| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 26-APR-10 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE TRA RETENTION BASIN | EDF-9489 | 0 |
| 27-JAN-10 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR EBR-II CLOSURE | EDF-9374 | 1 |
| 20-JAN-10 | NOT SPECIFIED | TECHNICAL FEASIBILITY FOR ALTERNATIVE 4 EBR-II ENGINEERING EVALUATION/COST ANALYSIS | EDF-9455 | 0 |
| 10-NOV-09 | NOT SPECIFIED | EBR-II PROPOSED REMOVAL ACTION: HUMAN AND ECOLOGICAL RISK ASSESSMENT | EDF-9359 | 0 |
| 02-NOV-09 | NOT SPECIFIED | GROUNDWATER PATHWAY RISK ASSESSMENT FOR EBR-II CLOSURE | EDF-9374 | 0 |
| 21-SEP-09 | KECK, JOHN F. | OPERABLE UNIT 10-08 REMOVAL AND DISPOSAL (RD) REMEDY PROFILE DEVELOPMENT | EDF-9312 | 0 |
| 18-JUL-07 | STALEY, C. S. | STREAMLINED RISK ASSESSMENT FOR DECONTAMINATING AND DISMANTLING (D&D) OF THE MATERIALS TEST REACTOR (MTR) FACILITY | EDF-7405 | 01 |
| 11-JUL-07 | HOWELL, W. F. | ENGINEERING DESIGN FILE - MATERIALS TEST REACTOR (MTR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6244 | 02 |
| 10-JUL-07 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE - GROUNDWATER PATHWAY RISK ASSESSMENT FOR MATERIALS TEST REACTOR (MTR) CLOSURE | EDF-5186 | 01 |
| 20-JUN-07 | NESSHOEFER, C. A. | MATERIALS TEST REACTOR (MTR) COMPLEX ACTIVITY VS. DEPTH | EDF-6381 | 01 |
| 04-MAY-07 | STALEY, C. S. | STREAMLINED RISK ASSESSMENT FOR DECONTAMINATION AND DECOMMISSIONING (D&D) OF THE POWER BURST FACILITY (PBF) REACTOR FACILITY | EDF-7433 | 01 |
| 16-APR-07 | MCCARTHY, J. M. | GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE POWER BURST FACILITY (PBF) CLOSURE - 2007 UPDATE | EDF-7618 | 01 |
| 14-FEB-07 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SOIL RISK ASSESSMENT FOR TEST AREA NORTH (TAN)-607: HOT SHOP AREA | EDF-7538 | 01 |
| 29-JAN-07 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SOIL RISK ASSESSMENT FOR TAN-607: HOT SHOP AREA | EDF-7538 | 00 |
| 11-DEC-06 | MCCARTHY, J. M. | GROUNDWATER ASSESSMENT FOR TEST AREA NORTH (TAN)-607: HOT SHOP AREA | EDF-7515 | 00 |
| 31-OCT-06 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - GROUNDWATER PATHWAY RISK ASSESSMENT FOR THE ENGINEERING TEST REACTOR (ETR) COMPLEX CLOSURE | EDF-5142 | 02 |
| 31-OCT-06 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR DECONTAMINATING AND DISMANTLING (D&D) OF THE ENGINEERING TEST REACTOR (ETR) FACILITY | EDF-7243 | 01 |
| 02-OCT-06 | PARRY, J. R. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) BERYLLIUM REFLECTOR AND VESSEL TRANSURANIC INVENTORIES | EDF-7222 | 00 |
| 28-SEP-06 | NESSHOEFER, C. A. | POWER BURST FACILITY (PBF) BELOW AND ABOVE GRADE SOURCE TERMS | EDF-7000 | 00 |
| 13-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) RADIONUCLIDES AND THE RADIONUCLIDE RELATIVE RATIOS | EDF-6958 | 01 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) VESSEL SOURCE TERM AND EXTERNAL DOSE RATES | EDF-6133 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX EXTERNAL SURFACES | EDF-6138 | 02 |
| 12-SEP-06 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - RADIOLOGICAL CHARACTERIZATION OF THE ENGINEERING TEST REACTOR (ETR) COMPLEX INTERNAL SURFACES | EDF-6291 | 01 |
| 09-AUG-06 | DICK, J. R. | ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) AND THE ACCELERATED RETRIEVAL PROJECT II | EDF-5307 | 01 |
| 10-APR-06 | VANHORN, R. L. | ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) OF THE ENGINEERING TEST REACTOR AND MATERIALS TESTING REACTOR (ETR/MTR) REMOVAL ALTERNATIVES | EDF-6705 | 00 |
| 07-APR-06 | KECK, K. N. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TANK FARM INADVERTENT INTRUDER ASSESSMENT | EDF-6803 | 00 |
| 15-FEB-06 | VARVEL, M. D. | ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS IN 743 SERIES WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 | INEEL/EXT-01-00277 | 02 |
| 30-JAN-06 | HOWELL, W. F. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX CHEMICAL CONSTITUENT SOURCE TERM | EDF-6225 | 01 |
| 15-DEC-05 | NESSHOEFER, C. A. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING TEST REACTOR (ETR) COMPLEX ACTIVITY VS. DEPTH | EDF-6304 | 00 |
| 05-DEC-05 | CORNETT, T. C. | ENGINEERING DESIGN FILE (EDF) - LOSS OF FLUID TEST (LOFT) CHARACTERIZATION STUDY | EDF-6355 | 00 |
| 31-MAY-05 | BRYAN, J. D. | ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) II | EDF-5447 | 01 |
| 03-MAY-05 | ST. MICHEL, W. D. | ENGINEERING DESING FILE (EDF) - AREA BASED APPROACH TO IDENTIFY TYPE IV (TYPE 4) WASTE FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) I | EDF-5601 | 00 |
| 28-APR-05 | BRYAN, J. D. | ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY ESTIMATE FOR THE DESCRIBED AREA WITHIN PIT 4 FOR THE ACCELERATED RETRIVAL PROJECT (ARP) WITHIN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EDF-4478 | 03 |
| 04-APR-05 | VARVEL, M. D. | ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 | INEEL/EXT-01-00277 | 01 |
| 20-JAN-05 | BRYAN, J. D. | ENGINEERING DESIGN FILE (EDF) - WASTE INVENTORY FOR PHASE II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) | EDF-5447 | 00 |
| 08-DEC-04 | SHAW, P. G. | ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT | EDF-5333 | 00 |
| 02-DEC-04 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - RISK BASED APPROACH FOR MANAGEMENT OF POLYCHLORINATED BIPHENYL (PCB) REMEDIATION WASTE FROM V-TANKS | EDF-3077 | 01 |
| 26-OCT-04 | DICK, J. R. | ENGINEERING DESIGN FILE (EDF) - CHEMICAL COMPATIBILITY AND INVENTORY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-5307 | 00 |
| 29-SEP-04 | SENTIERI, P. J. | ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-4494 | 02 |
| 29-SEP-04 | BUNNELL, P. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT MEASUREMENT AND CONTROLS - ATTACHMENT 12 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-4933 | 00 |
| 29-SEP-04 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FOUNDATION GROUTING STUDY - ATTACHMENT 5 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5028 | 00 |
| 29-SEP-04 | CLARK, D. W. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FIRE PROTECTION - ATTACHMENT 15 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5054 | 00 |
| 29-SEP-04 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT DELIVERY SYSTEM - ATTACHMENT 10 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5102 | 00 |
| 29-SEP-04 | GRAFF, K. E. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ELECTRICAL UTILITIES - ATTACHMENT 13 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5122 | 00 |
| 29-SEP-04 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT STORAGE AND MIXING - ATTACHMENT 9 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5135 | 00 |
| 29-SEP-04 | BLAKELY, B. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT FACILITIES - ATTACHMENT 11 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5144 | 00 |
| 29-SEP-04 | JENSEN, S. A. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT SELECTION BASIS - ATTACHMENT 4 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5146 | 00 |
| 29-SEP-04 | JENSEN, S. A. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUBSURFACE DISPOSAL AREA (SDA) SITE CONDITIONS - ATTACHMENT 6 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5147 | 00 |
| 29-SEP-04 | EASTMAN, R. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT SYSTEMS - ATTACHMENT 14 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5150 | 00 |
| 29-SEP-04 | THOMPSON, E. B. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H) - ATTACHMENT 17 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5152 | 00 |
| 29-SEP-04 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT HYDRAULIC EXCAVATOR AND DRILL INJECTION RIG - ATTACHMENT 7 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5153 | 00 |
| 29-SEP-04 | THOMPSON, E. B. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT OPERATIONS, MAINTENANCE, AND LOGISTICS - ATTACHMENT 8 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5155 | 00 |
| 29-SEP-04 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT VEHICLES - ATTACHMENT 16 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5162 | 00 |
| 21-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 01 |
| 18-JUN-04 | SENTIERI, P. J. | ENGINEERING DESIGN FILE (EDF) - CRITICALITY SAFETY EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-4494 | 01 |
| 17-JUN-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 01 |
| 02-JUN-04 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - AIR EMISSIONS EVALUATION FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | EDF-4692 | 00 |
| 26-MAR-04 | NICHOLS, T. T. | ENGINEERING DESIGN FILE (EDF) - REVISED RADIOLOGICAL DOSE AND NONRADIOLOGICAL EXPOSURE FACTORS FOR IN SITU VITRIFICATION (ISV) LOSS OF CONFINEMENT AND MELT EXPULSION ACCIDENT SCENARIOS AT OPERABLE UNIT (OU) 7-13 AND 7-14 | EDF-4527 | 00 |
| 10-MAR-04 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 01 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - STREAMLINED RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4488 | 00 |
| 09-MAR-04 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - SOIL CONTAMINATION GROUNDWATER PATHWAY RISK ASSESSMENT FOR CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) | EDF-4489 | 00 |
| 12-FEB-04 | SHAW, P. G. | ENGINEERING DESIGN FILE (EDF) - GROUT SELECTION CRITERIA AND RECOMMENDATION FOR OPERABLE UNIT (OU) 7-13 & 7-14 IN SITU GROUTING (ISG) EARLY ACTION PROJECT | EDF-4397 | 00 |
| 16-DEC-03 | FORBES, J. R. | ENGINEERING DESIGN FILE (EDF) - IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) INJECTION WELL - SUMMARY OF HISTORICAL INFORMATION AND GROUNDWATER QUALITY TRENDS | EDF-3943 | 00 |
| 09-DEC-03 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - RISK BASED APPROACH FOR MANAGEMENT OF POLYCHLORINATED BIPHENYL (PCB) REMEDIATION WASTE FROM V-TANKS | EDF-3077 | 00 |
| 09-DEC-03 | TYSON, D. R. | ENGINEERING DESIGN FILE (EDF) - V-TANK ANALYTICAL DATA: CALCULATED AVERAGES AND UPPER CONFIDENCE LIMITS | EDF-3868 | 01 |
| 09-DEC-03 | WINSTON, P. L. | ENGINEERING DESIGN FILE (EDF) - CPP-603 RADIONUCLIDE SAMPLE RESULTS | EDF-4235 | 00 |
| 09-DEC-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - QUANTIFICATION OF THREE DEBRIS OBJECTS FROM THE SOUTH BASIN OF CPP-603 USING THE UNDERWATER GAMMA SPECTROMETER SYSTEM (TUGS) | EDF-4271 | 00 |
| 05-DEC-03 | EATON, D. L. | ENGINEERING DESIGN FILE (EDF) - USE OF TANKS V-1, V-2, AND V-3 FOR STORING, BLENDING, AND ACCUMULATING WASTE DURING REMEDIATION OF THE V-TANKS | EDF-3948 | 00 |
| 20-AUG-03 | VAN AUSDEIN, L. A. | ENGINEERING DESIGN FILE (EDF) - CPP-603 BASINS - FISSILE MATERIAL IN PARTICULATE FORM BASED ON 137CS TO 235U RATIO | EDF-3535 | 00 |
| 15-MAY-03 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - ACCEPTABLE RESIDUAL INVENTORY CALCULATIONS FOR CPP-603 | EDF-3684 | 00 |
| 10-SEP-01 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - RECORD OF DECISION (ROD) COST ESTIMATE SUPPORT DATA RECAPITULATION - WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-07B ROD AMENDMENT | EDF-ER-201 | 02 |
| 22-AUG-01 | ANDERSON, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) SOIL MOISTURE INSTRUMENTED PROBE - PROBING, LOGGING AND INSTRUMENTATION PROJECT | EDF-ER-234 | 01 |
| 22-AUG-01 | ANDERSON, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 INTEGRATED PROBING PROJECT (IPP) VAPOR PORT INSTRUMENTED PROBE | EDF-ER-235 | 00 |
| 31-MAY-01 | VARVEL, M. D. | ENGINEERING DESIGN FILE (EDF) - MASS ESTIMATES OF ORGANIC COMPOUNDS BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-08 AND 7-13 & 7-14 | INEEL/EXT-01-00277 | 00 |
| 09-MAY-01 | PYLE, J. D. | ENGINEERING DESIGN FILE (EDF) - POTENTIAL AIR EMISSIONS ASSOCIATED WITH DEACTIVATION, DECOMMISSIONING AND DISMANTLEMENT (D&D&D) OF CPP-603A BASIN PROJECT | EDF-1931 | 00 |
| 08-MAY-01 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - D&D OF CPP-603 BASIN PROJECT - GROUNDWATER MONITORING - TRANSPORT SIMULATION APPROACH FOR THE RISK ASSESSMENT FOR DEACTIVATION OF IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) PLANT BUILDING CPP-603 | EDF-1962 | 00 |
| 13-MAR-01 | WELLS, R. P. | ENGINEERING DESIGN FILE (EDF) - REVIEW OF THE ROCKY FLATS PLANT (RFP) DATA CONTAINED IN THE HISTORICAL DATA TASK (HDT) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 - FUNCTIONAL FILE #INEEL/EXT-01-00030 | INEEL/EXT-01-00030 | 00 |
| 20-FEB-01 | GREEN, C. J. | ENGINEERING DESIGN FILE (EDF) - TEST AREA NORTH 616 (TAN-616) PUMP ROOM PERSONNEL PROTECTIVE EQUIPMENT (PPE) RADIOACTIVE SOURCE TERM DETERMINATION - OPERABLE UNIT (OU) 1-11 DELETED MAY 19, 2005 (05/19/05) | TAN-2001-002 | 00 |
| 15-JAN-01 | FOLKER, J. D. | ENGINEERING DESIGN FILE (EDF) - WAG-1 OU 1-07B RECORD OF DECISION (ROD) AMENDMENT COST ESTIMATE SUPPORT DATA RECAPITULATION | EDF-ER-201 | 01 |
| 27-NOV-00 | MILLER, R. E. | ENGINEERING DESIGN FILE (EDF) - DATA ACQUISITION METHODOLOGY & OPERABLE UNIT (OU) 10-04 DATABASE DEVELOPMENT - FUNTIONAL FILE NUMBER INEEL/EXT-2000-10422 | EDF-ER-230 | 00 |
| 25-SEP-00 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - METALS ANALYSIS OF SELECTED OPERABLE UNIT (OU) 1-07B GROUNDWATER MONITORING WELLS | EDF-ER-200 | 00 |
| 21-SEP-00 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B SAMPLE RESULTS SUMMARY FOR 40 CFR 264 APPENDIX IX VOLATILE ORGANIC COMPOUNDS (VOC) AND SEMI-VOLATILE ORGANIC COMPOUNDS (SVOC) - FUNCTIONAL FILE NUMBER INEEL/EXT-2000-00816 | EDF-ER-197 | 00 |
| 01-SEP-00 | NELSON, L. O. | ENGINEERING DESIGN FILE (EDF) - WAG-1 OU 1-07B RECORD OF DECISION (ROD) AMENDMENT COST ESTIMATE SUPPORT DATA RECAPITULATION - FUNCTIONAL FILE #INEEL/EXT-2000-01105 | EDF-ER-201 | 00 |
| 12-JUL-00 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B FIELD DEMONSTRATION REPORT - NEW GROUNDWATER TREATMENT FACILITY (NGWTF) PLANNING CONCEPTUAL DESIGN & COST ESTIMATE | EDF-ER-185 | 00 |
| 12-JUL-00 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 1-07B FIELD DEMONSTRATION REPORT - IN SITU BIOREMEDIATION (ISB) TREATMENT SYSTEM FACILITY PLANNING CONCEPTUAL DESIGN & COST ESTIMATE | EDF-ER-186 | 00 |
| 28-MAR-00 | HUNTLEY, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 4 (WAG-4) RECORD OF DECISION (ROD) COST ESTIMATE | EDF-ER-152 | 00 |
| 21-MAR-00 | WEIDNER, J. R. | ENGINEERING DESIGN FILE (EDF) - DURABILITY OF JET GROUT MATERIALS AND APPLICATION TECHNOLOGY FOR SUBSURFACE DISPOSAL AREA (SDA) - CONTAMINATED WASTE PITS AND TRENCHES TREATABILITY STUDIES (TS) - GROUT PERFORMANCE - IN SITU GROUTING (ISG) TREATABILITY | ER-EDF-128 | 00 |
| 08-FEB-00 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - IN SITU BIOREMEDIATION (ISB) SODIUM LACTATE V. S. MOLASSES COST COMPARISON | EDF-ER-127 | 00 |
| 09-DEC-99 | GILES, J. R. | ENGINEERING DESIGN FILE (EDF) - EXTENT OF SILVER-108M CONTAMINATION AT AUXILIARY REACTOR AREA III (ARA-III) RADIOACTIVE WASTE LEACH POND CERCLA SITE ARA-12 - FUNCTIONAL FILE #INEEL/EXT-99-01241 | EDF-ER-103 | 00 |
| 01-NOV-99 | BONNEMA, B. E. | ENGINEERING DESIGN FILE (EDF) - ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) DESIGN BASIS SELF ASSESSMENT - IDENTIFY KEY SYSTEM FEATURES FOR OCVZ THERMAL SOIL VAPOR EXTRACTION UNITS & EVALUATE DESIGN BASIS | EDF-ER-097 | 00 |
| 15-APR-99 | HATHAWAY, C. | TRANSMITTAL OF ENGINEERING DESIGN FILE (EDF) - HYDROGEOLOGIC ASSESSMENT OF NITRATE CONTAMINATION IN CENTRAL FACILITIES AREA (CFA) MONITORING WELLS | OPE-ER-56-99 | 00 |
| 08-APR-99 | BARRIE, S. L. | ENGINEERING DESIGN FILE (EDF) - GROUNDWATER MONITORING RESULTS FOR WASTE AREA GROUP 7 (WAG-7) - OCTOBER 1997 TO JULY 1998 (10/97 - 07/98) | EDF-ER-063 | 00 |
| 01-APR-99 | BUKOWSKI, J. M. | ENGINEERING DESIGN FILE (EDF) - HYDROGEOLOGIC ASSESSMENT OF NITRATE CONTAMINATION IN CFA MONITORING WELLS | EDF-ER-059 | 00 |
| 01-JUN-98 | GILES, J. R. | ENGINEERING DESIGN FILE (EDF) - TEST AREA NORTH (TAN) TSF-07 POND RADIUM-226 (RA-226) CONCENTRATIONS & CORRECTIONS | ER-WAG1-108 | 00 |
| 24-NOV-97 | COVELESKIE, A. D. | ENGINEERING DESIGN FILE (EDF) - AUXILIARY REACTOR AREA 729 (ARA-729) RADIOLOGICAL DATA EVALUATION OPERABLE UNIT (OU) 5-12 | EDF-ER-30/1000-69 | 00 |
| 28-OCT-97 | JOSTEN, N. E. | ENGINEERING DESIGN FILE (EDF) - IN SITU GAMMA RADIATION SURVEY AT ARA-23 & ARA-24 OPERABLE UNIT (OU) 5-12 WASTE AREA GROUP 5 (WAG-5) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | ER-WAG5-104 | 00 |
| 04-SEP-97 | MCCORMICK, S. H. | ENGINEERING DESIGN FILE (EDF) - QUALITATIVE RISK EVALUATION OF DISPOSAL AREA AT FORMER CENTRAL FACILITIES AREA 669 (CF-669 OR CFA-669) HOT LAUNDRY BUILDING - OPERABLE UNIT (OU) 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | ER-WAG4-94 | 00 |
| 05-FEB-97 | LABUY, S. A. | EDF - ENGINEERING DESIGN FILE - BORAX V DECONTAMINATION & DISMANTLEMENT (D&D) RESRAD SITE RELEASE ANALYSIS | EDF-ER-025 | 00 |
| 06-SEP-96 | BARNES, C. M. | EDF - ENGINEERING DESIGN FILE - ENGINEERING SUPPORT FILLING DATA GAPS FOR PROCESSES & TECHNOLOGIES - COLLECTION OF TECHNOLOGY & PROCESS INFORMATION FOR USE IN OU 7-13 & 7-14 FEASIBILITY STUDY (FS) | ER-WAG7-92 | 00 |
| 01-AUG-96 | BARNES, C. M. | EDF - ENGINEERING DESIGN FILE - INDEX & DISCUSSION OF DATA GATHERED FOR PLASMA ARC CENTRIFUGAL FURNACE | ER-WAG7-87 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 15-MAY-96 | LABUY, S. A. | ENGINEERING DESIGN FILE (EDF) - ADVANCED REACTIVITY MEASUREMENT FACILITY (ARMF) RADIOACTIVE SOURCE SHIPPING DRUM - DESIGN INPUTS, ANALYSES, DESIGN DESCRIPTION | EDF-ER-023 | 00 |
| 02-MAY-96 | HAMPTON, N. L. | ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION | ER-WAG7-76 | 01 |
| 10-APR-96 | BURGESS, D. | EDF - ENGINEERING DESIGN FILE - OU 7-13 ELEVATION OF SURFICIAL SEDIMENT & BASALT CONTACT & SOIL VOLUMES ABOVE PITS & TRENCHES IN SDA, INEL | ER-WAG7-88 | 00 |
| 07-FEB-96 | PRENDERGAST, W. J. | EDF - ENGINEERING DESIGN FILE - DIGEST OF REPORTS & INFORMATION ON STATUS OF ISV TECHNOLOGY | ER-WAG7-85 | 00 |
| 08-JAN-96 | COVELESKIE, A. D. | EDF - ENGINEERING DESIGN FILE - SOURCE TERM DETERMINATION OF ARA-02 SEPTIC TANKS | ER-BWP-88 | 00 |
| 25-OCT-95 | GARCIA, K. M. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) - DIGEST #2 (TWO) OF REPORTS ON SURFACE BARRIERS FOR ARID REGIONS | ER-WAG-83 | 00 |
| 02-OCT-95 | BARNES, C. M. | ENGINEERING DESIGN FILE (EDF) - ENGINEERING SUPPORT OF OPERABLE UNIT (OU) 7-13 & 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - PIT 9 INTERFACE INFORMATION FROM LESAT IN MEETING ON SEPTEMBER 14, 1995 (09/14/95) | ER-WAG7-79 | 00 |
| 07-SEP-95 | JORGENSEN, D. K. | ENGINEERING DESIGN FILE (EDF) - ARA WINDBLOWN AREA RISK EVALUATION - (EDF SERIAL NUMBER IS INEL-95/103) | ER-WAG5-54 | 02 |
| 01-SEP-95 | BARNES, C. M. | ENGINEERING DESIGN FILE (EDF) - PRELIMINARY DEVELOPMENT OF ALTERNATIVE REMEDIATION TECHNOLOGIES & IDENTIFICATION OF DATA NEEDS FOR OPERABLE UNIT (OU) 7-13 & 7-14 FEASIBILITY STUDY (FS) | ER-WAG7-78 | 01 |
| 12-JUL-95 | HARKER, Y. D. | ENGINEERING DESIGN FILE (EDF) - ENVIRONMENTAL RESTORATION (ER) HISTORICAL DATA TASK (HDT) RECENT & PROJECTED DATA TASK (RPDT) - TEST REACTOR AREA (TRA) EVALUATION - SCALING FACTORS FOR WASTE ACTIVITIES MEASURED BY G-M METHOD | ER-WAG7-57 | 00 |
| 09-JUN-95 | HAMPTON, N. L. | ENGINEERING DESIGN FILE (EDF) - WAG-7 DATA COMPILATION TASKS - SUBSURFACE DISPOSAL AREA (SDA) BIOTIC DATA COMPILATION | ER-WAG7-76 | 00 |
| 31-MAY-95 | KECK, K. N. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) SURFACE WATER DESCRIPTION & DATA | ER-WAG7-66 | 00 |
| 31-MAY-95 | MARTIAN, P. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SUBSURFACE DISPOSAL AREA (SDA) BURIED DRUM FAILURE RATE DATA COMPILATION | ER-WAG7-68 | 00 |
| 31-MAY-95 | NEUPAUER, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) - SDA LITHOLOGY & PERCHED WATER DATA COMPILATION | ER-WAG7-69 | 00 |
| 31-MAY-95 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: BASALTS | ER-WAG7-70 | 00 |
| 31-MAY-95 | MCCARTHY, J. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) PITS & TRENCHES REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - SUBSURFACE DISPOSAL AREA (SDA) HYDRAULIC CHARACTERIZATION DATA COMPILATION: SURFICIAL SEDIMENTS & INTERBEDS | ER-WAG7-71 | 00 |
| 31-MAY-95 | MAGNUSON, S. O. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) WATER & SOILS SAMPLING DATA - SUBSURFACE DISPOSAL AREA (SDA) SOIL BASALT & WATER CONCENTRATION DATA COMPILATION: RADIONUCLIDES & INORGANICS | ER-WAG7-72 | 00 |
| 31-MAY-95 | SONDRUP, A. J. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) SUBSURFACE DISPOSAL AREA (SDA) VOLATILE ORGANIC DATA COMPILATION SOIL VAPOR EMISSION & WATER SAMPLES | ER-WAG7-73 | 00 |
| 31-MAY-95 | NEUPAUER, R. M. | ENGINEERING DESIGN FILE (EDF) - WASTE AREA GROUP 7 (WAG-7) DATA COMPILATION SUBSURFACE DISPOSAL AREA (SDA) COVER OVERBURDEN THICKNESS | ER-WAG7-74 | 00 |
| 31-MAY-95 | STALEY, C. S. | ENGINEERING DESIGN FILE (EDF) - AIR MONITORING DATA SUPPORTING WASTE AREA GROUP 7 (WAG-7) REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | ER-WAG7-75 | 00 |
| 16-MAY-95 | ROHE, M. J. | ENGINEERING DESIGN FILE (EDF) - LARGE SCALE AQUIFER STRESS TEST & INFILTRATION TEST: WATER MANAGEMENT SYSTEM OPERATIONS & RESULTS | ER-WAG7-59 | 00 |
| 08-MAY-95 | BISHOP, C. W. | ENGINEERING DESIGN FILE (EDF) LARGE SCALE INFILTRATION TEST CPN DATA ANALYSIS | ER-WAG7-58 | 00 |
| 22-FEB-95 | WYLIE, A. H. | EDF - ENGINEERING DESIGN FILE - LARGE SCALE AQUIFER PUMPING TEST RESULTS | ER-WAG7-56 | 00 |
| 24-JAN-95 | DUNNIVANT, F. M. | EDF - ENGINEERING DESIGN FILE - RESULTS FROM LARGE SCALE AQUIFER PUMPING & INFILTRATION TEST (APIT) DOWNHOLE GAMMA SPECTROSCOPIC MONITORING | ER-WAG7-54 | 00 |
| 23-NOV-94 | MCCORMICK, S. H. | ENGINEERING DESIGN FILE (EDF) - BACKGROUND INFORMATION & DATA USED DURING SCOPING OF OPERABLE UNIT (OU) 4-12 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | ER-WAG4-60 | 00 |
| 25-OCT-94 | MCCORMICK, S. H. | EDF - ENGINEERING DESIGN FILE - CFA LANDFILL II AND LANDFILL III; INWMIS AND IWMIS DATABASES | ER-WAG4-56 | 00 |
| 26-SEP-94 | MCCORMICK, S. H. | EDF - ENGINEERING DESIGN FILE - CFA LANDFILL II AND III DISPOSAL OF WASTE SOLVENTS | ER-WAG4-55 | 00 |
| 26-SEP-94 | MCCORMICK, S. H. | EDF - ENGINEERING DESIGN FILE - CFA LANDFILL II & LANDFILL III; DISPOSAL OF CHEMICAL WASTE | ER-WAG4-57 | 00 |
| 26-SEP-94 | MCCORMICK, S. H. | EDF - ENGINEERING DESIGN FILE - CFA LANDFILL II AND LANDFILL III; POTENTIAL OF RADIOLOGICAL WASTE | ER-WAG4-58 | 00 |
| 26-SEP-94 | MCCORMICK, S. H. | EDF - ENGINEERING DESIGN FILE - CFA LANDFILL I, LANDFILL II AND LANDFILL III; DISPOSAL OF WASTE OIL | ER-WAG4-59 | 00 |
| 09-SEP-94 | MCCORMICK, S. H. | EDF - ENGINEERING DESIGN FILE - CFA LANDFILL II & LANDFILL III; DISPOSAL CONSTRUCTION DEBRIS | ER-WAG4-53 | 00 |
| 04-MAY-94 | DOWNS, W. C. | EDF - ENGINEERING DESIGN FILE - LONG TERM TESTING AT ORGANIC CONTAMINATION IN THE VADOSE (OCVZ) OU 7-08 POSSIBLE ORIGIN OF CHLOROFORM AT THE RWMC | ER-VVED-076 | 00 |
| 11-AUG-93 | STALEY, C. S. | EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL AND NONRADIOLOGICAL EFFECTS OF INCINERATING RETRIEVED WASTES FROM PIT 9 | RWMC-91-004.3 | 02 |
| 05-AUG-93 | STALEY, C. S. | EDF - ENGINEERING DESIGN FILE - RADIOLOGICAL IMPACTS FROM ROUTINE OPERATIONS OF PIT 9 WASTE RETRIEVAL | RWMC-91-004 | 02 |
| 02-AUG-93 | WYLIE, A. H. | EDF - ENGINEERING DESIGN FILE - GYROSCOPIC DIRECTIONAL SURVEY OF CFA GROUNDWATER WELLS, PART II | ER-WAG4-32 | 00 |
| 01-JUL-93 | MEACHUM, T. R. | ENGINEERING DESIGN FILE (EDF) - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES | ER&WM-EDF-0007-93 | 00 |
| 17-JUN-93 | MONSON, R. S. | ENGINEERING DESIGN FILE (EDF) - SAMPLE ANALYSIS RESULTS FROM SAMPLING OF RWMC SEPTIC & SEWER SYSTEMS FOR CONSTRUCTION | 639 | 00 |
| 28-MAY-93 | MEACHUM, T. R. | EDF - ENGINEERING DESIGN FILE - AREAS AND VOLUMES FOR SELECTED RWMC PITS AND TRENCHES | ER/WM-EDF-0007-93 | 00 |
| 22-DEC-92 | STALEY, C. S. | EDF - ENGINEERING DESIGN FILE - HAZARDOUS CHEMICAL RELEASES RESULTING FROM PIT 9 WASTE RETRIEVAL AT RWMC | RWMC-91-004.2 | 01 |
| 29-OCT-92 | BURTON, B. N. | EDF - ENGINEERING DESIGN FILE - SUMMARY PROCESS DESCRIPTION OF PROPOSED REMEDIAL ALTERNATIVES FOR A CLEANUP OF PIT 9 AT THE INEL RWMC | ERD-BWP-077 | 00 |
| 20-OCT-92 | FORSBERG, D. L. | EDF - ENGINEERING DESIGN FILE - PIT 9 COMPREHENSIVE DEMONSTRATION PROJECT COST ESTIMATE BASIS OF ALTERNATIVES LISTED IN THE REVISED PROPOSED PLAN | ERD-BWP-076 | 00 |
| 01-OCT-92 | MCCARTHY, J. M. | EDF - ENGINEERING DESIGN FILE - GWSCREEN MODELING FOR THE PIT 9 PROJECT - SENSITIVITY TO KD IN THE SOURCE AND ATTENUATION LAYER | RWMC-92-005.1 | 00 |
| 01-JUL-92 | RICE, R. S. | EDF - ENGINEERING DESIGN FILE - RESULTS OF PAD-A OVERBURDEN SAMPLING AND ANALYSIS | ERD-BWP-70 | 00 |
| 23-MAR-92 | FORSBERG, D. L. | EDF - ENGINEERING DESIGN FILE - EVALUATION OF REMEDIAL ALTERNATIVES FOR PIT 9 INTERIM ACTION (IA) | ERP-BWP-68 | 00 |
| 17-MAR-92 | FIGUEROA, I. C. | EDF - ENGINEERING DESIGN FILE - PIT 9 RESIDUAL RISK ASSESSMENT | ERP-BWP-69 | 00 |
| 28-FEB-92 | FIGUEROA, I. C. | ENGINEERING DESIGN FILE (EDF) - RISK ANALYSIS DETERMINATION OF RISK BASED SOIL SCREENING CONCENTRATIONS POTENTIAL EXPLOSIVE RESIDUES AT ORDNANCE AREAS (OU 10-05) AT INEL | ERP-WAG10-08 | 00 |
| 01-JAN-92 | LUGAR, R. M. | EDF - ENGINEERING DESIGN FILE - RESULTS OF CHEMICAL & RADIOLOGICAL ANALYSIS OF RWMC PIT 9 & ACID PIT PERIMETER SUBSURFACE SOIL | ERP-BWP-67 | 00 |
| 30-SEP-91 | MONSON, R. S. | ENGINEERING DESIGN FILE (EDF) - SAMPLE ANALYSIS RESULTS FROM SAMPLING OF RWMC & SWEPP SEWER & SEPTIC SYSTEMS | RWMC-505 | 00 |
| 26-AUG-91 | SLOAN, P. A. | ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) LARGE FIELD TEST SITING REQUIREMENTS & SELECTION | ERP-ISV-032 | 00 |
| 10-JUL-91 | KING, J. J. | ENGINEERING DESIGN FILE (EDF) - METHODOLOGY FOR DETERMINATION OF A RADIOLOGICAL INVENTORY FOR PIT 9 & CORRESPONDING RESULTS | ERP-BWP-64 | 00 |
| 08-MAY-90 | MIYASAKI, D. H. | ENGINEERING DESIGN FILE (EDF) - CALCULATION OF OFF GAS CONCENTRATIONS DURING IN SITU VITRIFICATION (ISV) PROCESS - INTERMEDIATE FIELD TEST | ERP-ISV-034 | 00 |
| 12-OCT-89 | MACKINNON, R. J. | ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) CODE IMPLEMENTATION - OUTLINE MODELING REQUIREMENTS FOR ISV | ERP-ISV-021 | 00 |
| 02-JUN-89 | BELLER, J. M. | ENGINEERING DESIGN FILE (EDF) - BURIED WASTE PROGRAM (BWP) IN SITU VITRIFICATION (ISV) - PRODUCTION SCALE COST ESTIMATE | BWP-ISV-006 | 00 |
| 31-MAY-89 | CALLOW, R. A. | ENGINEERING DESIGN FILE (EDF) - INTERMEDIATE SCALE IN SITU VITRIFICATION (ISV) TEST REQUIREMENTS & PIT DESIGN | BWP-ISV-010 | 00 |
| 21-FEB-89 | MELVILLE, J. B. | ENGINEERING DESIGN FILE (EDF) - ISV TREATABILITY STUDY (TS) - LARGE SCALE DEMONSTRATION TEST TIME REQUIRED TO VITRIFY TRU CONTAMINATED PITS & TRENCHES AT SDA | BWP-ISV-007 | 00 |
| 24-JAN-89 | GARCIA, E. C. | ENGINEERING DESIGN FILE (EDF) - IN SITU VITRIFICATION (ISV) SUMMARY CHARACTERIZATION OF SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE METAL CONTENT OF WASTE BURIED IN SDA | BWP-ISV-005 | 00 |
| 29-APR-88 | VIGIL, M. J. | ENGINEERING DESIGN FILE (EDF) - MODEL OF MIGRATION OF HAZARDOUS CONSTITUENT - ESTIMATE OF WATER IN PITS DURING FLOODING EVENTS | BWP-12 | 00 |
| 29-SEP-86 | MILLER, C. L. | EDF - ENGINEERING DESIGN FILE - RWMC SMALL SCALE SOIL GROUT TEST REPORT | EDF-263 | 00 |
| 28-JAN-86 | LUSK, M. W. | ENGINEERING DESIGN FILE (EDF) - OU 10-05 INTERIM ACTION (IA) | ERP-WAG10-06 | 00 |
Previous Page | Administrative Record Home Page