| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 26-JAN-10 | NOT SPECIFIED | EBR-II PRE-DEMOLITION SOURCE TERM | TBL-194 | 01 |
| 17-AUG-09 | NESSHOEFER, CRAIG A. | EBR-II PRE-DEMOLITION SOURCE TERM | TBL-194 | 0 |
| 17-JUL-08 | R. D. ROSELAND | OPERABLE UNIT (OU) 10-08 SITEWIDE GROUNDWATER AND MISCELLANEOUS SITES PROPOSED PLAN/PREFERRED ALTERNATIVE REVISED PROJECT SUPPORT COST ESTIMATE | RDR-05-08 | 0 |
| 25-MAR-08 | FORSYTHE, H. S. | WASTE AREA GROUP (WAG) 10, OPERABLE UNIT (OU) 10-08, ANNUAL MONITORING STATUS REPORT FOR FISCAL YEAR 2007 | DOE/ID-11355 | 00 |
| 22-JAN-07 | MARTIAN, P. | VERIFICATION AND BENCHMARK TESTING OF THE TETRAD SIMULATOR, - VERSION 12.7MS | RPT-335 | 00 |
| 18-DEC-06 | GEOTRANS, INC. | BENCHMARKING VERIFICATION OF TETRAD SIMULATOR VERSION 12.7MS | 2313772 | 00 |
| 22-NOV-06 | ANDERSON, D. L. | SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-05-01039 | 01 |
| 20-JUN-06 | LOSINSKI, S. J. | DRILLING, CORING AND INSTALLATION OF TWO (2) DEEP MONITORING WELLS (MIDDLE-2051 AND MIDDLE-2050A) IN FISCAL YEAR 2005 (FY-05) - APPENDIX E PHOTOGRAPHS ARE INCLUDED | RPT-178 | 00 |
| 27-APR-06 | BAILEY, A. L. | END OF WELL REPORTS FOR THE OPERABLE UNIT (OU) 3-14 2004 TANK FARM SOIL INVESTIGATION AT THE IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | ICP/EXT-04-00706 | 00 |
| 24-MAR-06 | ANDERSON, D. L. | SOURCE RELEASE MODELING REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-05-01039 | 00 |
| 22-MAR-06 | DANIELS, K. W. | INDEPENDENT INVESTIGATION REPORT OF THE NOVEMBER 2005 (11/05) DRUM FIRE AT THE IDAHO NATIONAL LABORATORY (INL) SITE | RPT-190 | 00 |
| 18-JAN-06 | HAMPTON, N. L. | BIOLOGICAL DATA TO SUPPORT OPERABLE UNIT (OU) 7-13 AND 7-14 MODELING OF PLANT AND ANIMAL INTRUSION AT BURIED WASTE SITES | INEEL/EXT-01-00273 | 01 |
| 16-DEC-05 | VAIL, J. A. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) | INEEL/EXT-03-00967 | 01 |
| 18-NOV-05 | LOPEZ, S. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) | INEEL/EXT-03-00997 | 02 |
| 10-NOV-05 | HULL, L. C. | OPERABLE UNIT (OU) 3-14 TANK FARM ALLUVIUM GEOCHEMICAL PROPERTIES REPORT | DOE/ID-11271 | 00 |
| 10-NOV-05 | CARBONEAU, M. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 | INEEL/EXT-02-01385 | 01 |
| 04-NOV-05 | MCKENZIE, M. D. | WASTE INFORMATION AND LOCATION DATABASE UPDATE FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROJECT | ICP/EXT-04-00271 | 00 |
| 26-OCT-05 | HUBBELL, J. M. | MOISTURE MONITORING PROGRAM AT THE SUBSURFACE DISPOSAL AREA (SDA) FOR FISCAL YEAR 2004 (FY-04) | ICP/EXT-05-00829 | 00 |
| 05-OCT-05 | SEBO, D. E. | COLLOCATED FACILITIES ANALYSIS FOR WASTE AREA GROUP 7 (WAG-7) , OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-00027 | 01 |
| 03-OCT-05 | WOOD, T. R. | OPERABLE UNIT (OU) 10-08 SUMMARY REPORT ON THE SUBREGIONAL SCALE TWO DIMENSIONAL AQUIFER MODEL | ICP/EXT-05-00979 | 01 |
| 29-SEP-05 | MATTHERN, G. E. | PREREMEDIAL DESIGN REPORT OF REMEDIATION OPTIONS FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-04-00330 | 00 |
| 28-SEP-05 | HANSON, D. J. | EVALUATION OF THE DURABILITY OF PORTLAND CEMENT BASED GROUT FOR SUBSURFACE APPLICATIONS AT OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-05-00798 | 00 |
| 12-SEP-05 | ROHE, M. J. | SELECTING AQUIFER WELLS FOR PLANNED GYROSCOPIC LOGGING | INEEL/EXT-02-00248 | 02 |
| 06-SEP-05 | KOCH, D. F. | IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) POSITION ON A PATH FORWARD FOR OPERABLE UNIT (OU) 10-08 SITE TRA-62 | 24925 | 00 |
| 24-AUG-05 | SEBO, D. E. | BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-01678 | 03 |
| 30-JUN-05 | ROOD, A. S. | WHITE PAPER - GROUNDWATER TRANSPORT MODELING USING RESPONSE SURFACE MODELING - PROOF OF PRINCIPLE | ICP/EXT-05-00952 | 00 |
| 09-JUN-05 | PERRY, J. N. | TRANSMITTAL OF WASTE AREA GROUP 7 (WAG-7) DOCUMENTS - ICP/EXT-05-00784 FINAL REPORT FOR WAG-7 PROBING PROJECT | WDP-RWMC-05-035 | 00 |
| 10-MAY-05 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 | 24902 | 00 |
| 10-MAY-05 | CETO, N. | ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO REQUEST TO PLACE WASTE AREA GROUP 9 (WAG-9) SEWAGE LAGOONS IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL | 24903 | 00 |
| 09-MAY-05 | PERRY, J. N. | TRANSMITTAL OF WAG-7 DOCUMENTS - QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RWMC AND SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR 2003 AND 2004 | WMD-RWMC-05-026 | 00 |
| 09-MAY-05 | PERRY, J. N. | TRANSMITTAL OF WAG-7 DOCUMENTS - OU 7-13 AND OU 7-14 QUARTERLY MONITORING REPORTS FOR AQUIFER SAMPLES AND LYSIMETER AND PERCHED WATER SAMPLES AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | WMD-RWMC-05-027 | 00 |
| 05-MAY-05 | KOEPPEN, L. D. | FISCAL YEAR 2004 (FY-04) OPERABLE UNIT (OU) 7-13 AND 7-14 ENVIRONMENTAL MONITORING REPORT FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-05-00795 | 00 |
| 04-MAY-05 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) APPROVAL TO DEPARTMENT OF ENERGY (DOE) REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 | 24901 | 00 |
| 03-MAY-05 | HAIN, K. E. | DEPARTMENT OF ENERGY (DOE) APPROVAL - DOE REQUEST TO DELETE OPERABLE UNIT (OU) 1-11 AND RE-ASSIGN SITES TO OU 1-10 OR OU 10-08 | FMDP-RFDP-05-028 | 00 |
| 01-MAY-05 | MEYER, T. J. | FINAL REPORT FOR THE WASTE AREA GROUP 7 (WAG-7) PROBING PROJECT | ICP/EXT-05-00784 | 00 |
| 28-APR-05 | PROVENCHER, R. B. | ACCELERATED RETRIEVAL PROJECT (ARP) DEPARTMENT OF ENERGY (DOE) MEMORANDUM - MULTI-SOURCE LEACHATE AT PIT 4 AND THE SUBSURFACE DISPOSAL AREA (SDA) AND PAPER DISCUSSING APPLICABILITY TO THE F039 HAZARDOUS WASTE NUMBER TO CERCLA REMEDIATION ACTIVITIES | 1808137 | 00 |
| 28-APR-05 | GROENEWOLD, G. S. | ACTINIDE ANALYSIS AND LEACHING OF SAMPLES COLLECTED FROM THE GLOVEBOX EXCAVATOR METHOD PROJECT FOR OU 7-13 AND 7-14 | ICP/EXT-04-00439 | 00 |
| 28-APR-05 | VEJVODA, E. | SUMMARY OF ROCKY FLATS PLANT WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00717 | 00 |
| 28-APR-05 | GILES, J. R. | SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FROM 1953 TO 1999 | ICP/EXT-05-00833 | 00 |
| 27-APR-05 | JOSTEN, N. E. | TYPE A NUCLEAR LOGGING DATA ACQUISITION AND PROCESSING FOR OPERABLE UNIT (OU) 7-13, 7-14 AND 7-10 | INEEL/EXT-02-00558 | 02 |
| 07-APR-05 | PERRY, J. N. | TRANSMITTAL OF DRAFT SUPPLEMENT TO EVALUATION OF NAVAL REACTORS FACILITY (NRF) RADIOACTIVE WASTE DISPOSED OF AT RADIOACTIVE WASTE MANAGMENT COMPLEX (RWMC) FROM 1953 TO 1999 - ENCLOSURES NOT AVAILABLE | WDP-RWMC-05-018 | 00 |
| 04-APR-05 | FAULK, D. | ENVIRONMENTAL PROTECTION AGENCY (EPA) APPROVAL - EPA RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO PLACE WASTE AREA GROUP 9 (WAG-9), RELEASE SITE ANL-04, SEWAGE LAGOON IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL - ANL TRANSFER | 24898 | 00 |
| 29-MAR-05 | NORTH WIND ENVIRONMENTAL | HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 | ICP/EXT-04-00248 | 01 |
| 17-MAR-05 | RITTER, P. D. | NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) RADIOLOGICAL MONITORING PLAN FOR PHASES I AND II OF THE ACCELERATED RETRIEVAL PROJECT (ARP) | ICP/EXT-04-00389 | 01 |
| 15-MAR-05 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) APPROVAL - DEQ RESPONSE TO DEPARTMENT OF ENERGY (DOE) REQUEST TO PLACE WASTE AREA GROUP 9 (WAG-9), RELEASE SITE ANL-04, SEWAGE LAGOON IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL | 24897 | 00 |
| 09-MAR-05 | JOSTEN, N. E. | SURFACE GEOPHYSICS AND DOWNHOLE GEOPHYSICAL LOGGING RESULTS FOR THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), 2003-2004 | ICP/EXT-04-00702 | 00 |
| 07-MAR-05 | HAIN, K. E. | DEPARTMENT OF ENERGY (DOE) APPROVAL - DOE REQUEST WASTE AREA GROUP 9 (WAG-9), RELEASE SITE ANL-04, SEWAGE LAGOON, BE PLACED IN OPERABLE UNIT (OU) 10-08 FOR ADMINISTRATIVE CONTROL | FMDP-FFA/CO-05-123 | 00 |
| 01-FEB-05 | USGS | U.S. GEOLOGICAL SURVEY (USGS) REVIEW OF TRANSPORT OF SELECTED RADIONUCLIDES IN INTERIM RISK ASSESSMENT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), WASTE AREA GROUP 7 (WAG-7), OPERABLE UNIT (OU) 7-13 & 7-14, INEEL - VOLUMES I & II (VOL.01 & VOL.0 | DOE/ID-22192 | 00 |
| 18-JAN-05 | LOPEZ, S. L. | SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 EARLY ACTIONS BERYLLIUM ENCAPSULATION PROJECT | ICP/EXT-04-00646 | 01 |
| 13-DEC-04 | MCILWAIN, B. A. | DATA QUALITY OBJECTIVES (DQO) FOR THE ACCELERATED RETRIEVAL PROJECT (ARP) FOR A DESCRIBED AREA WITHIN PIT 4 | ICP/EXT-04-00515 | 01 |
| 03-NOV-04 | VERWOLF, M. C. | RESPONSE TO SEPTEMBER 23, 2004 (09/23/04) LETTER REGARDING OPERABLE UNIT (OU) 3-13 GROUP 4 TC-99 INVESTIGATION AND OU 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | FMDP-FFA/CO-04-053 | 00 |
| 30-SEP-04 | ANKENY, M. | PRELIMINARY DESIGN FOR AN ENGINEERED SURFACE BARRIER AT THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00216 | 00 |
| 30-SEP-04 | JOHNESEE, J. A. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (CUSTOMER, PROJECT, AND SYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 1 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | TFR-267 | 00 |
| 30-SEP-04 | HOLDER, R. B. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (SUBSYSTEM) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 2 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | TFR-269 | 00 |
| 30-SEP-04 | JOHNESEE, J. A. | TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - REQUIREMENTS (ASSUMPTIONS) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - ATTACHMENT 3 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | TFR-280 | 00 |
| 29-SEP-04 | BUNNELL, P. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT MEASUREMENT AND CONTROLS - ATTACHMENT 12 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-4933 | 00 |
| 29-SEP-04 | STEPHENS, D. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FOUNDATION GROUTING STUDY - ATTACHMENT 5 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5028 | 00 |
| 29-SEP-04 | CLARK, D. W. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT FIRE PROTECTION - ATTACHMENT 15 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5054 | 00 |
| 29-SEP-04 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT DELIVERY SYSTEM - ATTACHMENT 10 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5102 | 00 |
| 29-SEP-04 | GRAFF, K. E. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ELECTRICAL UTILITIES - ATTACHMENT 13 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5122 | 00 |
| 29-SEP-04 | CRAM, A. J. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT STORAGE AND MIXING - ATTACHMENT 9 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5135 | 00 |
| 29-SEP-04 | BLAKELY, B. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT FACILITIES - ATTACHMENT 11 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5144 | 00 |
| 29-SEP-04 | JENSEN, S. A. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT GROUT SELECTION BASIS - ATTACHMENT 4 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5146 | 00 |
| 29-SEP-04 | JENSEN, S. A. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUBSURFACE DISPOSAL AREA (SDA) SITE CONDITIONS - ATTACHMENT 6 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5147 | 00 |
| 29-SEP-04 | EASTMAN, R. L. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT SYSTEMS - ATTACHMENT 14 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5150 | 00 |
| 29-SEP-04 | THOMPSON, E. B. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT ENVIRONMENTAL, SAFETY, AND HEALTH (ES&H) - ATTACHMENT 17 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5152 | 00 |
| 29-SEP-04 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT HYDRAULIC EXCAVATOR AND DRILL INJECTION RIG - ATTACHMENT 7 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5153 | 00 |
| 29-SEP-04 | THOMPSON, E. B. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT OPERATIONS, MAINTENANCE, AND LOGISTICS - ATTACHMENT 8 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5155 | 00 |
| 29-SEP-04 | RAIVO, B. D. | ENGINEERING DESIGN FILE (EDF) - OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT SUPPORT VEHICLES - ATTACHMENT 16 TO ENGINEERING STUDIES REPORT - ICP/EXT-04-00525, REV.00 | EDF-5162 | 00 |
| 29-SEP-04 | SHROPSHIRE, K. L. | ENGINEERING STUDIES REPORT FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT | ICP/EXT-04-00525 | 00 |
| 16-SEP-04 | LEECASTER, M. K. | FISCAL YEAR 2004 (FY-04) GEOSTATISTICAL MODELING OF LITHOLOGIC CHARACTERISTICS IN THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | ICP/EXT-04-00494 | 00 |
| 18-AUG-04 | HOLDREN, K. J. | METHODOLOGY FOR DEVELOPING PRELIMINARY REMEDIATION GOALS FOR OPERABLE UNIT (OU) 7-13 & 7-14 SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-03-00047 | 00 |
| 17-AUG-04 | NALLA, G. | NEAR FIELD SIMULATION OF CARBON-14 AND TRITIUM MIGRATION FROM BURIED BERYLLIUM BLOCKS IN THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00321 | 00 |
| 09-AUG-04 | BLACKWOOD, L. G. | VALIDATION OF THE ROCKY FLATS PLANT RADIONUCLIDE INVENTORY IN THE HISTORIC DATA TASK USING STORED WASTE EXPERIMENTAL PILOT PLANT (SWEPP) ASSAY DATA, VOLUME 1 (VOL.01) AND VOLUME 2 (VOL.02) | ICP/EXT-04-00211 | 01 |
| 28-JUL-04 | SHAW, R. M. | DOCUMENTATION OF AGENCY CONSENSUS ON WASTE AREA GROUP 10 (WAG-10) OPERABLE UNIT (OU) 10-08 GROUNDWATER MODELING OBJECTIVES AND TRANSMITTAL OF MEETING PRESENTATION MATERIALS | EM-ER-04-167 | 00 |
| 22-JUL-04 | CLOUGH, M. K. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DRAFT CPP-603A BASIN NON TIME CRITICAL REMOVAL ACTION (NTCRA) ENGINEERING EVALUATION COST ANALYSIS (EE/CA), IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) | 24876 | 00 |
| 19-JUL-04 | SONDRUP, A. J. | ESTIMATING CARBON TETRACHLORIDE AND TOTAL VOLATILE ORGANIC COMPOUND (VOC) MASS REMAINING IN SUBSURFACE DISPOSAL AREA (SDA) PITS | ICP/EXT-04-00396 | 00 |
| 15-JUL-04 | KOCH, D. F. | DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) RESPONSE TO DEPARTMENT OF ENERGY (DOE) PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | 24871 | 00 |
| 08-JUL-04 | SNOOK, J. G. | PROPOSAL FOR SEMIANNUAL AQUIFER MONITORING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EM-ER-04-144 | 00 |
| 08-JUL-04 | LOPEZ, S. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1960 THROUGH 1993 (1960 - 1993) | INEEL/EXT-03-00997 | 01 |
| 17-JUN-04 | PETERSON, D. T. | CPP-603 ENGINEERING EVALUATION COST ANALYSIS (EE/CA) ALTERNATIVES | RRH-11-04 | 00 |
| 15-JUN-04 | ANSLEY, S. L. | UPDATED STRATIGRAPHIC SELECTIONS FOR WELLS IN THE VICINITY OF THE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-04-00207 | 00 |
| 15-JUN-04 | WHITAKER, C. A. | STRATIGRAPHIC AND GEOPHYSICAL DATA FOR WELLS IN THE VICINITY OF THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00208 | 00 |
| 10-JUN-04 | TOMLINSON, G. E. | DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES | 24881 | 00 |
| 04-JUN-04 | RASCH, D. N. | SLUDGE REMOVAL FROM THE CPP-603 BASINS | TS-ETSD-04-113 | 00 |
| 03-JUN-04 | HANSON, D. J. | EVALUATION OF THE DURABILITY OF WAXFIX FOR SUBSURFACE APPLICATIONS | ICP/EXT-04-00300 | 00 |
| 01-JUN-04 | CAHN, L. S. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOIL AND GROUNDWATER REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - APPENDIX C TO RI/FS WORK PLAN - DOE/ID-10676, REV.01 | INEEL/EXT-99-00361 | 01 |
| 01-JUN-04 | RILEY, R. G. | RECOMMENDED PARAMETER VALUES FOR IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) SOURCE RELEASE MODELING | PNNL-14742 | 00 |
| 14-MAY-04 | LUKE, D. E. | PRELIMINARY DETERMINATION OF HAZARDOUS WASTE FROM OTHER GENERATORS COLLOCATED WITH ROCKY FLATS PLANT TRANSURANIC (TRU) WASTE IN THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-01139 | 00 |
| 12-MAY-04 | MCELROY, D. L. | FISCAL YEAR 2003 (FY-03), OPERABLE UNIT (OU) 7-13 AND 7-14 ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00241 | 00 |
| 12-MAY-04 | ABBOTT, C. | HISTORICAL BACKGROUND REPORT FOR ROCKY FLATS PLANT WASTE SHIPPED TO THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) AND BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1954 THROUGH 1971 | ICP/EXT-04-00248 | 00 |
| 11-MAY-04 | BATCHELLER, T. A. | COLLOIDAL PLUTONIUM AT THE OPERABLE UNIT (OU) 7-13 AND 7-14 SUBSURFACE DISPOSAL AREA (SDA) - ESTIMATE OF INVENTORY AND TRANSPORT PROPERTIES | ICP/EXT-04-00253 | 00 |
| 21-APR-04 | KOEPPEN, L. D. | FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00259 | 01 |
| 19-APR-04 | MYERS, D. R. | FISCAL YEAR 2003 (FY-03) SUMMARY REPORT FOR THE OPERABLE UNIT (OU) 7-13 AND 7-14 PROBING PROJECT | ICP/EXT-04-00189 | 00 |
| 12-APR-04 | CARBONEAU, M. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM ARGONNE NATIONAL LABORATORY WEST (ANL-W) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 | INEEL/EXT-02-01385 | 00 |
| 09-APR-04 | ABBOTT, D. G. | FEASIBILITY STUDY (FS) PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00316 | 01 |
| 08-APR-04 | KOEPPEN, L. D. | FISCAL YEAR 2003 (FY-03) ENVIRONMENTAL MONITORING (EM) REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | ICP/EXT-04-00259 | 00 |
| 01-APR-04 | DRESEL, P. E. | EVALUATION OF XENON GAS DETECTION AS A MEANS FOR IDENTIFYING BURIED TRANSURANIC (TRU) WASTE AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC), IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) | PNNL-14617 | 00 |
| 29-MAR-04 | VAIL, J. A. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) TO THE SUBSURFACE DISPOSAL AREA (SDA) FROM 1952 THROUGH 1993 (1952 - 1993) | INEEL/EXT-03-00967 | 00 |
| 16-FEB-04 | DOORNBOS, M. H. | WHITE PAPER - BUILDING CPP-627 DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) CAN BE PERFORMED UNDER THE DEPARTMENT OF ENERGY'S (DOE) CERCLA REMOVAL ACTION AUTHORITY | 24828 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 16-FEB-04 | DOORNBOS, M. H. | APPROVAL NEEDED OF CERCLA TIME CRITICAL REMOVAL ACTION (TCRA) FOR DEACTIVATION, DECONTAMINATION AND DECOMMISSIONING (D&D&D) OF BUILDING CPP-627 AND TRANSMITTAL OF WHITE PAPER | JHV-019-04 | 00 |
| 03-FEB-04 | HULL, L. C. | SPATIAL DISTRIBUTION OF NEPTUNIUM AND URANIUM PARTITION COEFFICIENTS (KD) FOR INTERBED SEDIMENTS AT A RADIOACTIVE WASTE SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-03-00088 | 00 |
| 28-JAN-04 | ROGERS, N. K. | CONCEPTUAL DESIGN PLAN FOR OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU GROUTING (ISG) PROJECT - PHASE TWO (PHASE II OR PHASE 2) | ICP/EXT-03-00039 | 00 |
| 27-JAN-04 | ARROWOOD, J. R. | DOSE ESTIMATES FOR INTEC-603 BASIN ACTIVITIES | 24837 | 00 |
| 20-JAN-04 | OLSON, G. L. | OPERABLE UNIT (OU) 7-13 AND 7-14 FIELD REPRESENTATIVE GLOVEBOX EXCAVATOR METHOD LOGBOOK - JANUARY 20, 2004 - FEBRUARY 20, 2004 (01/20/04 - 02/20/04) - GLOVEBOX BOOK | ER-038-2004 | 00 |
| 18-DEC-03 | HALL, R. C. | DECEMBER 9, 2003 (12/09/03) AGENCY MEETING MINUTES - DECISIONS FROM ENVIRONMENTAL PROTECTION AGENCY (EPA), IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (IDEQ) AND DEPARTMENT OF ENERGY (DOE) ON WASTE AREA GROUP 3 (WAG-3) ISSUES | EM-ER-03-315 | 00 |
| 03-DEC-03 | HALL, R. C. | NOTIFICATION THAT THE DRAFT PHASE I SUMMARY REPORT FOR OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED | EM-ER-03-299 | 00 |
| 02-DEC-03 | LOPEZ, S. L. | ESTIMATED RADIOLOGICAL INVENTORY SENT FROM TEST AREA NORTH (TAN) TO THE SUBSURFACE DISPOSAL AREA (SDA) 1960 - 1993 | INEEL/EXT-03-00997 | 00 |
| 25-NOV-03 | KOZAK, M. | INDEPENDENT PEER REVIEW OF SOURCE TERM MODELING FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) SUBSURFACE DISPOSAL AREA (SDA) | ICP/EXT-03-00081 | 00 |
| 17-NOV-03 | ARROWROCK GROUP, INC. | THE IDAHO NATIONAL ENVIRONMENTAL AND ENGINEERING LABORATORY (INEEL) A HISTORICAL CONTEXT AND ASSESSMENT NARRATIVE AND INVENTORY | INEEL/EXT-97-01021 | 01 |
| 29-OCT-03 | YANCEY, N. A. | TEST PLAN FOR EVALUATION OF IN SITU THERMAL DESORPTION (ISTD) AND GROUTING TECHNOLOGIES FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-03-00059 | 00 |
| 30-SEP-03 | ROHE, M. J. | SELECTING AQUIFER WELLS FOR PLANNED GYROSCOPIC LOGGING | INEEL/EXT-02-00248 | 01 |
| 30-SEP-03 | GROENEWOLD, G. S. | TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-03-00759 | 01 |
| 29-SEP-03 | NEELEY, M. N. | CRITICALITY SAFETY EVALUATION FOR IN SITU THERMAL DESORPTION (ISTD) AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-03-00825 | 00 |
| 20-SEP-03 | ABBOTT, D. G. | PRELIMINARY DOCUMENTED SAFETY ANALYSIS (PDSA) FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00316 | 00 |
| 18-SEP-03 | GEARHEARD, M. F. | UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (U. S. EPA) REGION 10 FIVE YEAR REVIEW REPORT FOR OPERABLE UNIT (OU) 7-12 PAD-A AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | 29223 | 00 |
| 04-SEP-03 | WEBBER, F. L. | TRANSMITTAL OF WHITE PAPER - THE NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS | JMS-105-03 | 00 |
| 02-SEP-03 | BURTON, B. N. | WASTE MANAGEMENT PLAN (WMP) FOR OPERABLE UNIT (OU) 7-13 & 7-14 PREREMEDIAL DESIGN, RETRIEVED WASTE AND SOIL CHARACTERIZATION, AND ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM TESTS | INEEL/EXT-03-00554 | 00 |
| 31-AUG-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-03-00638 | 00 |
| 28-AUG-03 | BERKEY, E. | WHITE PAPER - NUMERICAL VALUE OF THE SOIL-TO-WATER PARTITION COEFFICIENT (KD) FOR PLUTONIUM AT THE INEEL - REPRESENTS AN INDEPENDENT REVIEW BY OUTSIDE INEEL SUBJECT MATTER EXPERTS | 24827 | 00 |
| 27-AUG-03 | GROENEWOLD, G. S. | TEST PLAN FOR STUDY OF OPERABLE UNIT (OU) 7-13 & 7-14 SOIL AND WASTE MATERIAL SAMPLES OBTAINED FROM OU 7-10 GLOVEBOX EXCAVATOR METHOD PROJECT | INEEL/EXT-03-00759 | 00 |
| 18-AUG-03 | GEARHEARD, M. F. | UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (U. S. EPA) REGION 10 OFFICE OF ENVIRONMENTAL CLEANUP FIVE YEAR REVIEW - INEEL SUBSURFACE DISPOSAL AREA (SDA) ORGANIC CONTAMINATION IN THE VADOSE ZONE (OCVZ) OPERABLE UNIT (OU) 7-08 | 29222 | 00 |
| 30-JUN-03 | HULL, L. C. | FATE OF MAGNESIUM CHLORIDE BRINE APPLIED TO SUPPRESS DUST FROM UNPAVED ROADS AT INEEL SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-01-01173 | 00 |
| 30-JUN-03 | GILES, J. R. | EVALUATION OF GAMMA RAY PASSIVE LOGGING TOOL CALIBRATIONS FOR TYPE A PROBES AT INEEL SUBSURFACE DISPOSAL AREA (SDA) OPERABLE UNITS (OU) 7-13 AND 7-14 | INEEL/EXT-03-00118 | 00 |
| 25-JUN-03 | JESSMORE, J. J. | CONCEPTUAL DESIGN REPORT FOR EX SITU CHEMICAL OXIDATION, REDUCTION AND STABILIZATION OF THE V-TANKS AT WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-03-00438 | 00 |
| 09-JUN-03 | ROBACK, R. C. | INITIAL REPORT AQUIFER BACKGROUND STUDY: SUMMARY OF URANIUM AND PLUTONIUM DATA FROM INEEL GROUNDWATER SAMPLES | INEEL/EXT-03-00655 | 00 |
| 06-JUN-03 | HULL, L. C. | FATE AND TRANSPORT OF PLUTONIUM AND AMERICIUM IN THE SUBSURFACE OF OU 7-13 AND 7-14 | INEEL/EXT-03-00558 | 00 |
| 02-JUN-03 | LEECASTER, M. K. | DETERMINATION OF BACKGROUND URANIUM CONCENTRATION IN THE SNAKE RIVER PLAIN AQUIFER (SRPA) UNDER THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY'S (INEEL) RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-03-00367 | 00 |
| 30-APR-03 | SENTIERI, P. J. | CRITICALITY SAFETY EVALUATION FOR IN SITU VITRIFICATION (ISV) PROCESSING AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL | INEEL/EXT-03-00207 | 00 |
| 30-APR-03 | ROBACK, R. C. | INTERIM REPORT FOR PLUTONIUM AQUIFER BACKGROUND STUDY | INEEL/EXT-03-00358 | 00 |
| 21-APR-03 | MYERS, D. R. | FISCAL YEAR 2002 (FY-02) SUMMARY REPORT FOR OPERABLE UNIT (OU) 7-13 & 7-14 PROBING PROJECT | INEEL/EXT-03-00001 | 00 |
| 03-APR-03 | TYSON, D. R. | TECHNOLOGY EVALUATION REPORT FOR THE V-TANKS, TSF-09 AND TSF-18, AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | DOE/ID-11038 | 00 |
| 01-APR-03 | RICHARDSON, J. G. | V-TANKS DECISION SUPPORT MODEL DESIGN REPORT | INEEL/EXT-02-01448 | 00 |
| 31-MAR-03 | OLSON, G. L. | FISCAL YEAR 2002 (FY-02) ENVIRONMENTAL MONITORING REPORT FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-03-00055 | 00 |
| 05-MAR-03 | HALL, R. C. | NOTIFICATION THAT A SECONDARY DOCUMENT FOR THE OPERABLE UNIT (OU) 3-14 TANK FARM SOILS AND GROUNDWATER PROJECT WILL NOT BE SUBMITTED | EM-ER-03-065 | 00 |
| 04-MAR-03 | BOWHAN, B. R. | RESOLUTION OF DISPUTE - FINAL FULLY EXECUTED ORIGINAL COPY OF AGREEMENT TO RESOLVE DISPUTE FOR WASTE AREA GROUP 3 (WAG-3) OPERABLE UNIT (OU) 3-13 | OCC-03-025 | 00 |
| 01-MAR-03 | MULLEN, C. K. | BERYLLIUM WASTE TRANSURANIC (TRU) INVENTORY IN THE SUBSURFACE DISPOSAL AREA (SDA), OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-01678 | 02 |
| 12-FEB-03 | SENTIERI, P. J. | CRITICALITY SAFETY STUDY OF SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-01-01294 | 01 |
| 09-JAN-03 | MCELROY, D. L. | ADVANCED TENSIOMETER MONITORING RESULTS FROM THE DEEP VADOSE ZONE AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | INEEL/EXT-02-01276 | 00 |
| 19-DEC-02 | JOSTEN, N. E. | COMPILATION OF ANALYTICAL NOTES AND DATA ANALYSES FOR THE INTEGRATED PROBING PROJECT (IPP) 1999 - 2002 | INEEL/EXT-02-01306 | 00 |
| 25-NOV-02 | MCDANNEL, G. E. | PRECONCEPTUAL DESIGNS OF VARIOUS ALTERNATIVES FOR V-TANKS TSF-09 AND TSF-18 AT WASTE AREA GROUP 1 (WAG-1) OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01310 | 00 |
| 29-OCT-02 | SHAW, R. M. | TRANSMITTAL OF TECHNICAL SUPPORT FACILITY-06 (TSF-06) AND TECHNICAL SUPPORT FACILITY-26 (TSF-26) CALENDAR YEAR 2000 (CY-2000) SAMPLING AND REMEDIATION SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | EM-ER-02-185 | 00 |
| 23-OCT-02 | LITTLE, M. | A COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) INEEL RWMC DURING THE YEARS OF 1984 TO 2003 - SUPPLEMENTAL VOLUME 1 AND 2 (VOL.01 & VOL.02) | INEL-95/0135-SUPPL | 00 |
| 17-OCT-02 | MCDANNEL, G. E. | TECHNICAL SUPPORT FACILITY-06 (TSF-06) AND TECHNICAL SUPPORT FACILITY-26 (TSF-26) CALENDAR YEAR 2000 (CY-2000) SAMPLING AND REMEDIATION SUMMARY REPORT FOR WASTE AREA GROUP 1 (WAG-1), OPERABLE UNIT (OU) 1-10 | INEEL/EXT-02-01135 | 00 |
| 27-SEP-02 | HOLDREN, K. J. | ANCILLARY BASIS FOR RISK ANALYSIS OF SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-02-01125 | 00 |
| 01-AUG-02 | INEEL COMMUNITY RELATIONS | A COMMUNITY RELATIONS PLAN UPDATE FACT SHEET - NEW ALTERNATIVES CONSIDERED FOR V-TANKS AT WASTE AREA GROUP 1 (WAG-1) | 24747 | 00 |
| 01-AUG-02 | SMITH, R. P. | VARIABILITY OF THE AQUIFER THICKNESS BENEATH THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) - ATTACHMENT TO DOE/ID-10902 | INEEL/EXT-02-01022 | 00 |
| 10-JUL-02 | MCDANNEL, G. E. | TRANSMITTAL OF THE TECHNOLOGY EVALUATION SCOPE OF WORK FOR THE V-TANKS, TECHNICAL SUPPORT FACILITY 09 AND 18 (TSF-09 & TSF-18) FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-10 | DKJ-141-02 | 00 |
| 10-JUL-02 | SHAW, R. M. | TRANSMITTAL OF TECHNOLOGY EVALUATION SCOPE OF WORK FOR THE V-TANKS, TECHNICAL SUPPORT FACILITY 09 AND 18 (TSF-09 & TSF-18), FOR THE TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-10 | EM-ER-02-116 | 00 |
| 18-APR-02 | SHAW, R. M. | REQUEST FOR CONCURRENCE WITH V-TANKS PATH FORWARD | EM-ER-02-058 | 00 |
| 17-APR-02 | THOMPSON, E. R. | HISTORICAL DESCRIPTION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) SURROGATE BURIED WASTE TEST PITS FOR ENVIRONMENTAL RESTORATION (ER) WASTE AREA GROUP 7 (WAG-7) OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-2000-00785 | 01 |
| 15-APR-02 | LEECASTER, M. K. | GEOSTATISTIC MODELING OF SUBSURFACE CHARACTERISTICS IN RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) REGION, OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-02-00029 | 00 |
| 15-MAR-02 | SENTIERI, P. J. | CRITICALITY SAFETY STUDY OF THE SUBSURFACE DISPOSAL AREA (SDA) FOR OPERABLE UNIT (OU) 7-13 & 7-14 | INEEL/EXT-01-01294 | 00 |
| 14-MAR-02 | HAIN, K. E. | CONCURRENCE WITH V-TANKS PATH FORWARD | EM-ER-02-040 | 00 |
| 04-MAR-02 | JANTZ, A. E. | RECOMMENDED PATH FORWARD FOR OPERABLE UNIT (OU) 1-10 V-TANKS REMEDIAL ACTION (RA) | DKJ-42-02 | 00 |
| 29-NOV-01 | O'NEILL, K. C. | TRANSMITTAL OF FINAL CLEMSON SORPTION STUDY REPORT AND LONG TERM CORROSION DEGRADATION TEST THIRD (3RD) YEAR RESULTS | EM-ER-01-197 | 00 |
| 21-SEP-01 | ADLER-FLITTON, M. K. | LONG TERM CORROSION & DEGRADATION TEST THIRD (3RD) YEAR RESULTS | INEEL/EXT-01-00036 | 00 |
| 27-AUG-01 | HAIN, K. E. | PATH FORWARD FOR IN SITU VITRIFICATION (ISV) EVALUATION IN OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | EM-ER-01-141 | 00 |
| 22-AUG-01 | DICK, J. R. | NITRATE EXPLOSIVES TESTS TO SUPPORT THE OPERABLE UNIT (OU) 7-13 AND 7-14 IN SITU VITRIFICATION (ISV) PROJECT | INEEL/EXT-01-00265 | 00 |
| 28-JUN-01 | PIERRE, W. | POTENTIAL APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) OPERABLE UNIT (OU) 7-13 AND 7-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 24900 | 00 |
| 01-JUN-01 | GROSSMAN, C. J. | THE SORPTION OF SELECTED RADIONUCLIDES IN SEDIMENTARY INTERBED SOILS FROM THE SNAKE RIVER PLAIN | INEEL/EXT-01-01106 | 00 |
| 04-APR-01 | HULL, L. C. | APPROACH TO SIMULATION OF ACTINIDES FOR OPERABLE UNIT (OU) 7-13 7-14 BASELINE RISK ASSESSMENT (BRA) | LCH-04-01 | 00 |
| 03-APR-01 | DREHER, K. J. | INJECTION OF AMENDMENTS AND TREATED GROUNDWATER INTO THE EASTERN SNAKE PLAIN AQUIFER (ESPA) IN SUPPORT OF REMEDIAL ACTIONS (RA) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B, INEEL | 10941 | 00 |
| 01-APR-01 | WHITMIRE, D. L. | SUMMARY REPORT - SIMULATION OF GROUNDWATER FLOW NEAR SUBSURFACE DISPOSAL AREA (SDA) AT IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY (INEEL) | INEEL/EXT-01-01643 | 00 |
| 15-MAR-01 | BRADLEY, T. M. | NAVAL NUCLEAR PROPULSION PROGRAM - RADIOLOGICAL INVENTORY OF WASTE DISPOSED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) - RESPONSE TO QUESTIONS CONCERNING POTENTIAL DATA GAPS FOR NAVAL REACTORS FACILITY (NRF) WASTE DISPOSED AT THE RWMC | NR:IBO-01/039 | 00 |
| 02-JAN-01 | WYMORE, R. A. | SITE CONCEPTUAL MODEL: 1998 AND 1999 ACTIVITIES, DATA ANALYSIS, AND INTERPRETATION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-2000-00188 | 00 |
| 21-DEC-00 | FJELD, R. A. | FINAL REPORT - COLUMN TESTS TO STUDY TRANSPORT OF PLUTONIUM AND OTHER RADIONUCLIDES IN SEDIMENTARY INTERBED AT INEEL | INEEL/EXT-01-00763 | 00 |
| 20-DEC-00 | HAMPTON, N. L. | REVIEW OF WASTE AREA GROUP 7 (WAG-7) ECOLOGICAL CONTAMINANTS OF POTENTIAL CONCERN | INEEL/EXT-2000-01405 | 00 |
| 20-DEC-00 | FORSYTHE, H. S. | WASTE MANAGEMENT PLAN (WMP) FOR THE PHASE I OPERABLE UNIT (OU) 3-14 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | INEEL/EXT-99-00361 | 00 |
| 05-DEC-00 | SCHWIND, P. J. | DEVELOPMENT OF A NUMERICAL MODEL WITH PHYSICALLY BASED VERTICAL DISCRETIZATION TO SUPPORT IN SITU BIOREMEDIATION (ISB) FIELD EVALUATION AT TEST AREA NORTH (TAN) | INEEL/EXT-98-00367 | 00 |
| 05-DEC-00 | SONDRUP, A. J. | IN SITU BIOREMEDIATION (ISB) MODELING REPORT FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00418 | 00 |
| 01-DEC-00 | MCNEIL TECHNOLOGIES, INC. | ANALYSIS OF THE ENVIRONMENTAL PROTECTION AGENCY'S (EPA) RECORDS OF DECISION (ROD) RELATED TO LANDFILLS | 21310 | 00 |
| 17-NOV-00 | NELSON, L. O. | NO LONGER CONTAINED IN (NLCI) REQUEST FOR NEW PUMP AND TREAT FACILITY (NPTF) | FLS-796-00 | 00 |
| 14-NOV-00 | BARNES, J. M. | MICROBIAL STUDIES SUPPORTING IMPLEMENTATION OF IN SITU BIOREMEDIATION (ISB) AT TEST AREA NORTH (TAN) | INEEL/EXT-98-00474 | 00 |
| 01-NOV-00 | CHOPPIN, G. R. | ACTINIDE SOLUBILITY EXPERIMENTS IN INEEL PERCHED SIMULANT SOLUTION FINAL REPORT | INEEL/EXT-01-00762 | 00 |
| 01-NOV-00 | ROBACK, R. C. | ASSESSMENT OF URANIUM AND PLUTONIUM IN SATURATED AND UNSATURATED ZONES BENEATH THE SUBSURFACE DISPOSAL AREA (SDA), INEEL | INEEL/EXT-01-00771 | 00 |
| 26-OCT-00 | HULL, L. C. | TEST PLAN TO MEASURE ADSORPTION OF ACTINIDES ON INTERBED MATERIALS FROM RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | DOE/ID-10796 | 00 |
| 28-SEP-00 | BEITEL, G. A. | EVALUATION OF OPERABLE UNIT (OU) 7-10 STAGE I SOIL MOISTURE READINGS - OU 7-10 STAGED INTERIM ACTION (SIA) PROJECT STAGE I | INEEL/EXT-2000-00651 | 00 |
| 21-SEP-00 | ADLER-FLITTON, M. K. | LONG TERM CORROSION DEGRADATION (LTCD) TEST FIRST (1ST) YEAR RESULTS | INEEL/EXT-99-00678 | 00 |
| 01-SEP-00 | CASE, M. J. | TECHNICAL REVISION OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) LOW LEVEL WASTE (LLW) RADIOLOGICAL PERFORMANCE ASSESSMENT FOR CALENDAR YEAR 2000 (CY-2000) | INEEL/EXT-2000-01089 | 00 |
| 01-AUG-00 | SLATE, L. J. | PRELIMINARY CRITICALITY SAFETY EVALUATION FOR IN SITU GROUTING (ISG) IN SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-2000-00794 | 00 |
| 18-JUL-00 | BAUMER, A. R. | OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION, LOGGING & MONITORING OF PROBEHOLES IN THE SUBSURFACE DISPOSAL AREA (SDA) | INEEL/EXT-98-00856 | 01 |
| 05-JUN-00 | GUYMON, R. H. | POSITION ON NO LONGER CONTAINED IN (NLCI) REQUIREMENTS FOR THREE (3) NEW WELLS AT TEST AREA NORTH (TAN), OPERABLE UNIT (OU) 1-07B - DE-AC07-991D1327 | RHG-83-00 | 00 |
| 11-MAY-00 | FITCH, D. R. | INSTITUTIONAL CONTROL STATUS REPORT FOR TEST AREA NORTH (TAN) WASTE AREA GROUP 1 (WAG-1) | DOE/ID-10750 | 00 |
| 11-MAY-00 | MONTGOMERY, R. A. | REQUEST FOR A NO LONGER CONTAINED IN (NLCI) DETERMINATION (NLCID) FOR WELL DRILLING WATER, DRILL CUTTINGS, & SECONDARY CONTAINMENT PADS FOR OPERABLE UNIT (OU) 1-07B | RHG-71-00 | 00 |
| 10-MAY-00 | RASCH, D. N. | IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) AS ONE WASTE MANAGEMENT UNIT FOR CLOSURES AND DEMONSTRATING COMPLIANCE WITH DRINKING WATER STANDARDS | TS-ESTD-00-085 | 00 |
| 01-APR-00 | HULL, L. C. | SOLUBILITY CALCULATIONS FOR CONTAMINANTS OF POTENTIAL CONCERN, OPERABLE UNIT (OU) 7-13 AND 7-14 | INEEL/EXT-2000-00465 | 00 |
| 29-FEB-00 | GREEN, T. S. | ENVIRONMENTAL RESTORATION (ER) PLAN - DOWNHOLE LOGGING | PLN-493 | 04 |
| 26-JAN-00 | BUKOWSKI, J. M. | FISCAL YEAR 1999 (FY-99) GROUNDWATER MONITORING ANNUAL REPORT FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-99-01255 | 00 |
| 23-DEC-99 | BAUMER, A. R. | ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - DECEMBER 23, 1999 - JANUARY 12, 2000 (12/23/99 - 1/12/2000) | ER-122-99 | 00 |
| 17-DEC-99 | BAUMER, A. R. | ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - WELL #SOUTH MON-A-010 - RWMC SDA - TSA DRILLING - DECEMBER 17, 1999 - JANUARY 13, 2000 (12/17/99 - 01/13/2000) | ER-123-99 | 00 |
| 15-DEC-99 | ARMSTRONG, A. | OPERABLE UNIT (OU) 7-13 & 7-14 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - COMBINATION OF OPERABLE UNITS (OUS) 13 AND 14 | OPE-ER-198-99 | 00 |
| 18-NOV-99 | SHAW, R. M. | INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR TAN OPERABLE UNIT (OU) 1-10 - INDEX OF SAMPLING DATA DOCUMENTS | 10802 | 00 |
| 18-NOV-99 | NOT SPECIFIED | SPERT II AIR COMPRESSOR - ELECTRONIC NOTES REGARDING LOCATION | 10803 | 00 |
| 18-NOV-99 | ROSE, K. A. | IDHW CONCURRENCE WITH HAZARDOUS WASTE DETERMINATION (HWD) FOR ARA-I BUILDING ARA-626 HOT CELLS 1 AND 2 CONCRETE FLOORS AND SOILS BENEATH THE FLOORS | 10804 | 00 |
| 27-OCT-99 | JORGENSEN, D. K. | ENVIRONMENTAL RESTORATION (ER) DEPARTMENT DRILLING LOGBOOK - RWMC SDA - TSA DRILLING - OCTOBER 27, 1999 - DECEMBER 23, 1999 (10/27/99 - 12/23/99) | ER-100-99 | 00 |
| 01-OCT-99 | ROTHERMEL, J. S. | PHASE C REMEDIAL ACTION WORK PLAN (RAWP) FOR TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10679 | 00 |
| 01-OCT-99 | ROTHERMEL, J. S. | PHASE C GROUNDWATER MONITORING PLAN (GMP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-99-00021 | 00 |
| 20-SEP-99 | JENKINS, T. W. | INCLUSION OF DOCUMENTS INTO THE ADMINISTRATIVE RECORD (AR) FOR IDAHO NUCLEAR TECHNOLOGY AND ENGINEERING CENTER (INTEC) OPERABLE UNIT (OU) 3-13 - INDEX OF SAMPLING DATA DOCUMENTS | 10707 | 00 |
| 02-SEP-99 | HATHAWAY, C. | TRANSMITTAL OF LIMITATIONS & VALIDATION (L&V) REPORTS FOR OPERABLE UNIT (OU) 4-13 CFA SEWAGE TREATMENT PLANT - SITE CFA-08 | OPE-ER-122-99 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 16-JUL-99 | MCCORMICK, S. H. | HAZARDOUS WASTE DETERMINATION (HWD) FOR WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) CFA-04 POND SAMPLES | 10797 | 00 |
| 16-JUL-99 | MCCORMICK, S. H. | HAZARDOUS WASTE DETERMINATION (HWD) FOR WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-13 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) GROUNDWATER SAMPLES | 10798 | 00 |
| 01-JUL-99 | PINZEL, M. | HAZARDOUS WASTE DETERMINATION (HWD) FOR WASTE AREA GROUP 4 (WAG-4) CFA-08 SEWAGE TREATMENT PLANT VALIDATION SAMPLING & ANALYSIS | 10796 | 00 |
| 01-JUN-99 | WAGNER, E. P. | PROCESS DESCRIPTION AND OPERATING HISTORY FOR CPP-601, CPP-604 AND CPP-627 FUEL REPROCESSING COMPLEX AT INEEL | INEEL/EXT-99-00400 | 00 |
| 01-MAY-99 | HOLDREN, K. J. | OPERABLE UNIT (OU) 7-13 & 7-14 PLAN FOR INSTALLATION & LOGGING OF PROBEHOLES IN PITS 4 & 10 OF SDA | INEEL/EXT-98-00856 | 00 |
| 01-MAY-99 | BUKOWSKI, J. M. | FISCAL YEAR 1999 (FY-99) & 2000 (FY-2000) GROUNDWATER MONITORING PLAN (GMP) TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-99-00359 | 00 |
| 22-APR-99 | NICKLAUS, D. | HAZARDOUS WASTE DETERMINATION (HWD) FOR ARA-I BUILDING ARA-626 HOT CELLS 1 AND 2 CONCRETE FLOORS AND SOILS BENEATH THE FLOORS | 10805 | 00 |
| 14-APR-99 | GREENWELL, R. D. | SOIL RESTORATION DEPARTMENT MANAGEMENT ASSESSMENT OF WAG-3 CERCLA RADIOLOGICAL MANAGEMENT AREA (RMA) & STORAGE YARD | RDG-03-99 | 00 |
| 06-APR-99 | JONES, R. K. | HAZARDOUS WASTE DETERMINATION (HWD) FOR WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-13 REMEDIAL INVESTIGATION & FEASIBILITY STUDY (RI/FS) CFA-04 POND SAMPLES | 17202 | 00 |
| 01-APR-99 | DOE | REMEDIATION PLANS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEEL - REVISION 1 (REV.01) - REVISION 8 (REV.08) WERE DRAFTS - REVISION 9 (REV.09) WAS ISSUED AS THE FIRST FINAL DOCUMENT | DOE/ID-10670 | 09 |
| 01-APR-99 | STARR, R. C. | LABORATORY EVALUATION OF IN SITU CHEMICAL OXIDATION (ISCO) FOR GROUNDWATER REMEDIATION, TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B, INEEL | ORNL/TM-13711 | 00 |
| 01-JAN-99 | MARTIAN, P. | NUMERICAL MODELING SUPPORT OF NATURAL ATTENUATION FIELD EVALUATION FOR TRICHLOROETHENE (TCE) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B AT INEEL | INEEL/EXT-97-01284 | 01 |
| 04-NOV-98 | MCCORMICK, S. H. | HAZARDOUS WASTE DETERMINATION (HWD) - WASTE AREA GROUP 4 (WAG-4) OPERABLE UNIT (OU) 4-05 SITES CFA-17 & CFA-47 CENTRAL FACILITIES AREA (CFA) 1997 NON TIME CRITICAL REMOVAL ACTION (NTCRA) | 10557 | 00 |
| 21-SEP-98 | CHAMBERS, R. | MULTI-AGENCY RADIATION SURVEY & SITE INVESTIGATION MANUAL (MARSSIM) INVESTIGATION FOR CPP-709 RADIONUCLIDES | RC-10-98 | 00 |
| 01-AUG-98 | BUKOWSKI, J. M. | SITE CONCEPTUAL MODEL 1997 ACTIVITIES, DATA ANALYSIS AND INTERPRETATION FOR TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-98-00575 | 00 |
| 24-MAR-98 | HATHAWAY, C. | CENTRAL FACILITIES AREA (CFA) SEWAGE TREATMENT PLANT (STP) DEMOLITION | OPE-ER-47-98 | 00 |
| 01-FEB-98 | BUKOWSKI, J. M. | SITE CONCEPTUAL MODEL: 1996 ACTIVITIES DATA ANALYSIS & INTERPRETATION TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEL/EXT-97-00556 | 00 |
| 01-JAN-98 | JANTZ, A. E. | WELL CHARACTERIZATION & EVALUATION (WCE) REPORT SUPPORTING FUNCTIONAL & OPERATIONAL REQUIREMENTS (F&OR) FOR NEW PUMP AND TREAT FACILITY (NPTF) AT TEST AREA NORTH (TAN) OPERABLE UNIT (OU) 1-07B | INEEL/EXT-97-01356 | 00 |
| 04-NOV-97 | KOSHUTA, C. R. | TRA LISTED WASTE DETERMINATION REPORT | CRK-92-97 | 00 |
| 01-SEP-97 | NOT SPECIFIED | HOT SPOT REMOVAL SYSTEM - SYSTEM DESCRIPTION | INEEL/EXT-97-00666 | 00 |
| 01-AUG-97 | JONES, R. K. | INFORMATION REGARDING CFA-677 PUMPHOUSE | 10560 | 00 |
| 01-AUG-97 | ROTHERMEL, J. S. | REMEDIAL DESIGN REMEDIAL ACTION (RD/RA) SCOPE OF WORK (SOW) TEST AREA NORTH (TAN) FINAL GROUNDWATER REMEDIATION OPERABLE UNIT (OU) 1-07B | DOE/ID-10522 | 05 |
| 08-JUL-97 | FALCONER, K. L. | LISTING CODES APPLICABLE TO DISPOSITION OF INVESTIGATION DERIVED WASTE (IDW) ORIGINATING FROM IDAHO CHEMICAL PROCESSING PLANT (ICPP) | KLF-150-97 | 00 |
| 01-JUL-97 | REESE, C. L. | DECONTAMINATION PLAN FOR CONTAMINATED EQUIPMENT AT CERCLA OU 1-08 AND 4-05 MERCURY RETORTING | INEL/EXT-97-00503 | 01 |
| 01-JUN-97 | THIEL, T. N. | D&D OF ARMY REENTRY VEHICLE FACILITY STATION (ARVFS) BUNKER B17-702 FINAL REPORT | INEL/EXT-97-00469 | 00 |
| 27-MAY-97 | RODMAN, G. R. | FINAL REPORT - D&D OF BORAX V REACTOR BUILDING | INEL-96/0325 | 00 |
| 06-MAY-97 | JORGENSEN, M. D. | LMITCO HAZARDOUS WASTE DETERMINATION (HWD) - CENTRAL FACILITIES AREA (CFA) SEWAGE TREATMENT PLANT (STP) DECONTAMINATION & DISMANTLEMENT (D&D) OPERABLE UNIT (OU) 4-13 SAMPLING & REMOVAL ACTION ACTIVITIES | 13967 | 00 |
| 06-MAY-97 | JORGENSEN, M. D. | HAZARDOUS WASTE DETERMINATION (HWD) FOR CENTRAL FACILITIES AREA (CFA) SEWAGE TREATMENT PLANT DECONTAMINATION & DISMANTLEMENT (D&D) OPERABLE UNIT (OU) 4-13 SAMPLING & REMOVAL ACTION ACTIVITIES | 14089 | 00 |
| 06-MAY-97 | JORGENSEN, M. D. | HAZARDOUS WASTE DETERMINATION (HWD) - CENTRAL FACILITIES AREA (CFA) SEWAGE TREATMENT PLANT (STP) | 16175 | 00 |
| 01-MAY-97 | BLACKMORE, C. S. | BORAX V FACILITY SITE POST DECONTAMINATION & DISMANTLEMENT (D&D) CHARACTERIZATION REPORT | INEL-96/0464 | 00 |
| 24-APR-97 | JESSMORE, P. J. | HAZARDOUS WASTE DETERMINATION (HWD) RECORD - WASTE GENERATED DURING SAMPLING OF CFA-04 POND IN SUPPORT OF OPERABLE UNIT (OU) 4-13 COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) | 13980 | 00 |
| 21-MAR-97 | GROENEWOLD, G. S. | SCOPING STUDIES TO IDENTIFY FORMS OF MERCURY IN ACID PIT SOIL SAMPLES | GSG-10-97 | 00 |
| 20-MAR-97 | GREENWELL, R. D. | WASTE AREA GROUP 3 (WAG-3) CORE SAMPLES | RDG-03-97 | 00 |
| 12-MAR-97 | PIPER, J. H. | APPROVED ENVIRONMENTAL CHECKLIST (EC) - CENTRAL FACILITIES AREA (CFA) WASTE AREA GROUP 4 (WAG-4) COMPREHENSIVE REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) - CFA-97-003 | CFA-97-003EC | 00 |
| 01-MAR-97 | SCIENTECH, INC. | LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES | 18156 | 00 |
| 01-MAR-97 | SCIENTECH, INC. | REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 1 (VOL.01) OF 3 | 18157 | 00 |
| 01-MAR-97 | SCIENTECH, INC. | REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 2 (VOL.02) OF 3 | 18158 | 00 |
| 01-MAR-97 | SCIENTECH, INC. | REFERENCES - LETTER REPORT FOR UNEXPLODED ORDNANCE & ORDNANCE EXPLOSIVES CLEANUP AT GOVERNMENT & COMMERCIAL FACILITIES - VOLUME 3 (VOL.03) OF 3 | 18159 | 00 |
| 02-DEC-96 | COTTEN, G. B. | SUMMARY REPORT FOR OPERABLE UNIT (OU) 10-06 RADIONUCLIDE CONTAMINATED SOILS REMOVAL | 10562 | 00 |
| 13-NOV-96 | KENOYER, D. J. | TRANSITION OF RADIOLOGICALLY CONTAMINATED SURPLUS FACILITIES FROM EM-60 TO EM-40 | DJK-09-96-A | 00 |
| 04-SEP-96 | RICE, R. S. | CLOSURE REPORT FOR SAMPLING OF TRA COLD WASTE POND; EMS-010-96 | RSR-79-96 | 00 |
| 01-SEP-96 | ROOD, S. M. | EXECUTIVE SUMMARY FOR BACKGROUND DOSE EQUIVALENT RATES & SURFICIAL SOIL METAL & RADIONUCLIDE CONCENTRATIONS FOR INEL | INEL-94/0250(EXECSUM) | 01 |
| 01-AUG-96 | HARRIS, G. A. | BACKGROUND DOSE EQUIVALENT RATES & SURFICIAL SOIL METAL & RADIONUCLIDE CONCENTRATIONS FOR INEL | INEL-94/0250 | 01 |
| 01-MAY-96 | BURNS, D. E. | WHITE PAPER ON FOOD CROP INGESTION EXPOSURE ROUTE | INEL-95/0275 | 02 |
| 01-MAY-96 | SORENSON, K. S. | TEST AREA NORTH (TAN) SITE CONCEPTUAL MODEL & PROPOSED HYDROGEOLOGIC STUDIES OPERABLE UNIT (OU) 1-07B | INEL-96/0105 | 00 |
| 18-APR-96 | DUDZIAK, A. J. | OV NOTE - PLACE OPERABLE UNIT (OU) 4-09 TRACK 2 SUMMARY REPORT INTO ADMINISTRATIVE RECORD (AR) (ALSO 4-03 & 4-07) ALONG WITH COPY OF THIS NOTE | 10273 | 00 |
| 01-APR-96 | HOLDREN, K. J. | TECHNICAL MEMORANDUM: CONTAINMENT OPTIONS FOR BORAX-09 | INEL-95/0490 | 00 |
| 14-DEC-95 | GREEN, L. A. | TECHNICAL MEMORANDUM ASSESSMENT OF SURFACE SOILS SURROUNDING THE SL-1 BURIAL GROUND | OPE-ER-228-95 | 00 |
| 07-DEC-95 | JINES, A. | AUXILIARY REACTOR AREA (ARA) WINDBLOWN SOILS EVALUATION | OPE-ER-225-95 | 00 |
| 01-DEC-95 | RAVIO, B. D. | WASTE DESCRIPTION INFORMATION FOR TRANSURANICALLY CONTAMINATED WASTES STORED AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | INEL-95/0412 | 00 |
| 23-OCT-95 | BURNS, S. M. | ASSESSMENT OF EXPERIMENTAL BREEDER REACTOR 04 (EBR-04) SEPTIC TANK EXCAVATION | 10843 | 00 |
| 23-OCT-95 | JENKINS, T. W. | DISPOSAL OF DRILL CUTTINGS FOR MONITORING WELL 18 (MW-18) | 18017 | 00 |
| 10-OCT-95 | JORGENSEN, D. K. | CHANGE IN TITLE & NAME OF DRAFT OU 10-06 REMEDIAL INVESTIGATION FEASIBILITY STUDY (RI/FS) FOR PLACEMENT INTO ADMINISTRATIVE RECORD (AR) | DKJ-13-95 | 00 |
| 20-SEP-95 | JINES, A. | ASSESSMENT OF RISK FROM EXTERNAL EXPOSURE TO RADIATION FROM CONTAMINATION BROUGHT TO SURFACE BY BIOLOGICAL ACTIVITY AT SL-1 AND BORAX I SITES | OPE-ER-177-95 | 00 |
| 13-SEP-95 | GREEN, L. A. | TRANSMITTAL OF VARIOUS DOCUMENTS FOR OU 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) | OPE-ER-187-95 | 00 |
| 12-SEP-95 | GREEN, L. A. | TRANSMITTAL OF VARIOUS DOCUMENTS FOR OPERABLE UNITS (OU) 5-05 AND 6-01 (SL-1 AND BORAX I BURIAL GROUNDS) | OPE-ER0-172-95 | 00 |
| 01-SEP-95 | HOLDREN, K. J. | ASSESSMENT OF SURFACE SOILS SURROUNDING SL-1 BURIAL GROUNDS | 10137 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | SUPPORT DOCUMENTATION: ESTIMATION OF URANIUM-235 SURFACE SOIL CONCENTRATIONS BASED ON MASS UNRECOVERED AT BORAX I BURIAL GROUNDS | 10133 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | SUPPORT DOCUMENTATION; ANNUAL DOSE CALCULATIONS FOR SELECTED SCENARIOS AT SL-1 AND BORAX I BURIAL GROUNDS | 10135 | 00 |
| 30-AUG-95 | FILEMYR, R. G. | SL-1 & BORAX I CLASS C WASTE EQUIVALENCY DETERMINATION | 10136 | 00 |
| 01-AUG-95 | LITCO | A COMPREHENSIVE INVENTORY OF RADIOLOGICAL & NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN SDA OF INEL RWMC DURING YEARS 1984 - 2003, VOL.01 | INEL-95/0135,VOL.01 | 01 |
| 01-AUG-95 | LITCO | A COMPREHENSIVE INVENTORY OF RADIOLOGICAL & NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN SDA OF INEL RWMC DURING YEARS 1984 - 2003, VOL.02 | INEL-95/0135,VOL.02 | 01 |
| 01-AUG-95 | LITCO | A COMPREHENSIVE INVENTORY OF RADIOLOGICAL & NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED OR PROJECTED TO BE BURIED IN SDA OF INEL RWMC DURING YEARS 1984 - 2003, VOL.03 | INEL-95/0135,VOL.03 | 01 |
| 01-AUG-95 | LITCO | COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS ON WASTE BURIED SUBSURFACE DISPOSAL AREA (SDA) INEL RWMC DURING YEARS 1952 - 1983, VOL.01 - FORMERLY EGG-WM-10903 | INEL-95/0310,VOL.01 | 01 |
| 01-AUG-95 | LITCO | COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN SUBSURFACE DISPOSAL AREA (SDA) OF INEL RWMC DURING YEARS 1952 - 1983, VOL.02 | INEL-95/0310,VOL.02 | 01 |
| 01-AUG-95 | LITCO | COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN SUBSURFACE DISPOSAL AREA (SDA) INEL RWMC DURING YEARS 1952 - 1983, VOL.03 | INEL-95/0310,VOL.03 | 01 |
| 01-AUG-95 | LITCO | COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN THE SUBSURFACE DISPOSAL AREA (SDA) INEL RWMC DURING THE YEARS 1952 - 1983, VOL.04 | INEL-95/0310,VOL.04 | 01 |
| 01-AUG-95 | LITCO | COMPREHENSIVE INVENTORY OF RADIOLOGICAL AND NONRADIOLOGICAL CONTAMINANTS IN WASTE BURIED IN SUBSURFACE DISPOSAL AREA (SDA) OF INEL RWMC DURING YEARS 1952 - 1983, VOL.05 | INEL-95/0310,VOL.05 | 01 |
| 15-MAY-95 | RAUNIG, D. E. | WAG-3 INVESTIGATION DERIVED WASTE (IDW) AQUIFER WELL PURGE WATER | KLF-159-95 | 00 |
| 09-MAY-95 | BURNS, D. E. | GUIDANCE PROTOCOL FOR THE PERFORMANCE OF CUMULATIVE RISK ASSESSMENTS AT THE INEL | INEL-95/131 | 00 |
| 04-MAY-95 | DOE, EPA, IDHW | ACTION DETERMINATION FOR WAG-10 OU 10-06 RADIONUCLIDE CONTAMINATED SOIL SITES | 10016 | 00 |
| 24-APR-95 | BURNS, D. E. | SUMMARY REPORT FOR REMOVAL OF TEST AREA NORTH 603 (TAN-603) FRENCH DRAINS - TSF-36 | INEL-95/0065 | 00 |
| 02-DEC-94 | VETTER, D. W. | RECORD OF MEETING WITH CRAIG KVAMME, LITCO, REGARDING BASIS FOR RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) DISPOSAL COSTS | 10027 | 00 |
| 29-NOV-94 | DUDZIAK, A. J. | TRANSMITTAL OF TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-05 | OPE-ER-311-94 | 00 |
| 22-NOV-94 | DUDZIAK, A. J. | TRANSMITTAL OF FOURTH (4TH) OF FOUR (4) TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-09 FOR REVIEW | OPE-ER-305-94 | 00 |
| 26-OCT-94 | GREEN, L. A. | TRANSMITTAL OF DRAFT TRACK 2 PRELIMINARY SCOPING PACKAGES FOR OPERABLE UNIT (OU) 4-09 | OPE-ER-286-94 | 00 |
| 15-JUL-94 | BURNS, S. M. | IDAHO DEPARTMENT OF HEALTH & WELFARE (IDHW) REQUEST FOR IDAHO CHEMICAL PROCESSING PLANT (ICPP) STACK EMISSIONS DATA | SMB-05-94 | 00 |
| 06-JUL-94 | HOLDREN, K. J. | INTERVIEWS WITH DARRELL HANNI REGARDING THE STATIONARY LOW POWER REACTOR SL-1 BURIAL GROUND | KJH-09-94 | 00 |
| 01-MAY-94 | DOE | COMPREHENSIVE WELL SURVEY FOR INEL VOLUME II (VOL.02), REVISION 3 (REV.03) - EXPERIMENTAL BREEDER REACTOR (EBR) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DOE/ID-10402,VOL.02 | 03 |
| 15-APR-94 | MEADOWS, D. | RECORD OF MEETING WITH ROGER WILHELMSON, EG&G IDAHO REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) | 10024 | 00 |
| 14-APR-94 | MEADOWS, D. | RECORD OF MEETING WITH EDDY CHEW, DEPARTMENT OF ENERGY (DOE) IDAHO, REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND - PIPES | 10025 | 00 |
| 14-APR-94 | HOLDREN, K. J. | MEMO OF CONVERSATION WITH RICHARD GREEN REGARDING PIPES IN STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | 10028 | 00 |
| 28-FEB-94 | WINCO | BACKGROUND CONCENTRATIONS OF SELECTED METALS & RADIONUCLIDES IN BIG LOST RIVER ALLUVIUM AT ICPP, REVISION 1 (REV.01) | 14143 | 00 |
| 17-FEB-94 | TUCKER, J. | RECORD OF MEETING WITH DICK MESERVEY, EG&G IDAHO REGARDING BOILING WATER REACTOR EXPERIMENT (BORAX) I | 10023 | 00 |
| 16-FEB-94 | VANDERPOEL, G. | RECORD OF MEETING WITH ROGER G. JENSEN, USGS REGARDING DEPTH TO AQUIFER NEAR BOILING WATER REACTOR EXPERIMENT (BORAX) I & STATIONARY LOW POWER REACTOR 1 (SL-1) | 10022 | 00 |
| 01-FEB-94 | WENZEL, D. R. | RADIOLOGICAL SAFETY ANALYSIS COMPUTER PROGRAM (RSAC-5) USER'S MANUAL | WINCO-1123 | 01 |
| 25-JAN-94 | MEADOWS, D. | RECORD OF MEETING WITH GLENN BRISCOE REGARDING STATIONARY LOW POWER REACTOR 1 (SL-1) BURIAL GROUND | 10026 | 00 |
| 01-AUG-93 | DAMES & MOORE | POST RECORD OF DECISION (ROD) MONITORING PLAN FOR TRA PERCHED WATER SYSTEM OU 2-12 (OU 2-13 RECORD PER DOE-ID REQUEST) | EGG-ER-10547 | 01 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 1 (VOL.01) | DOE/ID-10392,VOL.01 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 2 (VOL.02) - ICPP | DOE/ID-10392,VOL.02 | 00 |
| 01-JUN-93 | SEHLKE, G. | WELL FITNESS EVALUATION FOR INEL, VOLUME 3 (VOL.03) - ICPP CONT'D & INEL MIDDLE, NORTH & SOUTH | DOE/ID-10392,VOL.03 | 00 |
| 01-MAY-93 | PICKETT, S. L. | TRACK 2 SUMMARY REPORT FOR OPERABLE UNIT (OU) 5-07: ARA-1 SITES ARA-02 AND ARA-03 & REVIEW COMMENTS | EGG-ER-10593 | 00 |
| 08-JAN-93 | RHODES, D. W. | EVALUATION OF RECORDS FOR WASTE GENERATED AT ICPP & DISPOSED AT RWMC DURING THE PERIOD OF 1960 - 1983 | DWR-01-93 | 00 |
| 01-DEC-92 | DORIGAN, L. | EROSION MODELING RESULTS AND EROSION CONTROL DESIGN RECOMENDATIONS PAD-A OPERABLE UNIT (OU) 7-12 | 5308 | 00 |
| 01-DEC-92 | ARAVE, A. E. | FINAL REPORT - DECONTAMINATION AND DECOMMISSIONING (D&D) OF BORAX V FACILITY TURBINE BUILDING | EGG-2683 | 00 |
| 22-OCT-92 | DOORNBOS, M. H. | EVALUATION OF A UNIDIRECTIONAL GAMMA DETECTOR FOR OPERABLE UNIT (OU) 3-07 | 6614 | 00 |
| 01-SEP-92 | HARELSON, D. B. | SUITABILITY EVALUATION FOR INTERIM ACTION (IA) DISCHARGE TO THE TSF-07 DISPOSAL POND | 5171 | 00 |
| 17-AUG-92 | RETZLAFF, R. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) GEOPHYSICAL SURVEY | 903-1188 | 00 |
| 30-JUL-92 | NITSCHKE, R. L. | SR-90 DISCHARGE CALCULATION | RLN-51-92 | 00 |
| 29-JUL-92 | NOT SPECIFIED | ASSESSMENT OF THE GROUNDWATER PATHWAY FROM THE LEACHING OF SURFICIAL & BURIED CONTAMINATION | 5169 | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 13-JUL-92 | PITTMAN, J. R. | WATER - ROCK INTERACTION - PROCEEDINGS OF THE SEVENTH (7TH) INTERNATIONAL SYMPOSIUM OF WATER - ROCK INTERACTION | 5307 | 00 |
| 01-JUL-92 | PIGOTT, W. R. | TECHNICAL MEMORANDUM FUTURE LAND USE SCENARIOS FOR THE CFA, INEL, REV.01 | 5134 | 00 |
| 01-JUL-92 | BARGELT, R. J. | TECHNICAL MEMORANDUM EXPOSURE ASSESSMENT SCENARIOS FOR THE PBF AND ARA, INEL | 5135 | 00 |
| 01-JUL-92 | MANN, L. J. | PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT THE INEL, IDAHO 1990 & 1991 - USGS OPEN FILE REPORT 92-174 | DOE/ID-22104 | 00 |
| 08-JUN-92 | MALIK, L. E. | REPORT ON PRELIMINARY REVIEW OF IMPACT ON TANK FARM DUE TO CHARACTERIZATION ACTIVITIES | 6622 | 00 |
| 01-JUN-92 | DAMES & MOORE | SELECTION OF GROUNDWATER AND CONTAMINANT TRANSPORT MODELS FOR THE TEST REACTOR AREA (TRA) AT THE INEL | EGG-ERD-10313 | 00 |
| 08-APR-92 | AWC, INC. | JOHNSTON ATOLL TRU SOIL CLEANUP PROJECT (DRAFT REPORT) | 5101 | 00 |
| 01-MAR-92 | KNOBEL, L. L. | CHEMICAL CONSTITUENTS IN THE DISSOLVED AND SUSPENDED FRACTIONS OF GROUNDWATER FROM SELECTED SITES, INEL AND VICINITY, IDAHO, 1989 - USGS OPEN FILE REPORT 92-51 | DOE/ID-22101 | 00 |
| 19-FEB-92 | URBANSKI, C. J. | SUBSURFACE IMAGING RESULTS FOR HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT | CJU-05-92 | 00 |
| 23-JAN-92 | VANDEUSEN, L. C. | DECISION DOCUMENTATION PACKAGE FOR TRACK 1 FOR CHEMICAL WASTE POND TRA-06 OU 2-13 - DRAFT, BACKGROUND INFORMATION ONLY | 10269 | 00 |
| 14-JAN-92 | JONES, K. L. | STATE OF IDAHO, REQUEST FOR INFORMATION | KXJ-9-92 | 00 |
| 08-JAN-92 | ZIMMERLE, J. R. | CONTAMINANTS OF CONCERN IN TAN GROUNDWATER | 3533 | 00 |
| 08-JAN-92 | ZIMMERLE, J. R. | SUMMARY OF RCRA FACILITY INVESTIGATION (RFI) ACTIVITIES AT TAN | 3534 | 00 |
| 01-JAN-92 | MOTAZED, B. | PORTABLE PIPE MAPPER (PPM) FIELD TEST AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 6623 | 00 |
| 01-JAN-92 | BACA, R. G. | A MODELING STUDY OF WATER FLOW IN THE VADOSE ZONE BENEATH THE RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) | EGG-GEO-10068 | 00 |
| 01-JAN-92 | LIEKHUS, K. J. | NONRADIONUCLIDE INVENTORY IN PIT 9 AT RWMC | EGG-WM-10079 | 00 |
| 18-DEC-91 | EARLE, O. K. | DISPOSITION OF RADIOACTIVELY CONTAMINATED SOIL | 6594 | 00 |
| 02-DEC-91 | JOSTEN, N. E. | FINAL REPORT ON ROBOTIC GEOPHYSICAL SURVEY | NEJ-28-91 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 1 (VOL.01) | EGG-WM-9707,VOL.01 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 2 (VOL.02) | EGG-WM-9707,VOL.02 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 3 (VOL.03) | EGG-WM-9707,VOL.03 | 00 |
| 01-DEC-91 | PAARMANN, M. L. | RWMC INVESTIGATIONS REPORT, VOLUME 4 (VOL.04) | EGG-WM-9707,VOL.04 | 00 |
| 06-NOV-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CFA 713-4, 713-5, 731, 732, 741-7, IRC-1, 01SSW 103, 01SSW 111, 01SSW 104, NRF 503, 511, TAN 783, 792, 707, CPP-SAA 152 & 153 | SGS-464-91 | 00 |
| 29-OCT-91 | MASCARENAS, C. S. | SITES WITHIN OPERABLE UNIT (OU) 3-07 | 6596 | 00 |
| 13-OCT-91 | EARLE, O. K. | HIGH LEVEL WASTE TANK FARM REPLACEMENT (HLWTFR) PROJECT USING DEVICES TO LOCATE UNDERGROUND UTILITIES | 6589 | 00 |
| 27-SEP-91 | SCHWALLER, R. G. | FINAL REPORT - SOIL OVERBURDEN SAMPLING AT RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) TRANSURANIC STORAGE AREA (TSA) | EGG-WM-8986-B | 00 |
| 10-SEP-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-YDA-106 | SGS-353-91 | 00 |
| 04-SEP-91 | GOLDER ASSOCIATES, INC. | REPORT ON SURFACE GEOPHYSICAL SURVEYS AT ICPP | 893-1195.950 | 00 |
| 22-AUG-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBER: CHEMICAL PROCESSING PLANT (CPP) VES-HBF-102 | SGS-334-91 | 00 |
| 01-AUG-91 | KNIGHT, J. L. | BRIEF ANALYSIS & DESCRIPTION OF TRANSURANIC (TRU) WASTES IN SUBSURFACE DISPOSAL AREA (SDA) OF RWMC AT INEL | EGG-WTD-9438 | 01 |
| 31-JUL-91 | EVANS, T. A. | TANK CLOSURE NOTIFICATION - THIRTY (30) DAY NOTICE OF CLOSURE FORM FOR TANK NUMBERS: CHEMICAL PROCESSING PLANT (CPP) VES-UTI-653, VES-UTI-655 & VES-UTI-654 | SGS-289-91 | 00 |
| 18-JUL-91 | DOUTHAT, C. D. | APPLICATION OF RISK ASSESSMENT TECHNIQUES TO EVALUATE PUBLIC RISK & ESTABLISH PRIORITIES FOR CLEANUP OF ORDNANCE AT FORMERLY USED DEFENSE SITE | 3528 | 00 |
| 16-JUL-91 | FORD, J. S. | DOCUMENT REVIEW: CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-40 IDAHO CHEMICAL PROCESSING PLANT (ICPP) INEL | ERD-102-91 | 00 |
| 13-JUN-91 | BURNS, T. F. | TRANSMITTAL OF CLOSURE PLAN (CP) FOR CPP-48, EXCESS CHEMICAL DUMP TANK FRENCH DRAIN SOUTH OF CPP-633 FOR REVIEW & APPROVAL | ERD-229-91 | 00 |
| 10-JUN-91 | BURNS, T. F. | FINAL CLOSURE PLAN (CP) LAND DISPOSAL UNIT (LDU) CPP-48 EXCESS CHEMICAL FRENCH DRAIN | 3090 | 00 |
| 04-JUN-91 | BURNS, T. F. | CLOSURE PLAN (CP) FOR CPP-33 CONTAMINATED SOIL IN TANK FARM AREA NEAR WL-102 NE OF CPP-604 | ERD-210-91 | 00 |
| 25-APR-91 | BERGEMAN, N. L. | INFORMATION REQUEST FOR WELLS IN VICINITY OF TEST REACTOR AREA (TRA), TEST AREA NORTH (TAN) & IDAHO CHEMICAL PROCESSING PLANT (ICPP) | SGS-127-91 | 00 |
| 28-MAR-91 | BURNS, T. F. | CHARACTERIZATION DATA & OTHER INFORMATION REGARDING COCA UNITS CPP-39, CPP-51, CPP-54, CPP-59, & CPP-64 | ERD-105-91 | 00 |
| 14-MAR-91 | BURNS, T. F. | NOTIFICATION OF MODIFICATION OF PART A PERMIT FOR INEL - SUMMARY OF IDAHO CHEMICAL PROCESSING PLANT (ICPP) LAND DISPOSAL RESTRICTIONS (LDR) RECLASSIFICATIONS | ERD-075-91 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEMICAL PROCESSING PLANT (ICPP) WASTE AREA GROUP (WAG) ASSESSMENT | 6625 | 00 |
| 04-JAN-91 | NOT SPECIFIED | IDAHO CHEICAL PROCESSING PLANT (ICPP) TANK FARM CONTAMINATED SOIL INVESTIGATION | 6632 | 00 |
| 01-JAN-91 | ARRENHOLZ, D. A. | HISTORICAL REPORT OF TRANSURANIC (TRU) WASTE PITS AND TRENCHES AT SUBSURFACE DISPOSAL AREA (SDA) OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | WTD-91-027 | 00 |
| 05-DEC-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-39, HYDROFLUORIC (HF) ACID STORAGE TANK AND DRY WELL DATED DECEMBER 4, 1990 (12/04/90), TRANSMITTED FOR REVIEW & COMMENT | 611 | 00 |
| 03-DEC-90 | SOLECKI, J. E. | FINAL CLOSURE REPORT FOR CPP-55, MERCURY CONTAMINATED AREA | 610 | 00 |
| 08-NOV-90 | EARLE, O. K. | CPP-59 CLOSURE PLAN (CP) SUBMITTAL | AMU-161-90 | 00 |
| 06-NOV-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-59 KEROSENE SPILL | 965 | 00 |
| 01-OCT-90 | STANISICH, S. N. | CLOSURE PLAN (CP) FOR TRA CHEMICAL WASTE POND COCA UNIT TRA-06 | EGG-WM-9193 | 00 |
| 01-AUG-90 | BACA, R. G. | INDEPENDENT VERIFICATION AND BENCHMARK TESTING OF THE PORFLO-3 COMPUTER CODE, VERSION 1.0 | EGG-BG-9175 | 00 |
| 19-JUL-90 | SOLECKI, J. E. | CLOSURE PLAN (CP) FOR CPP-64 HEXONE SPILL WEST OF CPP-660 | 3077 | 00 |
| 01-JUL-90 | MANN, L. J. | PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT THE INEL, IDAHO 1988 & 1989 - USGS OPEN FILE REPORT 90-367 | DOE/ID-22089 | 00 |
| 28-JUN-90 | MILLER, S. M. | CHARACTERIZATION OF SOIL COVER & ESTIMATION OF WATER INFILTRATION AT CFA LANDFILL II, INEL | 2912 | 00 |
| 19-JUN-90 | SOLECKI, J. E. | TRANSMITTAL OF CLOSURE PLAN (CP) FOR LDU CPP-34 SOIL STORAGE AREA IN THE NE CORNER OF THE ICPP FOR REVIEW AND APPROVAL | 6722 | 00 |
| 01-JAN-90 | EPA | ASSESSMENT OF TECHNOLOGIES FOR REMEDIATION OF RADIOACTIVELY CONTAMINATED SUPERFUND SITES | EPA/540/2-90/001 | 00 |
| 11-DEC-89 | MOZES, R. F. | IDAHO CHEMICAL PROCESSING PLANT (ICPP) INJECTION WELL ABANDONMENT REPORT | RFM-41-89 | 00 |
| 01-DEC-89 | CLAWSON, K. L. | CLIMATOGRAPHY OF THE INEL, 2ND (SECOND) EDITION | DOE/ID-12118 | 00 |
| 01-DEC-89 | CASEY, C. E. | INTERNAL TECHNICAL REPORT - RADIOLOGICAL ANALYSIS OF POWER BURST FACILITY (PBF) EVAPORATION POND SAMPLES | ST-CS-035-89 | 00 |
| 15-NOV-89 | SOLECKI, J. E. | RESPONSE TO NOTICE OF DEFICIENCY (NOD) FOR CLOSURE PLAN (CP) SUBMITTAL RECEIVED FROM EPA & STATE | 10986 | 00 |
| 07-NOV-89 | MATULE, A. J. | EPA REGION X REVIEW OF SUMMARY ASSESSMENT CPP-41, CPP-43, CPP-70, CPP-71, CPP-76, AND CPP-77 | 6533 | 00 |
| 01-OCT-89 | FENIX SCISSON & MK-FIC | REPORT ON PERFORATION & CEMENTING FOR ABANDONMENT OF THE INJECTION WELL MAH-FE-PL-304 | 6638 | 00 |
| 01-OCT-89 | HULL, L. C. | CONCEPTUAL MODEL & DESCRIPTION OF AFFECTED ENVIRONMENT FOR TRA WARM WASTE POND (WWP) - (WM UNIT TRA-03) | EGG-ER-8644 | 00 |
| 01-SEP-89 | SOLECKI, J. E. | REVISED CLOSURE PLAN (CP) APPROACH FOR LAND DISPOSAL UNITS (LDU) | 8472 | 00 |
| 01-SEP-89 | MCCUSKER, T. K. | FINAL REPORT: DECONTAMINATION & DECOMMISSIONING (D&D) OF HEAT TRANSFER REACTOR EXPERIMENT (HTRE) TEST ASSEMBLIES HTRE-2 & HTRE-3 | EGG-2575 | 00 |
| 22-AUG-89 | SOLECKI, J. E. | REVISION OF CLOSURE PLAN (CP) FOR LAND DISPOSAL UNIT (LDU) CPP-63, HEXONE LEAK NEAR BUILDING CPP-710 FOR REVIEW | 6111 | 00 |
| 01-MAY-89 | LEWIS, B. D. | REF - STRATIGRAPHY OF UNSATURATED ZONE AT RWMC, INEL, IDAHO | DOE/ID-22080 | 00 |
| 01-MAR-89 | BURROWS, E. P. | ORGANIC EXPLOSIVES & RELATED COMPOUNDS: ENVIRONMENTAL & HEALTH CONSIDERATIONS | 8901 | 00 |
| 01-JAN-89 | GORDON, L. | HEALTH ADVISORY ON 2,4,6-TRINITROTOLUENE (TNT) | 3527 | 00 |
| 01-DEC-88 | KNOBEL, L. L. | RADIONUCLIDES IN GROUNDWATER AT THE IDAHO NATIONAL ENGINEERING LABORATORY (INEL), IDAHO - USGS OPEN FILE REPORT 88-731 | DOE/ID-22077 | 00 |
| 01-NOV-88 | HARTLEY, W. R. | HEALTH ADVISORY FOR HEXAHYDRO-1,3,4-TRINITRO-1,3,5-TRIAZINE (RDX) | 3529 | 00 |
| 14-SEP-88 | HANSON, N. W. | FINAL REPORT FOR CPP-42 - LOG NO. 8809145 | 6628 | 00 |
| 01-SEP-88 | MARKHAM, O. D. | PLUTONIUM, AM, CM & SR IN DUCKS MAINTAINED ON RADIOACTIVE LEACHING PONDS IN SOUTHEASTERN IDAHO | 5172 | 00 |
| 01-AUG-88 | GLEBS, R. T. | SUBTITLE D: HOW WILL IT AFFECT LANDFILLS? | 5306 | 00 |
| 01-AUG-88 | EPA | TECHNOLOGICAL APPROACHES TO CLEANUP OF RADIOLOGICALLY CONTAMINATED SUPERFUND SITES | EPA/540/2-88/002 | 00 |
| 01-APR-88 | LANEY, P. T. | ANNUAL PROGRESS REPORT FY-87 SUBSURFACE INVESTIGATIONS (SI) PROGRAM AT RWMC OF INEL | DOE/ID-10183 | 00 |
| 01-DEC-87 | MANN, L. J. | REF - PURGEABLE ORGANIC COMPOUNDS IN GROUNDWATER AT INEL, IDAHO - USGS OPEN FILE REPORT 87-766 | DOE/ID-22074 | 00 |
| 01-NOV-87 | LEWIS, B. D. | HYDROGEOLOGY & GEOCHEMISTRY OF UNSATURATED ZONE RWMC, INEL | DOE/ID-22073 | 00 |
| 27-AUG-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-63 HEXONE SPILL BY CPP-710 | 2549 | 00 |
| 01-JUN-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR HEXONE SPILL WEST OF CPP-660 | 2560 | 00 |
| 01-JUN-87 | MARKHAM, O. D. | SUMMARIES OF INEL RADIOECOLOGY AND ECOLOGY PROGRAM RESEARCH PROJECTS | DOE/ID-12111 | 00 |
| 27-MAY-87 | MANN, L. J. | USGS COMMENTS - GROUNDWATER MONITORING PLAN (GMP) ICPP INJECTION WELL | 2558 | 00 |
| 27-MAY-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP), ICPP INJECTION WELL | 2559 | 00 |
| 29-APR-87 | MANN, L. J. | USGS COMMENTS - CLOSURE PLAN (CP) FOR CPP-55, MERCURY CONTAMINATED AREA SOUTH OF ICPP T-15 | 2801 | 00 |
| 24-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) WL-212 CONTAMINATED LIQUID SPILL | WIN-86-0032-CPP | 00 |
| 22-OCT-86 | LEE, J. L. | UNUSUAL OCCURRENCE REPORT (UOR) INADVERTENT TRANSFER RESULTING IN LOSS OF WASTE SOLUTION | WIN-86-0034-CPP | 00 |
| 08-MAY-86 | VALENTINE, J. H. | MEETING - INJECTION WELL - MAY 8, 1986 (05/08/86) | 6626 | 00 |
| 02-FEB-86 | NEBEKER, R. L. | SOURCES OF INFORMATION FOR CERCLA STUDY | NEB-3-86 | 00 |
| 15-JAN-86 | WALLACE, M. T. | HAZARDOUS WASTE STREAMS AT CPP | 7756 | 00 |
| 13-NOV-85 | SHELDON, D. E. | UNUSUAL OCCURRENCE REPORT (UOR) - FACILITY NUMBER ATR-85-3 | EGG-85-17 | 00 |
| 13-NOV-85 | SHELDON, D. E. | UNUSUAL OCCURRENCE REPORT (UOR) - FACILITY NUMBER ATR-85-8 | EGG-85-41 | 00 |
| 09-AUG-85 | SMITH, D. L. | SUMMARY OF RALA D&D STATUS | DLS-31-85 | 00 |
| 01-AUG-85 | REYES, B. D. | ENVIRONMENTAL SURVEILLANCE FOR THE INEL RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AND OTHER AREAS - ANNUAL REPORT 1984 | EGG-2386 | 00 |
| 01-JUL-85 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1984 AND RECORD TO DATE | IDO-10057(84) | 00 |
| 01-JUL-85 | MOSER, C. L. | RALA OFF GAS CELL AND STORAGE TANK (CPP-631 & VES-702) DECONTAMINATION AND DECOMMISSIONING (D&D) PLAN | WINCO-1032 | 00 |
| 01-JUL-85 | RODGERS, A. D. | A HISTORY OF RADIOACTIVE WASTE MANAGEMENT COMPLEX (RWMC) AT INEL | WM-F1-81-003 | 03 |
| 11-APR-85 | NISHIMOTO, D. D. | IDENTIFICATION OF RADIOACTIVE MIXED WASTE STREAMS AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | DDN-01-85 | 00 |
| 01-JAN-85 | SMITH, D. L. | FINAL REPORT DECONTAMINATION & DECOMMISSIONING (D&D) OF BORAX V LEACH POND | EGG-2300 | 00 |
| 26-OCT-84 | MESERVEY, R. H. | TRANSMITTAL OF CHEMICAL PROCESSING PLANT 601 (CPP-601) PROCESS CELLS A, B, C, D, & L - D&D FINAL REPORT | RHM-33-84 | 00 |
| 01-SEP-84 | SCHMIDT, D. A. | RADIOLOGICAL CHARACTERIZATION & DECISION ANALYSIS FOR VES-SFE-20 WASTE TANK & VAULT | WINCO-1021 | 00 |
| 19-JUL-84 | IKENBERRY, T. A. | RADIOLOGICAL CONTROLS FOR THE DECONTAMINATION OF LOW LEVEL WASTE (LLW) PROJECT EQUIPMENT | TAI-05-84 | 00 |
| 01-JUL-84 | ARTHUR, W. J. | VERTEBRATES OF INEL | DOE/ID-12099 | 00 |
| 01-JUL-84 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1983 AND RECORD TO DATE | IDO-10057(83) | 00 |
| CREATION DATE |
AUTHOR | TITLE | DOCUMENT NUMBER |
REV |
|---|---|---|---|---|
| 16-APR-84 | ERBEN, J. F. | LOCATION OF CONTAMINATED DIRT BURIAL | JFE-13-84 | 00 |
| 08-DEC-83 | BINGHAM, G. E. | DISPOSITION OF STOCKPILED SOIL | BING-106-83 | 00 |
| 28-NOV-83 | HICKS, F. E. | DISPOSITION OF STOCKPILED LOW LEVEL CONTAMINATED SOIL EXCAVATED DURING THE LOW LEVEL WASTE (LLW) PROJECT PHASE I AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) - M-K PROJECT S-2258, ICWA 83-49 | MK-83-E-1792 | 00 |
| 01-JUN-83 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1982 & RECORD TO DATE | IDO-10057(82) | 00 |
| 04-FEB-83 | SODERBERG, J. D. | DEMOLITION OF ABANDONED SEWAGE PLANT CPP-703 & CPP-715 | 6648 | 00 |
| 01-JUL-82 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1981 & RECORD TO DATE | IDO-10057(81) | 00 |
| 01-MAR-82 | LEENHEER & JEFFERSON | ORGANIC SOLUTES IN GROUNDWATER AT IDAHO NATIONAL ENGINEERING LABORATORY (INEL) | IDO-22061 | 00 |
| 01-SEP-81 | CLEMENTS, T. L. | INTERNAL TECHNICAL REPORT - IDAHO NATIONAL ENGINEERING LABORATORY (INEL) STORED TRANSURANIC (TRU) WASTE CHARACTERIZATION: NONRADIOLOGICAL HAZARDS IDENTIFICATION | WM-F1-81-015 | 00 |
| 01-JUL-81 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1980 & RECORD TO DATE | IDO-10057(80) | 00 |
| 01-SEP-80 | WINCO | CHARACTERISTICS OF THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) SANITARY WASTE COLLECTION SYSTEMS | 6650 | 00 |
| 01-SEP-80 | HINE, R. E. | DECONTAMINATION & DECOMMISSIONING (D&D) OF ORGANIC MODERATED REACTOR EQUIPMENT (OMRE) FACILITY | EGG-2059 | 00 |
| 01-JUL-80 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1979 AND RECORD TO DATE | IDO-10057(79) | 00 |
| 01-MAY-80 | WINCO | MAPS FOR CPP-14 | 6660 | 00 |
| 01-MAY-79 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1978 AND RECORD TO DATE | IDO-10057(78) | 00 |
| 01-MAY-78 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1977 & RECORD TO DATE | IDO-10057(77) | 00 |
| 01-JAN-77 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1976 AND RECORD TO DATE | IDO-10057(76) | 00 |
| 01-AUG-76 | BARRACLOUGH, J. T. | HYDROLOGY OF SOLID WASTE BURIAL GROUND AS RELATED TO POTENTIAL MIGRATION OF RADIONUCLIDES, INEL - USGS OPEN FILE REPORT 76-471 | IDO-22056 | 00 |
| 16-JAN-76 | LOHSE, G. E. | ALLIED CHEMICAL CORPORATION OPERATING OCCURRENCE REPORT - WASTE TRANSFER LINE GASKET LEAK | 6634 | 00 |
| 01-JAN-76 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1975 & RECORD TO DATE | IDO-10057(75) | 00 |
| 01-JUL-75 | KENDALL, E. W. | DECONTAMINATION & DECOMMISSIONING (D&D) OF EBR-I COMPLEX FINAL REPORT (ARVFS/NAK) | ANCR-1242 | 00 |
| 19-JAN-75 | NOT SPECIFIED | INEL INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1974 & RECORD TO DATE | IDO-10057(74) | 00 |
| 24-SEP-74 | NOT SPECIFIED | NRTS INDUSTRIAL WASTE MANAGEMENT INFORMATION FOR 1971, 1972 & 1973 - NATIONAL REACTOR TESTING STATION (NRTS) | IDO-10057 | 00 |
| 01-APR-73 | NICCUM, M. R. | FLOODING POTENTIAL AT THE IDAHO CHEMICAL PROCESSING PLANT (ICPP) | 4962 | 00 |
| 01-JUN-72 | PAIGE, B. E. | BURIED WASTE (BW) LINE REGISTER NATIONAL REACTOR TESTING STATION (NRTS) PART IV CPP | ACI-110 | 00 |
| 01-MAY-72 | THOMPSON, R. J. | SOLID RADIOACTIVE WASTE RETRIEVAL TEST | ACI-120 | 00 |
| 10-JUN-71 | LEE, W. H. | ROCKY FLATS SOLID WASTE SENT TO THE NATIONAL REACTOR TESTING STATION (NRTS) 1954 THROUGH 1970 | 1792319 | 00 |
| 10-JUN-71 | LEE, W. H. | ROCKY FLATS SOLID WASTE SHIPPED TO NATIONAL REACTOR TESTING STATION (NRTS) | 26267 | 00 |
| 17-APR-62 | LATCHUM, J. W. | REPORT OF THE INVESTIGATING COMMITTEE CHEMICAL PROCESSING PLANT (CPP) WASTE TANK LEAKAGE OF MARCH 17, 1962 (03/17/62) | LA-53-62A | 00 |
| 01-DEC-52 | NACE, R. L. | GEOLOGY, GROUNDWATER & WASTE DISPOSAL AT THE AIRCRAFT NUCLEAR PROPULSION PROJECT SITE, NATIONAL REACTOR TESTING STATION (NRTS), IDAHO | IDO-22023 | 00 |
| 05-SEP-52 | NACE, R. L. | WATER SUPPLY AND FLUID WASTE DISPOSAL AT THE AIRCRAFT NUCLEAR PROPULSION REACTOR (ANPR) SITE | IDO-22021 | 00 |
Previous Page | Administrative Record Home Page