| Document as GIF pages | Total Pages | |
|---|---|---|
| View GIF pages | 323 | |
| Document as Multipage Sections (If available) PDF files require Adobe Acrobat Reader |
Pages in Section | First Page in Section (if have multiple sections) |
| Section 1 View File PDF File Size: 6478K | 86 | TABLE OF CONTENTS |
| Section 2 View File PDF File Size: 229K | 50 | APPENDIX A - EDF-ER-274 - LEACHATE CONTAMINANT REDUCTION TIME STUDY |
| Section 3 View File PDF File Size: 3398K | 24 | APPENDIX Z - ICDF DRAWINGS |
| Section 4 View File PDF File Size: 3612K | 23 | APPENDIX Z CONT'D - DRAWINGS CONT'D - #AS-201 |
| Section 5 View File PDF File Size: 289K | 6 | APPENDIX AA - PROJECT SCHEDULE & ASSUMPTIONS |
| Section 6 View File PDF File Size: 1685K | 56 | APPENDIX BB - DETAILED COST ESTIMATE |
| Section 7 View File PDF File Size: 3408K | 78 | APPENDIX EE - EPA & IDEQ COMMENT RESOLUTION FORMS |
| Title: | INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE |
| Create Date: | 14-MAY-02 |
| File Category: | PF170.3 RD/RA WORK PLAN |
| File Category: | PF170.21 TITLE II DESIGN/90% & FINAL DESIGNS |
| WAG and OU: | Waste Area Group:3 Operable Unit:3-13 |
| Receiver: | NOT SPECIFIED |
| Sender: | DOORNBOS, M. H. |
| Author: | DAVISON, R. L. |
| Related Doc: | DOE/ID-10851 02 : INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN - APPENDIX X TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 |
| Related Doc: | DOE/ID-10955 00 : INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX GROUNDWATER MONITORING PLAN (GMP) - APPENDIX S TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 |
| Related Doc: | DOE/ID-10958 00 : INEEL CERCLA DISPOSAL FACILITY (ICDF) CONSTRUCTION WASTE MANAGEMENT PLAN (WMP) - APPENDIX W TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 |
| Related Doc: | EDF-2899 00 : ENGINEERING DESIGN FILE (EDF) - INEEL CERCLA DISPOSAL FACILITY (ICDF) TEST PAD CONSTRUCTION REPORT - APPENDIX U TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 |
| Related Doc: | EDF-ER-266 01 : ENGINEERING DESIGN FILE (EDF) - SUBSURFACE CONSOLIDATION CALCULATION - APPENDIX F TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-267 01 : ENGINEERING DESIGN FILE (EDF) - LANDFILL COMPACTION AND SUBSIDENCE STUDY - APPENDIX H TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-268 01 : ENGINEERING DESIGN FILE (EDF) - SLOPE STABILITY ASSESSMENT - APPENDIX G TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-269 01 : ENGINEERING DESIGN FILE (EDF) - LEACHATE GENERATION STUDY - APPENDIX GG TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 |
| Related Doc: | EDF-ER-271 01 : ENGINEERING DESIGN FILE (EDF) - EVAPORATION POND SIZING WITH WATER BALANCE AND MAKE-UP WATER CALCULATIONS - APPENDIX L TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-273 02 : ENGINEERING DESIGN FILE (EDF) - PERMEABLE REACTIVE BARRIER DECISION ANALYSIS - APPENDIX FF TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 |
| Related Doc: | EDF-ER-274 01 : ENGINEERING DESIGN FILE (EDF) - LEACHATE CONTAMINANT REDUCTION TIME STUDY - APPENDIX A TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 |
| Related Doc: | EDF-ER-275 02 : ENGINEERING DESIGN FILE (EDF) - FATE AND TRANSPORT MODELING RESULTS AND SUMMARY REPORT - APPENDIX B TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 |
| Related Doc: | EDF-ER-276 01 : ENGINEERING DESIGN FILE (EDF) - EVALUATION OF GEOTECHNICAL INVESTIGATIONS REQUIRED TO COMPLETE DESIGN & CONSTRUCTION - APPENDIX D TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-277 01 : ENGINEERING DESIGN FILE (EDF) - WASTE TO SOIL DESIGN RATIO CALCULATIONS - APPENDIX I TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-278 01 : ENGINEERING DESIGN FILE (EDF) - LINER AND LEACHATE COMPATABILITY STUDY - APPENDIX C TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - VOLUME 1 (VOL.01) OF 5 |
| Related Doc: | EDF-ER-279 02 : ENGINEERING DESIGN FILE (EDF) - HYDROLOGIC MODELING OF FINAL COVER - APPENDIX M TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-280 01 : ENGINEERING DESIGN FILE (EDF) - LANDFILL LEACHATE COLLECTION SYSTEM DESIGN ANALYSIS - APPENDIX K TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-281 01 : ENGINEERING DESIGN FILE (EDF) - LINER AND FINAL COVER LONG TERM PERFORMANCE EVALUATION AND FINAL COVER LIFE CYCLE EXPECTATION - APPENDIX J TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-282 01 : ENGINEERING DESIGN FILE (EDF) - SEISMIC EVALUATION OF LANDFILL AND EVAPORATION POND - APPENDIX E TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 2 (VOL.02) OF 5 |
| Related Doc: | EDF-ER-286 01 : ENGINEERING DESIGN FILE (EDF) - WASTE PLACEMENT PLAN - APPENDIX T TO INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 |
| Related Doc: | EDF-ER-290 01 : ENGINEERING DESIGN FILE (EDF) - NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAP) MODELING FOR ICDF COMPLEX - APPENDIX O TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (V |
| Related Doc: | EDF-ER-311 01 : ENGINEERING DESIGN FILE (EDF) - SCREENING LEVEL ECOLOGICAL RISK ASSESSMENT (ERA) FOR THE INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX - APPENDIX R TO ICDF RD/CWP - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 |
| Related Doc: | EDF-ER-315 00 : ENGINEERING DESIGN FILE (EDF) - IDAHO ADMINISTRATIVE PROCEDURES ACT (IDAPA) PRELIMINARY AIR SCREENING RESULTS - APPENDIX N TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 3 (VOL.03) OF 5 |
| Related Doc: | EM-ER-02-083 00 : TRANSMITTAL OF FINAL INEEL CERCLA DISPOSAL FACILITY (ICDF) REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) TITLE II DESIGN |
| Related Doc: | PLN-962 00 : STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) STAGE II CONSTRUCTION - APPENDIX V TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - FINAL TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 4 (VOL.04) OF 5 |
| Related Doc: | SPC-1476 01 : TECHNICAL SPECIFICATIONS (SPC) - INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - APPENDIX Y TO ICDF RD/CWP - INCLUDED IN VOLUME 4 (VOL.04) OF 5 |
| Related Doc: | TFR-2520 00 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) FOR INEEL CERCLA DISPOSAL FACILITY (ICDF) COMPLEX CONTROL SYSTEM - APPENDIX DD TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) OF 5 |
| Related Doc: | TFR-71 02 : TECHNICAL AND FUNCTIONAL REQUIREMENTS (T&FR) - WAG-3 INEEL CERCLA DISPOSAL FACILITY (ICDF) LANDFILL AND EVAPORATION POND - APPENDIX CC TO ICDF REMEDIAL DESIGN CONSTRUCTION WORK PLAN (RD/CWP) - TITLE II DESIGN PACKAGE - INCLUDED IN VOLUME 5 (VOL.05) O |