Search Within All Documents

File Category is PF170.3

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
09-AUG-10 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 1
27-JAN-10 NOT SPECIFIED PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11405 PART 1 0
27-JAN-10 NOT SPECIFIED PHASE 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11405 PART 2 0
19-AUG-09 NOT SPECIFIED PHASE 1 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OPERABLE UNIT 7-13/14 DOE/ID-11389 0
02-JUL-09 NOT SPECIFIED IN SITU BIOREMEDIATION REMEDIAL ACTION WORK PLAN FOR TAN FINAL GROUNDWATER REMEDIATION, OU 1-07B DOE/ID-11015 3
02-JUL-09 NOT SPECIFIED MONITORED NATURAL ATTENUATION REMEDIAL ACTION WORK PLAN FOR TEST AREA NORTH FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT 1-07B DOE/ID-11055 1
30-JAN-08 DAVISON, L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM DOE/ID-11048 02
15-NOV-07 SCHWENDIMAN, G. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4-6 (PHASE II) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN APPENDIX F-1, NEW SITE CPP-130 - SOILS AND BURIED DEBRIS - NOVEMBER 2007 DOE/ID-11342 00
01-OCT-07 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11127 01
12-JUN-07 NELSON, L. O. NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10679 02
14-DEC-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10886 01
14-DEC-06 HEILESON, W. M. IDAHO CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) DOE/ID-10984 01
20-NOV-06 BRAGASSA, J. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11089 02
20-NOV-06 RICE, R. S. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11092 02
14-NOV-06 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 6-05 AND 10-04 PHASE IV DOE/ID-11261 00
19-SEP-06 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III DOE/NE-ID-11202 01
08-SEP-06 ASHWORTH, S. C. ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - REV. 0 OF THIS EDF IS PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 EDF-6376 01
28-JUL-06 SHANKLIN, D. E. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 4 - 6 (PHASE II) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11254 00
22-DEC-05 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - V-9 TANK MACROENCAPSULATION & LIFTING DESIGN - STRUCTURAL ANALYSIS & LIFT PLAN - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, RE EDF-6306 00
15-DEC-05 BAKER, E. L. ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION PUMP SEAL EVALUATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) EDF-6259 00
01-DEC-05 ASHWORTH, S. C. ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 EDF-6376 00
21-NOV-05 HALEY, D. J. GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION AT TEST AREA NORTH (TAN) WAG-1 OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11150 03
17-NOV-05 TYSON, D. R. ENGINEERING DESIGN FILE (EDF) - REVISED SOURCE TERM INVENTORY FOR THE V-TANK WASTE - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) EDF-6326 00
17-NOV-05 EATON, D. L. ENGINEERING DESIGN FILE (EDF) - APAD SUPPORT CALCULATIONS FOR REVISED SOURCE TERM FOR TAN V-TANKS REMEDEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, R EDF-6332 00
15-NOV-05 FARNSWORTH, R. K. EDF - EVALUATING AIR SAFETY FOR CO-LOCATED WORKER DURING CONTROLLED AIR SPARGING OF CONSOLIDATED TAN V-TANK WASTE, WITHOUT ACTIVATED CARBON ADSORPTION - PART OF ATTACHMENT 3 RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, EDF-6327 00
01-NOV-05 TYSON, D. R. ENGINEERING DESIGN FILE (EDF) - V-TANK OFF GAS DATA EVALUATION AND REMAINING INVENTORY DETERMINATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 EDF-6364 00
22-SEP-05 VARVEL, M. D. CANCELLED DUE TO PROJECT CLOSURE - REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - DMCS NON-ACTIVE DOCUMENT NOTIFICATION DOE/ID-10838 03
14-SEP-05 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE III DOE/NE-ID-11202 00
29-AUG-05 BRAGASSA, P. W. ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION CRANE VERIFICATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 AND TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) EDF-6099 00
16-AUG-05 HALEY, D. J. GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 AND TSF-18 V-TANKS AND CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, AND SITE REMEDIATION AT TEST AREA NORTH (TAN) WAG-1 OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11150 02
16-AUG-05 SHAW, R. M. TRANSMITTAL OF WASTE AREA GROUP 1 (WAG-1) DOCUMENTS FOR OPERABLE UNIT (OU) 1-10 FMDP-RFDP-05-078 00
19-MAY-05 YONK, A. K. GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-26, PM-2A TANKS - PHASE 2 (PHASE II) TANK V-14 TREATMENT AND DISPOSAL FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11233 00
07-MAR-05 TYSON, D. R. ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 EDF-4928 02
27-JAN-05 JESSMORE, P. J. ADDENDUM FOR THE CONSTRUCTION WORK PLAN FOR WASTE AREA GROUP (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ATTACHMENT 3 INCLUDES AGENCY REVIEW COMMENTS AND RESOLUTIONS DOE/ID-11086 01
12-JAN-05 FORBES, J. R. IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) 2005 MONITORING WELL INSTALLATION PLAN - APPENDIX P TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 3 (REV.03) DOE/NE-ID-11207 00
06-JAN-05 FORBES, J. R. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13, GROUP 4, PERCHED WATER WELL INSTALLATION DOE/ID-10774 03
08-DEC-04 JANTZ, A. E. GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL & SITE REMEDIATION FOR TAN, WASTE AREA GROUP 1 (WAG-1), OU 1-10 - DOE, EPA & DEQ COMMENTS ARE INCLUDED IN APPENDIX F & APPEN DOE/NE-ID-11161 01
17-NOV-04 ASHWORTH, S. C. ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 EDF-4956 01
17-NOV-04 LIPPERT, R. F. ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 EDF-5017 01
16-NOV-04 HALEY, D. J. GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 FOR TSF-09 & TSF-18 V-TANKS & CONTENTS REMOVAL, PHASE 1 CONTENTS TREATMENT, & SITE REMEDIATION AT TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11150 01
20-SEP-04 POPE, M. I. ENGINEERING DESIGN FILE (EDF) - V-TANKS CONTENTS REMEDIATION MECHANICAL DESIGN - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 EDF-4751 00
16-SEP-04 ASHWORTH, S. C. ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 EDF-4602 01
16-SEP-04 BRAGASSA, P. W. ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - SITEWORK DESIGN - PART OF ATTACHMENT 3 TO THE RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & REV.03 EDF-4672 00
16-SEP-04 ASHWORTH, S. C. ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 AND R EDF-4956 00
14-SEP-04 EATON, D. L. ENGINEERING DESIGN FILE (EDF) - SUPPORTING CALCULATIONS FOR APAD-04-53 TEST AREA NORTH (TAN) V-TANKS REMEDIATION OF TSF-09 & TSF-18 - PART OF ATTACHMENT 3 OF RD/RA WORK PLAN ADDENDUM 2, DOE/NE-ID-11150, REV.01 AND REV.02 AND REV.03 EDF-5196 00
10-SEP-04 MILLER, R. E. ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 EDF-4604 01
09-SEP-04 TYSON, D. R. ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS FOR INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.0 EDF-4928 00
09-SEP-04 LIPPERT, R. F. ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 EDF-5017 00
19-AUG-04 SCHWENDIMAN, G. L. GROUP 2 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR THE ASSESSMENT AND CLEANUP OF V-TANK AREA NEW SITES, FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11152 00
19-AUG-04 JESSMORE, J. J. CONSTRUCTION SPECIFICATION (SPC) - TSF-09 AND TSF-18 V-TANKS REMEDIATION - APPROVED FOR CONSTRUCTION - ATTACHMENT 2 OF DOE/NE-ID-11150, REV.01, DOE/NE-ID-11152, REV.00, DOE/NE-ID-11150, REV.02 AND DOE/NE-ID-11150, REV.03 SPC-555 00
09-AUG-04 FARNSWORTH, R. K. ENGINEERING DESIGN FILE (EDF) - REEAVALUATION OF CHARACTERISTIC TOXICITY DESIGNATION FOR V-TANK WASTE USING EXISITING SAMPLE DATA PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & RE EDF-4885 01
04-AUG-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE II DOE/NE-ID-11127 00
01-AUG-04 DOE FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 9 (WAG-9) OPERABLE UNIT (OU) 9-04 W7500-0550-ES-00 01
26-JUL-04 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B - APPENDIX A AND APPENDIX B ARE AGENCY REVIEW COMMENTS AND RESOLUTIONS FOR THE DRAFT AND DRAFT FINAL DOE/ID-11015 02
16-JUL-04 VARVEL, M. D. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/ID-10838 02
15-JUL-04 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 2 (REV.02) DOE/ID-10837 02
21-JUN-04 JANTZ, A. E. GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 1 FOR TSF-26, PM-2A TANKS - PHASE 1 (PHASE I) TANK REMOVAL AND SITE REMEDIATION FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 DOE/NE-ID-11161 00
08-APR-04 ROSENBERGER, M. S. VICINITY DISCHARGES ELIMINATION WORK PLAN FOR THE HAZARDOUS WASTE MANAGEMENT ACT (HWMA) AND THE RESOURCE CONSERVATION RECOVERY ACT (RCRA) POST CLOSURE PERMIT FOR INTEC WASTE CALCINING FACILITY (WCF) AT THE INEEL DOE/NE-ID-11138 00
09-MAR-04 TYSON, D. R. SUSPENDED - LABORATORY STUDY WORK PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF V-TANKS' CONTENTS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 DOE/ID-11083 01
11-FEB-04 HALL, R. C. TRANSMITTAL OF FINAL OU 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-04-030 00
10-FEB-04 BRAGASSA, J. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11089 00
09-FEB-04 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 6-05 AND 10-04, PHASE I DOE/ID-11101 00
06-FEB-04 BRAGASSA, J. L. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) CHARACTERIZATION PLAN - ATTACHMENT 3 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11090 00
05-FEB-04 VARVEL, M. D. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) FIELD SAMPLING PLAN (FSP) - ATTACHMENT 1 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11091 00
02-FEB-04 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - EARTHWORK QUANTITIES FOR SUBPROJECT 6, OPERABLE UNIT (OU) 3-13, GROUP 3 - OTHER SURFACE SOILS PROJECT - ATTACHMENT 5 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3778 00
29-JAN-04 RICE, R. S. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) WASTE MANAGEMENT PLAN (WMP) - ATTACHMENT 6 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11092 00
29-JAN-04 STALEY, C. S. ENGINEERING DESIGN FILE (EDF) - ANALYSIS OF POTENTIAL AIR EMISSIONS FROM EXCAVATION OF WASTE AREA GROUP 3 (WAG-3) SOIL CONTAMINATION SITES - ATTACHMENT 2 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3902 00
29-JAN-04 MCMANAMON, L. E. OPERABLE UNIT (OU) 3-13, GROUP 3, OTHER SURFACE SOILS REMEDIATION SETS 1-3 (PHASE I) HEALTH AND SAFETY PLAN (HSP OR HASP) - ATTACHMENT 4 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN INEEL/EXT-03-00628 00
19-DEC-03 HALL, R. C. TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 3 OTHER SURFACE SOILS REMEDIATION, SETS 1-3 PHASE I (PHASE 1) EM-ER-03-316 00
09-DEC-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) DOE/ID-10837 01
09-DEC-03 BRAGASSA, J. L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/ID-10838 01
09-DEC-03 MCMANAMON, L. E. HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS - ATTACHMENT 2 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 1 (REV.01) INEEL/EXT-2000-00270 03
06-DEC-03 BRUCE, J. E. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 3, PM-2A TANKS AND BURN PITS FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 - APPENDIX G CONTAINS AGENCY REVIEW COMMENTS DOE/ID-11073 00
05-DEC-03 BRUCE, J. E. CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-26 PM-2A TANKS REMEDIAL DESIGN - ATTACHMENT 1 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 SPC-475 00
05-DEC-03 BRUCE, J. E. CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, TSF-03 BURN PIT REMEDIAL DESIGN - ATTACHMENT 2 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 SPC-476 00
05-DEC-03 BRUCE, J. E. CONSTRUCTION SPECIFICATION (SPC) - WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 3, WRRTF-01 BURN PITS REMEDIAL DESIGN - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - DOE/ID-11073 SPC-477 00
06-NOV-03 NEHER, E. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 02
04-NOV-03 ELLIOTT, M. D. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G DOE/ID-10712 02
23-OCT-03 FORSYTHE, H. S. SUPPLEMENTAL WORK PLAN FOR TC-99 EVALUATION IN GROUNDWATER, WASTE AREA GROUP 3 (WAG-3) GROUP 4 PERCHED WATER - APPENDIX O TO DOE/ID-10774, REVISION 2 (REV.02) AND REVISION 3 (REV.03) ICP/EXT-03-00029 00
13-OCT-03 WAGONER, D. W. POST RECORD OF DECISION (ROD) MONITORING WORK PLAN FOR THE CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II AND III OPERABLE UNIT (OU) 4-12 INEL-95/0579 05
30-SEP-03 FORSYTHE, H. S. WASTE MANAGEMENT PLAN (WMP) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC)OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I & II - APPENDIX L TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, R DOE/ID-10770 03
30-SEP-03 FORSYTHE, H. S. OPERATION AND MAINTENANCE (O&M) PLAN FOR INTEC OPERABLE UNIT (OU) 3-13, GROUP 1, TANK FARM INTERIM ACTION (TFIA), PHASES I AND II - APPENDIX K TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 DOE/ID-10771 01
30-SEP-03 FORSYTHE, H. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR GROUP 1 TANK FARM INTERIM ACTION (TFIA) DOE/ID-10772 01
29-SEP-03 VANDEL, D. S. NEW PUMP AND TREAT FACILITY (NPTF) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10679 01
29-SEP-03 GIANOTTO, D. F. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 01
16-JUL-03 SHAW, R. M. TRANSMITTAL OF FINAL LABORATORY STUDY WORK PLAN FOR V-TANKS CONTENTS AND FINAL COLD BENCH SCALE TEST PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF SURROGATE V-TANK WASTE (TSF-09 & TSF-18) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 EM-ER-03-179 00
14-JUL-03 TYSON, D. R. LABORATORY STUDY WORK PLAN FOR CHEMICAL OXIDATION AND STABILIZATION OF V-TANKS' CONTENTS, TSF-09 & TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - APPENDIX A INCLUDES EPA AND IDEQ REVIEW COMMENTS AND RESOLUTIONS DOE/ID-11083 00
30-JUN-03 ORR, B. R. MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B DOE/ID-11055 00
26-JUN-03 BRAGASSA, J. L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM DOE/ID-11048 00
26-JUN-03 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN (RD) EXCAVATION ESTIMATES - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3254 00
26-JUN-03 VAN VOST, R. M. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIATION UNDERGROUND UTILITIES STUDY - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3266 00
26-JUN-03 BRAGASSA, P. W. ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK RETRIEVAL AND DEMOLITION STRUCTURAL DESIGN - ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3282 00
26-JUN-03 HALL, R. C. TRANSMITTAL OF THE FINAL OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-03-168 00
25-JUN-03 RICE, R. S. WASTE MANAGEMENT PLAN (WMP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 9 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11049 00
25-JUN-03 BRAGASSA, J. L. ENGINEERING DESIGN FILE (EDF) - TRU CONSTITUENT CALCULATIONS AND THE PROPOSED DISPOSAL PATH FOR THE VES-SFE-20 HOT WASTE TANK AND CONTENTS - ATTACHMENT 6 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-3273 00
23-JUN-03 TUOTT, L. C. FIELD SAMPLING PLAN (FSP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) - ATTACHMENT 8 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN DOE/ID-11047 00
23-JUN-03 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR THE VES-SFE-20 HOT WASTE TANK SYSTEM - ATTACHMENT 10 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN INEEL/EXT-02-01436 00
27-MAY-03 SHAW, R. M. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM AND SUPPORTING DOCUMENTS FOR V-TANKS EARLY REMEDIAL ACTION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES EM-ER-03-136 00
23-MAY-03 JESSMORE, J. J. FIELD SAMPLING PLAN (FSP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 - SUPPORTING DOCUMENT FOR THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (RD/RAWP) AND ADDENDUM DOE/ID-11065 00
23-MAY-03 JESSMORE, J. J. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM FOR V-TANKS EARLY REMEDIAL ACTION FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES DOE/ID-11075 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
23-MAY-03 HARRIS, J. D. WASTE MANAGEMENT PLAN (WMP) FOR V-TANKS EARLY REMEDIAL ACTION (RA) FOR THE TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10, GROUP 2 SITES - SUPPORTING DOCUMENT FOR REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND ADDENDU INEEL/EXT-02-01608 00
20-MAY-03 MCMANAMON, L. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3), OPERABLE UNIT (OU) 3-13, GROUP 1 SOILS TANK FARM INTERIM ACTION (TFIA) - APPENDIX M TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 INEEL/EXT-2000-00194 04
05-MAY-03 BRUCE, J. E. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES - DOE, IDEQ AND EPA REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED IN APPENDIX G DOE/ID-10712 01
01-APR-03 WELLS, R. P. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II FOR WASTE AREA GROUP 5 (WAG-5) DOE/ID-10798 01
05-MAR-03 HAIN, K. E. REQUEST FOR A MILESTONE EXTENSION RELATED TO SUBMISSION OF PHASED WASTE AREA GROUP 3 (WAG-3) GROUP 3 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLANS - POSITION PAPER FOR PHASING THE WAG-3 GROUP 3 RD/RA EM-ER-03-064 00
12-FEB-03 WAGONER, D. W. WASTE AREA GROUP 4 (WAG-4) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN CENTRAL FACILITIES AREA 04 (CFA-04) POND MERCURY CONTAMINATED SOILS OPERABLE UNIT (OU) 4-13 DOE/ID-11028 00
10-FEB-03 O'NEILL, K. C. TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) EM-ER-03-042 00
03-FEB-03 CRISP, D. E. ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) AIR COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX L TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF EDF-2237 00
03-FEB-03 MORGANS, D. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT - APPENDIX E TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 EDF-ER-327 00
03-FEB-03 SHAW, R. M. TRANSMITTAL OF DRAFT MONITORED NATURAL ATTENUATION (MNA) REMEDIAL ACTION WORK PLAN (RAWP) AND DRAFT MONITORED NATURAL ATTENUATION OPERATIONS, MONITORING AND MAINTENANCE (O&M) PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B EM-ER-02-036-A 00
01-FEB-03 CRISP, D. E. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS WASTE MANAGEMENT PLAN (WMP) - APPENDIX G TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10886 00
01-FEB-03 CRISP, D. E. TREATABILITY STUDY (TS) TEST PLAN FOR SOIL STABILIZATION - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10903 00
01-FEB-03 CRISP, D. E. SAMPLING AND ANALYSIS PLAN (SAP) FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) WASTE STABILIZATION OPERATIONS WAG-3 OU 3-13 - APPENDIX J TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10924 00
01-FEB-03 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - ENVIRONMENTAL PROTECTION AGENCY (EPA) AND IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) REVIEW COMMENTS AND RESOLUTIONS ARE INCLUDED AS APPENDIX P DOE/ID-10984 00
01-FEB-03 CRISP, D. E. INEEL CERCLA DISPOSAL FACILITY (ICDF) GROUNDWATER DETECTION MONITORING PROGRAM DATA ANALYSIS PLAN - APPENDIX H TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-10998 00
01-FEB-03 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONS AND MAINTENANCE (O&M) PLAN - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 1 (VOL.01) OF 2 DOE/ID-11000 00
01-FEB-03 CRISP, D. E. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX OPERATIONAL AND MONITORING (O&M) SAMPLING AND ANALYSIS PLAN (SAP) - APPENDIX M TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 DOE/ID-11005 00
01-FEB-03 CRISP, D. E. ENGINEERING DESIGN FILE (EDF) - NESHAP COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 EDF-2236 00
01-FEB-03 JENKINS, T. W. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX ON-SITE VERSUS OFF-SITE COST COMPARISON - APPENDIX O TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 EDF-2385 00
01-FEB-03 CRISP, D. E. HEALTH AND SAFETY PLAN (HSP OR HASP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONS - APPENDIX F TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 INEEL/EXT-01-01318 00
01-FEB-03 VERNON, D. K. PLAN (PLN) - TRACKING PLAN FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX C TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 PLN-914 00
06-JAN-03 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B DOE/ID-11015 01
24-DEC-02 HATHAWAY, C. TRANSMITTAL OF DRAFT FINAL CFA-04 MERCURY POND REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN AND FIELD SAMPLING PLAN (FSP) EM-ER-02-217 00
31-OCT-02 NELSON, L. O. IN SITU BIOREMEDIATION (ISB) REMEDIAL ACTION WORK PLAN (RAWP) FOR TAN FINAL GROUNDWATER REMEDIATION, OPERABLE UNIT (OU) 1-07B DOE/ID-11015 00
30-AUG-02 BREWER, K. ENGINEERING DESIGN FILE (EDF) - TRANSURANIC (TRU) CALCULATIONS FOR VES-SFE-20 WASTE TANK - ATTACHMENT 7 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EDF-2360 00
01-AUG-02 NRF PHASE II (TWO) REMEDIAL DESIGN (RD) REPORT AND REMEDIAL ACTION (RA) WORK PLAN OPERABLE UNIT (OU) 8-08 - NAVAL REACTORS FACILITY (NRF) 24885 00
18-JUL-02 COLLINS, R. L. TRANSMITTAL OF MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), REVISION 2 (REV.02) EM-ER-02-121 00
15-JUL-02 SORENSON, K. S. IN SITU BIOREMEDIATION (ISB) PRE-DESIGN OPERATIONS WORK PLAN TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B - APPENDIX A IS THE 2002 TRACER TEST INEEL/EXT-2000-00647 01
01-JUL-02 GIANOTTO, D. F. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS MSIP IS THE RD/RA WORK PLAN FOR GROUP 5 DOE/ID-10782 02
01-JUL-02 NEHER, E. PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13, GROUP 5, SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 DOE/ID-10784 02
01-JUL-02 GIANOTTO, D. F. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.02 DOE/ID-10829 02
14-MAY-02 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE DOE/ID-10848 01
14-MAY-02 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN - APPENDIX X TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 DOE/ID-10851 02
14-MAY-02 VERNON, D. K. INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX W TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 DOE/ID-10958 00
14-MAY-02 FRITZLER, B. E. ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 EDF-2899 00
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-266 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-267 01
14-MAY-02 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-268 01
14-MAY-02 BOSE, D. H. ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 EDF-ER-269 01
14-MAY-02 BOSE, D. H. ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-271 01
14-MAY-02 EVANS, S. K. ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 EDF-ER-273 02
14-MAY-02 DAY, R. E. ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 EDF-ER-274 01
14-MAY-02 MCMAHON, W. J. ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 EDF-ER-275 02
14-MAY-02 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5 EDF-ER-276 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-277 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 EDF-ER-278 01
14-MAY-02 CROUSE, P. E. ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-279 02
14-MAY-02 THOMPSON, B. ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-280 01
14-MAY-02 CROUSE, P. ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-281 01
14-MAY-02 REIMBOLD, M. ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 EDF-ER-282 01
14-MAY-02 THURSTON, M. ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 EDF-ER-286 01
14-MAY-02 ZOHNER, S. K. ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V EDF-ER-290 01
14-MAY-02 DAVISON, R. L. ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 EDF-ER-311 01
14-MAY-02 ROUTT, T. M. ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 EDF-ER-315 00
14-MAY-02 JENKINS, T. W. TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) TITLE II DESIGN EM-ER-02-083 00
14-MAY-02 VERNON, D. K. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) STAGE II CONSTRUCTION - APPENDIX V TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 PLN-962 00
14-MAY-02 DEHNER, J. G. TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - APPENDIX Y TO ICDF RD/CWP - INCLUDED IN VOLUME 4 (VOL.04) OF 5 SPC-1476 01
14-MAY-02 VERNON, D. K. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX CONTROL SYSTEM - APPENDIX DD TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 TFR-2520 00
14-MAY-02 VERNON, D. K. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WAG-3 INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND - APPENDIX CC TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) O TFR-71 02
01-MAY-02 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) - APPENDIX S TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 DOE/ID-10955 00
28-MAR-02 GILES, J. R. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4), CFA-08 SEWAGE PLANT DRAINFIELD, OPERABLE UNIT (OU) 4-13 DOE/ID-10929 00
12-MAR-02 JENKINS, T. W. TRANSMITTAL OF THE FINAL REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX EM-ER-02-037 00
12-MAR-02 DAVISON, R. L. A-E PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, AND SIZING TREATMENT FACILITY (SSSTF) SOIL STABILIZATION SYSTEM (SSS) - APPENDIX B OF EDF-ER-296 WHICH IS APPENDIX B-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX SPC-1481 00
11-MAR-02 NISHIOKA, D. E. PROCUREMENT SPECIFICATION (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - CPP-1689 ADMINISTRATIVE OFFICE TRAILER (AOT) - APPENDIX C-1 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX SPC-1484 00
07-MAR-02 HURST, C. J. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DEBRIS TREATMENT PROCESS SELECTION AND DESIGN - APPENDIX B-2 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-1730 00
07-MAR-02 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ACCESS ROAD AND SITE PAVEMENT BALLAST REQUIREMENTS - APPENDIX B-11 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-1913 00
07-MAR-02 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - SANITARY SEWER LIFT STATION PUMP DESIGN - APPENDIX B-3 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-1937 00
07-MAR-02 HUNTER, L. D. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - INTEC FIRE WATER SYSTEM FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX B-5 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) EDF-1948 00
07-MAR-02 KINGSFORD, C. O. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - PROCESS SYSTEMS DRAIN PIPE SIZING - APPENDIX B-6 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2648 00
07-MAR-02 POPE, M. I. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FLOW AND PRESSURE CALCULATIONS OF THE RAW WATER AND POTABLE WATER SYSTEMS - APPENDIX B-4 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF CO EDF-2655 00
07-MAR-02 POPE, M. I. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DECONTAMINATION FACILITY HVAC SYSTEM - APPENDIX B-7 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2676 00
07-MAR-02 HIPP, T. M. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FIBER OPTIC SELECTION - APPENDIX B-9 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2738 00
07-MAR-02 DUGGAN, J. E. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ELECTRICAL LOAD STUDY - APPENDIX B-10 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-2747 00
07-MAR-02 STEPHENS, D. L. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - POST-TENSIONED SLAB DESIGN - APPENDIX B-12 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-3061 00
07-MAR-02 HAEFNER, D. R. ENGINEERING DESIGN FILE (EDF) - PROCESS AND TREATMENT OVERVIEW FOR THE MINIMUM TREATMENT PROCESS - APPENDIX B-1 TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-ER-296 00
07-MAR-02 SUMMERS, A. D. ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DESIGN RADIOLOGICAL CONTROL ANALYSIS - APPENDIX B-8 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX EDF-ER-302 00
07-MAR-02 DAVISON, R. L. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR CONSTRUCTION ACTIVITIES - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX I TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX PLN-1034 00
07-MAR-02 NISHIOKA, D. E. A-E CONSTRUCTION SPECIFICATIONS (SPC) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) - APPENDIX C TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX SPC-1485 00
07-MAR-02 DAVISON, R. L. TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX A TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX TFR-17 02
01-MAR-02 DAVISON, R. L. STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX H TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX DOE/ID-10873 00
01-MAR-02 MCDANNEL, G. E. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR THE TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 2 SITES DOE/ID-10875 01
01-MAR-02 DAVISON, R. L. INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX WASTE ACCEPTANCE CRITERIA (WAC) - APPENDIX J TO THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX DOE/ID-10881 00
01-MAR-02 DAVISON, R. L. REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) FOR WAG-3 STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ICDF COMPLEX DOE/ID-10889 00
01-MAR-02 DAVISON, R. L. HEALTH & SAFETY PLAN (HSP) FOR CONSTRUCTION OF THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - APPENDIX G TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX INEEL/EXT-01-00271 00
01-MAR-02 THOMPSON, R. G. PRELIMINARY INSPECTION PLAN FOR STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) CONSTRUCTION ACTIVITIES - APPENDIX F TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX INEEL/EXT-01-00777 00
01-MAR-02 DAVISON, R. L. QUALITY PROGRAM PLAN (QPP) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX PLN-873 00
07-JAN-02 IVY, K. ENVIRONMENTAL PROTECTION AGENCY (EPA) GENERAL, SPECIFIC AND EDITORIAL REVIEW COMMENTS ON THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 4 (WAG-4), CFA-08 SEWAGE PLANT DRAINFIELD, OPERABLE UNIT (OU) 4-13 (DRAFT) 10954 00
26-NOV-01 SHAW, R. M. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 2 SITES AND SUPPORTING DOCUMENTS EM-ER-01-192 00
01-NOV-01 ROY F. WESTON, INC. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN), WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10, GROUP 2 SITES DOE/ID-10875 00
23-AUG-01 HAIN, K. E. TRANSMITTAL OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 3 (WAG-3) STAGING, STORAGE, SIZING & TREATMENT FACILITY (SSSTF) EM-ER-01-136 00
01-JUL-01 CH2M HILL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN TITLE II DESIGN - ANNOTATED OUTLINE (TITLE I) 30% DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 DOE/ID-10848 00
26-JUN-01 HATHAWAY, C. TRANSMITTAL OF REVISION 1 (REV.01) OF WASTE AREA GROUP 5 (WAG-5) OPERABLE UNIT (OU) 5-12 POWER BURST FACILITY & AUXILIARY REACTOR AREA (PBF/ARA) PHASE I REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN EM-ER-01-111 00
19-JUN-01 WELLS, R. P. WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE I - OPERABLE UNIT (OU) 5-12 DOE/ID-10761 01
01-MAY-01 BECHTEL DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OPERABLE UNIT (OU) 3-13 GROUP 6, BURIED GAS CYLINDERS - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (REV. DOE/ID-10836 00
01-MAY-01 BECHTEL WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13, GROUP 6, BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) DOE/ID-10837 00
01-MAY-01 BECHTEL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) OU 3-13, GROUP 6, BURIED GAS CYLINDERS DOE/ID-10838 00
01-APR-01 WIGGINS-WAGONER, D. J. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN - INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 DOE/ID-10826 00
01-MAR-01 RAUNIG, D. E. PRELIMINARY CHARACTERIZATION PLAN FOR OU 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT 1 TO RD/RA WORK PLAN, REVISION 1 (REV.01) AND REVISION 2 (REV.02) DOE/ID-10842 02
01-MAR-01 MCMANAMON, L. E. HEALTH & SAFETY PLAN (HSP OR HASP) FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 GROUP 6 BURIED GAS CYLINDERS (ATTACHMENT TO RD/RA WORK PLAN) INEEL/EXT-2000-00270 02
29-JAN-01 IVY, K. EPA REVIEW OF DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR INEEL CENTRAL FACILITIES AREA (CFA) OPERABLE UNIT (OU) 4-13 TRANSFORMER YARD CFA-10 22346 00
CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
19-DEC-00 GIANOTTO, D. F. PRELIMINARY CHARACTERIZATION PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES CPP-84 & CPP-94 (FORMERLY INEEL/EXT-2000-00398) - ATTACHMENT TO RD/RA WORK PLAN DOE/ID-10842 01
19-DEC-00 HATHAWAY, C. TRANSMITTAL OF WASTE AREA GROUP 5 (WAG-5) DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II EM-ER-244-00 00
18-DEC-00 WELLS, R. P. WASTE AREA GROUP 5 (WAG-5) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PHASE II DOE/ID-10798 00
29-NOV-00 HAIN, K. E. TRANSMITTAL OF FINAL MONITORING SYSTEM INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - PER EM-ER-206-00 THIS DOCUMENT IS THE RD/RA WORK PLAN FOR THIS PROJECT EM-ER-223-00 00
01-NOV-00 ROBERTS, C. J. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) DOE/ID-10782 01
01-NOV-00 ROBERTS, C. J. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX B TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) - DOE/ID-10782, REV.01 & DOE/ID-10782, REV.02 DOE/ID-10783 01
01-NOV-00 ROBERTS, C. J. PLUME EVALUATION FIELD SAMPLING PLAN (FSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX A TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 DOE/ID-10784 01
01-NOV-00 ROBERTS, C. J. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX H TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP), DOE/ID-10782, REV.01 DOE/ID-10829 01
01-OCT-00 DAVISON, R. L. TREATABILITY STUDY (TS) WORK PLAN FOR THE STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION PROCESS (DRAFT) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 DOE/ID-10828 00
01-OCT-00 FORSYTHE, H. S. HEALTH AND SAFETY PLAN (HSP) FOR OU 3-13 SNAKE RIVER PLAIN AQUIFER (SRPA) - THIS DOCUMENT IS APPENDIX G TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 INEEL/EXT-2000-00817 00
20-SEP-00 THOMPSON, R. G. QUALITY ASSURANCE PROJECT PLAN (QAPJP) FOR WAG-1 WAG-2 WAG-3 WAG-4 WAG-5 WAG-6 WAG-7 WAG-10 & INACTIVE SITES (APPENDIX J TO MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 5 DOE/ID-10782, REV.01, APPENDIX C TO DOE/ID-10774, REV.00 & REV DOE/ID-10587 06
20-SEP-00 ROBERTS, C. J. HEALTH & SAFETY PLAN (HSP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER PROJECT - THIS DOCUMENT IS APPENDIX H TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 INEEL/EXT-2000-00257 00
19-SEP-00 HURST, C. J. ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 EDF-ER-206 00
18-SEP-00 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 EDF-1379 00
18-SEP-00 FRITZ, K. D. ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, EDF-1387 00
01-SEP-00 ROBERTS, C. J. FIELD SAMPLING PLAN (FSP) FOR OU 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION - THIS DOCUMENT IS APPENDIX B TO DOE/ID-10774, REV.00 & REV.01 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10745 00
01-SEP-00 ROBERTS, C. J. LONG TERM MONITORING PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - THIS DOCUMENT IS APPENDIX E TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) OU 3-13 GROUP 4 DOE/ID-10746 00
01-SEP-00 ROBERTS, C. J. WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER -THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10749 00
01-SEP-00 ROBERTS, C. J. TRACER TEST PLAN FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER - APPENDIX D TO MONITORING SYSTEM AND INSTALLATION PLAN - DOE/ID-10774, REVISION 0 (REV.00), REVISION 1 (REV.01), REVISION 2 (REV.02), AND REVISION 3 (REV.03) DOE/ID-10762 00
01-SEP-00 ROBERTS, C. J. DATA MANAGEMENT PLAN (DMP) FOR FIELD AND NONCHEMICAL DATA FROM OU 3-13 GROUP 4 AND GROUP 5, WELL INSTALLATION AND MONITORING PROJECTS - APPENDIX D TO MSIP FOR OU 3-13 GROUP 5 SRPA, DOE/ID-10782, REV.01 & REV.02 & APPENDIX J TO GROUP 4 MSIP, DOE/ID-10 DOE/ID-10768 00
01-SEP-00 ROBERTS, C. J. MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OPERABLE UNIT (OU) 3-13 GROUP 4 PERCHED WATER WELL INSTALLATION DOE/ID-10774 00
01-SEP-00 FRENCH, P. S. WASTE MANAGEMENT PLAN (WMP) FOR STAGING & STORAGE ANNEX (SSA) - THIS DOCUMENT IS A PART OF APPENDIX F TO DOE/ID-10774 MONITORING SYSTEM AND INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 4 DOE/ID-10800 00
30-AUG-00 SHAW, R. M. TRANSMITTAL OF FINAL COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 1-10 GROUP 1 SITES & SUPPORTING DOCUMENTS EM-ER-167 00
17-AUG-00 JANTZ, A. E. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 GROUP 1 SITES DOE/ID-10712 00
09-MAY-00 RAUNIG, D. E. HAZARD CLASSIFICATION FOR REMEDIATION OF OPERABLE UNIT (OU) 3-13 GROUP 6 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) BURIED GAS CYLINDER SITES - CPP-84 & CPP-94 - ATTACHMENT 3 TO RD/RA WORK PLAN, REVISION 0 (REV.0), REVISION 1 (REV.01) AND REVISION 2 (R INEEL/EXT-2000-00254 00
26-OCT-99 DOE COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR WASTE AREA GROUP 9 (WAG-9) OPERABLE UNIT (OU) 9-04 W7500-0550-ES-00 00
13-OCT-99 FRITZ, K. D. A-E CONSTRUCTION SPECIFICATION (SPC) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) CERCLA STORAGE PAD AREA CPP-92 AND LOW LEVEL WASTE (LLW) HOLDING AREA - PART OF APPENDIX E TO SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF SPC-218 00
13-SEP-99 BRADLEY, T. M. TRANSMITTAL OF IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) WASTE AREA GROUP 8 (WAG-8) FINAL PHASE I REMEDIAL DESIGN (RD) REPORT & REMEDIAL ACTION (RA) WORK PLAN NR:IBO-99/097 00
01-SEP-99 NRF PHASE I (ONE) REMEDIAL DESIGN (RD) REPORT AND REMEDIAL ACTION (RA) WORK PLAN OPERABLE UNIT (OU) 8-08 - NAVAL REACTORS FACILITY (NRF) 19167 00
01-JUL-99 JANTZ, A. E. REMEDIAL ACTION WORK PLAN (RAWP) TAN FINAL GROUNDWATER REMEDIATION - PHASE B FOR OPERABLE UNIT (OU) 1-07B DOE/ID-10629 00
01-SEP-98 REESE, C. L. COMPREHENSIVE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR TEST REACTOR AREA (TRA) OPERABLE UNIT (OU) 2-13 DOE/ID-10643 00
29-JUN-98 DUSTIN, J. D. WORK PLAN FOR STAGE I OU 7-10 CONTINGENCY PROJECT DOE/ID-10623 00
12-MAY-98 LMITCO INEEL STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES (SWPPP-CA) - GENERIC PLAN - THIS DOCUMENT IS APPENDIX M TO THE MONITORING SYSTEM & INSTALLATION PLAN (MSIP) FOR OU 3-13 GROUP 5 SNAKE RIVER PLAIN AQUIFER (SRPA), DOE/ID-10782, RE DOE/ID-10425(98) 02
01-JUN-97 NEHER, E. POST RECORD OF DECISION (ROD) MONITORING WORK PLAN CENTRAL FACILITIES AREA (CFA) LANDFILL I, II & III OPERABLE UNIT (OU) 4-12 INEL-95/0579 04
01-MAR-97 PETERSON, L. N. TECHNOLOGY EVALUATION WORK PLAN TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B DOE/ID-10562 00
09-OCT-96 DUDZIAK, A. J. TRANSMITTAL OF UPDATE (REV.03) TO MONITORING WORK PLAN PORTION OF FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) OPE-ER-145-96 00
01-AUG-96 NEHER, E. POST RECORD OF DECISION (ROD) MONITORING WORK PLAN FOR CENTRAL FACILITIES AREA (CFA) LANDFILLS I, II & III OPERABLE UNIT (OU) 4-12 (ALSO PART OF APPENDIX A OF THE RD/RA INEL-95/0579 03
01-JUN-96 WELLS, R. P. FIELD SAMPLING PLAN (FSP) FOR POST RECORD OF DECISION (ROD) MONITORING CFA LANDFILL I, II & III OU 4-12 (PARSONS #ES-20.6.19) - THIS FSP IS ALSO PART OF APPENDIX A OF THE RD/RA WORK PLAN INEL-95/0585 02
10-MAY-96 GREEN, L. A. REVISED ENFORCEABLE SCHEDULE FOR WAG-5 REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN OPE-ER-96-84 00
06-MAY-96 ROSENBERGER, M. S. IDHW REVIEW COMMENTS ON DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA LANDFILL I, II & III 11920 00
19-APR-96 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNIT (OU) 4-12 OPE-ER-66-96 00
04-APR-96 GREEN, L. A. TRANSMITTAL OF DRAFT FINAL WORK PLAN FOR SL-1 AND BORAX I BURIAL GROUNDS REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) ACTIVITIES & DOE COMMENT RESOLUTIONS TO IDAHO DEPARTMENT OF HEALTH & WELFARE DIVISION OF ENVIRONMENTAL QUALITY (IDHW-DEQ) COMMENTS OPE/ER-96-061 00
02-APR-96 ROSENBERGER, M. S. IDHW REVIEW COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA LANDFILL I, II & III 11919 00
01-APR-96 COTTEN, G. B. DESIGN DRAWINGS - CONSTRUCTION PLANS - APPENDIX C OF DOE/ID-10532, SL-1 & BORAX I BURIAL GROUNDS ENGINEERED BARRIERS PROJECT RD/RA WORK PLAN 11822 00
01-APR-96 ROSENBERGER, M. S. DOE RESOLUTIONS FOR IDAHO DEPARTMENT OF HEALTH AND WELFARE DIVISION OF ENVIRONMENTAL QUALITY ( IDHW-DEQ) COMMENTS ON DRAFT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR OPERABLE UNITS (OU) 5-05 & 6-01 11823 00
01-APR-96 ROTHERMEL, J. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CENTRAL FACILITIES AREA (CFA) LANDFILL I, II, AND III NATIVE SOIL COVER PROJECT - THIS DOE/ID-10528 00
01-APR-96 COTTEN, G. B. STATIONARY LOW POWER REACTOR-1 (SL-1) & BOILING WATER REACTOR EXPERIMENT I (BORAX I) BURIAL GROUNDS ENGINEERED BARRIERS PROJECT REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN (PARSON'S #ES.28.06.23) DOE/ID-10532 00
01-APR-96 JENKINS, S. L. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) CFA LANDFILLS I, II & III NATIVE SOIL COVER PROJECT OU 4-12 (ALSO APPENDIX K OF THE RD/RA WORK PLAN) INEL-95/0435 03
20-MAR-96 GREEN, L. A. TRANSMITTAL OF DRAFT RD/RA WORK PLAN & FINAL SCOPE OF WORK (SOW) FOR OU 4-12 OPE-ER-48-96 00
01-MAR-96 ROTHERMEL, J. S. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN FOR CFA LANDFILLS I, II & III (NATIVE SOIL COVER PROJECT) - INEL-95/0638 02
01-MAR-96 GREEN, L. A. TRANSMITTAL OF DRAFT POST ROD MONITORING WORK PLAN FOR OU 4-12 OPE-ER-36-96 00
01-AUG-95 NRF REMEDIAL DESIGN REPORT AND REMEDIAL ACTION WORK PLAN (RAWP) FOR NRF INACTIVE LANDFILLS 11377 00
24-JUL-95 GREEN, L. A. PAD-A LIMITED ACTION DOCUMENTATION 9965 00
01-JUN-94 MK-FIC REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN PAD-A LIMITED ACTION RWMC OU 7-12 (DRAFT FINAL) 07.012.1.1.101.01 01
01-DEC-93 BURTON, B. N. REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) & REMEDIAL DESIGN WORK PLAN (RDWP) - OU 7-10 PIT 9 PROJECT INTERIM ACTION (IA) EGG-ER-11055 00
22-NOV-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN FOR PBF-08 CORROSIVE WASTE SUMP & PBF-10 EVAPORATION POND REMEDIATION OU 5-13 05.013.1.3.101.01 02
19-NOV-93 MK-FIC & ADTECHS CORP. FINAL REMEDIAL ACTION (RA) WORK PLAN FOR TEST AREA NORTH (TAN) GROUNDWATER INTERIM ACTION (IA) OPERABLE UNIT (OU) 1-07A 01.07A.2.1.201.01 03
10-SEP-93 MK-FIC FINAL REMEDIAL DESIGN (RD) IMPLEMENTING REMEDIAL ACTION (RA) WORK PLAN TRA WARM WASTE POND (WWP) INTERIM ACTION (IA) OU 2-10 02.010.1.1.114.01 01
10-JUN-93 WYLE LABORATORIES INTERIM ORDNANCE CLEANUP PROGRAM REMEDIAL ACTION WORK PLAN (RAWP) - THIS MANUAL WAS RECEIVED AS A VENDOR DATA ITEM FROM WYLE LABORATORIES FOR OU 10-05 SUBMITTAL #S-500992-005(10-05), REVISION 4 (REV.04) 23-ICP-05 03


Send Questions and Comments to: tua@inel.gov

Previous Page | Administrative Record Home Page