| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 01-APR-90 | ANL-W | INITIAL ASSESSMENT - COOLING TOWER RISER PITS | 5501 | 00 |
| 08-FEB-89 | PIGOTT, W. R. | INITIAL ASSESSMENT - DAIRY FARM - DISPOSAL PIT DF-1 | 1146 | 00 |
| 08-FEB-89 | PIGOTT, W. R. | INITIAL ASSESSMENT - CFA-674 EXCESS YARD - LEAD SPILL | 2233 | 00 |
| 08-FEB-89 | PIGOTT, W. R. | INITIAL ASSESSMENT - EBR-1 RADIOACTIVE SOIL CONTAMINATION EBR-15 | 576 | 00 |
| 08-FEB-89 | PIGOTT, W. R. | INITIAL ASSESSMENT FORM - TRA-731 PIPE TUNNEL - FRENCH DRAIN | 578 | 00 |
| 02-FEB-89 | PIGOTT, W. R. | INITIAL ASSESSMENT - ZPPR-1 DISPOSAL AREA | 579 | 00 |
| 26-JAN-89 | ANL-W | INITIAL ASSESSMENT - INDUSTRIAL WASTE POND AND COOLING TOWER BLOWDOWN DITCHES (3) | 5469 | 00 |
| 26-JAN-89 | ANL-W | INITIAL ASSESSMENT - ANL-01A, MAIN COOLING TOWER BLOWDOWN DITCH | 5470 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-39 COOLING TOWER N OF TRA-607 | 2215 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-13 REACTOR AREA RUBBLE PIT | 2232 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - LOFT-03 RUBBLE PIT SOUTH OF LOFT DISPOSAL POND | 2237 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - IET-02 BURIAL PIT NE OF IET | 2238 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-38 ATR COOLING TOWER TRA-771 | 2239 | 00 |
| 12-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-37 MATERIALS TEST REACTOR (MTR) CANAL IN BASEMENT TRA-603 | 2240 | 00 |
| 11-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-35 RUBBLE SITE EAST OF WEST ROAD NEAR BETA BUILDING RUBBLE PILE | 2253 | 00 |
| 11-JAN-88 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-36 ETR COOLING TOWER BASIN TRA-751 | 2254 | 00 |
| 21-JUL-87 | ANL-W | INITIAL ASSESSMENT - TREAT PHOTO PROCESSING DISCHARGE DITCH | 5500 | 00 |
| 14-JUL-87 | ANL-W | INITIAL ASSESSMENT - INDUSTRIAL WASTE LIFT STATION DISCHARGE DITCH | 5499 | 00 |
| 08-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-34 NORTH STORAGE AREA | 2844 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - CPP-604 RADIOACTIVE WASTE UNLOADING AREA | 5384 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - CPP HF STORAGE TANK (YDB-105) & DRY WELL | 5403 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - LIME PIT AT THE BASE OF THE CPP-601 BERM AND FRENCH DRAIN | 5404 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - KEROSENE TANK OVERFLOW OF CPP-633 | 5423 | 00 |
| 08-JUL-87 | WINCO | INITIAL ASSESSMENT - ABANDONED GASOLINE TANK CPP-VES-UTI-652 | 5432 | 00 |
| 08-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - CPP PRESSURIZATION OF SOLID STORAGE CYCLONE NORTHEAST OF THE WASTE CALCINING FACILITY (WCF) | 6679 | 00 |
| 08-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-20 CPP-604 RADIOACTIVE WASTE UNLOADING AREA | 6685 | 00 |
| 07-JUL-87 | POLAND, D. J. | INITIAL ASSESSMENT - PRESSURIZATION OF SOLID STORAGE CYCLONENE OF CPP-633 | 6645 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TSF-22 RAILROAD TURNTABLE | 2235 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TSF-21 IET VALVE PIT | 2236 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-06 LEAD SHOP - OUTSIDE AREAS | 2511 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-26 PUMP STATION FUEL SPILL CFA-760 | 2521 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-42 TANK FARM PUMP STATION SPILLS | 2532 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-41 EXCESS DRUM STORAGE SOUTH OF CFA-674 | 2533 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-40 RETURNABLE DRUM STORAGE SOUTH OF CFA-601 | 2536 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-39 DRUM DOCK CFA-771 | 2537 | 00 |
| 06-JUL-87 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-07 REACTOR AREA OIL DRUM STORAGE PER-T-13 | 2717 | 00 |
| 24-OCT-86 | ANL-W | INITIAL ASSESSMENT - EBR-II LEACH PIT (RADIOACTIVE) | 5473 | 00 |
| 23-OCT-86 | ANL-W | INITIAL ASSESSMENT - INDUSTRIAL WASTE LIFT STATION | 5493 | 00 |
| 22-OCT-86 | ANL-W | INITIAL ASSESSMENT - INDUSTRIAL & SANITARY WASTE LIFT STATION (INDUSTRIAL SIDE NOT USED) | 5495 | 00 |
| 21-OCT-86 | ANL-W | INITIAL ASSESSMENT - SLUDGE PIT W OF T-7 (IMHOFF TANK) (FILLED IN 1979) | 5483 | 00 |
| 17-OCT-86 | ANL-W | INITIAL ASSESSMENT - ANL INTERCEPTOR CANAL | 5474 | 00 |
| 16-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-15 HOT WASTE TANKS #2, #3, #4 AT TRA-613 | 2872 | 00 |
| 16-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-19 RAD TANKS 1 & 4 AT TRA-630, REPLACED BY TANKS 1, 2, 3, & 4 | 2876 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - PCB TRANSFORMER YARD (CPP-731) | 5414 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - PCB STAGING AREA WEST OF CPP-660 | 5415 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - PICKLING SHED EAST OF CPP-631 | 5416 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - PAINT AND PAINT SOLVENT AREA SOUTH OF CPP-697 | 5417 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - DRUM STORAGE AREA WEST OF CPP-660 | 5418 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - MERCURY CONTAMINATED AREA SOUTH OF CPP T-15 | 5419 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - NITRIC ACID CONTAMINATION SOUTH OF CPP-734 | 5420 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - SULFURIC ACID SPILL EAST OF CPP-606 | 5421 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR OVERHEAD PIPELINE SPILLS | 5422 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - PAINT SHOP AT PRESENT LOCATION OF CPP-645 | 5424 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - PCB SPILL IN CPP-718 TRANSFORMER YARD | 5425 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - MERCURY CONTAMINATED AREA NEAR CPP TB-4 | 5426 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - HEXONE SPILL BY CPP-710 | 5427 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - HEXONE SPILL BY CPP-660 | 5428 | 00 |
| 16-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL WEST OF CPP-693 EAST OF DRY FUEL STORAGE AREA | 5442 | 00 |
| 15-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-06 CHEMICAL WASTE POND TRA-701 | 2863 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - FIRE TRAINING PITS BETWEEN CPP-602 & CPP-603 | 5405 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - DRAINAGE DITCH WEST OF CPP-637 | 5406 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - GREASE PIT SOUTH OF CPP-637 | 5407 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - GREASE PIT SOUTH OF CPP-608 | 5408 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-621 CHEMICAL STORAGE AREA SPILLS | 5409 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-637 COURTYARD PILOT PLANT RELEASE | 5410 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - PILOT PLANT STORAGE AREA WEST OF CPP-620 | 5411 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - FRENCH DRAIN SOUTH OF CPP-633 | 5412 | 00 |
| 15-OCT-86 | WINCO | INITIAL ASSESSMENT - PCB TRANSFORMER YARD (CPP-705) | 5413 | 00 |
| 15-OCT-86 | ANL-W | INITIAL ASSESSMENT - ANL SEWAGE LAGOONS | 5471 | 00 |
| 15-OCT-86 | ANL-W | INITIAL ASSESSMENT - ANL OPEN BURN PITS #1, #2, AND #3 | 5472 | 00 |
| 14-OCT-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - ARVFS-02 TANK CONTAINING LOW LEVEL RAD WASTE (UNDER WHITE BLDG) | 3002 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SW AND NW OF VALVE BOX B-4 | 5396 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN THE TANK FARM AREA NEAR WL-102 NE OF CPP-604 | 5397 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - SOIL STORAGE AREA IN THE NE CORNER OF THE CPP | 5398 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-633 DECONTAMINATION SPILL | 5399 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - TRANSFER LINE LEAK FROM CPP-633 TO WL-102 | 5400 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP GRAVEL PITS #1 AND #2 | 5401 | 00 |
| 14-OCT-86 | WINCO | INITIAL ASSESSMENT - FRIABLE TRANSITE ON CPP-601, CPP-603, CPP-603, CPP-604, CPP-605, CPP-606, CPP-640, CPP-644, AND CPP-648 | 5402 | 00 |
| 14-OCT-86 | ANL-W | INITIAL ASSESSMENT - SUSPECT WASTE RETENTION TANK 783 (REMOVED 1979) | 5477 | 00 |
| 14-OCT-86 | ANL-W | INITIAL ASSESSMENT - FUEL OIL SPILL BY BUILDING 755 (ANL-755) | 5498 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP INJECTION WELL (MAH-FE-304) | 5387 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP CONTAMINATED SOIL TANK FARM AREA BUCKET SPILL | 5388 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NORTH OF CPP-604 | 5389 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA FROM STEAM FLUSHING | 5390 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA EAST OF CPP-604 | 5391 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM SOUTH OF WM-181 BY VALVE BOX A-6 | 5392 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN NORTH & WEST OF THE MAIN STACK (CPP-708) | 5393 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA NEAR VALVE BOX B-9 | 5394 | 00 |
| 13-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL IN TANK FARM AREA SOUTH OF TANK WM-183 | 5395 | 00 |
| 09-OCT-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-29 ACID POND (TAN-735) | 2699 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-17 FIRE DEPARTMENT TRAINING AREA; BERMED | 2499 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-18 FIRE DEPARTMENT TRAINING AREA, OIL STORAGE TANKS | 2500 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-32 FUEL TANK CFA-667 (NORTHSIDE) | 2501 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-01 LANDFILL I | 2502 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-19 GASOLINE TANKS (2) EAST OF CFA-606 | 2503 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-33 FUEL TANK CFA-667 SOUTH SIDE | 2504 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-02 LANDFILL II | 2505 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-20 FUEL OIL TANK AT CFA-609, CFA-732 | 2506 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-03 LANDFILL III | 2507 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-21 FUEL TANK AT NEVADA CIRCLE 1 SOUTH BY CFA-629 | 2508 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-04 POND CFA-674 | 2509 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-05 MOTOR POOL POND | 2510 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-07 FRENCH DRAIN E/S OF CFA-633 | 2512 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-08 SEWAGE PLANT CFA-691 SEPTIC TANK CFA-716 AND DRAINFIELD | 2513 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-09 CENTRAL GRAVEL PIT | 2514 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-10 TRANSFORMER YARD OIL SPILLS | 2515 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-11 FRENCH DRAIN CONTAINING 5" SHELL NORTH OF CFA-633 | 2516 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-22 FUEL OIL TANK CFA-640 | 2517 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-23 FUEL OIL TANK CFA-641 | 2518 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-24 FUEL TANK NEVADA CIRCLE 2 SOUTH BY CFA-629 | 2519 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-25 FUEL OIL TANK CFA-656 NORTH SIDE | 2520 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-27 FUEL OIL TANK CFA-669 (CFA-740) | 2522 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-12 FRENCH DRAINS (2) CFA-690 | 2523 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-13 DRY WELL SOUTH OF CFA-640 | 2524 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-14 TWO DRY WELLS CFA-665 | 2525 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-15 DRY WELL CFA-674 | 2526 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-16 DRY WELL SOUTH OF CFA-682 PUMPHOUSE | 2527 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-28 FUEL OIL TANK AT CFA-674 WEST | 2528 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-29 WASTE OIL TANK CFA-664 | 2529 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-30 WASTE OIL TANK CFA-665, ACTIVE | 2530 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-31 WASTE OIL TANK AT CFA-754 ACTIVE | 2531 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-34 DIESEL TANK AT CFA-674 SOUTH | 2534 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-35 SULFURIC ACID TANK CFA-674 (WEST SIDE) | 2535 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-38 FUEL OIL TANK, CFA-683 | 2538 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-37 DIESEL TANK CFA-681 SOUTH SIDE | 2539 | 00 |
| 08-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - CFA-36 GASOLINE TANK CFA-680 | 2540 | 00 |
| 08-OCT-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-05 INJECTION WELL TAN-331 | 2627 | 00 |
| 08-OCT-86 | ANL-W | INITIAL ASSESSMENT - DRY WELLS BETWEEN T-1 AND ZPPR MOUND | 5475 | 00 |
| 08-OCT-86 | ANL-W | INITIAL ASSESSMENT - ANL-30 SANITARY WASTE LIFT STATION | 5494 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-01, CONCRETE SETTLING BASIN, VAULT, AND DRY WELLS E. OF CPP-603 | 5365 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - FRENCH DRAIN W. OF CPP-603 | 5366 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - TEMPORARY STORAGE AREA SE OF CPP-603 | 5367 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING TANK | 5368 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL AROUND CPP-603 SETTLING BASIN | 5369 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - TRENCH E. OF CPP-603 FUEL STORAGE BASIN | 5370 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOIL CONTAMINATION NW OF CPP-642 | 5371 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-08, CPP-603 BASIN FILTER SYSTEM LINE FAILURE | 5372 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOIL CONTAMINATION NEAR THE NE CORNER OF CPP-603 S. BASIN | 5373 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK | 5374 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-603 SLUDGE AND WATER RELEASE | 5375 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED PAINT CHIPS AND PAD SOUTH OF CPP-603 | 5376 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - PRESSURIZATION OF THE SOLID STORAGE CYCLONE NE OF CPP-633 | 5377 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEWAGE TREATMENT PLANT SOUTH OF CPP-664 | 5378 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOLVENT BURNER EAST OF CPP-605 | 5379 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CONTAMINATED SOIL FROM LEAK IN LINE FROM CPP WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 5380 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOIL STORAGE AREA SOUTH OF CPP PEACH BOTTOM FUEL STORAGE AREA | 5381 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - GAS STORAGE BUILDING | 5382 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-603 TO CPP-604 LINE LEAK | 5383 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SOLID WASTE STORAGE BIN SOUTH OF CPP-601 | 5385 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - PARTICULATE AIR RELEASE SOUTH OF CPP-603 | 5386 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP SEWAGE PLANT LAGOONS | 5429 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP COAL FIRED STEAM GENERATOR PROJECT (CFSGP) FLY ASH PIT | 5430 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP PERCOLATION PONDS #1 AND #2 | 5431 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - ABANDONED LIQUID RADIOACTIVE WASTE STORAGE TANK CPP VES-SFE-20 | 5433 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEPTIC TANK EAST OF CPP-655 | 5434 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEEPAGE PIT WEST OF CPP-656 | 5435 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - CPP-758 CESSPOOL EAST OF CPP-651 | 5436 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - LEACHING CESSPOOL EAST OF CPP T-5 | 5437 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEWAGE PIT WEST OF CPP-626 | 5438 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEPTIC TANK WEST OF CPP-603 | 5439 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEPTIC TANK AND WEST OF CPP-659 | 5440 | 00 |
| 07-OCT-86 | WINCO | INITIAL ASSESSMENT - SEEPAGE PIT AND CESSPOOL NORTH OF CPP-662 | 5441 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOIL CONTAMINATION NORTHWEST OF CPP-642 (EAST OF CPP-603) | 6673 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 BASIN FILTER SYSTEM LINE FAILURE | 6674 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - SOIL CONTAINMENT NEAR NORTHEAST CORNER OF CPP-603 SOUTH BASIN | 6675 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 PLASTIC PIPELINE BREAK | 6676 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-603 SLUDGE & WATER RELEASE | 6677 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED PAINT CHIPS & PAD SOUTH OF CPP-603 | 6678 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOLVENT BURNER EAST OF CPP-605 | 6680 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP CONTAMINATED SOIL FROM LEAK IN LINE FROM WM-181 TO PROCESS EQUIPMENT WASTE (PEW) EVAPORATOR | 6681 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP SOIL STORAGE AREA NEAR PEACH BOTTOM FUEL STORAGE AREA | 6682 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP GAS STORAGE BUILDING | 6683 | 00 |
| 07-OCT-86 | POLAND, D. J. | INITIAL ASSESSMENT - CPP-19, CPP-603 TO CPP-604 LINE LEAK | 6684 | 00 |
| 06-OCT-86 | ANL-W | INITIAL ASSESSMENT - DRY WELL BY 720 | 5481 | 00 |
| 05-OCT-86 | ANL-W | INITIAL ASSESSMENT - SUSPECT TANK AND DRAINFIELDS (2) BY 753 (TANK REMOVED 1979) | 5478 | 00 |
| 05-OCT-86 | ANL-W | INITIAL ASSESSMENT - SEPTIC TANK AND LEACH FIELD BY 793 | 5484 | 00 |
| 05-OCT-86 | ANL-W | INITIAL ASSESSMENT - TREAT SEEPAGE PIT AND SEPTIC TANK W. OF 720 (FILLED 1980) | 5487 | 00 |
| 05-OCT-86 | ANL-W | INITIAL ASSESSMENT - CRITICAL SYSTEMS MAINTENANCE DEGREASING UNIT | 5490 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-02 BORAX I BURIAL SITE | 2629 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-01 BORAX I I- V LEACH POND | 2763 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-03 AEF SEPTIC TANK AEF-703 | 2766 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-04 BORAX TRASH DUMPS | 2767 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-05 FUEL OIL TANK, SOUTHWEST OF AEF-602 | 2768 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-33 WEST STAGING AREA - DRAINAGE DITCH RUBBLE SITE | 2845 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-32 WEST ROAD RUBBLE PILE | 2846 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-31 WEST RUBBLE SITE | 2847 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-30 BETA BUILDING RUBBLE SITE | 2848 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-29 ATR CONSTRUCTION RUBBLE | 2849 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-28 NORTH LANDFILL RUBBLE SITE | 2850 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-27 NORTH STORAGE AREA RUBBLE PILE | 2851 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-26 RUBBLE SITE BY USGS OBSERVATION WELL | 2852 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-25 SEWER PLANT SETTLING POND RUBBLE PILE | 2853 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-24 GUARDHOUSE CONSTRUCTION RUBBLE PILE | 2854 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-23 ETR EXCAVATION SITE RUBBLE PILE | 2855 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-22 INACTIVE DIESEL FUEL TANK AT ETR-648 | 2856 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-21 INACTIVE TANK, NORTH SIDE OF MTR-643 | 2857 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-07 SEWAGE TREATMENT PLANT TRA-732 & SLUDGE PIT TRA-732 | 2864 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-10 MATERIALS TEST REACTOR (MTR) CONSTRUCTION EXCAVATION PILE | 2867 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-11 FRENCH DRAIN AT TRA-645 | 2868 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-12 FUEL OIL TANK SPILL TRA-727B | 2869 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-13 FINAL SEWAGE LEACH PONDS (2) BY TRA-732 | 2870 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-14 INACTIVE GASOLINE TANK AT TRA-605 | 2871 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-17 INACTIVE GASOLINE TANK AT TRA-616 | 2873 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-16 INACTIVE RADIOACTIVE CONTAMINATED TANK AT TRA-614 | 2874 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-18 INACTIVE GASOLINE TANK AT TRA-619 | 2875 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-20 BRINE TANK TRA-731 AT TRA-631 | 2879 | 00 |
| 03-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - BORAX-07 INACTIVE FUEL OIL TANK BY AEF-601 | 3003 | 00 |
| 03-OCT-86 | ANL-W | INITIAL ASSESSMENT - TREAT SUSPECT WASTE TANK AND LEACHING FIELD | 5486 | 00 |
| 03-OCT-86 | ANL-W | INITIAL ASSESSMENT - TREAT CONTROL BUILDING 721 (ANL-721) SEPTIC TANK AND SEEPAGE PIT (REMOVED 1978) | 5497 | 00 |
| 02-OCT-86 | ANL-W | INITIAL ASSESSMENT - TREAT SUSPECT WASTE TANK AND LEACHING FIELD (NONRADIOACTIVE) | 5485 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-11 EBR-1 FUEL OIL TANK EBR-706 | 2633 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-03 EBR-1 SEEPAGE PIT WMO-702 | 2634 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-04 EBR-1 SEPTIC TANK WMO-701 | 2635 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-06 - EBR-1 SEPTIC TANK (EBR-714) & SEEPAGE PIT (EBR-716) | 2637 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-07 EBR-1 AEF-704 FUEL OIL TANK AT AEF-603 (MAP SAYS DIESEL) | 2638 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-08 EBR-1 WMO-703 FUEL OIL TANK, SOON INACTIVE | 2639 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-09 EBR-1 WMO-704 FUEL OIL TANK AT WMO-601 | 2640 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-10 EBR-1 WMO-750 GASOLINE TANK | 2641 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT- EBR-12 EBR-1 DIESEL TANK EBR-707 | 2643 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-13 EBR-1 GASOLINE TANK EBR-708 | 2644 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-14 EBR-1 GASOLINE TANK EBR-717 | 2645 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - RWMC-03 SEPTIC TANK & DRAINFIELD FOR SWEPP | 2734 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - RWMC-02 SEPTIC TANK AND DRAINFIELD FOR WMF-601 AND WMF-604 | 2735 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - RWMC-01 DRAINAGE AND SEPTIC TANK FOR WMF-613 NEW FACILITY NOT OPERATIONAL YET | 2736 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - LCCDA-02 LIMESTONE TREATMENT AND DISPOSAL PIT EAST END | 2750 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - LCCDA-01 OLD DISPOSAL PIT WEST END | 2751 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - RWMC-05 TRANSURANIC STORAGE AREA (TSA) TEMPORARY STORAGE ONLY | 2764 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-02 - EBR-1 SEPTIC TANK (AEF-702) & SEEPAGE PIT (AEF-703) | 2765 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EBR-05 EBR-1 CESSPOOL, SEPTIC TANK EBR-709 & SEEPAGE PIT EBR-713 | 2770 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - RWMC SUBSURFACE DISPOSAL AREA (SDA) | 2837 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-01 CHEMICAL - EVAPORATION POND TO SE ARA-745 | 2979 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-02 SANITARY WASTE LEACH FIELD AND SEEPAGE PIT ARA-746 | 2980 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-03 PAD NEAR ARA-627 (PB SHEETING) | 2981 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-04 SEWAGE TREATMENT FACILITY ARA-737 | 2982 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-05 EVAPORATION POND TO NORTH EAST ARA-744 | 2983 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-07 SEEPAGE PIT TO EAST ARA-720A | 2985 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-08 SEEPAGE PIT TO WEST ARA-720B | 2986 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-09 SEPTIC TANK ARA-738 | 2987 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-10 SEPTIC TANK EAST ARA-613 | 2988 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-11 SEPTIC TANK WEST ARA-606 | 2989 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-16 RADIONUCLIDE TANKS ARA-729 | 2994 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-21 TEST AREA SEPTIC TANK AND LEACH PIT NO. 2 | 2999 | 00 |
| 01-OCT-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-22 CONTROL AREA SEPTIC TANK AND LEACH PIT NO. 3 ARA-617 | 3000 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - DRY WELLS BY 759 (2) | 5480 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - SEPTIC TANK AND DRAINFIELD BY 789 (REMOVED 1979) | 5482 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - LAB AND OFFICE ACID NEUTRALIZATION TANK | 5488 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - INTERIOR BUILDING COFFIN (IBC) NEUTRALIZATION TANK | 5489 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - PLANT SERVICES DEGREASING UNIT | 5491 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - EBR-II SUMP (REGENERATION) | 5492 | 00 |
| 30-SEP-86 | ANL-W | INITIAL ASSESSMENT - TREAT CONTROL BUILDING 721 (ANL-721) SEPTIC TANK AND LEACH FIELD | 5496 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #11 - S1W SB#1: TILE DRAINFIELD | 5453 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - S1W SB#2: LEACHING PIT (SWMU #12) | 5454 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #13 SB#3: TEMPORARY LEACHING PIT | 5455 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - S1W SB#4: INDUSTRIAL WASTE LAGOONS (SWMU #14) | 5456 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #15 - S1W ACID SPILL AREA | 5457 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #16 - RADIOGRAPHY BUILDING COLLECTION TANKS | 5458 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #17 - S1W RETENTION BASINS | 5459 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #18 - S1W SPRAY PONDS | 5460 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #19 - A1W LEACHING BED | 5461 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #20 - A1W ACID SPILL AREA | 5462 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #21 - OLD SEWAGE TREATMENT PLANT | 5463 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #22 - A1W PAINTING LOCKER FRENCH DRAIN | 5464 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #24 - DEMINERALIZER & NEUTRALIZATION FACILITY | 5466 | 00 |
| 29-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #25 - CHEMICAL WASTE STORAGE PAD | 5467 | 00 |
| 26-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU UNIT #23 - SEWAGE LAGOON | 5465 | 00 |
| 26-SEP-86 | NRF | INITIAL ASSESSMENT - LDU #1 - INDUSTRIAL WASTE DITCH | 5468 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF INJECTION WELL | 1034 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-06 INJECTION WELL | 2618 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-02 PHASE POND TAN-763 | 2624 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-06 SEWAGE LAGOON | 2628 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-07 DISPOSAL POND | 2710 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-02 DISPOSAL POND TAN-750 | 2748 | 00 |
| 25-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-04 INJECTION WELL | 2753 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-08 SEPTIC TANK TAN-710 & FILTER BED | 2612 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-04 STACK RUBBLE SITE | 2616 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-01 BURN PIT | 2623 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-07 SEPTIC TANK TAN-737 & SANDFILTERS | 2630 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-18 CONTAMINATED TANK SOUTH EAST OF TANK V-3 | 2689 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-19 CAUSTICS TANK V-4 SOUTH OF TAN-616 | 2690 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-20 TWO NEUTRALIZATION PITS NORTH OF TAN-607 | 2691 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-24 OIL SUMP TAN-609 | 2694 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-25 FUEL TANK CORNER OF TAN-607 | 2695 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-27 PAINT SHOP FLOOR DRAIN LEACH FIELD | 2697 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-28 SEWAGE TREATMENT PLANT TAN-623 | 2698 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-30 SEPTIC TANK EAST OF TAN-602 | 2700 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-31 ACID PIT WEST OF TAN-647 | 2701 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-01 DIESEL TANK & SPILL WEST OF TAN-607 | 2704 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-02 SERVICE STATION SPILL TAN-664 | 2705 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-03 BURN PIT | 2706 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-09 INTERMEDIATE LEVEL WASTE DISPOSAL SYSTEM | 2726 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-16 BRINE PIT NORTH OF TAN-608 | 2727 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-15 FUEL OIL TANK TAN-777 WEST OF TAN-603 | 2728 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-11 THREE CLARIFIER PITS EAST OF TAN-604 | 2732 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-10 DRAINAGE POND TAN-782 | 2733 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-08 HTRE III MERCURY SPILL AREA | 2745 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-01 DIESEL FUEL SPILLS AT TAN-629 | 2749 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-09 SEPTIC TANK & DRAINFIELD TAN-762 | 2758 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-10 SULFURIC ACID SPILL TAN-771 | 2759 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-11 CRYOGEN PITS 3 EAST OF TAN-629 | 2760 | 00 |
| 24-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-13 DRY WELL TAN-333 | 2761 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-09 LUBE OIL TANK TAN-316 | 2613 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-01 GASOLINE STORAGE TANK TAN-318 | 2614 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-05 FOAM STABILIZATION TANK TAN-317 | 2617 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - IET-07 HOT WASTE TANK TAN-319 | 2621 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-03 EVAPORATION POND | 2625 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-04 RADIOACTIVE LIQUID WASTE TANK TAN-735 | 2626 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-09 DIESEL FUEL TANK TAN-103 | 2631 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - WRRTF-10 GASOLINE TANK TAN-644 | 2632 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-17 TWO NEUTRALIZATION PITS NORTH OF TAN-649 | 2688 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-26 PM 2 TANKS TAN-710 A AND B | 2696 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-32 OIL TANK TAN-775 SOUTH OF TAN-601 BETWEEN GATEHOUSE & SUBSTATION | 2702 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-33 T-11 FUEL TANK EAST OF TAN-602 | 2703 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-06 TAN - TSF-1 AREA | 2709 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-14 FUEL OIL TANK NORTHWEST OF TAN-603 | 2729 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-13 GASOLINE TANK NORTH OF TAN-610 | 2730 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-12 ACID NEUTRALIZATION TANKS NORTH END OF TAN-602 | 2731 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-05 FUEL TANKS 2 TAN-109 A & B | 2754 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-06 SLOP TANKS EAST OF TAN-621 | 2755 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-07 FOAM SOLUTION TANK | 2756 | 00 |
| 23-SEP-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - LOFT-08 TANK IN BORROW PITS TAN-110 | 2757 | 00 |
| 23-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #10 - SAND BLASTING SLAG TRENCH | 5452 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-14 SPERT II INACTIVE FUEL OIL TANK FRONT OF PBF-612 | 2724 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-26 SPERT IV LAKE ADJACENT TO PBF-758 | 2737 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-25 SPERT IV SEPTIC TANK & LEACH PIT PBF-727 & PBF-757 | 2738 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-24 SPERT IV BLOWDOWN PIT ADJACENT TO PBF-716 | 2739 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-22 SPERT IV LEACH POND PBF-758 | 2740 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-21 SPERT III LARGE LEACH POND | 2741 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-20 SPERT III SMALL LEACH POND | 2742 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-16 SPERT II LEACH POND | 2743 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-17 SPERT II SEPTIC TANK & SEEPAGE PIT PBF-725 | 2746 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-19 SPERT III INACTIVE FUEL OIL TANK AT PBF-609 WEST SIDE OF WERF | 2747 | 00 |
| 22-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-27 SPERT III SEPTIC TANK PBF-726 & SEEPAGE PIT | 2762 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-01 CONTROL AREA SEPTIC TANK PBF-724 SEEPAGE PIT PBF-735 | 2711 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-02 CONTROL AREA SEPTIC TANKS PBF-738,PBF-739 AND SEEPAGE PIT PBF-736 | 2712 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-03 CONTROL AREA SEPTIC TANK FOR PBF-632 & SEEPAGE PITS PBF-745 AND PBF-748 | 2713 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-04 CONTROL AREA OIL TANK AT PBF-608 SUBSTATION OUTSIDE PBF FENCE | 2714 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-05 REACTOR AREA WARM WASTE INJECTION WELL PBF-301 | 2715 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-06 REACTOR AREA BLOWDOWN PIT FOR BOILER BY PBF-621 | 2716 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-08 REACTOR AREA CORROSIVE WASTE DISPOSAL SUMP BRINE TANK PBF-731 | 2718 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-09 REACTOR AREA SEPTIC TANK & DRAINFIELD PBF-728 | 2719 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-10 REACTOR AREA EVAPORATION POND PBF-733 | 2720 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-11 SPERT I SEEPAGE PIT PBF-750 | 2721 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-12 SPERT I LEACH POND | 2722 | 00 |
| 19-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - PBF-15 REACTOR AREA CORROSIVE WASTE INJECTION WELL PBF-302 | 2725 | 00 |
| 18-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EOCR-01 LEACH POND | 2607 | 00 |
| 18-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EOCR-02 INJECTION WELL | 2608 | 00 |
| 18-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EOCR-03 OXIDATION POND | 2609 | 00 |
| 18-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EOCR-04 SEPTIC TANK | 2610 | 00 |
| 18-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - EOCR-05 BLOWDOWN SUMP EOCR-719 | 2611 | 00 |
| 18-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ORGANIC MODERATED REACTOR EXPERIMENT (OMRE) - OMRE-01 LEACH POND | 2619 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU UNIT #1 - FIELD AREA NORTH OF S1W | 5443 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU UNIT #2 - OLD DITCH SURGE POND | 5444 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU UNIT #3 - ECF GRAVEL PIT | 5445 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU UNIT #4 - TOP SOIL PIT AREA | 5446 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #5 - WEST LANDFILL | 5447 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #6 - SOUTHEAST LANDFILL | 5448 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #7 - EAST LANDFILL | 5449 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #8 - NORTH LANDFILL | 5450 | 00 |
| 17-SEP-86 | NRF | INITIAL ASSESSMENT - SWMU #9 - PARKING LOT RUN OFF TRENCHES | 5451 | 00 |
| 16-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-01 ACID SPILL DISPOSAL PIT TRA-608 | 2858 | 00 |
| 16-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-02 PAINT SHOP DITCH TRA-606 | 2859 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-06 SL-1 BURIAL GROUND | 2984 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-12 RADIOACTIVE WASTE LEACH POND | 2990 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-13 SANITARY SEWER LEACH FIELD AND SEPTIC TANK ARA-740 | 2991 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-14 SEPTIC TANK AND DRAINFIELD ARA-739 | 2992 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-15 RADIONUCLIDE TANK ARA-735 | 2993 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-17 DRAIN FROM ARA-626 | 2995 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-18 RADIONUCLIDE TANK ARA-736 | 2996 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-19 DETENTION TANK FOR FUEL OIL - RADIONUCLIDES ARA-719 | 2997 | 00 |
| 15-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - ARA-20 TEST AREA CONTAMINATED LEACH PIT #1 | 2998 | 00 |
| 15-SEP-86 | ANL-W | INITIAL ASSESSMENT - HOT WELL (DRY WELL) BY BUILDING ANL-768 | 5479 | 00 |
| 12-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA WARM WASTE LEACH POND (WWP) TRA-758 | 2860 | 00 |
| 12-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-08 COLD WASTE DISPOSAL POND TRA-702 | 2865 | 00 |
| 11-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-04 WARM WASTE RETENTION BASIN TRA-712 | 2861 | 00 |
| 11-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-05 WASTE DISPOSAL WELL, SAMPLING PIT TRA-764 SUMP TRA-703 | 2862 | 00 |
| 11-SEP-86 | ALEXANDER, T. G. | INITIAL ASSESSMENT - TRA-09 SPILLS AT TRA LOADING DOCK TRA-722 | 2866 | 00 |
| 09-SEP-86 | ANL-W | INITIAL ASSESSMENT - WASTE RETENTION TANK 783 (NEVER USED) | 5476 | 00 |
| 01-AUG-86 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - TSF-04 GRAVEL PIT - ACID PIT | 2707 | 00 |
| 14-OCT-84 | SAINT-LOUIS, M. L. | INITIAL ASSESSMENT - ARVFS-01 CONTAINERS OF CONTAMINATED NAK | 3001 | 00 |
Previous Page | Administrative Record Home Page