Return to Administrative Record Home Page

DOE/ID-10848 Rev. 01

INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE

DOCUMENT IMAGE LINKS

PDF files may be large and take a long time to load. Also, the server may be slow during busy times. If you are having problems opening a file, you can save it to your computer first by Right-clicking on the link, then clicking Save Target As or Save Link As. (Be sure that PDFs have a PDF extension.) After the file is saved, open it on your computer to display it.
GIF images are available for access to individual pages.
Document as GIF pages Total Pages
View GIF pages 323
Document as Multipage Sections
(If available)
PDF files require Adobe Acrobat Reader
Pages in Section First Page in Section (if have multiple sections)
Section 1 View File PDF File Size: 6478K 86 TABLE OF CONTENTS
Section 2 View File PDF File Size: 229K 50 APPENDIX A - EDF-ER-274 - LEACHATE CONTAMINANT REDUCTION TIME STUDY
Section 3 View File PDF File Size: 3398K 24 APPENDIX Z - ICDF DRAWINGS
Section 4 View File PDF File Size: 3612K 23 APPENDIX Z CONT'D - DRAWINGS CONT'D - #AS-201
Section 5 View File PDF File Size: 289K 6 APPENDIX AA - PROJECT SCHEDULE & ASSUMPTIONS
Section 6 View File PDF File Size: 1685K 56 APPENDIX BB - DETAILED COST ESTIMATE
Section 7 View File PDF File Size: 3408K 78 APPENDIX EE - EPA & IDEQ COMMENT RESOLUTION FORMS

Image file troubleshooting - Look at the status bar (at the bottom of the browser window where the document is loading) and see if it indicates that a document is being loaded. If activity is occurring, you may need to just give it more time. If activity is not occurring or appears to be stuck, then click your browser's Back button and try again. You may need to select Refresh. If this does not help - your best approach is to save the file on your computer and view it from there.

DOCUMENT DETAILS

Title: INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE
Create Date: 14-MAY-02
File Category: PF170.3 RD/RA WORK PLAN
File Category: PF170.21 TITLE II DESIGN/90% & FINAL DESIGNS
WAG and OU: Waste Area Group:3 Operable Unit:3-13
Receiver: NOT SPECIFIED
Sender: DOORNBOS, M. H.
Author: DAVISON, R. L.
Related Doc: DOE/ID-10851 02 : INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN - APPENDIX X TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5
Related Doc: DOE/ID-10955 00 : INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) - APPENDIX S TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5
Related Doc: DOE/ID-10958 00 : INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX W TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5
Related Doc: EDF-2899 00 : ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5
Related Doc: EDF-ER-266 01 : ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-267 01 : ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-268 01 : ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-269 01 : ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5
Related Doc: EDF-ER-271 01 : ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-273 02 : ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5
Related Doc: EDF-ER-274 01 : ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5
Related Doc: EDF-ER-275 02 : ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5
Related Doc: EDF-ER-276 01 : ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-277 01 : ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-278 01 : ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5
Related Doc: EDF-ER-279 02 : ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-280 01 : ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-281 01 : ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-282 01 : ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5
Related Doc: EDF-ER-286 01 : ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5
Related Doc: EDF-ER-290 01 : ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V
Related Doc: EDF-ER-311 01 : ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5
Related Doc: EDF-ER-315 00 : ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5
Related Doc: EM-ER-02-083 00 : TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) TITLE II DESIGN
Related Doc: PLN-962 00 : STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) STAGE II CONSTRUCTION - APPENDIX V TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5
Related Doc: SPC-1476 01 : TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - APPENDIX Y TO ICDF RD/CWP - INCLUDED IN VOLUME 4 (VOL.04) OF 5
Related Doc: TFR-2520 00 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX CONTROL SYSTEM - APPENDIX DD TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5
Related Doc: TFR-71 02 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WAG-3 INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND - APPENDIX CC TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) O