Search Within All Documents

File Category is AR2.4

CREATION
DATE
AUTHOR TITLE DOCUMENT
NUMBER
REV
19-JAN-10 NOT SPECIFIED ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE EXPERIMENTAL BREEDER REACTOR II FINAL END-STATE DOE/ID-11398 0
10-SEP-09 NOT SPECIFIED ENGINEERING EVALUATION/COST (EE/CA) ANALYSIS FOR DECOMMISSIONING OF THE TRA-632 HOT CELLS DOE/ID-11397 0
19-MAY-09 NOT SPECIFIED ENGINEERING EVALUATION/COST ANALYSIS FOR TSF-07 DISPOSAL POND AT TEST AREA NORTH DOE/ID-11401 0
18-JUN-08 WOOLEY, K. A. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) III IN THE SUBSURFACE DISPOSAL AREA (SDA) DOE/ID-11349 00
14-JAN-08 EATON, D. L. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE CHEMICAL PROCESSING PLANT (CPP-601/640) FUEL REPROCESSING FACILITIES DOE/ID-11346 02
12-JUL-07 RENO, S. L. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MATERIALS TEST REACTOR (MTR) FACILITY END-STATE AND VESSEL DISPOSAL DOE/ID-11328 00
01-MAY-07 CULP, B. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR POWER BURST FACILITY (PBF) (PER-620) FINAL END STATE AND POWER BURST FACILITY (PBF) VESSEL DISPOSAL DOE/ID-11309 00
31-JAN-07 PINZEL, M. A. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE TEST AREA NORTH (TAN)-607 HOT SHOP AREA DOE/ID-11302 00
24-OCT-06 CULP, B. ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX DOE/ID-11272 00
31-AUG-06 DOE ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT (ICP) DOE/ID-11291 00
17-JUL-06 PINZEL, M. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TEST AREA NORTH 607A (TAN-607A) RPT-214 00
19-JAN-06 PINZEL, M. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR DECOMMISSIONING OF TAN-630 AND TAN-650 AT THE LOSS OF FLUID TEST (LOFT) AREA DOE/ID-11253 00
01-MAR-05 BURTON, B. N. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II DOE/NE-ID-11223 00
17-DEC-04 RENO, S. L. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR PHASE 1 (PHASE I) OF THE DECOMMISSIONING FOR THE POWER BURST FACILITY (PBF) REACTOR BUILDING (PER-620) DOE/NE-ID-11196 00
26-AUG-04 RICHARDS, B. T. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) DOE/NE-ID-11140 01
02-AUG-04 HAIN, K. E. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC), DOE/NE-ID-11140, JULY 2004 (07/04) EM-ER-04-171 00
22-JUL-04 CLOUGH, M. K. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) REVIEW OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE CPP-603A NON TIME CRITICAL REMOVAL ACTION (NTCRA), DRAFT DOCUMENT (DOE/NE-ID-11140) 24877 00
29-APR-04 BURTON, B. N. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE ACCELERATED RETRIEVAL OF A DESIGNATED PORTION OF PIT 4 DOE/NE-ID-11146 00
15-APR-04 BRAGASSA, J. L. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR THE DECONTAMINATION AND DECOMMISSIONING (D&D) OF BUILDING CPP-627, THE REMOTE ANALYTICAL FACILITY DOE/NE-ID-11157 01
03-MAR-04 LOPEZ, S. L. ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM PROJECT DOE/NE-ID-11144 00
14-OCT-98 JESSMORE, P. J. IDAHO CHEMICAL PROCESSING PLANT (ICPP) WINDBLOW AREA - SECTION 9 OF EE/CA FOR OU 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL - INEL-95/0259,VOL.01 10543 00
25-JUL-97 JENSEN, N. R. DOE-ID TRANSMITTAL OF WAG-4 DOCUMENTS - ENGINEERING EVALUATION COST ANALYSIS (EE/CA) & ACTION MEMORANDUM FOR WAG-4 MISCELLANEOUS SITES NON TIME CRITICAL REMOVAL ACTION (NTCRA) CFA-13, CFA-15, CFA-17, CFA-47 & CFA-42 OPE-ER-907-117 00
01-JUL-97 LATRAY, D. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WAG-4 MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 CFA-42 DOE/ID-10582 01
24-JUN-97 JENSEN, N. R. TRANSMITTAL OF ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT ICPP OPE-ER-102-97 00
03-JUN-97 SHERWOOD, J. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT INEEL OU 10-03 DOE/ID-10577 01
01-JUN-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHENMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 01
01-MAY-97 LATRAY, D. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR WASTE AREA GROUP 4 (WAG-4) MISCELLANEOUS SITES 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) - CFA-13 CFA-15 CFA-17 CFA-47 & CFA-42 DOE/ID-10582 00
28-APR-97 JENSEN, N. R. TRANSMITTAL OF DRAFT ENGINEERING EVALUATION & COST ANALYSIS (EE/CA) FOR 1997 WAG-4 MISCELLANEOUS SITES REMOVAL ACTION, OU 4-02, 4-05, 4-08 & 4-09 OPE-ER-64-97 00
16-APR-97 SHERWOOD, J. A. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) FOR UNEXPLODED ORDNANCE AT THE IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 10-03 DOE/ID-10577 00
28-FEB-97 JENSEN, N. R. TRANSMITTAL OF THE ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) OPE-ER-29-97 00
01-FEB-97 FRANCIS, C. S. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) DOE/ID-10568 00
10-JUN-95 MARTY, R. C. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME III (VOL.03) INEL-95/0259,VOL.03 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL ACTION AT INEL, VOLUME I, (VOL.01) INEL-95/0259,VOL.01 00
08-JUN-95 ROOD, S. M. ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATION SOILS REMOVAL ACTION AT (INEL), VOLUME II, (VOL.02) INEL-95/0259,VOL.02 00
28-APR-94 MK-FIC ENGINEERING EVALUATION COST ANALYSIS (EE/CA) FOR NON TIME CRITICAL REMOVAL ACTION (NTCRA) AT UNEXPLODED ORDNANCE LOCATIONS AT INEL 10.003.2.1.201.01 02
12-APR-94 NIESLANIK, R. W. SUBMITTAL OF ENGINEERING COST ESTIMATES FOR TRACK 1 REMOVAL ACTIONS FOR INFORMATION & TRANSMITTAL TO THE ADMINISTRATIVE RECORD (AR), NAVAL REACTORS FACILITY (NRF) NRFEM-RR-1149 00
15-JUN-93 MARSHALL, G. C. TRANSMITTAL AND ENGINEERING EVALUATION COST ANALYSIS (EE/CA) REPORT FOR EBR-II LEACH PIT REMOVAL 5291 00


Send Questions and Comments to: tua@inel.gov

Previous Page | Administrative Record Home Page