID-10851 | 02 |
| 14-MAY-02 | VERNON, D. K. | INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX W TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | DOE/ID-10958 | 00 |
| 14-MAY-02 | FRITZLER, B. E. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | EDF-2899 | 00 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-266 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-267 | 01 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-268 | 01 |
| 14-MAY-02 | BOSE, D. H. | ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | EDF-ER-269 | 01 |
| 14-MAY-02 | BOSE, D. H. | ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-271 | 01 |
| 14-MAY-02 | EVANS, S. K. | ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | EDF-ER-273 | 02 |
| 14-MAY-02 | DAY, R. E. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-274 | 01 |
| 14-MAY-02 | MCMAHON, W. J. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-275 | 02 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5 | EDF-ER-276 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-277 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-278 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-279 | 02 |
| 14-MAY-02 | THOMPSON, B. | ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-280 | 01 |
| 14-MAY-02 | CROUSE, P. | ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-281 | 01 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-282 | 01 |
| 14-MAY-02 | THURSTON, M. | ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-286 | 01 |
| 14-MAY-02 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V | EDF-ER-290 | 01 |
| 14-MAY-02 | DAVISON, R. L. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-311 | 01 |
| 14-MAY-02 | ROUTT, T. M. | ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-315 | 00 |
| 14-MAY-02 | JENKINS, T. W. | TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) TITLE II DESIGN | EM-ER-02-083 | 00 |
| 14-MAY-02 | VERNON, D. K. | STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) STAGE II CONSTRUCTION - APPENDIX V TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | PLN-962 | 00 |
| 14-MAY-02 | DEHNER, J. G. | TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - APPENDIX Y TO ICDF RD/CWP - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | SPC-1476 | 01 |
| 14-MAY-02 | VERNON, D. K. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX CONTROL SYSTEM - APPENDIX DD TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | TFR-2520 | 00 |
| 14-MAY-02 | VERNON, D. K. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WAG-3 INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND - APPENDIX CC TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) O | TFR-71 | 02 |
| 01-MAY-02 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) - APPENDIX S TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | DOE/ID-10955 | 00 |
| 28-MAR-02 | GILES, J. R. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4), CFA-08 SEWAGE PLANT DRAINFIELD, OPERABLE UNIT (OU) 4-13 | DOE/ID-10929 | 00 |
| 12-MAR-02 | JENKINS, T. W. | TRANSMITTAL OF THE FINAL REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX | EM-ER-02-037 | 00 |
| 12-MAR-02 | DAVISON, R. L. | A-E PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, AND SIZING TREATMENT FACILITY (SSSTF) SOIL STABILIZATION SYSTEM (SSS) - APPENDIX B OF EDF-ER-296 WHICH IS APPENDIX B-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | SPC-1481 | 00 |
| 11-MAR-02 | NISHIOKA, D. E. | PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - CPP-1689 ADMINISTRATIVE OFFICE TRAILER (AOT) - APPENDIX C-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | SPC-1484 | 00 |
| 07-MAR-02 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DEBRIS TREATMENT PROCESS SELECTION AND DESIGN - APPENDIX B-2 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1730 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ACCESS ROAD AND SITE PAVEMENT BALLAST REQUIREMENTS - APPENDIX B-11 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1913 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - SANITARY SEWER LIFT STATION PUMP DESIGN - APPENDIX B-3 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1937 | 00 |
| 07-MAR-02 | HUNTER, L. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - INTEC FIRE WATER SYSTEM FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX B-5 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) | EDF-1948 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - PROCESS SYSTEMS DRAIN PIPE SIZING - APPENDIX B-6 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2648 | 00 |
| 07-MAR-02 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FLOW AND PRESSURE CALCULATIONS OF THE RAW WATER AND POTABLE WATER SYSTEMS - APPENDIX B-4 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF CO | EDF-2655 | 00 |
| 07-MAR-02 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DECONTAMINATION FACILITY HVAC SYSTEM - APPENDIX B-7 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2676 | 00 |
| 07-MAR-02 | HIPP, T. M. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FIBER OPTIC SELECTION - APPENDIX B-9 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2738 | 00 |
| 07-MAR-02 | DUGGAN, J. E. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ELECTRICAL LOAD STUDY - APPENDIX B-10 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2747 | 00 |
| 07-MAR-02 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - POST-TENSIONED SLAB DESIGN - APPENDIX B-12 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-3061 | 00 |
| 07-MAR-02 | HAEFNER, D. R. | ENGINEERING DESIGN FILE (EDF) - PROCESS AND TREATMENT OVERVIEW FOR THE MINIMUM TREATMENT PROCESS - APPENDIX B-1 TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-296 | 00 |
| 07-MAR-02 | SUMMERS, A. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DESIGN RADIOLOGICAL CONTROL ANALYSIS - APPENDIX B-8 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-302 | 00 |
| 07-MAR-02 | DAVISON, R. L. | STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR CONSTRUCTION ACTIVITIES - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX I TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | PLN-1034 | 00 |
| 07-MAR-02 | NISHIOKA, D. E. | A-E CONSTRUCTION SPECIFICATIONS (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - APPENDIX C TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | SPC-1485 | 00 |
| 07-MAR-02 | DAVISON, R. L. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX A TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | TFR-17 | 02 |
| 01-MAR-02 | DAVISON, R. L. | STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX H TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | DOE/ID-10873 | 00 |
| 01-MAR-02 | MCDANNEL, G. E. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | DOE/ID-10875 | 01 |
| 01-MAR-02 | DAVISON, R. L. | INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) - APPENDIX J TO THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | DOE/ID-10881 | 00 |
| 01-MAR-02 | DAVISON, R. L. | REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WAG-3 STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX | DOE/ID-10889 | 00 |
| 01-MAR-02 | DAVISON, R. L. | HEALTH & SAFETY PLAN (HSP) FOR CONSTRUCTION OF THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX G TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | INEEL/EXT-01-00271 | 00 |
| 01-MAR-02 | THOMPSON, R. G. | PRELIMINARY INSPECTION PLAN FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION ACTIVITIES - APPENDIX F TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | INEEL/EXT-01-00777 | 00 |
| 01-MAR-02 | DAVISON, R. L. | QUALITY PROGRAM PLAN (QPP) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | PLN-873 | 00 |
| 07-JAN-02 | IVY, K. | ENVIRONMENTAL PROTECTION AGENCY (EPA) GENERAL, SPECIFIC AND EDITORIAL REVIEW COMMENTS ON THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4), CFA-08 SEWAGE PLANT DRAINFIELD, OPERABLE UNIT (OU) 4-13 (DRAFT) | 10954 | 00 |
| 26-NOV-01 | SHAW, R. M. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES AND SUPPORTING DOCUMENTS | EM-ER-01-192 | 00 |
| 01-NOV-01 | ROY F. WESTON, INC. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 2 SITES | DOE/ID-10875 | 00 |
| 23-AUG-01 | HAIN, K. E. | TRANSMITTAL OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING & TREATMENT FACILITY (SSSTF) | EM-ER-01-136 | 00 |
| 01-JUL-01 | CH2M HILL | INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN TITLE II DESIGN - ANNOTATED OUTLINE (TITLE I) 30% DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | DOE/ID-10848 | 00 |
| 26-JUN-01 | HATHAWAY, C. | TRANSMITTAL OF REVISION 1 (REV.01) OF WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EM-ER-01-111 | 00 |
| 19-JUN-01 | WELLS, R. P. | WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE I - OPERABLE UNIT (OU) 5-12 | DOE/ID-10761 | 01 |
| 01-MAY-01 | BECHTEL | DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OPERABLE UNIT (OU) 3-13 GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (REV. | DOE/ID-10836 | 00 |
| 01-MAY-01 | BECHTEL | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) | DOE/ID-10837 | 00 |
| 01-MAY-01 | BECHTEL | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS | DOE/ID-10838 | 00 |
| 01-APR-01 | WIGGINS-WAGONER, D. J. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 | DOE/ID-10826 | 00 |
| 01-MAR-01 | RAUNIG, D. E. | PRELIMINARY CHARACTERIZATION PLAN FOR OU 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT 1 TO RD/RA WORK PLAN, REVISION 1 (REV.01) AND REVISION 2 (REV.02) | DOE/ID-10842 | 02 |
| 01-MAR-01 | MCMANAMON, L. E. | HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) | INEEL/EXT-2000-00270 | 02 |
| 29-JAN-01 | IVY, K. | EPA REVIEW OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 | 22346 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 19-DEC-00 | GIANOTTO, D. F. | PRELIMINARY CHARACTERIZATION PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT TO RD/RA WORK PLAN | DOE/ID-10842 | 01 |
| 19-DEC-00 | HATHAWAY, C. | TRANSMITTAL OF WASTE AREA GROUP 5 (WAG-5) DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II | EM-ER-244-00 | 00 |
| 18-DEC-00 | WELLS, R. P. | WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II | DOE/ID-10798 | 00 |
| 29-NOV-00 | HAIN, K. E. | TRANSMITTAL OF FINAL MONITORING SYSTEM INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS DOCUMENT IS THE RD/RA WORK PLAN FOR THIS PROJECT | EM-ER-223-00 | 00 |
| 01-NOV-00 | ROBERTS, C. J. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) | DOE/ID-10782 | 01 |
| 01-NOV-00 | ROBERTS, C. J. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02 | DOE/ID-10783 | 01 |
| 01-NOV-00 | ROBERTS, C. J. | PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 | DOE/ID-10784 | 01 |
| 01-NOV-00 | ROBERTS, C. J. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 | DOE/ID-10829 | 01 |
| 01-OCT-00 | DAVISON, R. L. | TREATABILITY STUDY (TS) WORK PLAN FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION PROCESS (DRAFT) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 | DOE/ID-10828 | 00 |
| 01-OCT-00 | FORSYTHE, H. S. | HEALTH AND SAFETY PLAN (HSP) FOR OU 3-13 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX G TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 | INEEL/EXT-2000-00817 | 00 |
| 20-SEP-00 | THOMPSON, R. G. | QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV | DOE/ID-10587 | 06 |
| 20-SEP-00 | ROBERTS, C. J. | HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | INEEL/EXT-2000-00257 | 00 |
| 19-SEP-00 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | EDF-ER-206 | 00 |
| 18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 | EDF-1379 | 00 |
| 18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, | EDF-1387 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | FIELD SAMPLING PLAN (FSP) FOR OU 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - THIS DOCUMENT IS APPENDIX B TO DOE/ID-10774, REV.00 & REV.01 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | DOE/ID-10745 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - THIS DOCUMENT IS APPENDIX E TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 4 | DOE/ID-10746 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER -THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | DOE/ID-10749 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | TRACER TEST PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX D TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 0 (REV.00), REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) | DOE/ID-10762 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OU 3-13 GROUP 4 AND GROUP 5, WELL INSTALLATION AND MONITORING PROJECTS - APPENDIX D TO MSIP FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 & REV.02 & APPENDIX J TO GROUP 4 MSIP, DOE/ID-10 | DOE/ID-10768 | 00 |
| 01-SEP-00 | ROBERTS, C. J. | MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION | DOE/ID-10774 | 00 |
| 01-SEP-00 | FRENCH, P. S. | WASTE MANAGEMENT PLAN (WMP) FOR STAGING & STORAGE ANNEX (SSA) - THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 | DOE/ID-10800 | 00 |
| 30-AUG-00 | SHAW, R. M. | TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 1-10 GROUP 1 SITES & SUPPORTING DOCUMENTS | EM-ER-167 | 00 |
| 17-AUG-00 | JANTZ, A. E. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES | DOE/ID-10712 | 00 |
| 09-MAY-00 | RAUNIG, D. E. | HAZARD CLASSIFICATION FOR REMEDIATION OF OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES - CPP-84 & CPP-94 - ATTACHMENT 3 TO RD/RA WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (R | INEEL/EXT-2000-00254 | 00 |
| 26-OCT-99 | DOE | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 9 (WAG-9) OPERABLE UNIT (OU) 9-04 | W7500-0550-ES-00 | 00 |
| 13-OCT-99 | FRITZ, K. D. | A-E CONSTRUCTION SPECIFICATION (SPC) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) CERCLA STORAGE PAD AREA CPP-92 AND LOW LEVEL WASTE (LLW) HOLDING AREA - PART OF APPENDIX E TO SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF | SPC-218 | 00 |
| 13-SEP-99 | BRADLEY, T. M. | TRANSMITTAL OF IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 8 (WAG-8) FINAL PHASE I REMEDIAL DESIGN (RD) REPORT & REMEDIAL ACTION (RA) WORK PLAN | NR:IBO-99/097 | 00 |
| 01-SEP-99 | NRF | PHASE I (ONE) REMEDIAL DESIGN (RD) REPORT AND REMEDIAL ACTION (RA) WORK PLAN OPERABLE UNIT (OU) 8-08 - NAVAL REACTORS FACILITY (NRF) | 19167 | 00 |
| 01-JUL-99 | JANTZ, A. E. | REMEDIAL ACTION WORK PLAN (RAWP) TAN FINAL GROUNDWATER REMEDIATION - PHASE B FOR OPERABLE UNIT (OU) 1-07B | DOE/ID-10629 | 00 |
| 01-SEP-98 | REESE, C. L. | COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 | DOE/ID-10643 | 00 |
| 29-JUN-98 | DUSTIN, J. D. | WORK PLAN FOR STAGE I OU 7-10 CONTINGENCY PROJECT | DOE/ID-10623 | 00 |
| 12-MAY-98 | LMITCO | INEEL STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - GENERIC PLAN - THIS DOCUMENT IS APPENDIX M TO THE MONITORING SYSTEM & INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), DOE/ID-10782, RE | DOE/ID-10425(98) | 02 |
| 01-JUN-97 | NEHER, E. | POST RECORD OF DECISION (ROD) MONITORING WORK PLAN CENTRAL FACILITIES AREA (CFA) LANDFILL I, II & III OPERABLE UNIT (OU) 4-12 | INEL-95/0579 | 04 |
| 01-MAR-97 | PETERSON, L. N. | TECHNOLOGY EVALUATION WORK PLAN TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10562 | 00 |
| 09-OCT-96 | DUDZIAK, A. J. | TRANSMITTAL OF UPDATE (REV.03) TO MONITORING WORK PLAN PORTION OF FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) | OPE-ER-145-96 | 00 |
| 01-AUG-96 | NEHER, E. | POST RECORD OF DECISION (ROD) MONITORING WORK PLAN FOR CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II & III OPERABLE UNIT (OU) 4-12 (ALSO PART OF APPENDIX A OF THE RD/RA | INEL-95/0579 | 03 |
| 01-JUN-96 | WELLS, R. P. | FIELD SAMPLING PLAN (FSP) FOR POST RECORD OF DECISION (ROD) MONITORING CFA LANDFILL I, II & III OU 4-12 (PARSONS #ES-20.6.19) - THIS FSP IS ALSO PART OF APPENDIX A OF THE RD/RA WORK PLAN | INEL-95/0585 | 02 |
| 10-MAY-96 | GREEN, L. A. | REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | OPE-ER-96-84 | 00 |
| 06-MAY-96 | ROSENBERGER, M. S. | IDHW REVIEW COMMENTS ON DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA LANDFILL I, II & III | 11920 | 00 |
| 19-APR-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 4-12 | OPE-ER-66-96 | 00 |
| 04-APR-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) ACTIVITIES & DOE COMMENT RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS | OPE/ER-96-061 | 00 |
| 02-APR-96 | ROSENBERGER, M. S. | IDHW REVIEW COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA LANDFILL I, II & III | 11919 | 00 |
| 01-APR-96 | COTTEN, G. B. | DESIGN DRAWINGS - CONSTRUCTION PLANS - APPENDIX C OF DOE/ID-10532, SL-1 & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT RD/RA WORK PLAN | 11822 | 00 |
| 01-APR-96 | ROSENBERGER, M. S. | DOE RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY ( IDHW-DEQ) COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 5-05 & 6-01 | 11823 | 00 |
| 01-APR-96 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CENTRAL FACILITIES AREA (CFA) LANDFILL I, II, AND III NATIVE SOIL COVER PROJECT - THIS | DOE/ID-10528 | 00 |
| 01-APR-96 | COTTEN, G. B. | STATIONARY LOW POWER REACTOR-1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (PARSON'S #ES.28.06.23) | DOE/ID-10532 | 00 |
| 01-APR-96 | JENKINS, S. L. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) CFA LANDFILLS I, II & III NATIVE SOIL COVER PROJECT OU 4-12 (ALSO APPENDIX K OF THE RD/RA WORK PLAN) | INEL-95/0435 | 03 |
| 20-MAR-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT RD/RA WORK PLAN & FINAL SCOPE OF WORK (SOW) FOR OU 4-12 | OPE-ER-48-96 | 00 |
| 01-MAR-96 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA LANDFILLS I, II & III (NATIVE SOIL COVER PROJECT) - | INEL-95/0638 | 02 |
| 01-MAR-96 | GREEN, L. A. | TRANSMITTAL OF DRAFT POST ROD MONITORING WORK PLAN FOR OU 4-12 | OPE-ER-36-96 | 00 |
| 01-AUG-95 | NRF | REMEDIAL DESIGN REPORT AND REMEDIAL ACTION WORK PLAN (RAWP) FOR NRF INACTIVE LANDFILLS | 11377 | 00 |
| 24-JUL-95 | GREEN, L. A. | PAD-A LIMITED ACTION DOCUMENTATION | 9965 | 00 |
| 01-JUN-94 | MK-FIC | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PAD-A LIMITED ACTION RWMC OU 7-12 (DRAFT FINAL) | 07.012.1.1.101.01 | 01 |
| 01-DEC-93 | BURTON, B. N. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) - OU 7-10 PIT 9 PROJECT INTERIM ACTION (IA) | EGG-ER-11055 | 00 |
| 22-NOV-93 | MK-FIC | FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN FOR PBF-08 CORROSIVE WASTE SUMP & PBF-10 EVAPORATION POND REMEDIATION OU 5-13 | 05.013.1.3.101.01 | 02 |
| 19-NOV-93 | MK-FIC & ADTECHS CORP. | FINAL REMEDIAL ACTION (RA) WORK PLAN FOR TEST AREA NORTH (TAN) GROUNDWATER INTERIM ACTION (IA) OPERABLE UNIT (OU) 1-07A | 01.07A.2.1.201.01 | 03 |
| 10-SEP-93 | MK-FIC | FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 | 02.010.1.1.114.01 | 01 |
| 10-JUN-93 | WYLE LABORATORIES | INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL ACTION WORK PLAN (RAWP) - THIS MANUAL WAS RECEIVED AS A VENDOR DATA ITEM FROM WYLE LABORATORIES FOR OU 10-05 SUBMITTAL #S-500992-005(10-05), REVISION 4 (REV.04) | 23-ICP-05 | 03 |
Previous Page | Administrative Record Home Page