| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 08-SEP-06 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - REV. 0 OF THIS EDF IS PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 01 |
| 09-AUG-06 | CAHN, L. S. | METHODS TO REDUCE WATER INFILTRATION AND RECHARGE OF THE NORTHERN SHALLOW PERCHED WATER ZONE AT IDAHO NUCLEAR TECHNOLOGIES AND ENGINEERING CENTER (INTEC) | EDF-6868 | 00 |
| 17-MAY-06 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TRANSPORT TIE DOWN ANALYSIS | EDF-5734 | 02 |
| 11-MAY-06 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TRANSPORT TIE DOWN ANALYSIS | EDF-5734 | 01 |
| 22-DEC-05 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - V-9 TANK MACROENCAPSULATION & LIFTING DESIGN - STRUCTURAL ANALYSIS & LIFT PLAN - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, RE | EDF-6306 | 00 |
| 15-DEC-05 | BAKER, E. L. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION PUMP SEAL EVALUATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6259 | 00 |
| 01-DEC-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - V-TANK AIR STRIPPING CALCULATIONS AND PROCESS SIZING - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6376 | 00 |
| 17-NOV-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - REVISED SOURCE TERM INVENTORY FOR THE V-TANK WASTE - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6326 | 00 |
| 17-NOV-05 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - APAD SUPPORT CALCULATIONS FOR REVISED SOURCE TERM FOR TAN V-TANKS REMEDEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, R | EDF-6332 | 00 |
| 15-NOV-05 | FARNSWORTH, R. K. | EDF - EVALUATING AIR SAFETY FOR CO-LOCATED WORKER DURING CONTROLLED AIR SPARGING OF CONSOLIDATED TAN V-TANK WASTE, WITHOUT ACTIVATED CARBON ADSORPTION - PART OF ATTACHMENT 3 RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, | EDF-6327 | 00 |
| 01-NOV-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - V-TANK OFF GAS DATA EVALUATION AND REMAINING INVENTORY DETERMINATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-6364 | 00 |
| 29-AUG-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION CRANE VERIFICATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 AND TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REVISION 3 (REV.03) | EDF-6099 | 00 |
| 21-JUL-05 | GIBSON, P. L. | ENGINEERING DESIGN FILE (EDF) - IDAHO CERCAL DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN | EDF-ER-286 | 04 |
| 06-JUL-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - EVALUATION OF NECESSITY OF OFF GAS SCRUBBER FOR V-TANKS TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 | EDF-5905 | 00 |
| 23-JUN-05 | BONNEMA, B. E. | ENGINEERING DESIGN FILE (EDF) - SUBSIDENCE EVALUATION FOR V-1, V-2, V-3, AND V-14 TANKS IN IDAHO CERCLA DISPOSAL FACILITY (ICDF) CELL - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND RE | EDF-5786 | 00 |
| 19-MAY-05 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - TANK V-14 AIR STRIPPING CALCULATIONS AND PROCESS SIZING - MAY ALSO BE FOUND AS ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 - DOE/NE-ID-11233 | EDF-5558 | 02 |
| 19-MAY-05 | RODDY, M. S. | ENGINEERING DESIGN FILE (EDF) - GEOCHEMICAL STUDY FOR PERCHED WATER SOURCE IDENTIFICATION AT IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | EDF-5758 | 00 |
| 25-APR-05 | NORBY, B. C. | ENGINEERING DESIGN FILE (EDF) - CORROSION EVALUATION FOR STAINLESS STEEL V-TANKS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV.03 | EDF-5727 | 00 |
| 25-APR-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TRANSPORT TIE DOWN ANALYSIS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV. | EDF-5734 | 00 |
| 18-APR-05 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 AND TSF-18 V-TANKS REMEDIATION TANK LIFTING DESIGN - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV.03 | EDF-5595 | 00 |
| 07-MAR-05 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4928 | 02 |
| 31-JAN-05 | HEILESON, W. M. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT | EDF-ER-275 | 04 |
| 27-JAN-05 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.03 | EDF-4604 | 02 |
| 26-JAN-05 | HEILESON, W. M. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT | EDF-ER-327 | 02 |
| 20-JAN-05 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY | EDF-ER-274 | 03 |
| 11-JAN-05 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - RISK BASED APPROACH FOR MANAGEMENT OF POLYCHLORINATED BIPHENYL (PCB) REMEDIATION WASTE FROM V-TANKS | EDF-3077 | 02 |
| 11-JAN-05 | DOORNBOS, M. H. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY | EDF-ER-264 | 03 |
| 11-JAN-05 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY | EDF-ER-278 | 03 |
| 10-JAN-05 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX | EDF-ER-290 | 03 |
| 17-NOV-04 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - V-TANKS CONTENTS REMEDIATION MECHANICAL DESIGN PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.02 AND REV.03 | EDF-4751 | 01 |
| 17-NOV-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-4956 | 01 |
| 17-NOV-04 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.03 | EDF-5017 | 01 |
| 20-SEP-04 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - V-TANKS CONTENTS REMEDIATION MECHANICAL DESIGN - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 | EDF-4751 | 00 |
| 16-SEP-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4602 | 01 |
| 16-SEP-04 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - TSF-09 & TSF-18 V-TANK CONTENTS REMOVAL AND SITE REMEDIATION - SITEWORK DESIGN - PART OF ATTACHMENT 3 TO THE RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & REV.03 | EDF-4672 | 00 |
| 16-SEP-04 | ASHWORTH, S. C. | ENGINEERING DESIGN FILE (EDF) - DESIGN FOR VOLATILE ORGANIC COMPOUND (VOC) CONTROL FOR TSF-09 & TSF-18 V-TANK REMEDIAL ACTION (RA) - ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 AND R | EDF-4956 | 00 |
| 14-SEP-04 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - SUPPORTING CALCULATIONS FOR APAD-04-53 TEST AREA NORTH (TAN) V-TANKS REMEDIATION OF TSF-09 & TSF-18 - PART OF ATTACHMENT 3 OF RD/RA WORK PLAN ADDENDUM 2, DOE/NE-ID-11150, REV.01 AND REV.02 AND REV.03 | EDF-5196 | 00 |
| 10-SEP-04 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - SHIELDING AND EXPOSURE CALCULATIONS FOR V-TANK WASTE PROCESS ACTIVITIES - ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.02 | EDF-4604 | 01 |
| 09-SEP-04 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL FEED STREAMS FOR INCLUSION INTO V-TANK TREATMENT PROCESS - PART OF ATTACHMENT 3 TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 & REV.0 | EDF-4928 | 00 |
| 09-SEP-04 | LIPPERT, R. F. | ENGINEERING DESIGN FILE (EDF) - SECONDARY CONTAINMENT AND SUPPORT SKID DESIGN FOR V-TANK CONSOLIDATION TANKS - PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01 AND REV.02 | EDF-5017 | 00 |
| 26-AUG-04 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY | EDF-ER-274 | 02 |
| 12-AUG-04 | EDGETT, S. M. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT | EDF-ER-275 | 03 |
| 09-AUG-04 | FARNSWORTH, R. K. | ENGINEERING DESIGN FILE (EDF) - REEAVALUATION OF CHARACTERISTIC TOXICITY DESIGNATION FOR V-TANK WASTE USING EXISITING SAMPLE DATA PART OF ATTACHMENT 3 TO RD/RA WORK PLAN ADDENDUM 2 TSF-09 & TSF-18 V-TANKS OU 1-10, DOE/NE-ID-11150, REV.01, REV.02 & RE | EDF-4885 | 01 |
| 21-JUL-04 | ESPINOSA, JOHN M. | REEVALUATION OF APPLICABLE HAZARDOUS WASTE NUMBERS AT HISTORICAL TAN FACILITIES | EDF-4714 | 01 |
| 18-JUN-04 | DOORNBOS, M. H. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY | EDF-ER-264 | 02 |
| 18-JUN-04 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY | EDF-ER-278 | 02 |
| 18-JUN-04 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX | EDF-ER-290 | 02 |
| 18-MAY-04 | GIBSON, P. L. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN | EDF-ER-286 | 03 |
| 17-MAR-04 | HAIN, K. E. | TRANSMITTAL OF RECORD OF DECISION (ROD) AMENDMENT FOR V-TANKS TSF-09 AND TSF-18 AND EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR THE PM-2A TANKS TSF-26 AND TSF-06, AREA 10, AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | EM-ER-04-058 | 00 |
| 04-MAR-04 | GIBSON, P. L. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT PLAN | EDF-ER-286 | 02 |
| 02-FEB-04 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - EARTHWORK QUANTITIES FOR SUBPROJECT 6, OPERABLE UNIT (OU) 3-13, GROUP 3 - OTHER SURFACE SOILS PROJECT - ATTACHMENT 5 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3778 | 00 |
| 29-JAN-04 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - ANALYSIS OF POTENTIAL AIR EMISSIONS FROM EXCAVATION OF WASTE AREA GROUP 3 (WAG-3) SOIL CONTAMINATION SITES - ATTACHMENT 2 TO DOE/ID-11089, REVISION 0 (REV.0) REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3902 | 00 |
| 22-DEC-03 | HALL, R. C. | TRANSMITTAL OF DRAFT FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES (ESD) FOR FINAL RECORD OF DECISION (ROD) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 AND SUPPORTING DOCUMENTATION | EM-ER-03-314 | 00 |
| 16-DEC-03 | FORBES, J. R. | ENGINEERING DESIGN FILE (EDF) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INJECTION WELL - SUMMARY OF HISTORICAL INFORMATION AND GROUNDWATER QUALITY TRENDS | EDF-3943 | 00 |
| 02-SEP-03 | NISHIOKA, D. E. | ENGINEERING DESIGN FILE (EDF) - WASTE RETRIEVAL PROCESS TECHNOLOGY SEARCH FOR THE OPERABLE UNIT (OU) 7-10 STAGE III PROJECT | EDF-4025 | 00 |
| 23-JUL-03 | O'NEILL, K. C. | ENGINEERING DESIGN FILE (EDF) - ALTERNATIVES FOR PROTECTION OF STAGING AREA LINER SYSTEMS - DOE-ID HAS DECIDED TO USE ALTERNATIVE 4, HOT MIX ASPHALT CONCRETE WITH ASPHALT SURFACE, OF EDF-3434 FOR BULK SOIL STAGING PILE LINER SYSTEM | EM-ER-03-184 | 00 |
| 26-JUN-03 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIAL DESIGN (RD) EXCAVATION ESTIMATES - ATTACHMENT 5 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3254 | 00 |
| 26-JUN-03 | VAN VOST, R. M. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 7 VES-SFE-20 HOT WASTE TANK SYSTEM REMEDIATION UNDERGROUND UTILITIES STUDY - ATTACHMENT 4 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3266 | 00 |
| 26-JUN-03 | BRAGASSA, P. W. | ENGINEERING DESIGN FILE (EDF) - VES-SFE-20 HOT WASTE TANK RETRIEVAL AND DEMOLITION STRUCTURAL DESIGN - ATTACHMENT 3 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3282 | 00 |
| 25-JUN-03 | BRAGASSA, J. L. | ENGINEERING DESIGN FILE (EDF) - TRU CONSTITUENT CALCULATIONS AND THE PROPOSED DISPOSAL PATH FOR THE VES-SFE-20 HOT WASTE TANK AND CONTENTS - ATTACHMENT 6 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-3273 | 00 |
| 06-JUN-03 | SAMPACO, K. | ENGINEERING DESIGN FILE (EDF) - ALTERNATIVES FOR PROTECTION OF STAGING AREA LINER SYSTEMS | EDF-3434 | 00 |
| 12-FEB-03 | SNOOK, J. G. | TRANSMITTAL OF FINALIZED GLOVEBOX EXCAVATOR METHOD PROJECT DOCUMENTS | EM-ER-03-044 | 00 |
| 03-FEB-03 | CRISP, D. E. | ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) AIR COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX L TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF | EDF-2237 | 00 |
| 03-FEB-03 | MORGANS, D. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SHORT TERM RISK ASSESSMENT - APPENDIX E TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-ER-327 | 00 |
| 01-FEB-03 | CRISP, D. E. | ENGINEERING DESIGN FILE (EDF) - NESHAP COMPLIANCE DEMONSTRATION FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX K TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-2236 | 00 |
| 01-FEB-03 | JENKINS, T. W. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX ON-SITE VERSUS OFF-SITE COST COMPARISON - APPENDIX O TO ICDF COMPLEX REMEDIAL ACTION WORK PLAN (RAWP) - APPENDICES VOLUME 2 (VOL.02) OF 2 | EDF-2385 | 00 |
| 21-JAN-03 | BURTON, B. N. | ENGINEERING DESIGN FILE (EDF) - APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR) IMPLEMENTATION MATRIX FOR OPERABLE UNIT (OU) 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | EDF-2324 | 00 |
| 18-DEC-02 | HATHAWAY, C. | TRANSMITTAL OF ENGINEERING DESIGN FILE (EDF) - RISK ASSESSMENT FOR THE RESIDUAL RADIOLOGICAL CONTAMINATION AT THE BORAX I REACTOR BURIAL SITE, CERCLA SITE BORAX-02, OPERABLE UNIT (OU) 6-01 | EM-ER-02-212 | 00 |
| 12-DEC-02 | GILES, J. R. | ENGINEERING DESIGN FILE (EDF) - RISK ASSESSMENT FOR THE RESIDUAL RADIOLOGICAL CONTAMINATION AT THE BORAX I REACTOR BURIAL SITE, CERCLA SITE BORAX-02, OPERABLE UNIT (OU) 6-01 | EDF-2208 | 01 |
| 27-NOV-02 | DOORNBOS, M. H. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY | EDF-ER-264 | 01 |
| 30-AUG-02 | BREWER, K. | ENGINEERING DESIGN FILE (EDF) - TRANSURANIC (TRU) CALCULATIONS FOR VES-SFE-20 WASTE TANK - ATTACHMENT 7 TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN | EDF-2360 | 00 |
| 14-MAY-02 | FRITZLER, B. E. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 | EDF-2899 | 00 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-266 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-267 | 01 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-268 | 01 |
| 14-MAY-02 | BOSE, D. H. | ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | EDF-ER-269 | 01 |
| 14-MAY-02 | BOSE, D. H. | ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-271 | 01 |
| 14-MAY-02 | EVANS, S. K. | ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 | EDF-ER-273 | 02 |
| 14-MAY-02 | DAY, R. E. | ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-274 | 01 |
| 14-MAY-02 | MCMAHON, W. J. | ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-275 | 02 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5 | EDF-ER-276 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-277 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 | EDF-ER-278 | 01 |
| 14-MAY-02 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-279 | 02 |
| 14-MAY-02 | THOMPSON, B. | ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-280 | 01 |
| 14-MAY-02 | CROUSE, P. | ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-281 | 01 |
| 14-MAY-02 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 | EDF-ER-282 | 01 |
| 14-MAY-02 | THURSTON, M. | ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-286 | 01 |
| 14-MAY-02 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V | EDF-ER-290 | 01 |
| 14-MAY-02 | DAVISON, R. L. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-311 | 01 |
| 14-MAY-02 | ROUTT, T. M. | ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 | EDF-ER-315 | 00 |
| 07-MAR-02 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DEBRIS TREATMENT PROCESS SELECTION AND DESIGN - APPENDIX B-2 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1730 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ACCESS ROAD AND SITE PAVEMENT BALLAST REQUIREMENTS - APPENDIX B-11 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1913 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - SANITARY SEWER LIFT STATION PUMP DESIGN - APPENDIX B-3 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-1937 | 00 |
| 07-MAR-02 | HUNTER, L. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - INTEC FIRE WATER SYSTEM FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX B-5 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) | EDF-1948 | 00 |
| 07-MAR-02 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - PROCESS SYSTEMS DRAIN PIPE SIZING - APPENDIX B-6 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2648 | 00 |
| 07-MAR-02 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FLOW AND PRESSURE CALCULATIONS OF THE RAW WATER AND POTABLE WATER SYSTEMS - APPENDIX B-4 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF CO | EDF-2655 | 00 |
| 07-MAR-02 | POPE, M. I. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - DECONTAMINATION FACILITY HVAC SYSTEM - APPENDIX B-7 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2676 | 00 |
| 07-MAR-02 | HIPP, T. M. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - FIBER OPTIC SELECTION - APPENDIX B-9 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2738 | 00 |
| 07-MAR-02 | DUGGAN, J. E. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - ELECTRICAL LOAD STUDY - APPENDIX B-10 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-2747 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 07-MAR-02 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) - POST-TENSIONED SLAB DESIGN - APPENDIX B-12 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-3061 | 00 |
| 07-MAR-02 | HAEFNER, D. R. | ENGINEERING DESIGN FILE (EDF) - PROCESS AND TREATMENT OVERVIEW FOR THE MINIMUM TREATMENT PROCESS - APPENDIX B-1 TO THE STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-296 | 00 |
| 07-MAR-02 | SUMMERS, A. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING, AND TREATMENT FACILITY (SSSTF) DESIGN RADIOLOGICAL CONTROL ANALYSIS - APPENDIX B-8 TO THE SSSTF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - ICDF COMPLEX | EDF-ER-302 | 00 |
| 28-FEB-02 | HOUSLEY, L. T. | ENGINEERING DESIGN FILE (EDF) - A COMPILATION OF RESULTS FROM SHALLOW SOIL-GAS SURVEYS OF THE SUBSURFACE DISPOSAL AREA (SDA) FOR OU 7-08 | INEEL/EXT-01-00026 | 01 |
| 30-NOV-01 | EVANS, S. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS (60% DESIGN COMPONENT) | EDF-ER-273(60%) | 01 |
| 30-NOV-01 | MCMAHON, W. J. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT (60% DESIGN COMPONENT | EDF-ER-275(60%) | 01 |
| 30-NOV-01 | CROUSE, P. E. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - HYDROLOGIC MODELING OF FINAL COVER - (60% DESIGN COMPONENT) | EDF-ER-279(60%) | 01 |
| 30-NOV-01 | ZOHNER, S. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING (60% DESIGN COMPONENT) - APPENDIX O TO DRAFT FINAL ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN ( | EDF-ER-290(60%) | 00 |
| 30-NOV-01 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) EVAPORATION POND LINING SYSTEM EQUIVALENCY ANALYSIS (60% DESIGN COMPONENT) | EDF-ER-312(60%) | 00 |
| 30-NOV-01 | NIELSEN, M. R. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) WASTE PLACEMENT MAPPING PLAN (60% DESIGN COMPONENT) | EDF-ER-322(60%) | 00 |
| 30-NOV-01 | REIMBOLD, M. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) EVAPORATION POND BERM OVERTOPPING ANALYSIS (60% DESIGN COMPONENT) | EDF-ER-323(60%) | 00 |
| 29-NOV-01 | PERRY, S. W. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) - (60% DESIGN COMPONENT) | EDF-ER-311(60%) | 00 |
| 17-JUL-01 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) AIR SPACE VOLUME CALCULATION - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | EDF-ER-265 | 00 |
| 17-JUL-01 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) STORM WATER DRAINAGE CALCULATIONS - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | EDF-ER-270 | 00 |
| 17-JUL-01 | VERNON, D. K. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) SOIL AMENDMENT STUDY - EXCAVATION & TEST PAD FINAL DESIGN VOLUME 1 OF 2 | EDF-ER-272 | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SUBSURFACE CONSOLIDATION CALCULATION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-266(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LANDFILL COMPACTION SUBSIDENCE STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-267(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SLOPE STABILITY ASSESSMENTS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-268(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LEACHATE GENERATION STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-269(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-271(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-273(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LEACHATE AND CONTAMINANT REDUCTION TIME STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-274(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-275(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN AND CONSTRUCTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-276(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-277(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LINER AND LEACHATE COMPATIBILITY STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-278(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-280(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-281(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-282(30%) | 00 |
| 09-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - WASTE PLACEMENT PLAN - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 3 OF 5 | EDF-ER-286(30%) | 00 |
| 01-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) DESIGN INVENTORY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-264(30%) | 00 |
| 01-JUL-01 | CH2M HILL | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) - HYDROLOGIC MODELING OF FINAL COVER - TITLE I 30% DESIGN PACKAGE - INCLUDED IN VOLUME 2 OF 5 | EDF-ER-279(30%) | 00 |
| 09-MAY-01 | PYLE, J. D. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL AIR EMISSIONS ASSOCIATED WITH DEACTIVATION, DECOMMISSIONING AND DISMANTLEMENT (D&D&D) OF CPP-603A BASIN PROJECT | EDF-1931 | 00 |
| 08-MAY-01 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 | EDF-1962 | 00 |
| 22-DEC-00 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) STABILIZATION TREATMENT PROCESS SELECTION - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1542(30%) | 00 |
| 20-DEC-00 | PREUSSNER, B. D. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE INVENTORY DESIGN BASIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 1 OF 3 | EDF-1540(30%) | 00 |
| 18-DEC-00 | WALSH, S. S. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) AND INEEL CERCLA DISPOSAL FACILITY (ICDF) OPERATIONAL SCENARIO AND PROCESS FLOWS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1547(30%) | 00 |
| 15-DEC-00 | PINTO, A. P. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) EVAPORATION POND WASTE ACCEPTANCE CRITERIA (WAC) BASIS & AQUEOUS WASTE MANAGEMENT - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1549(30%) | 00 |
| 15-DEC-00 | PODGORNEY, A. K. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE ACCEPTANCE CRITERIA (WAC) - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 3 OF 3 | EDF-1551(30%) | 00 |
| 14-DEC-00 | ABBOTT, C. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE TRANSPORT STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1543(30%) | 00 |
| 14-DEC-00 | FRENCH, P. S. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE VERIFICATION AND TREATED WASTE STATISTICAL APPROACH - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1544(30%) | 00 |
| 14-DEC-00 | KINGSFORD, C. O. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) WASTE STAGING AND STORAGE CRITERIA - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1545(30%) | 00 |
| 14-DEC-00 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) PRELIMINARY HAZARD CLASSIFICATION ANALYSIS - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1546(30%) | 00 |
| 14-DEC-00 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - STAGING, STORAGE, SIZING AND TREATMENT FACILITY (SSSTF) SITING STUDY - TITLE I 30% DESIGN PACKAGE - INCLUDED IN BOOK 2 OF 3 | EDF-1548(30%) | 00 |
| 01-NOV-00 | MARTIAN, P. | ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) CONTAMINANT OF CONCERN (COC) IDENTIFICATION MODELING - SCREENING MODEL RESULTS OF A MIXED LOW LEVEL WASTE (MLLW) DISPOSAL FACILITY PROPOSED FOR THE INEEL - FUNCTIONAL FILE #2000-00 | EDF-ER-170 | 00 |
| 19-SEP-00 | HURST, C. J. | ENGINEERING DESIGN FILE (EDF) - OU 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) - EVAPORATION POND SIZING DESIGN - FUNCTIONAL FILE #INEEL/EXT-2000-00920 - APPENDIX C TO REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, REV.01 | EDF-ER-206 | 00 |
| 18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - OLIVE STREET STORM WATER LIFT STATION AT INTEC - APPENDIX B TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772 | EDF-1379 | 00 |
| 18-SEP-00 | FRITZ, K. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 3-13 GROUP 1 TANK FARM INTERIM ACTION (TFIA) PHASE 1 AND PHASE 2 - DRAINAGE DITCH CAPACITY VERIFICATION AT INTEC - APPENDIX A TO THE REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) WORK PLAN, DOE/ID-10772, | EDF-1387 | 00 |
| 08-MAR-00 | BEITEL, G. A. | ENGINEERING DESIGN FILE (EDF) - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT - STAGE I INDEPENDENT TECHNICAL PANEL SAFETY REVIEW OF PROPOSED STAGE I DRILLING ACTIVITIES | EDF-ER-143 | 00 |
| 23-FEB-94 | FORSBERG, D. L. | EDF - ENGINEERING DESIGN FILE - REVISED PLUTONIUM, AMERICIUM-241, AND URANIUM-235 INVENTORY ESTIMATES FOR PIT 9 BASED ON THE 1993 HISTORICAL DATA TASK | ER-BWP-82 | 02 |
Previous Page | Administrative Record Home Page