| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 04-SEP-08 | CAHN, LORIE S. | PROPOSED PLAN FOR SITEWIDE GROUNDWATER, MISCELLANEOUS SITES, AND PROCESS FOR FUTURE SITES, OPERABLE UNIT 10-08 | DOE/ID-11366 | 0 |
| 17-OCT-07 | HOLDREN, K. J. | PROPOSED PLAN FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) OPERABLE UNIT (OU) 7-13/14 | DOE/ID-11288 | 00 |
| 01-AUG-06 | CAHN, L. S. | PROPOSED PLAN FOR TANK FARM SOIL AND GROUNDWATER AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), OPERABLE UNIT (OU) 3-14 | RPT-223 | 00 |
| 16-APR-03 | SHAW, R. M. | TRANSMITTAL OF THE FINAL TECHNOLOGY EVALUATION REPORT FOR THE V-TANKS, TSF-09 AND TSF-18, AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 AND THE NEW PROPOSED PLAN FOR THE V-TANKS CONTENTS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN) OU 1-10 | EM-ER-03-105 | 00 |
| 01-APR-03 | DOE | NEW PROPOSED PLAN FOR THE V-TANKS CONTENTS (TSF-09 AND TSF-18) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | 24783 | 00 |
| 01-JAN-02 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR OPERABLE UNIT (OU) 10-04 - WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) | 10956 | 00 |
| 13-SEP-01 | HAIN, K. E. | TRANSMITTAL OF INEEL WASTE AREA GROUP 6 (WAG-6) AND WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-04 SUBMITTAL OF DRAFT PROPOSED PLAN FOR REVIEW AND COMMENT | EM-ER-01-151 | 00 |
| 01-NOV-00 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR OPERABLE UNIT (OU) 1-07B - FINAL REMEDIAL ACTION (RA) AT TSF INJECTION WELL TSF-05 AND SURROUNDING GROUNDWATER CONTAMINATION TSF-23 | 21251 | 00 |
| 16-AUG-99 | HATHAWAY, C. | TRANSMITTAL OF OPERABLE UNIT (OU) 4-13 INTERIM ACTION (IA) PROPOSED PLAN | OPE-ER-97-99 | 00 |
| 01-AUG-99 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR OPERABLE UNIT (OU) 4-13A INTERIM ACTION (IA) WASTE AREA GROUP 4 (WAG-4) CENTRAL FACILITIES AREA (CFA) INEEL | 10669 | 00 |
| 15-JUL-99 | HATHAWAY, C. | TRANSMITTAL OF FINAL OPERABLE UNIT (OU) 4-13A INTERIM ACTION (IA) PROPOSED PLAN | OPE-ER-96-99 | 00 |
| 18-JUN-99 | HATHAWAY, C. | TRANSMITTAL OF FINAL DRAFT OPERABLE UNIT (OU) 4-13A INTERIM ACTION (IA) PROPOSED PLAN | OPE-ER-84-99 | 00 |
| 01-MAY-99 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) POWER BURST FACILITY AUXILIARY REACTOR AREA (PBF/ARA) INEEL | 17237 | 00 |
| 28-APR-99 | HATHAWAY, C. | TRANSMITTAL OF OPERABLE UNIT (OU) 4-13A INTERIM ACTION (IA) PROPOSED PLAN FOR REVIEW AND COMMENT | OPE-ER-64-99 | 00 |
| 18-FEB-99 | HATHAWAY, C. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 4 (WAG-4) REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) REPORT | OPE-ER-30-99 | 00 |
| 16-FEB-99 | O'NEILL, K. C. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 5 (WAG-5) | OPE-ER-27-99 | 00 |
| 01-NOV-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) AT INEEL | 10553 | 00 |
| 14-OCT-98 | JENKINS, T. W. | TRANSMITTAL OF FINAL PROPOSED PLAN, REVISION 6 (REV.06) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-159-98 | 00 |
| 01-OCT-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) AT IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | 10542 | 00 |
| 15-SEP-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 5 (REV.05) FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-148-98 | 00 |
| 17-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 4 (REV.04) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) | OPE-ER-133-98 | 00 |
| 22-JUN-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 3 (REV.03) FOR WASTE AREA GROUP 3 (WAG-3) - IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-104-98 | 00 |
| 14-MAY-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN, REVISION 2 (REV.02) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL; PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-78-98 | 00 |
| 17-APR-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN REVISION 1 (REV.01) FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-68-98 | 00 |
| 13-FEB-98 | HAIN, K. E. | TRANSMITTAL OF REVISED DRAFT PROPOSED PLAN FOR WASTE AREA GROUP 3 (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | OPE-ER-28-98 | 00 |
| 01-FEB-98 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 1 (WAG-1) TEST AREA NORTH (TAN) IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 1-10 | 10443 | 00 |
| 01-JAN-98 | HUTCHISON, M. E. | PROPOSED PLAN FOR WASTE AREA GROUP 8 (WAG-8) NAVAL REACTORS FACILITY (NRF) | 10440 | 00 |
| 01-JAN-98 | LEE, S. D. | PROPOSED PLAN FOR WASTE AREA GROUP 9 (WAG-9) ARGONNE NATIONAL LABORATORY WEST (ANL-W) AT INEEL | 10441 | 00 |
| 04-DEC-97 | JENKINS, T. W. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR WASTE AREA GROUP (WAG-3) IDAHO CHEMICAL PROCESSING PLANT (ICPP) AT INEEL | OPE-ER-261-97 | 00 |
| 14-NOV-97 | ROBISON, S. A. | DOE-HQ APPROVAL AND COMMENTS ON DRAFT PROPOSED PLAN FOR REMEDIATION OF INEEL WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13, ICPP COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY( RI/FS) | 15054 | 00 |
| 07-OCT-97 | HAIN, K. E. | TRANSMITTAL OF DRAFT PROPOSED PLAN FOR TAN OU 1-10 | OPE-ER-159-97 | 00 |
| 01-MAR-97 | INEEL COMMUNITY RELATIONS | PROPOSED PLAN FOR WASTE AREA GROUP 2 (WAG-2) - TEST REACTOR AREA (TRA) IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 10408 | 00 |
| 20-SEP-95 | GREEN, L. A. | COMMENT RESOLUTION TABLES FOR 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS), PROPOSED PLAN | OPE-ER-176-95 | 00 |
| 02-MAY-95 | GREEN, L. A. | TRANSMITTAL OF PROPOSED PLAN FOR OU 5-05, SL-1 BURIAL BURIAL GROUND AND 6-01, BORAX I BURIAL GROUND AND VARIOUS NO ACTION TRACK 1 SITES | OPE-ER-086-95 | 00 |
| 01-MAY-95 | DOE, EPA, IDHW | PROPOSED PLAN FOR OPERABLE UNITS (OU) 5-05 AND 6-01 STATIONARY LOW POWER REACTOR 1 (SL-1) AND THE BOILING WATER REACTOR EXPERIMENT (BORAX) I BURIAL GROUNDS | 10011 | 00 |
| 01-APR-95 | DOE, EPA, IDHW | PROPOSED PLAN FOR OPERABLE UNIT (OU) 4-12 CENTRAL FACILITIES AREA (CFA) LANDFILL I, II, AND III | 10012 | 00 |
| 01-MAY-94 | INEL COMMUNITY RELATIONS | PROPOSED PLAN FOR THE GROUNDWATER CONTAMINATION OPERABLE UNIT (OU) 1-07B AND NO ACTION SITES OU 1-01, 1-02, 1-06 AND 1-09 | 5711 | 00 |
| 15-APR-94 | LYLE, J. L. | TRANSMITTAL OF THE REVISED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) | OPE-ER-082-94 | 00 |
| 01-APR-94 | NEWBRY, R. D. E. | PROPOSED PLAN FOR NRF INDUSTRIAL WASTE DITCH (EXTERIOR) & LANDFILL AREAS OPERABLE UNITS (OU) 8-07, 8-05 & 8-06 | 5770 | 00 |
| 01-MAR-94 | INEL COMMUNITY RELATIONS | PROPOSED PLAN FOR OPERABLE UNIT (OU) 7-08, ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) | 5642 | 00 |
| 18-FEB-94 | ROBISON, S. A. | PROPOSED PLAN FOR ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ), INEL | 5672 | 00 |
| 28-JAN-94 | LYLE, J. L. | RECISION OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER & PROPOSED PLAN FOR THE TRACK 1 SITES DESIGNATED FOR NO FURTHER ACTION | OPE-ER-027-94 | 00 |
| 13-JAN-94 | LYLE, J. L. | TRANSMITTAL OF THE DRAFT PROPOSED PLAN FOR THE TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B GROUNDWATER INVESTIGATION | OPE-ER-008-94 | 00 |
| 01-JUL-93 | INEL COMMUNITY RELATIONS | PROPOSED PLAN FOR PAD-A AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | 5342 | 00 |
| 21-MAY-93 | LYLE, J. L. | DRAFT PROPOSED PLAN (PP) FOR THE PAD-A OPERABLE UNIT (OU) 7-12 IN WASTE AREA GROUP 7 (WAG-7) | ERWM-ERD-033-93 | 00 |
| 26-JUN-92 | INEL COMMUNITY RELATIONS | PROPOSED PLANS AND DEAR CITIZEN LETTER FOR MONITORING THE PERCHED WATER AT TRA, THE MOTOR POOL POND AT CFA, AND THE CHEMICAL EVAPORATION POND AT ARA - SEE DOCUMENT NUMBER 5141 FOR CORRECTED PAGE B-6 TO CFA PROPOSED PLAN | 5130 | 00 |
| 12-MAR-92 | MK-FIC | INTERIM ACTION (IA) PROPOSED PLAN FOR PBF-10 COST ESTIMATE | ERP-92-199 | 00 |
| 22-JAN-92 | ZIMMERLE, J. R. | TECHNOLOGIES ASSESSED IN THE DEVELOPMENT OF THE "PROPOSED PLAN FOR AN INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR THE INJECTION WELL AND IN THE SURROUNDING GROUNDWATER" | 3539 | 00 |
| 20-JAN-92 | EG&G & MK-FIC | TAN INTERIM ACTION (IA) PROPOSED PLAN COST ESTIMATE FOR ALTERNATIVES 2, 3, AND 4 | 5069 | 00 |
| 08-JAN-92 | INEL COMMUNITY RELATIONS | DEAR CITIZEN LETTER - PROPOSED PLAN FOR INTERIM ACTION (IA) TO REDUCE CONTAMINATION NEAR INJECTION WELL AND IN THE SURROUNDING GROUNDWATER AT TAN, PROPOSED PLAN FOR CLEANUP UNEXPLODED ORDNANCE LOCATIONS, COMMUNITY RELATIONS PLAN FACT SHEET - DOE STU | 3532 | 00 |
| 05-DEC-91 | NOT SPECIFIED | PROPOSED PLAN FOR A CLEANUP OF PIT 9 AT RWMC, INEL | 3543 | 00 |
| 01-JUL-91 | BAUMER, A. R. | PROPOSED PLAN FOR CLEANUP OF WARM WASTE POND (WWP) SEDIMENTS AT TRA INEL | 3558 | 00 |
Previous Page | Administrative Record Home Page