| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 01-JUN-04 | CAHN, L. S. | EVALUATION OF FEASIBILITY OF AN EARLY DECISION AND PERMANENT REMEDY FOR TANK FARM SOIL - APPENDIX E TO OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) WORK PLAN -DOE/ID-10676, REV.01 | INEEL/EXT-03-01010 | 00 |
| 05-DEC-03 | ABBOTT, D. G. | FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU THERMAL DESORPTION (ISTD) IN THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00962 | 00 |
| 08-JUL-03 | MEAGHER, B. G. | FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU VITRIFICATION (ISV) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00317 | 00 |
| 23-DEC-02 | ZITNIK, J. F. | PRELIMINARY EVALUATION OF REMEDIAL ALTERNATIVES FOR THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-02-01258 | 00 |
| 01-AUG-01 | FORSYTHE, H. S. | REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) ADDITIONAL SOIL SITES SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 | DOE/ID-10880 | 00 |
| 30-APR-01 | JACKSON, T. | FEASIBILITY STUDY (FS) ASSESSMENT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | 21311 | 00 |
| 06-AUG-98 | JENKINS, T. W. | TRANSMITTAL OF REVISED DRAFT COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPERABLE UNIT (OU) 3-13 AT INEEL- PART B FEASIBILITY STUDY (FS) SUPPLEMENT REPORT - REVISION 1 (REV.01) | OPE-ER-128-98 | 00 |
| 12-MAR-98 | JENKINS, T. W. | TRANSMITTAL OF DOCUMENTS FOR REVIEW OF WASTE AREA GROUP 3 (WAG-3) COST ESTIMATES | OPE-ER-40-98 | 00 |
| 29-JAN-98 | HAIN, K. E. | TRANSMITTAL OF DRAFT OPERABLE UNIT (OU) 3-13 FEASIBILITY STUDY (FS) SUPPLEMENT TO FINAL OU 3-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) OU 3-13 AT INEEL | OPE-ER-18-98 | 00 |
| 06-NOV-97 | HAIN, K. E. | TRANSMITTAL OF FINAL COMPREHENSIVE FEASIBILITY STUDY (FS) FOR OU 1-10 | OPE-ER-184-97 | 00 |
| 06-OCT-97 | HAIN, K. E. | TRANSMITTAL OF DRAFT FINAL FEASIBILITY STUDY (FS) FOR TAN OU 1-10 | OPE-ER-157-07 | 00 |
| 01-APR-94 | NRF | FEASIBILITY STUDY (FS) FOR NRF LANDFILL AREAS | 5668 | 00 |
| 11-MAR-94 | MEYER, L. | DRAFT FEASIBILITY STUDY (FS) NRF LANDFILL AREAS OU 8-05 & 8-06 | NR-IBO-94/048 | 00 |
| 01-JAN-94 | DUNNIVANT, F. M. | FEASIBILITY STUDY (FS) REPORT FOR TEST AREA NORTH (TAN) GROUNDWATER OPERABLE UNIT (OU) 1-07B AT INEL | EGG-ER-10802 | 00 |
| 28-SEP-92 | BATTAGLIA, P. J. | FEASIBILITY STUDY (FS) FOR GAMMA PROFILING AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | FL-92-0234 | 00 |
| 01-MAY-92 | EPA | VITRIFICATION TECHNOLOGIES FOR TREATMENT OF HAZARDOUS AND RADIOACTIVE WASTE | EPA/625/R-92/002 | 00 |
| 01-NOV-91 | BELLER, J. M. | TRA WARM WASTE POND (WWP) AT INEL SEDIMENT TREATABILITY STUDY (TS), PHASE I REPORT | EGG-WM-10000 | 00 |
| 11-SEP-91 | LIIKALA, S. C. | ENGINEERING SCALE TESTS OF ISV TO PCB AND RADIOACTIVE CONTAMINATED SOILS | 5099 | 00 |
Previous Page | Administrative Record Home Page